Dundee Precious Metals Announces 2015 Second Quarter Results


Download this Press Release (PDF 365 KB)

TORONTO, ONTARIO--(Marketwired - July 30, 2015) - Dundee Precious Metals Inc. (TSX:DPM)(TSX:DPM.WT.A) -

(All monetary figures are expressed in U.S. dollars unless otherwise stated)

FINANCIAL AND OPERATING HIGHLIGHTS:

  • Metals production - Achieved gold and copper production in the second quarter of 2015 of 32,699 ounces and 10.6 million pounds;
  • All-in sustaining cost per ounce of gold - Remains below the industry average at $664;
  • Smelter - Smelted 53,721 tonnes of complex concentrate in the second quarter. Completed construction of the acid plant and commenced hot commissioning in the quarter, with commercial production of acid expected to commence in the third quarter of 2015;
  • Near term growth opportunities progressing - Krumovgrad local permitting advancing, although approval process progressing at a slower pace than planned. Preliminary land redesignation approval was received in late July, and construction permit now expected in early 2016; and
  • Financial position - Exited the quarter with approximately $195 million of cash resources, including the undrawn portion of the Company's long-term revolving credit facility.

Dundee Precious Metals Inc. ("DPM" or the "Company") today reported second quarter net earnings attributable to common shareholders of $1.9 million ($0.01 per share) compared to a net loss of $79.7 million ($0.57 per share) for the same period in 2014. Net loss attributable to common shareholders in the first six months of 2015 was $1.2 million ($0.01 per share) compared to $69.7 million ($0.50 per share) for the same period in 2014.

Net earnings (loss) attributable to common shareholders for the second quarter and first six months of 2015 and 2014 were impacted by several items not reflective of the Company's underlying operating performance, including impairment losses, unrealized gains and losses attributable to hedging future copper and gold production, net gains and losses attributable to DPM's equity settled warrants and net gains and losses on Sabina warrants. In the second quarter and first six months of 2014, DPM reported after-tax impairment losses on exploration and evaluation assets at Kapan of $65.8 million and impairment losses on property, plant and equipment at Chelopech of $6.1 million. Excluding these items, adjusted net earnings(1) during the second quarter of 2015 were $1.6 million ($0.01 per share) compared to $9.3 million ($0.07 per share) for the corresponding period in 2014. This decrease was due primarily to lower volumes of complex concentrate smelted and a higher proportion of third party concentrate smelted at Tsumeb, which generates lower tolling rates than Chelopech concentrate, lower metal prices, higher treatment charges at Chelopech, higher operating expenses in local currencies and lower volumes of payable metals in concentrate sold, partially offset by the favourable impact of a stronger U.S. dollar, lower general and administrative expenses and higher third party tolling rates at Tsumeb.

In the first six months of 2015, adjusted net earnings were $nil ($0.00 per share) compared to $7.0 million ($0.05 per share) in the corresponding period in 2014. This decrease was due primarily to weaker results from Tsumeb, due to the timing of the annual maintenance shutdown, which took place in the first quarter of 2015 compared to the third quarter in 2014, a higher proportion of third party concentrate smelted, which generates a lower gross margin than Chelopech concentrate, and higher stockpile interest, estimated metal exposure and local currency operating expenses, as well as lower metal prices, and higher operating expenses in local currency and treatment charges at Chelopech. These unfavourable variances were partially offset by the favourable impact of a stronger U.S. dollar, lower general and administrative expenses, higher volumes of payable gold in concentrate sold and higher third party tolling rates at Tsumeb.

"All operations remain on track to meet 2015 guidance" said Rick Howes, President and CEO. "DPM remains below average with respect to all-in sustaining cost per ounce of gold as we benefit from a strong U.S. dollar and a number of productivity and cost saving initiatives. Looking forward, we will continue to focus on optimizing operational performance, reducing costs at each of our operations, and securing the remaining permits for the Krumovgrad Gold Project."

Adjusted EBITDA

Adjusted EBITDA(1) during the second quarter and first six months of 2015 was $21.5 million and $41.4 million, respectively, compared to $32.2 million and $48.9 million in the corresponding periods in 2014, driven primarily by the same factors affecting adjusted net earnings(1).

The average market price for gold during the second quarter and first six months of 2015 decreased by 7% and 6%, respectively, compared to the corresponding periods in 2014. The average market price for copper during the second quarter and first six months of 2015 decreased by 11% and 14%, respectively, compared to the corresponding periods in 2014. The average realized copper price, including realized hedging gains, for the second quarter and first six months of 2015 was $3.19 per pound and $3.18 per pound, respectively, compared to $3.34 per pound and $3.30 per pound in the corresponding periods in 2014.

Production

Production of copper and zinc concentrates in the second quarter and first six months of 2015 of 31,741 tonnes and 58,638 tonnes, respectively, was 8% lower than the corresponding periods in 2014 due primarily to lower copper grades in copper concentrate produced at Chelopech.

Relative to the second quarter of 2014, gold contained in copper and zinc concentrates produced in the second quarter of 2015 decreased by 16% to 32,699 ounces and copper production decreased by 9% to 10.6 million pounds. Silver and zinc production in the second quarter of 2015 of 168,378 ounces and 3.0 million pounds, respectively, were comparable to the corresponding period in 2014. The decrease in gold production was due primarily to lower volumes of ore processed at Chelopech, combined with lower gold recoveries to copper concentrate, partially offset by higher volumes of ore processed and gold grades at Kapan. The decrease in gold recoveries at Chelopech was caused by processing ore types containing less gold that is recoverable in copper concentrate, with more being associated with the pyrite host mineral. Recovery and distribution to the pyrite concentrate increased during the period. The decrease in copper production was due primarily to lower volumes of ore processed and copper grades at Chelopech, partially offset by higher volumes of ore processed, copper grades and recoveries at Kapan.

Relative to the first six months of 2014, gold contained in copper and zinc concentrates produced in the first six months of 2015 increased by 3% to 67,442 ounces, copper production decreased by 8% to 19.3 million pounds, silver production increased by 9% to 326,919 ounces and zinc production decreased by 3% to 5.9 million pounds. The increase in gold production was due primarily to higher gold grades and higher volumes of ore mined and processed at Chelopech and Kapan, partially offset by lower gold recoveries to copper concentrate at Chelopech. The decrease in copper production was due primarily to lower copper grades and recoveries at Chelopech, partially offset by higher volumes of ore mined and processed at Chelopech and Kapan and higher copper grades and recoveries at Kapan. The increase in silver production was due primarily to higher volumes of ore processed at Chelopech and Kapan and higher silver grades at Chelopech, partially offset by lower silver recoveries at Chelopech and Kapan and lower silver grades at Kapan. The decrease in zinc production was due primarily to lower zinc grades and recoveries at Kapan, partially offset by higher volumes of ore processed.

On a consolidated basis, year-to-date gold, copper, zinc and silver production levels were in line with the annual guidance provided on February 12, 2015.

Gold contained in pyrite concentrate produced in the second quarter and first six months of 2015 was 14,010 ounces (2014 - 10,188 ounces) and 24,766 ounces (2014 - 14,980 ounces), respectively.

Complex concentrate smelted during the second quarter of 2015 of 53,721 tonnes was 11% lower than the corresponding period in 2014 due primarily to the ramp-up following the annual maintenance shutdown, which was completed on April 5, 2015. Complex concentrate smelted during the first six months of 2015 of 96,822 tonnes was 12% lower than the corresponding period in 2014 due primarily to the timing of the annual maintenance shutdown, which took place in the first quarter in 2015, whereas in 2014, the maintenance shutdown took place in the third quarter.

Deliveries

Deliveries of copper and zinc concentrates during the second quarter and first six months of 2015 of 33,457 tonnes and 65,472 tonnes, respectively, were 6% and 2% lower than the corresponding periods in 2014 due primarily to a decrease in concentrate produced, partially offset by a drawdown of copper concentrate inventories reflecting the timing of shipments.

Relative to the second quarter of 2014, payable gold in copper and zinc concentrates sold in the second quarter of 2015 decreased by 11% to 31,674 ounces, payable copper in concentrate sold decreased by 7% to 10.4 million pounds, payable silver in concentrate sold increased by 31% to 166,566 ounces and payable zinc in concentrate sold increased by 1% to 3.1 million pounds. The decreases in payable gold and copper in concentrate sold were due primarily to the decreases in gold and copper contained in copper concentrate produced at Chelopech, partially offset by higher deliveries of copper concentrate at Kapan as a result of the timing of shipments. The increase in payable silver in concentrate sold was due primarily to higher deliveries of copper concentrate at Kapan and higher grades at Chelopech.

Relative to the first six months of 2014, payable gold in copper and zinc concentrates sold in the first six months of 2015 increased by 5% to 65,615 ounces, payable copper in concentrate sold decreased by 2% to 20.3 million pounds, payable silver in concentrate sold increased by 11% to 262,313 ounces and payable zinc in concentrate sold increased by 1% to 5.1 million pounds. The increase in payable gold in concentrate sold was due primarily to the drawdown of copper concentrate inventories with a high gold content at Chelopech in the first quarter of 2015 and higher gold grades at Kapan. The decrease in payable copper in concentrate sold was due primarily to lower copper grades at Chelopech, partially offset by the drawdown of copper concentrate inventories with a high copper content at Chelopech in the first quarter of 2015. The increase in payable silver in concentrate sold was due primarily to higher silver grades at Chelopech.

Payable gold in pyrite concentrate sold in the second quarter and first six months of 2015 was 8,972 ounces (2014 - 8,115 ounces) and 16,308 ounces (2014 - 10,993 ounces), respectively.

Cash cost per ounce of gold sold

Consolidated cash cost per ounce of gold sold, net of by-product credits(1), during the second quarter of 2015 of $435 was 57% higher than the cash cost of $277 during the corresponding period in 2014 due primarily to lower volumes of payable gold and copper in copper and zinc concentrates sold, higher operating expenses in local currencies and lower prices for by-products, partially offset by the favourable impact of a stronger U.S. dollar relative to the Euro and the Armenian dram.

Consolidated cash cost per ounce of gold sold, net of by-product credits(1), during the first six months of 2015 of $395 was 2% lower than the cash cost of $402 during the corresponding period in 2014 due primarily to higher volumes of payable gold in copper and zinc concentrates sold and the favourable impact of a stronger U.S. dollar relative to the Euro and the Armenian dram, partially offset by higher operating expenses in local currencies and lower prices for by-products.

All-in sustaining cost per ounce of gold

Consolidated all-in sustaining cost per ounce of gold, net of by-product credits(1), in the second quarter of 2015 was $664 compared to $581 in the corresponding period in 2014. This increase was due primarily to the same factors affecting cash cost per ounce of gold sold, partially offset by lower cash outlays for sustaining capital expenditures and lower general and administrative expenses allocated to Chelopech and Kapan.

Consolidated all-in sustaining cost per ounce of gold, net of by-product credits(1), in the first six months of 2015 was $623 compared to $794 in the corresponding period in 2014. This decrease was due primarily to the same factors affecting cash cost per ounce of gold sold, lower cash outlays for sustaining capital expenditures and lower general and administrative expenses allocated to Chelopech and Kapan.

Cash provided from operating activities

Cash provided from operating activities in the second quarter of 2015 of $40.9 million was $16.8 million higher than the cash provided from operating activities of $24.1 million in the corresponding period in 2014. This increase was due primarily to a decrease in non-cash working capital and the favourable impact of a stronger U.S. dollar, partially offset by lower volumes of payable metals in concentrate sold, lower metal prices, higher operating expenses in local currencies and lower volumes of complex concentrate smelted at Tsumeb.

Cash provided from operating activities in the first six months of 2015 of $41.5 million was $5.8 million higher than the cash provided from operating activities of $35.7 million in the corresponding period in 2014. This increase was due primarily to a decrease in non-cash working capital, the favourable impact of a stronger U.S. dollar and higher volumes of payable gold in concentrate sold, partially offset by lower volumes of complex concentrate smelted at Tsumeb, lower metal prices and higher operating expenses in local currencies.

Cash provided from operating activities, before changes in non-cash working capital(1), during the second quarter and first six months of 2015 of $19.6 million and $38.0 million, respectively, was $12.8 million and $11.3 million lower than the corresponding periods in 2014.

Capital expenditures

Capital expenditures during the second quarter and first six months of 2015 totaled $20.6 million and $39.0 million, respectively, compared to $51.1 million and $119.2 million in the corresponding periods in 2014. These variances were due primarily to a lower rate of spending for the acid plant project at Tsumeb, and the completion of the pyrite recovery project at Chelopech in the first quarter of 2014.

Financial position

As at June 30, 2015, DPM maintained a consolidated cash position of $30.0 million, an investment portfolio valued at $8.6 million and $165 million of undrawn lines under its committed long-term revolving credit facility. These cash resources, together with the cash flow currently being generated, support the Company's on-going operating and capital requirements.

2015 Guidance

The Company's production and cash cost guidance for 2015 is set out in the following table and is unchanged from the original guidance issued in February 2015:

2015 Production & Cash Cost Guidance
Chelopech Kapan Tsumeb Consolidated
Ore mined/milled ('000s tonnes) 1,900 - 2,100 400 - 500 - 2,300 - 2,600
Complex concentrate smelted ('000s tonnes) - - 190 - 220 190 - 220
Metals contained in copper and zinc concentrates produced (1),(2)
Gold ('000s ounces) 108 - 120 22 - 30 - 130 - 150
Copper (million pounds) 39.5 - 43.5 2.2 - 2.9 - 41.7 - 46.4
Zinc (million pounds) - 8.8 - 11.8 - 8.8 - 11.8
Silver ('000s ounces) 210 - 235 365 - 485 - 575 - 720
Payable gold in pyrite concentrate sold ('000s ounces) 33 - 36 - - 33 - 36
Cash cost per tonne of ore processed ($) (3),(4) 35 - 40 68 - 85 - 42 - 48
Cash cost per ounce of gold sold, net of by-product credits ($) (1),(3),(4) 240 - 400 550 - 900 - 300 - 500
All-in sustaining cost per ounce of gold ($) (1),(3),(4) - - - 720 - 810
Cash cost per tonne of complex concentrate smelted ($) (3),(4) - - 320 - 400 320 - 400
Cash cost per ounce of gold sold in pyrite concentrate ($) (4) 950 - 1,040 - - 950 - 1,040
(1) Excludes metals in pyrite concentrate and, where applicable, the treatment charges, transportation and other selling costs related to the sale of pyrite concentrate, which is reported separately.
(2) Metals contained in concentrate produced are prior to deductions associated with smelter terms.
(3) Based on foreign exchange rates that approximate current rates and, where applicable, a copper price of $3.19 per pound, a silver price of $16.53 per ounce and a zinc price of $0.96 per pound. The copper price reflects the impact of 90% of 2015 copper production being hedged at $3.21 per pound.
(4) Cash cost per tonne of ore processed, cash cost per ounce of gold sold, net of by-product credits, all-in sustaining cost per ounce of gold, cash cost per tonne of complex concentrate smelted and cash cost per ounce of gold sold in pyrite concentrate are not defined measures under GAAP. Refer to the "Non-GAAP Financial Measures" section of the management's discussion and analysis for the three and six months ended June 30, 2015 (the "MD&A") for further discussion of these items, including reconciliations to IFRS measures.

For 2015, the majority of the Company's growth capital expenditures(1) will be focused on the completion of the acid plant and new converters at Tsumeb and securing the remaining permits and planning for the commencement of construction related to the Krumovgrad Gold Project. In aggregate, these expenditures are expected to range between $70 million and $90 million. Sustaining capital expenditures(1) are expected to range between $33 million and $40 million.

Cash costs are expected to be at the low end of the guidance, reflecting the favourable impact of a stronger U.S. dollar and various cost improvement initiatives being undertaken at each operation.

The 2015 guidance provided above is not expected to occur evenly throughout the year. The estimated metals contained in concentrate produced and volumes of complex concentrate smelted are expected to vary from quarter to quarter depending on the areas being mined, the timing of concentrate deliveries and planned outages. Production in the second half of 2015 is expected to be higher than the first half based on the existing mine plans at Chelopech and Kapan and the timing of the annual maintenance shutdown at Tsumeb, which was completed on April 5, 2015. The rate of capital expenditures is also expected to vary from quarter to quarter based on the schedule for, and execution of, each capital project and, where applicable, the receipt of necessary permits and approvals. Further details can be found in the Company's MD&A under the section "2015 Guidance".

Second quarter of 2015 copper production at Chelopech increased over first quarter copper production, as expected, as a result of higher copper grades and, in accordance with the mine plan, full year production is expected to meet 2015 guidance. Gold contained in copper concentrate produced in the second quarter was below expectation due to lower gold recoverability as a result of the mineralogy of the treated ore. This was partially offset by higher gold recoveries in the pyrite concentrate produced. Higher gold recoveries over the balance of 2015 are expected to support the achievement of 2015 guidance.

Preparations continued in the period at Kapan for the planned production increase in the second half of 2015 with the arrival of new production equipment early in the third quarter. Kapan remains on track to meet 2015 guidance.

At the Tsumeb smelter, smelting rates were in line with 2015 guidance following completion of a 19 day annual maintenance shutdown on April 5, 2015 that had been advanced from the original June timing.

(1) Adjusted net earnings, adjusted basic earnings per share, adjusted earnings before interest, taxes, depreciation and amortization ("EBITDA"), cash from operating activities, before changes in non-cash working capital, cash cost per ounce of gold sold, net of by-product credits, all-in sustaining cost per ounce of gold, and growth and sustaining capital expenditures are not defined measures under International Financial Reporting Standards ("IFRS"). Presenting these measures from period to period helps management and investors evaluate earnings and cash flow trends more readily in comparison with results from prior periods. Refer to the "Non-GAAP Financial Measures" section of the MD&A for further discussion of these items, including reconciliations to IFRS measures.

KEY FINANCIAL AND OPERATIONAL HIGHLIGHTS

$ millions, except where noted
Ended June 30,
Three Months Six Months
2015 2014 2015 2014
Revenue 71.1 98.0 136.0 174.4
Gross profit (1) 4.9 30.4 5.9 43.2
Earnings (loss) before income taxes 2.2 (82.1) 0.9 (70.0)
Net earnings (loss) attributable to common shareholders 1.9 (79.7) (1.2) (69.7)
Basic earnings (loss) per share ($) 0.01 (0.57) (0.01) (0.50)
Adjusted EBITDA (2) 21.5 32.2 41.4 48.9
Adjusted net earnings (2) 1.6 9.3 - 7.0
Adjusted basic earnings per share ($) (2) 0.01 0.07 0.00 0.05
Cash provided from operating activities 40.9 24.1 41.5 35.7
Cash provided from operating activities, before changes in non-cash working capital (2) 19.6 32.4 38.0 49.3
Copper and zinc concentrates produced (mt) 31,741 34,341 58,638 63,402
Metals contained in copper and zinc concentrates produced:
Gold (ounces) 32,699 38,835 67,442 65,442
Copper ('000s pounds) 10,613 11,600 19,312 20,955
Zinc ('000s pounds) 3,014 2,990 5,943 6,124
Silver (ounces) 168,378 168,612 326,919 298,935
Tsumeb - complex concentrate smelted (mt) 53,721 60,322 96,822 109,472
Deliveries of copper and zinc concentrates (mt) 33,457 35,513 65,472 66,705
Payable metals in copper and zinc concentrates sold:
Gold (ounces) 31,674 35,411 65,615 62,736
Copper ('000s pounds) 10,394 11,173 20,270 20,759
Zinc ('000s pounds) 3,075 3,051 5,083 5,031
Silver (ounces) 166,566 126,760 262,313 236,373
Payable gold in pyrite concentrate sold (ounces) 8,972 8,115 16,308 10,993
Cash cost per ounce of gold sold, net of by-product credits ($) (2) 435 277 395 402
All-in sustaining cost per ounce of gold ($) (2) 664 581 623 794
Cash cost per tonne of complex concentrate smelted at Tsumeb ($) (2) 330 296 366 301
(1) Gross profit is regarded as an additional GAAP measure and is presented in the Company's condensed interim unaudited consolidated statements of earnings (loss). Gross profit represents revenue less cost of sales and is one of several measures used by management and investors to assess the underlying operating profitability of a business.
(2) Adjusted EBITDA; adjusted net earnings; adjusted basic earnings per share; cash flow provided from operating activities, before changes in non-cash working capital; cash cost of sales per ounce of gold sold, net of by-product credits; all-in sustaining cost per ounce of gold; and cash cost per tonne of complex concentrate smelted, are not defined measures under IFRS. Refer to the MD&A for reconciliations to IFRS measures.

DPM's unaudited condensed interim consolidated financial statements, and MD&A for the second quarter and first six months ended June 30, 2015, are posted on the Company's website at www.dundeeprecious.com and have been filed on SEDAR at www.sedar.com.

The Company will be holding a call and a webcast to discuss its 2015 second quarter results on Friday, July 31, 2015, at 9:00 a.m. (E.S.T.). Participants are invited to join the live webcast (listen/view only) at: www.gowebcasting.com/6605. Alternatively, participants can access a listen only telephone option at 416-340-2218 or North America Toll Free at 1-866-225-0198. A replay of the call will be available at 905-694-9451 or North America Toll Free at 1-800-408-3053, passcode 4453094. The audio webcast for this conference call will also be archived and available on the Company's website at www.dundeeprecious.com.

Dundee Precious Metals Inc. is a Canadian based, international gold mining company engaged in the acquisition of mineral properties, exploration, development, mining and processing of precious metals. The Company's principal operating assets include the Chelopech operation, which produces a copper concentrate containing gold and silver, located east of Sofia, Bulgaria; the Kapan operation, which produces a copper concentrate and a zinc concentrate, both containing gold and silver, located in southern Armenia; and the Tsumeb smelter, a concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold properties located in Bulgaria, Serbia, and northern Canada, including the Krumovgrad project and interests held through its 50.1% owned subsidiary, Avala Resources Ltd., and its 12.1% interest in Sabina Gold & Silver Corp.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This press release contains "forward looking statements" that involve a number of risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold, copper, zinc and silver, the estimation of mineral reserves and resources, the realization of such mineral estimates, the timing and amount of estimated future production and output, life of mine, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, success of permitting activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, reclamation expenses, the potential or anticipated outcome of title disputes or claims and timing and possible outcome of pending litigation. Often, but not always, forward looking statements can be identified by the use of words such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words and phrases or that state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others: the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold, copper, zinc and silver; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, uncertainties inherent with conducting business in foreign jurisdictions where corruption, civil unrest, political instability and uncertainties with the rule of law may impact the Company's activities; fluctuations in metal prices; unanticipated title disputes; claims or litigation; limitation on insurance coverage; as well as those risk factors discussed or referred to in the Company's MD&A under the heading "Risks and Uncertainties" and under the heading "Cautionary Note Regarding Forward-Looking Statements" which include further details on material assumptions used to develop such forward-looking statements and material risk factors that could cause actual results to differ materially from forward-looking statements, and other documents (including without limitation the Company's 2014 AIF) filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available on SEDAR at www.sedar.com. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Unless required by securities laws, the Company undertakes no obligation to update forward looking statements if circumstances or management's estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on forward looking statements.

Contact Information:
Rick Howes
President and Chief Executive Officer
Tel: (416) 365-2836
[email protected]

Hume Kyle
Executive Vice President and Chief Financial Officer
Tel: (416) 365-5091
[email protected]

Lori Beak
Senior Vice President, Governance, and Corporate Secretary
Tel: (416) 365-5165
[email protected]

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Armenia | Bulgaria | Canada | Namibia | Serbia | All
Gold and Silver Prices for these countries : Armenia | Bulgaria | Canada | Namibia | Serbia | All

Dundee Precious Metals Inc

PRODUCER
CODE : DPM.TO
ISIN : CA2652692096
CUSIP : 265269-20-9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Dundee Precious Metals is a zinc and gold producing company based in Canada.

Dundee Precious Metals produces zinc, gold, copper and silver in Armenia, develops copper, gold and silver in Bulgaria.

Its main asset in production is KAPAN in Armenia, its main assets in development are CHELOPECH and KRUMOVGRAD in Bulgaria and its main exploration property is SURDULICA in Bulgaria.

Dundee Precious Metals is listed in Canada. Its market capitalisation is CA$ 1.9 billions as of today (US$ 1.4 billions, € 1.3 billions).

Its stock quote reached its lowest recent point on January 22, 2016 at CA$ 0.84, and its highest recent level on April 19, 2024 at CA$ 10.80.

Dundee Precious Metals has 178 440 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Dundee Precious Metals Inc
2/27/2019Exyn introduces robots into Dundee Precious Metals' gold min...
4/13/2010Discovers New Gold Deposits in Bulgaria
Financings of Dundee Precious Metals Inc
10/9/2013Issued Shares and Warrants of Sabina Gold & Silver Corp. on ...
6/11/2013Announces Result of Early Warrant Exercise Program
Nominations of Dundee Precious Metals Inc
3/21/2013DPM Board Announces Executive Transition and Senior Officer ...
11/14/2012DPM Board Announces Senior Appointment
9/19/2012Eira Thomas Joins Dundee Precious Metals' Board of Directors
Financials of Dundee Precious Metals Inc
10/15/2013NOTICE: DPM 2013 Third Quarter Financial Results
8/1/2013Announces 2013 Second Quarter Results
7/10/2013NOTICE: DPM 2013 Second Quarter Financial Results
5/9/2013Announces 2013 First Quarter Results
4/17/2013NOTICE: DPM 2013 First Quarter Financial Results
2/15/2013Announces 2012 Fourth Quarter and Annual Results and 2013 Gu...
1/24/2013NOTICE: DPM Fourth Quarter and Year End 2012 Results
11/7/2012Announces 2012 Third Quarter Results
10/18/2012NOTICE: Dundee Precious Metals 2012 Third Quarter Results
8/1/2012Announces 2012 Second Quarter Results and Updated 2012 Guida...
7/9/2012NOTICE: DPM 2012 Second Quarter Results
5/8/2012DPM First Quarter 2012 Financial Results
10/14/2011NOTICE: DPM Third Quarter 2011 Results
7/11/2011NOTICE: DPM Second Quarter 2011 Results
4/27/2011Notice: DPM Annual General Meeting and 2011 First Quarter Re...
2/23/2011DPM Reports Fourth Quarter 2010
Project news of Dundee Precious Metals Inc
9/16/2013s 2013 Production Guidance
5/16/2013(Chelopech)Confirms Fundamentals Unchanged; Chelopech Mine Operating at...
9/10/2012(Chelopech)DPM Files Technical Report on Chelopech Pyrite Recovery Proj...
1/13/2012(Krumovgrad)Files Technical Report on Krumovgrad Gold Project
11/24/2011(Krumovgrad)Bulgarian Government Approves EIA for DPM's Krumovgrad Gold ...
2/23/2011(Chelopech)DPM Reports Fourth Quarter 2010 and Year-End Results and Upd...
Corporate news of Dundee Precious Metals Inc
7/28/2016Dundee Precious Metals Announces 2016 Second Quarter Results
7/25/2016Dundee Precious Metals Announces Power Blackout in Namibia R...
7/11/2016DPM Announces Closing of C$54.65 Million Bought Deal Financi...
7/7/2016Dundee Precious Metals Announces Second Quarter Production R...
6/20/2016DPM Announces C$50 Million Bought Deal Financing
12/21/2015Dundee Precious Metals Announces 15% Increase to Measured an...
12/21/2015AVALA RESOURCES STARTS DRILLING ON THE LENOVAC PROJECT
11/30/2015AVALA RESOURCES ANNOUNCES EARN-IN AND JOINT VENTURE AGREEMEN...
11/19/2015Dundee Precious Metals Announces Approval of Main Detailed D...
11/5/2015Dundee Precious Metals Announces 2015 Third Quarter Results
11/4/2015Dundee Precious Metals Announces Changes to Board of Directo...
10/8/2015Dundee Precious Metals Announces Third Quarter Production Re...
9/15/2015Dundee Precious Metals Announces Maintenance of the Tsumeb S...
7/30/2015Dundee Precious Metals Announces 2015 Second Quarter Results
7/9/2015Dundee Precious Metals Announces Second Quarter Production R...
4/14/2015Dundee Precious Metals Announces First Quarter Production Re...
4/14/2015Announces First Quarter Production Results and Provides Noti...
3/31/2015Dundee Precious Metals Announces Reserve and Resource Update...
3/31/2015Announces Reserve and Resource Update for 2015
3/18/2015Dundee Precious Metals Announces Commencement of Annual Tsum...
3/18/2015Announces Commencement of Annual Tsumeb Smelter Shutdown
2/26/2015AVALA RESOURCES PROVIDES AN EXPLORATION UPDATE
2/18/2015Tags to Riches: Mining Company Tracks Production With Sensor...
2/13/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
2/13/2015Dundee Precious Metals Announces 2014 Fourth Quarter and Ann...
1/22/2015NOTICE: Dundee Precious Metals 2014 Fourth Quarter and Year ...
1/14/2015Dundee Precious Metals Announces Record Fourth Quarter Produ...
1/14/2015(Chelopech)Announces Record Fourth Quarter Production at Chelopech and ...
11/6/2014Dundee Precious Metals Announces 2014 Third Quarter Results
11/5/2014Dundee Precious Metals Announces 2014 Third Quarter Results
10/16/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
10/16/2014NOTICE: Dundee Precious Metals 2014 Third Quarter Results
10/8/2014Dundee Precious Metals Announces a Favourable Preliminary Ec...
10/8/2014Dundee Precious Metals Provides Third Quarter 2014 Productio...
10/3/2014Dundee Precious Metals Acquires Shares and Warrants of Avala...
7/30/2014Dundee Precious Metals Announces 2014 Second Quarter Results
7/14/2014NOTICE: DPM 2014 Second Quarter Results
7/10/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
7/10/2014Dundee Precious Metals Announces Krumovgrad Municipal Counci...
6/26/2014Dundee Precious Metals Increases Revolving Credit Facility b...
5/20/2014Dundee Precious Metals Strengthens Senior Management Team
8/29/2013Announces First Underground Mineral Resource Estimate for th...
7/24/2012Reports on Progress of Acid Plant at Smelter in Namibia
4/30/2012Receives First Contact from Namibian Government on Tsumeb Sm...
4/23/2012DPM Exercises Warrants of Dunav Resources Ltd.
2/16/2012DPM Announces 2011 Deno Gold Open Pit Project and Undergroun...
1/26/2012(Krumovgrad)Bulgarian Court Dismisses Appeal of DPM's Krumovgrad Mining ...
11/30/2011(Krumovgrad)DPM: New Krumovgrad Feasibility Study Confirms Low Cash Cost...
9/15/2011Improves Safety and Operational Efficiency With AeroScout Re...
9/2/2011Dunav Resources and Dundee Precious Metals Complete Transact...
8/23/2011DPM to Acquire Shares and Warrants of Dunav Resources Ltd. o...
5/10/2011(Chelopech)DPM and Chelopech Mining Raise Final US$14.5 Million of Chel...
3/23/2011DPM Exercises Warrants of Avala Resources Ltd.
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (DPM.TO)
10.80+0.65%
TORONTO
CA$ 10.80
04/19 17:00 0.070
0.65%
Prev close Open
10.73 10.65
Low High
10.63 10.82
Year l/h YTD var.
7.98 -  10.80 28.11%
52 week l/h 52 week var.
7.98 -  10.80 6.19%
Volume 1 month var.
241,548 8.65%
24hGold TrendPower© : -11
Produces Copper - Gold - Silver - Zinc
Develops Copper - Gold - Silver
Explores for Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202427.21%
202330.41%9.9210.00
2022-14.00%8.415.41
2021-17.27%9.956.99
202058.30%9.9610.03
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :