Dynasty Metals and Mining Inc

Published : September 18th, 2014

Dynasty Announces Updated Zaruma Gold Project Resource Estimate and Preliminary Economic Assessment

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Dollar | Ecuador | Gold | Silver |

Dynasty Announces Updated Zaruma Gold Project Resource Estimate and Preliminary Economic Assessment

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sep 18, 2014) - Dynasty Metals & Mining Inc. ("Dynasty" or the "Company") (DMM.TO)(DMMIF) is pleased to announce that it has filed a technical report entitled "Independent Preliminary Assessment - Zaruma Gold Project" (the "Technical Report") dated September 17, 2014, which contains a Preliminary Economic Assessment ("PEA") based upon an updated mineral resource Estimate on its Zaruma Gold Project (the "Zaruma Project") in El Oro Province, Ecuador.

The Technical Report was prepared by Consulting Mining Engineer Mr RL Procter BSc (Eng), MBA, MIMMM, CEng, and Consulting Geologists Mr AJ Maynard, BAppSc (Geol) MAIG, MAusIMM and Mr PA Jones, BAppSc (Geol), MAIG, all of whom are independent "qualified persons" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). The Technical Report has been prepared in accordance with NI 43-101 and is available on the Company's website (www.dynastymining.com) and on SEDAR (www.sedar.com).

The selected information presented herein is qualified in its entirety by, and should be read in conjunction with, the Technical Report. All dollar amounts in United States dollars unless otherwise stated.

Zaruma Project

The Zaruma Project is situated in El Oro Province of southern Ecuador, about 175 kilometres south and 60 kilometres southeast of the major port cities of Guayaquil and Machala respectively.

The Zaruma Project comprises 41 concessions covering a total area of 10,121.47 hectares in a readily accessible region of southern Ecuador. The gold mineralization found on the concessions is associated with extensive high grade gold and silver epithermal vein systems.

Updated Resource Estimate

The Company's updated mineral resource estimate was calculated using data related to concessions that cover a relatively small section of the total concession area that makes up the Zaruma Project. Such additional area is considered by the authors of the Technical Report to be highly prospective for additional mineralized veins, which may become the focus of future exploration work.

Estimated mineral resources at the Zaruma Project as contained in the Technical Report are as follows:

Measured Indicated Inferred
Location Tonnes (million) Grade Au (g/t) Contained Au (Ozs) Tonnes (million) Grade Au (g/t) Contained Au (Ozs) Tonnes (million) Grade Au (g/t) Contained Au (Ozs)
Cabo de Hornos 1.30 13.99 585,000 0.86 12.46 343,000 3.0 12.30 1,201,000
Barbasco 0.19 11.05 66,000 0.09 10.81 33,000 0.3 12.13 128,000
Ayapamba 0.07 12.64 30,000 0.06 11.63 23,000 0.2 12.40 96,000
Vizcaya 0.03 8.40 8,000 0.02 8.40 6,000 0.1 8.40 23,000
Total 1.59 13.48 689,000 1.03 12.18 405,000 3.7 12.2 1,448,000
Notes: - Mineral Resources that are not Mineral Reserves have not demonstrated economic viability.
- A cut-off grade of 2.06 was used to derive the Mineral Resource estimate.

Updated Preliminary Economic Analysis

An updated PEA has been prepared based upon the updated mineral resource estimate. Highlights of the PEA as set out in the Technical Report are as follows:

Unit Value
Gold Price Used $/oz Au 1,300
Gold Recovered(1) Au (oz) 1,081,108
Total Mined Resources (undiluted)(1)
- Measured + Indicated tonnes 2,590,000
- Inferred tonnes 935,000
Operating Revenue $M 1,459.5
Operating Cash Flow (EBITDA) $M 682.5
Net Cash Flow (untaxed) $M 653.4
Net Cash Flow (taxed) $M 440.9
NPV(2) (untaxed) $M 321.6
NPV(2) (taxed) $M 218.2
Unit Operating Cost (untaxed) $/oz Au 658
Unit Operating Cost (taxed) $/oz Au 855
1. It is assumed that 100% of the measured and indicated resource and 25% of the inferred resource is mined.
2. At 10% base case discount rate

As required by NI 43-101, it should be noted that these evaluations are preliminary in nature and that the Inferred Mineral Resources in particular are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. As such there is no certainty that the PEA will be realised.

The Zaruma Project has sufficient Measured and Indicated Mineral Resources for a mine life of about 10.5 years. The Project also has available to it a significant inventory of Inferred Mineral Resource (59% of all tonnes and 57% in gold content). Adding only 27% of the Inferred Mineral Resource (equating to 25% of gold output) to the Zaruma Project's production schedule increases mine life to 15 years, which is considered to be a reasonable mine life period to assess the Project on a discounted cash flow basis. This is the base case evaluated for the PEA.

The Inferred Mineral Resource is also assumed to be processed at the end of the mine's life (i.e. after all Measured and Indicated material has been treated), so it suffers the greatest discounted cash flow effect in the analysis.

The salient information for the Zaruma Project from the PEA contained in the Technical Report is the following:

  • it produces an earnings before interest, tax, depreciation and amortisation of $683 million;
  • at a 10% discount rate, it produces a taxed net present value (NPV) of $218 million and untaxed NPV of $322 million;
  • it produces a taxed net cash flow of $441 million and an untaxed net cash flow of $653 million;
  • it has a total unit cash operating cost of $855/oz (taxed) and $658/oz (untaxed);
  • the overall operating costs equate to 51% of total revenue;
  • total capital expenditure is estimated at $29 million; and
  • it pays $66 million in royalties and $213 million in taxes, over its estimated 15 year mine life.

Company Comment

Company President and Chief Executive Officer, Robert Washer, commented: "The updated PEA provides an encouraging financial model that supports management's belief that Zaruma is a world class asset. We have worked extremely hard to develop Zaruma under very difficult operating circumstances primarily with proceeds from the pre-commercial processing and sale of gold. We look forward to increasing mine production over time to meet plant capacity in order to enhance shareholder value."

About Dynasty Metals & Mining

Dynasty is a Canadian based mining company involved in the exploration and development of mineral properties in Ecuador.

The Company is currently focused on developing its Zaruma Gold Project, at which the Company is in production. The Company also has the following non-producing assets: the Jerusalem Project and Dynasty Goldfield Project.

The technical information of this news release has been reviewed and approved by Brian Speechly, a Fellow of AUSIMM (Australian Institute of Mining and Metallurgy), a director of the Company and a "qualified person" within the definition of that term in the NI 43-101.

For further information please visit the Company's website at www.dynastymining.com

Forward-Looking Information

This news release contains statements which are, or may be deemed to be, "forward-looking information" which are prospective in nature. Often, but not always, forward-looking information can be identified by the use of forward-looking words such as "plans", "expects" or "does not expect", "is expected", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. Such information in this news release includes, without limitation, statements regarding Dynasty's future plans and expectations relating to the future exploration work at the Zaruma Project; Zaruma mine development and mineral extraction; and analyses and other information that are based on expectations of future performance as outlined in the updated mineral resource estimate and PEA. Statements concerning mineral resource estimates may also constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if the Zaruma Project is developed. Forward-looking information is not based on historical facts, but rather on then current expectations, beliefs, assumptions, estimates and forecasts about the business and the industry and markets in which the Company operates, including assumptions relating to the Company's ability to continue progress through its declines with minimal or no interruption; that the Company will be able to continue its progress in respect of its mines as planned; that the Company will continue to sell processed gold and silver at levels that allow it to fund the continued development of its mining projects and sustain its operations; that the Company will have access to capital if required; that all necessary approvals and arrangements will be obtained, renewed and/or finalized in a satisfactory manner in order to continue developing the Company's projects; and that the Company's equipment will operate at expected levels. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause Dynasty's actual results, revenues, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

Important risks that could cause Dynasty's actual results, revenues, performance or achievements to differ materially from Dynasty's expectations include, among other things: risks related to fluctuations in the price of gold; risks related to fluctuations in currency markets; risks related to the inherently dangerous activity of mining; uncertainty in the Company's ability to fund the development of the Zaruma Project pursuant to the PEA, including the availability of capital on satisfactory terms; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in a profitable mining operation at the Zaruma Project; risks related to mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral resources as properties are mined; risks related to governmental regulations and obtaining necessary licenses and permits; risks related to the business being subject to environmental laws and regulations which may increase costs of doing business and restrict our operations; risks related to the Zaruma Project being located in Ecuador, including political, economic, social and regulatory instability; and other risks found in Dynasty's Annual Information Form for the year ended December 31, 2013 and other public filings which are available on SEDAR at www.sedar.com. For the reasons set forth above, investors should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward looking information, except in accordance with applicable securities laws.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Ecuador | All
Gold and Silver Prices for these countries : Ecuador | All

Dynasty Metals and Mining Inc

PRODUCER
CODE : DMM.TO
ISIN : CA26813S1002
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Dynasty Metals is a gold and silver development stage company based in Canada.

Dynasty Metals develops gold, silver, copper and zinc in Ecuador, and holds various exploration projects in Ecuador.

Its main asset in production is ZARUMA in Ecuador, its main assets in development are JERUSALEM and JERUSALEM in Ecuador and its main exploration property is DYNASTY in Ecuador.

Dynasty Metals is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 28.1 millions as of today (US$ 20.7 millions, € 19.0 millions).

Its stock quote reached its highest recent level on August 17, 2007 at CA$ 9.50, and its lowest recent point on April 22, 2016 at CA$ 0.10.

Dynasty Metals has 87 810 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Dynasty Metals and Mining Inc
6/9/2006Follow up N° 6
Annual reports of Dynasty Metals and Mining Inc
Annual Report 2007
Financings of Dynasty Metals and Mining Inc
10/21/2009$6,000,000 bought deal financing
Nominations of Dynasty Metals and Mining Inc
1/9/2013Announces Director Resignation
5/17/2011Appoints New Director
3/12/2008APPOINTS NEW DIRECTOR
7/31/2007Ecuador Appoints New Undersecretary Of Mines
7/25/2007 ECUADOR APPOINTS NEW MINISTER OF MINES & PETROLEUM
6/28/2007Management Appointments
Financials of Dynasty Metals and Mining Inc
8/15/2013Reports Financial Results for the Three and Six Months Ended...
5/16/2013Reports Financial Results for the Three Months Ended March 3...
3/29/2013Reports Financial Results for the Year Ended December 31, 20...
8/15/2012Reports Financial Results for the Three and Six Months Ended...
4/2/2012Releases 2011 Financial Statements
Project news of Dynasty Metals and Mining Inc
7/23/2012(Zaruma)Announces Armed Robbery at Zaruma Gold Project
1/21/2011(Zaruma)Commences Formal Contract Negotiations
2/2/2010(Zaruma)President's Update on Zaruma
9/28/2009(Zaruma)Dynasty Pours First Gold
8/20/2009(Zaruma)Provides update on ecuador gold projects
4/17/2007RECEIVES FINAL PERMITTING TO CONSTRUCT AND OPERATE ZARUMA GO...
Corporate news of Dynasty Metals and Mining Inc
7/29/2016Dynasty Receives Forbearance Period on Vertex One Asset Mana...
7/9/2016Dynasty Provides Corporate Update
7/6/2016Dynasty Announces Annual General Meeting Voting Results
6/15/2016Dynasty Provides Corporate Update
5/31/2016Dynasty Mining Engages a Financial Advisor to the Special Co...
5/17/2016Dynasty Reports Financial Results for the Quarter Ended Marc...
4/27/2016Dynasty Metals & Mining Announces Dynasty Goldfield Project ...
4/20/2016Dynasty Reports 2,785 Ounces of Gold Sold and 2,221 Ounces o...
4/11/2016Dynasty Announces Temporary Work Delay at the Zaruma Gold Pr...
4/5/2016Dynasty Provides Corporate Update
1/23/2016Dynasty Reports 5,634 Ounces of Gold Sold and 4,133 Ounces o...
11/2/2015DYNASTY ANNOUNCES AMENDMENTS TO THE TERMS OF DEBT FINANCING
10/14/2015DYNASTY REPORTS 6,285 OUNCES OF GOLD PRODUCED IN Q3 2015 & P...
9/15/2015DYNASTY SETTLES US$1.44 MILLION OF SHORT TERM DEBT BY WAY OF...
9/14/2015Dynasty Settles US$1.44 Million of Short Term Debt By Way of...
8/14/2015DYNASTY REPORTS FINANCIAL RESULTS FOR THE SIX AND THREE MONT...
6/22/2015DYNASTY CLOSES US$4 MILLION DEBT FINANCING & PROVIDES OPERAT...
4/13/2015DYNASTY METALS AND MINING ANNOUNCES THE APPOINTMENT OF NAOMI...
4/8/2015Announces the Appointment of Naomi Nemeth to the Role of Vic...
4/8/2015Dynasty Metals and Mining Announces the Appointment of Naomi...
4/1/2015DYNASTY REPORTS FINANCIAL RESULTS FOR THE YEAR ENDED DECEMBE...
1/24/2015DYNASTY ANNOUNCES GOLD PRODUCTION OF 25,868 OUNCES AND GOLD ...
1/18/2015Dynasty Announces Gold Production of 25,868 Ounces and Gold ...
11/14/2014DYNASTY REPORTS FINANCIAL RESULTS FOR THE THREE AND NINE MON...
11/14/2014Dynasty Reports Financial Results for the Three and Nine Mon...
11/6/2014DYNASTY ANNOUNCES UPDATED DYNASTY GOLDFIELD PROJECT AND JERU...
11/6/2014Dynasty Announces Updated Dynasty Goldfield Project and Jeru...
9/18/2014Dynasty Announces Updated Zaruma Gold Project Resource Estim...
8/15/2014Dynasty Reports Financial Results for the Three and Six Mont...
6/30/2014Dynasty Provides Update on Preparation of Revised Technical ...
6/25/2014Dynasty Announces Annual General Meeting Voting Results
6/2/2014Dynasty Provides Update on Preparation of Revised Technical ...
5/16/2014Dynasty Reports Financial Results for the Three Months Ended...
5/2/2014DYNASTY PROVIDES UPDATE ON PREPARATION OF REVISED TECHNICAL ...
4/30/2014Dynasty Provides Update on Preparation of Revised Technical ...
4/21/2014Dynasty Reports Mine Incident
4/1/2014Dynasty Reports Financial Results for the Year Ended Decembe...
6/20/2013Announces Annual General and Special Meeting Voting Results
10/16/2012(Zaruma)Qualifies Key Zaruma Concessions for Small Scale Mining Lice...
9/6/2012Insurance Claim Settled
10/7/2011(Dynasty)Director Retires From Dynasty's Board
11/30/2009Comments on Ecuadorian Mining Regulations
11/3/2009Completes $6,000,000 equity financing
7/7/2009Welcomes Ecuador Vice Minister of Mines to Its Zaruma Gold P...
7/1/2009Dynasty and IAMGOLD Extend Option Period
3/3/2009CEO Interviewed on BNN
12/17/2008 plans to commission gold plant by the end of March
4/28/2008WELCOMES ECUADOR PRESIDENT TO ITS ZARUMA PROJECT
4/25/2008COMMENTS ON RECENT DEVELOPMENTS IN ECUADOR
4/23/2008 SEEKS CLARIFICATION ON NEW MINING MANDATE
4/15/2008ENTERS INTO REVISED AGREEMENT
3/10/2008Completes $18,750,000 Equity Financing
2/20/2008SPROTT ASSET MANAGEMENT TO INCREASE ITS DYNASTY STAKE TO 22....
1/29/2008PRESIDENT'S UPDATE
1/25/2008CONCESSIONS IN GOOD STANDING
12/18/2007Exercises Option to Buy Back Royalty at Its Near Production ...
12/12/2007MOURNS PASSING OF DIRECTOR PAUL MACNEILL
11/20/2007Increases Gold and Silver Resource Estimate
10/25/2007 RECEIVES CONDITIONAL APPROVAL OF COPPER DUKE SPIN-OFF
8/1/2007To Trade On The Toronto Stock Exchange
7/18/2007New Optimized Zaruma Plant Design
7/16/2007Receives Conditional Approval to Trade on Toronto Stock Exch...
6/12/2007 Provides Zaruma Gold Project Update
2/24/2007Engages Brisco Capital Partners
10/1/2005Follow up N° 4
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (DMM.TO)OTC BB (DMMIF)
0.320-3.03%0.267+4.21%
TORONTO
CA$ 0.320
04/26 13:46 -0.010
-3.03%
Prev close Open
0.330 0.320
Low High
0.320 0.320
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.320 -%
Volume 1 month var.
8,150 -%
24hGold TrendPower© : 2
Produces Gold
Develops Gold
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/5/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.71-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :