ICS Copper Systems Ltd

Published : July 23rd, 2008

DRILLS 40.9 METERS OF 1.10% CU & 16.0 METERS OF 1.56% CU AT THE MOKAMBO PROPERTY

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | Zambia |

Press Release 08-13

 

 

ICS Copper Drills 40.9 meters of 1.10% Cu and 16.0 meters of 1.56% Cu at the Mokambo Property

July 23rd 2008-Abbotsford, British Columbia, Canada ? ICS Copper Systems Ltd. (ICX:TSX.V) is pleased to announce that the Company has obtained important assays and widths from the sulphide twinning confirmation Diamond drill program which is now completed. The latest results show that HOLE M-08-S-04 INTERSECTED 40.9 METERS TRUE THICKNESS OF 1.10% TOTAL COPPER AND HOLE M-08-S-05 INTERSECTED 16.0 METERS TRUE THICKNESS OF 1.56% TOTAL COPPER.

To confirm that the historic mineral estimate was accurate and to bring the estimate into a NI 43-101 compliant mineral resource, ICS re-sampled the same historic sulphide drill holes that were twinned. The re-sampled new assay results show a very good correlation to the historic assay results as illustrated below.

The first table illustrates a few selected mineralized zones in each drill hole, for direct comparison of the historic assays and the re-sampled assays (A H Knight Labs, Kitwe, Zambia, 2008).

Hole No.

Intersection

Assay T Cu (%)

Assay AS Cu (%)

 

From (m)

To (m)

Original

Re-Sampled

Original

Re-Sampled

KN20

173.1

174.2

2.90

3.57

1.73

2.16

 

204.8

206.8

2.56

2.66

0.12

0.18

 

242.0

242.8

1.57

1.44

0.15

0.18

KN21

266.4

269.7

1.88

1.36

0.11

0.10

 

289.9

291.4

1.56

1.27

0.22

0.05

 

313.3

314.6

1.70

1.76

0.64

0.45

KN22

332.5

336.2

1.73

1.97

0.20

0.93

 

346.3

351.1

1.69

1.73

0.01

0.02

 

373.1

374.6

1.28

1.20

0.01

0.01

KN33

325.7

327.1

2.85

1.86

2.78

1.32

 

346.7

347.7

1.38

1.24

0.03

0.03

 

378.9

382.2

0.53

0.50

0.06

0.02

Note:      T Cu ? Total Copper in percent.

                AS Cu ? Acid Soluble Copper in percent.

The second table illustrates the statistical analysis, for all the intersections, for each hole, in the re-sampling program. The low variance and a small standard deviation confirm the good correlation between the current assays and assays that were done over 50 years ago using the same intersections of core.

Hole No.

Copper

Variance ? Historic Assays VS Re-Sampled Assays (% Cu)

 

Type

Average

Maximum

Minimum

Standard Dev.

Median

KN20

T Cu

0.12

0.94

-0.35

0.291

0.05

 

AS Cu

0.05

0.43

-0.13

0.121

0.02

KN21

T Cu

0.09

3.80

-0.52

0.751

-0.01

 

AS Cu

0.02

2.19

-0.19

0.432

-0.06

KN22

T Cu

-0.02

0.25

-0.69

0.200

0.00

 

AS Cu

0.11

0.73

0.00

0.225

0.01

KN33

T Cu

-0.09

0.09

-0.99

0.206

-0.05

 

AS Cu

-0.08

0.09

-1.46

0.296

-0.02

Note:      T Cu ? Total Copper in percent.

                AS Cu ? Acid Soluble Copper in percent.

Sulphide Twin Drill Program

The twinned hole drill sites were chosen not only to confirm the largest defined areas of mineralization but to confirm the other mineralization along strike (+ 3,400 meters) over the property.

The 5 hole sulphide twinning program results are now complete and again the assay results compare well with the historical drill results. Direct assay comparison with respect to lithology or depth within the hole is difficult, due to hole deflections in the historic and twinned holes that subsequently vary the depth and the lithologic thicknesses. Indirect comparison shows however, highly anomalous mineralized zones that are equivalent within those lithologies. In several holes, the mineralized intersections were thicker than the historic sulphide holes due to previous operators not sampling all mineralization in the core.

Highlights of the Program

M-08-S-01 (DH3)

 

From

To

Intersection

Total Copper

Oxide Copper

Cobalt

 

(m)

(m)

True Width (m)

(%)

(%)

(%)

 

69.10

84.43

9.44

0.82

0.42

0.001

including

74.10

74.75

0.40

1.76

0.89

0.001

including

75.75

76.95

0.74

1.22

0.05

0.001

including

78.65

80.50

1.14

1.69

0.97

0.001

including

81.99

82.91

0.57

1.30

1.09

0.001

 

85.65

92.90

4.46

0.35

0.13

0.001

M-08-S-02 (KN33)

 

From

To

Intersection

Total Copper

Oxide Copper

Cobalt

 

(m)

(m)

True Width (m)

(%)

(%)

(%)

 

375.5

391.7

9.3

0.41

0.29

0.01

including

387.1

391.7

2.6

0.87

0.65

0.01

This hole was abandoned due to extremely high hydraulic pressure from an intersected aquifer just as the hole was intersecting the mineralization.

M-08-S-03 (KN22)

 

From

To

Intersection

Total Copper

Oxide Copper

Cobalt

 

(m)

(m)

True Width (m)

(%)

(%)

(%)

 

286.55

323.30

21.08

0.88

0.61

0.005

including

294.00

301.80

4.47

2.29

2.08

0.008

including

310.00

312.60

1.49

1.31

0.29

0.001

 

326.30

369.30

24.66

0.40

0.07

0.002

including

330.30

332.80

1.43

2.25

0.11

0.010

including

338.90

344.10

2.98

1.94

0.23

0.001

including

356.60

358.60

1.15

1.74

0.10

0.020

including

364.70

367.30

1.49

1.12

0.18

0.003

M-08-S-04 (KN21)

 

From

To

Intersection

Total Copper

Oxide Copper

Cobalt

 

(m)

(m)

True Width (m)

(%)

(%)

(%)

 

272.9

344.2

40.9

1.10

0.04

0.006

including

281.1

297.2

9.2

2.09

0.03

0.012

including

299.3

304.5

3.0

2.40

0.03

0.019

including

311.7

315.1

2.0

1.66

0.03

0.010

including

317.1

320.6

2.0

2.22

0.35

0.001

including

335.2

336.6

0.8

2.47

0.08

0.001

M-08-S-05 (KN20)

 

From

To

Intersection

Total Copper

Oxide Copper

Cobalt

 

(m)

(m)

True Width (m)

(%)

(%)

(%)

 

163.05

180.20

10.1

0.60

 

0.001

including

168.00

172.20

2.4

1.33

 

0.001

 

181.20

198.20

9.8

0.62

 

0.010

including

186.20

187.20

0.6

1.08

 

0.001

 

199.20

227.10

16.0

1.56

 

0.010

including

199.20

200.20

0.6

1.02

 

0.010

including

203.60

210.90

4.2

2.64

 

0.010

including

213.90

214.90

0.6

1.33

 

0.010

including

215.60

224.10

4.9

1.74

 

0.001

These results are very encouraging as it confirms the historic sulphide mineralization identified by previous operators not only exists but that it covers a strike length across the entire concession. RSG Global, a subsidiary of Coffey Mining is presently auditing these results as part of their requirements under NI 43-101 as they prepare to undertake a new mineral resource calculation and subsequent Technical Report.

Oxide Copper Drill Program

ICS is also pleased to announce that the shallow (100 meter) grid drill program covering the property is now complete. Assay results are pending but will be fast tracked so that they can be included in RSG Global?s mineral resource estimation and subsequent Technical Report.

It is anticipated that the report will be finalized by mid to late August so that GRD Minproc can economically evaluate the Mokambo Property.

David Makepeace, P.Eng. M.Eng, a director of the Company and its acting Chief Operating Officer, a qualified person as defined by National Instrument 43-101, supervised the preparation of the technical information in this news release.

 

President and CEO of ICS, Graham Chisholm comments: ?The sulphide drill program corroborates the historical assays and the results above speak for themselves.  We are pleased with these drilling results and we look forward to receiving the NI 43-101 Technical Report being prepared by Coffey Mining.?

 

ICS COPPER SYSTEMS LTD.

Signed ?Graham Chisholm?

Graham Chisholm, President & CEO

 

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

 

This release includes certain statements that are ?forward-looking statements?. All statements in this release, other than statements of historical facts that address future exploration, development and production activities, and other circumstances, events and developments that the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results, events and developments may differ materially from those in the forward-looking statements. The occurrence of certain risk factors, the probability of which is unknown, may also affect actual results, events and developments expected by the Company.

 For Further  information contact:

Graham Chisholm, President ? (604) 859-3007 ? Email: graham@icscopper.com

         Brett Whitelaw, Vice-President of Public Relations   ? (778) 836-5891 ? Email: brett_whitelaw@telus.net

www.icscopper.com

Important Information:

We respect your privacy.  If you wish to be removed from ICX email distribution list please reply to this email by typing ?UNSUBSCRIBE? in the subject line and you will be removed from future mailings. 

 

 

 

 

 

 

 

 


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.518 / Virus Database: 269.21.7/1323 - Release Date: 10/03/2008 11:07 AM


No virus found in this incoming message.
Checked by AVG.
Version: 7.5.518 / Virus Database: 269.21.7/1323 - Release Date: 10/03/2008 11:07 AM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.519 / Virus Database: 269.22.1/1352 - Release Date: 31/03/2008 10:13 AM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.519 / Virus Database: 269.22.4/1355 - Release Date: 01/04/2008 5:37 PM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.519 / Virus Database: 269.22.4/1355 - Release Date: 01/04/2008 5:37 PM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.519 / Virus Database: 269.22.5/1359 - Release Date: 04/04/2008 8:23 AM


No virus found in this incoming message.
Checked by AVG.
Version: 7.5.519 / Virus Database: 269.22.5/1359 - Release Date: 04/04/2008 8:23 AM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.524 / Virus Database: 270.1.0/1492 - Release Date: 09/06/2008 10:29 AM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.524 / Virus Database: 270.2.0/1497 - Release Date: 11/06/2008 8:32 AM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.526 / Virus Database: 270.5.5/1569 - Release Date: 23/07/2008 1:31 PM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.526 / Virus Database: 270.5.5/1569 - Release Date: 23/07/2008 1:31 PM


No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.526 / Virus Database: 270.5.5/1569 - Release Date: 23/07/2008 1:31 PM

Data and Statistics for these countries : Canada | Zambia | All
Gold and Silver Prices for these countries : Canada | Zambia | All

ICS Copper Systems Ltd

DEVELOPMENT STAGE
CODE : ICX.V
CUSIP : 45107L 10 0
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

ICS Copper Systemps is a copper development stage company based in Canada.

ICS Copper Systemps holds various exploration projects in Congo Dem. Rep. of.

Its main asset in development is MOKAMBO MINE in Zambia and its main exploration properties are EXACOM, MUSOSHI TAILINGS and SKANIA in Congo Dem. Rep. of.

ICS Copper Systemps is listed in Canada and in Germany. Its market capitalisation is CA$ 2.5 millions as of today (US$ 2.5 millions, € 1.8 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 1.37, and its lowest recent point on April 09, 2009 at CA$ 0.01.

ICS Copper Systemps has 35 889 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of ICS Copper Systems Ltd
9/5/2007report by Fundamental Research
In the News and Medias of ICS Copper Systems Ltd
12/18/2007targeting production for July 2009
Annual reports of ICS Copper Systems Ltd
2008 Annual report
Financings of ICS Copper Systems Ltd
5/27/2008Announces $1.1 Million Private Placement
Nominations of ICS Copper Systems Ltd
8/21/2008APPOINTMENT OF CHAIRMAN & NEW DIRECTOR TO THE BOARD OF DIREC...
4/16/2008 APPOINTS RICHARD MOLYNEUX TO THE BOARD
Project news of ICS Copper Systems Ltd
1/7/2009(Mokambo Mine)ICS Abandons Mokambo Property
11/25/2008(Mokambo Mine)NEARS PRODUCTION OF THIRD PARTY ORE
7/23/2008(Mokambo Mine) DRILLS 40.9 METERS OF 1.10% CU & 16.0 METERS OF 1.56% CU AT...
4/18/2008(Mokambo Mine)UPDATES MOKAMBO SULPHIDE DRILL PROGRAM
3/10/2008(Mokambo Mine) MOKAMBO PROJECT SULPHIDE DRILL PROGRAM HAS COMMENCED
Corporate news of ICS Copper Systems Ltd
11/4/2008PAUSES FOR STRATEGIC REVIEW
5/7/2008INSTALLATION OF EMEW PLANT IN ZAMBIA BY Q4 OF 2008 - ON SCHE...
4/4/2008CLARIFIES ITS PRESS RELEASE 08-02
4/2/2008SIGNS JOINT VENTURE WITH TRANSAFRICAN MINERALS LIMITED
3/31/2008SIGNS JOINT VENTURE ON THE KARUKURUKU CONCESSION (DRC)
1/28/2008 MANAGEMENT CLARIFICATION
10/30/2007CLARIFIES ITS DISCLOSURE
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (ICX.V)FRANKFURT (IVH.F)
0.070+16.67%0.050+0.00%
TSX-V
CA$ 0.070
02/08 15:52 0.010
16.67%
Prev close Open
0.060 0.070
Low High
0.070 0.070
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.070 -84.44%
Volume 1 month var.
2,000 -84.44%
24hGold TrendPower© : 9
Produces
Develops Copper
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :