Legend Gold Corp.

Published : June 30th, 2010

Drills Intercepts at the FT Gold Project in Southern Mali

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

NEWS RELEASE

JUNE 29, 2010

 

 

 

NORTH ATLANTIC DRILLS INTERCEPTS AT THE FT GOLD PROJECT IN SOUTHERN MALI

 

HIGHLIGHTS INCLUDE:

 

                     � 44 METRES AT 1.95 GPT AU,

                     � 32 METRES AT 2.65 GPT AU,

                     � 12 METRES AT 8.99 GPT AU and,

                     � 8 METRES AT 7.10 GPT AU

 

North Atlantic Resources Ltd. (NAC:TSX-V) ("North Atlantic" or "the Company") is pleased to announce drill results from approximately 1,100 metres of drilling from the ongoing reverse circulation (RC) drill program at its 100% owned FT Gold Project ("FT") in Southern Mali. The reported holes are from two significant areas where gaps existed in the previous drilling and resource models.

 

The FT project is the Company's most advanced gold discovery with an initial NI 43-101 compliant resource calculation of 7,880,000 tonnes at a grade of 0.95 grams per tonne for 241,000 ounces of gold in the indicated category and 10,550,000 tonnes at a grade of 1.05 grams gold per tonne for 353,000 ounces of gold of inferred category. Property-wide exploration is currently underway at the FT project, and will consist of 6,000 metres of reverse circulation drilling ("RC"), auger drilling, and termite mound geochemical sampling.

 

 

HIGHLIGHTS

 

Of particular note are the results from the "Village Gap" that include:

 

                     � 44 metres at 1.95 gpt Au in hole 10FLRC-06 that also included 12 metres at 2.13 gpt Au, 6 metres at �� 7.48 gpt Au and 4 metres at 1.74 gpt Au,

                     � 72 metres at 1.38 gpt Au in hole 10FLRC-07 that also included 32 metres at 2.65 gpt Au,

                     � 50 metres at 1.43 gpt Au in hole 10FLRC-08 that also included 8 metres at 7.10 gpt Au and

                     � 26 metres at 4.35 gpt Au in hole 10FLRC-12A that also included 12 metres at 8.99 gpt Au

 

In addition to the "Village Gap", the second major area, the "Plantation Gap", returned the following highlights:

 

                     � 32 metres at 0.48 gpt Au in hole 10TKRC-01 that included 2 metres at 1.52 gpt Au and a second 10 ��� metres at 1.05 gpt Au that included 2 metres at 4.22 gpt Au,

                     � 36 metres at 0.61 gpt Au in hole 10TKRC-04 that included 4 metres at 3.61 gpt Au

 

Results from the Village Gap area cover approximately 600 metres of strike infill drilling within the FT resource model. RC drilling in the Plantation Gap area covers approximately 700 metres of strike infill drilling within the FT resource model. The drilling represents near surface mineralization to a maximum vertical depth of approximately 75 metres. These results include oxide material from 35 to 40 metres vertical depth, and transition zone and sulphide material below approximately 40 metres. All drill hole inclinations are between -55 and -70 degrees and true width of the mineralization is 50% to 75% of the reported drill intercept depending on the drill angle. All assays results are reported as uncut values.

 

The results from this drilling program demonstrate the robust nature of the gold mineralization at FT. A core of higher grade gold mineralization also includes a broad zone of gold enrichment of up to 50 metres of core length (approximately 30 metres true width). This geometry should lend itself to flexible grade control and pit design for preliminary economic assessment at FT. This assay data will be incorporated into the existing North Atlantic database and used to plan the next phase of what is expected to be a combined RC and diamond drill program at FT in Q4 of 2010.

 

This drilling completes Phase 1 of 4 stages of a 6,000 metre drill program at FT. Phase 1 consisted of infill drilling to test gaps in the deposit model at FT. Phase 2 is designed to test Northwest and Southeast strike extensions of the FT deposit with a series of broadly spaced RC holes. Phase 3 is designed to test gold in soil anomalies which are parallel to sub parallel to the FT resource area. Phase 4 is reserved to test new targets developed form termite mound or auger drilling. The results from the ongoing drilling will be released within the next quarter.

 

Scott Waldie, President and CEO of North Atlantic said, "We are very encouraged by the results from the infill drilling at FT. These results indicate the potential for a considerable increase in resource grade and tonnage. From this drilling there is now significantly improved continuity from section to section in the higher-grade areas of the Village Gap and the Plantation Gap. These results now definitively link the northern half of the FT deposit with the southern portion which includes the Village Gap area. All of these attributes will contribute to improving the project economics as we work toward preliminary assessment of the economic potential at FT."

 

In the tables below intersections are calculated down the drill holes using both a 0.1 gram per tonne (gpt) assay cut-off and a 0.4 gpt assay cut-off. The differing cut-off grades were selected to demonstrate the wide continuity of the mineralization and to reflect the potential bulk mining of the entire zone at a 0.1gpt cut-off. The 0.40 gpt cut-off table intersections demonstrate the higher grade continuity of the mineralization and reflect the potential for higher grade bulk mining potential of selected zones.

 

TABLE 1: Significant Assay Results - "Village Gap" - 0.1 gram per tonne cut-off (Note 1)

 

 

 

HOLE NUMBER

FROM

(m)

TO

(m)

LENGTH

(m)

GOLD ASSAY

(grams per tonne)

10FLRC-01A

48.0

76.0

28.0

2.20

includes

48.0

68.0

20.0

2.86

10FLRC-02

6.0

24.0

18.0

0.67

includes

12.0

14.0

2.0

1.54

10FLRC-02A

30.0

34.0

4.0

0.86

 

44.0

76.0

32.0

0.60

includes

50.0

56.0

6.0

1.34

10FLRC-03

0.0

22.0

22.0

0.39

10FLRC-03A

120.0

156.0

36.0

0.58

includes

128.0

134.0

6.0

1.65

10FLRC-04

0.0

22.0

22.0

1.59

includes

2.0

10.0

8.0

3.64

10FLRC-05

18.0

52.0

34.0

1.34

includes

18.0

24.0

6.0

3.48

 

28.0

36.0

8.0

1.55

 

40.0

44.0

4.0

1.40

10FLRC-06A

22.0

40.0

18.0

0.27

 

44.0

88.0

44.0

1.95

includes

46.0

58.0

12.0

2.13

 

62.0

68.0

6.0

7.48

 

82.0

86.0

4.0

1.74

10FLRC-07

0.0

72.0

72.0

1.38

includes

4.0

36.0

32.0

2.65

10FLRC-07A

70.0

76.0

6.0

0.87

includes

72.0

74.0

2.0

1.49

10FLRC-08

22.0

72.0

50.0

1.43

includes

30.0

38.0

8.0

7.10

10FLRC-08A

66.0

106.0

40.0

0.90

includes

70.0

86.0

16.0

1.47

 

100.0

102.0

2.0

1.12

10FLRC-09

2.0

38.0

36.0

0.80

includes

12.0

16.0

4.0

1.56

 

28.0

34.0

6.0

2.47

 

48.0

70.0

22.0

0.17

10FLRC-10

0.0

44.0

44.0

0.35

includes

8.0

10.0

2.0

1.36

 

30.0

32.0

2.0

2.12

10FLRC-11

0.0

20.0

20.0

0.33

includes

2.0

4.0

2.0

1.08

 

26.0

42.0

16.0

0.13

10FLRC-12

2.0

20.0

18.0

0.65

includes

4.0

10.0

6.0

1.58

 

30.0

54.0

24.0

0.28

includes

32.0

34.0

2.0

1.07

10FLRC-12A

4.0

30.0

26.0

4.35

includes

16.0

28.0

12.0

8.99

 

54.0

90.0

36.0

0.29

10FLRC-13

44.0

52.0

8.0

0.23

 


TABLE 2: Significant Assay Results - "Plantation Gap" - 0.1 gram per tonne cut-off (Note 1)

 

 

HOLE NUMBER

FROM

(m)

TO

(m)

LENGTH

(m)

GOLD ASSAY

(grams per tonne)

10TKRC-01

0.0

32.0

32.0

0.48

includes

24.0

26.0

2.0

1.52

 

40.0

46.0

6.0

1.27

includes

42.0

44.0

2.0

3.16

 

50.0

60.0

10.0

0.53

 

78.0

88.0

10.0

1.05

includes

80.0

82.0

2.0

4.22

10TKRC-02

2.0

14.0

12.0

0.20

 

18.0

32.0

14.0

0.22

 

40.0

66.0

26.0

0.50

includes

50.0

52.0

2.0

2.14

10TKRC-03

12.0

80.0

68.0

0.27

 

94.0

98.0

4.0

0.96

includes

96.0

98.0

2.0

1.15

10TKRC-04

42.0

78.0

36.0

0.61

includes

46.0

50.0

4.0

3.61

10TKRC-05

54.0

76.0

22.0

0.52

includes

64.0

66.0

2.0

1.77

 

84.0

86.0

2.0

1.30

10TKRC-06

42.0

64.0

22.0

0.31

10TKRC-07

0.0

12.0

12.0

0.22

 

30.0

38.0

8.0

1.11

includes

30.0

36.0

6.0

1.27

 

44.0

52.0

8.0

1.02

includes

46.0

48.0

2.0

2.37

 

58.0

72.0

14.0

0.17

 

Note 1: Intersections are calculated down the drill holes using a 0.1 gram per tonne (gpt) or 100 part per billion (ppb) assay cut-off and allowing a maximum of 4 metres of internal waste. Assays immediate following the internal waste must carry the waste interval to be included in a particular intersection. "Includes" is calculated using a 1.0 gpt or 1000 ppb assay cut-off with the same internal waste criteria. 0.1 gpt or 100 ppb was chosen as a cut-off to show the wide continuity of the mineralization and to reflect the potential bulk mining of the entire zone. All drill hole inclinations are between -55 and -70 degrees and true width of the mineralization is 50%-75% of the reported drill intercept depending on the drill angle.


 

TABLE 3: Significant Assay Results - "Village Gap" - 0.4 gram per tonne cut-off (Note 2)

 

 

HOLE NUMBER

FROM

(m)

TO

(m)

LENGTH

(m)

GOLD ASSAY

(grams per tonne)

10FLRC-01A

48.0

72.0

24.0

2.53

includes

48.0

68.0

20.0

2.86

10FLRC-02

6.0

22.0

16.0

0.71

includes

12.0

14.0

2.0

1.54

10FLRC-02A

48.0

68.0

20.0

0.84

includes

50.0

56.0

6.0

1.34

10FLRC-03

6.0

18.0

12.0

0.55

10FLRC-03A

126.0

146.0

20.0

0.85

includes

128.0

134.0

6.0

1.65

10FLRC-04

0.0

22.0

22.0

1.59

includes

2.0

10.0

8.0

3.64

10FLRC-05

18.0

46.0

28.0

1.59

includes

18.0

24.0

6.0

3.48

 

28.0

36.0

8.0

1.55

 

40.0

44.0

4.0

1.40

10FLRC-06A

46.0

86.0

40.0

2.13

includes

46.0

58.0

12.0

2.13

 

62.0

68.0

6.0

7.48

 

82.0

86.0

4.0

1.74

10FLRC-07

4.0

60.0

56.0

1.74

includes

4.0

36.0

32.0

2.65

10FLRC-07A

70.0

76.0

6.0

0.87

includes

72.0

74.0

2.0

1.49

10FLRC-08

26.0

48.0

22.0

2.87

includes

30.0

38.0

8.0

7.10

10FLRC-08A

66.0

104.0

38.0

0.93

includes

70.0

86.0

16.0

1.47

 

100.0

102.0

2.0

1.12

10FLRC-09

10.0

18.0

8.0

1.07

includes

12.0

16.0

4.0

1.56

 

24.0

38.0

14.0

1.31

includes

28.0

34.0

6.0

2.47

10FLRC-11

2.0

8.0

6.0

0.77

includes

2.0

4.0

2.0

1.08

10FLRC-12

4.0

10.0

6.0

1.58

10FLRC-12A

8.0

30.0

22.0

5.12

includes

16.0

28.0

12.0

8.99

 

40.0

44.0

4.0

0.69

 

68.0

78.0

6/1/2011Win 2 nights stay at LEGENDS WHISTLER – drop by Legend Gold ...
4/14/2011Reports Results From Tiekoumala Drill Program
2/17/2011. Changes Name to Legend Gold Corp and Named to 2011 TSX Ven...
4/19/2010Engages Investor Relations Consultants
4/7/2010Files Year End Audited Financial Statements and MD&A and Ann...
2/17/2010Brighton Energy Limited completes acquisition of permits
12/1/2009Applies to List on TSX Venture Exchange and Voluntarily Deli...
8/14/2009Increase in Proposed
8/13/2009Revises Terms of Proposed Equity Private Placement
5/20/2008Annual General Meeting
3/31/2008Files Year End Audited Financial Statements and MD&A
2/6/2008and Orezone Form Uranium Exploration Company
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (LGN.V)
0.900-3.23%
TSX-V
CA$ 0.900
04/22 16:59 -0.030
-3.23%
Prev close Open
0.930 0.930
Low High
0.900 0.930
Year l/h YTD var.
0.770 -  0.960 8.43%
52 week l/h 52 week var.
0.750 -  1.20 150.00%
Volume 1 month var.
214,720 9.76%
24hGold TrendPower© : -37
Produces
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/28/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.87-3.12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+0.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-4.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.79-0.32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.86+0.54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.13+0.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :