DYNASTY REPORTS FINANCIAL RESULTS FOR THE YEAR ENDED DECEMBER 31, 2014


Vancouver, B.C., March 31, 2015 - Dynasty Metals & Mining Inc. ("Dynasty" or the "Company") (TSX: DMM, OTCQX: DMMIF) announces that it has released its audited consolidated financial statements for the year ended December 31, 2014 (the "Financial Statements"). The selected financial information presented herein is qualified in its entirety by, and should be read in conjunction with, the Financial Statements and the related notes thereto and the Company's management's discussion and analysis ("MD&A"), which are available on the Company's website (www.dynastymining.com) and on SEDAR (www.sedar.com).

All dollar amounts in United States dollars unless otherwise stated.

Zaruma Gold Project Operating Results

a) Net of by-product credits.
b) Non-GAAP measure. For the disclosure of the manner in which these measures are calculated and a reconciliation to operating expenditures refer to the "Non-GAAP Measures" section of the Company's MD&A available on SEDAR(www.sedar.com)

There are no comparable operating results for year ended December 31, 2013 since the Company commenced accounting for the Zaruma Project as being in commercial production commencing on October 1, 2013 as the project was meeting production milestones to be operating, for accounting purposes, in the way intended by Management

The average grade of material processed during year ended December 31, 2014 was 8.43 grams per tonne (¡§g/t¡¨). With the exception of the second quarter of 2014 where lower grade, non-resource development material was mined, substantially all the high grade material mined during the year ended December 31, 2014 was from certain sections of the Soroche group of veins.

As previously disclosed it is not uncommon or unexpected to encounter areas of mineral deposit at the Zaruma Project with significantly higher or lower grades as compared to the average grade disclosed in the Company's mineral resource estimate, since the resource at Zaruma is known to contain a significant variability in grade between different areas, which are often in close proximity to each other. As a result, it is unlikely that the Company will achieve a consistent monthly production profile during this early production phase of operations until material is mined from multiple veins.

Cash costs per ounce and all-in sustaining cash costs per ounce for the year ended December 31, 2014 were $973 and $1,328 respectively which was impacted by a combination of a number of factors, including:

  • normal course maintenance and development work which resulted in decreased tonnage delivered to the mill in the first quarter of 2014;

  • a decrease in the average grade of material mined during the second quarter of 2014 due to limited access to regions of veins with higher grade while development work on these areas was ongoing during this period;

  • the Company has adopted a policy to expense any further development expenditure as it is incurred in respect of a mine property subsequent to the commencement of commercial production, unless substantial new future economic benefits are derived from such expenditure at which point it will be capitalized. As a result all of the costs of carrying out the decline maintenance and development work was all expensed in the period and therefore included in the per ounce cost calculations; and

  • the Company's operations consist of a large fixed cost proportion, with the actual cash expenditure not varying a great deal between periods.

The following tables show selected consolidated financial information as at December 31, 2014 and December 31, 2013 and for the years ending December 31, 2014 and 2013:

(a) For accounting purposes the Company commenced recognizing revenue and net income from production effective October 1, 2013.

Consolidated Statements of Financial Position, as at:

Zaruma Mine Operations Update

The Company previously commenced the development of three separate declines, being "Cabo de Hornos" (the "main decline"), "Ayapamba" and "Barbasco", at the Zaruma Project to access the resource contained therein. Primarily as a result of budget constraints since 2013, the Company has concentrated development activities on the main decline, "Cabo de Hornos", since it provided the best access to the in-situ resources and where the installation of an electrical sub-station allows the mine to be powered from the main grid.

The main decline has advanced approximately 3.3 kilometres from the portal entrance at mine Level 700 reaching a vertical depth of 340 metres (¡§m¡¨) and is now on Level 360. The dimension of the main decline is between 4.5 x 5 m to 5 x 5 m throughout. The majority of the high grade material mined during the year ended December 31, 2014 was extracted from the Soroche group of veins operating between Level 600 to Level 450. The proximity of old underground workings, some sections of which still contain water, has meant it has been more efficient in the short term to advance the decline deeper rather than expanding the mine laterally on these levels.

The Company has now advanced the main decline to level 360 which, based on the old mine plans available, is a depth at which the majority of old workings never reached. It is from this point that the Company has now split the decline and is advancing one extension to the north and one to the south. This is expected to provide simultaneous access to multiple veins, including the Soroche vein, the Matalanga vein, the Abundacia vein, the St. Ernest vein, the Nudo vein and other subparallel veins in the future.

The northern extension has currently advanced 100 m and has reached the Soroche vein at Level 360. In the near term, concurrent with the development of the Soroche vein to prepare it for mining, the northern extension will continue to advance for another 150 m which is the estimated length of the Soroche vein. From here it is expected that the Soroche vein will be available to be mined upwards for approximately 80 m on average.

The southern extension has currently advanced 100 m and needs to extend a further 100 m to reach the Matalanga vein, which is expected to take between 4 to 6 weeks. Once the Matalanga vein has been reached, concurrent with the development of the Matalanga vein to prepare it for mining, the southern extension will continue to advance for another 70 m which is the estimated length of the Matalanga vein. From here it is expected that the Matalanga vein will be available to be mined upwards for approximately 60 m on average.

To expedite this decline development and to facilitate the mining of multiple faces on multiple veins in the future at a deeper level of the mine the Company has made significant investments of its mining and financial resources to advance these declines in 2015 to date, including:

  • the purchase of a new Atlas Copco two Boom Jumbo ("Jumbo") for approximately $1 million. The Company now owns three of these machines which are operational as well as an additional Jumbo which is in the process of being fully refurbished in the workshop. Having three Jumbos currently operational means that at any given time a Jumbo is operating on each extension of the main decline whilst the other is being serviced in the Company workshop;

  • a significant upgrade of the mine ventilation system including the purchase and installation of a 500 horsepower exhaust fan;

  • additional investment to the mine pumping systems;

  • the purchase of two new motors to refurbish two of the Company's underground loaders;

  • the installation of another underground transformer deep in the mine as well as upgrades to electrical cables; and

  • the recent employment of two underground mine decline specialists from the United States and an experienced underground mine super intendant from Chile.

With this new infrastructure in place the Company is now advancing the two extensions of the main decline at approximately 8 m per day in aggregate.

The reallocation of the Company's focus and resources from the mining of resource grade material to development has resulted in a decrease in the grade of the material mined and hence a decrease in gold production in the first quarter of 2015 as compared to the three months ended December 31, 2014 and the three months ended September 30, 2014.

Zaruma Plant Operations Update

The Zaruma Processing Plant operated efficiently during the year ending December 31, 2014, recovering an average of 93.7% of gold contained in the material processed. Recent and ongoing investments in the Plant include:

  • the purchase of an additional crushing circuit to be used after the material goes through the current crushing circuit. The purpose of this investment is not to increase crushing capacity but to have finer material delivered to the ball mills so as to decrease future wear on the ball mills;

  • the construction of a dam for a new tailings pond which is scheduled for completion in July of this year; and

  • the expansion of the current tailings facility, which required the plant to be shut down for an additional week beyond the normal operating schedule, during which mined material was stockpiled. This tailings facility is now expected to have sufficient capacity to be operated until the new tailings facility is operational.

Liquidity

As at December 31, 2014 the Company had cash resources of $3.5 million and a working capital surplus (current assets less current liabilities) of $1.3 million compared to cash resources of $4.9 million and a working capital surplus of $0.2 million as at December 31, 2013.

Subsequent to December 31, 2014, as a result of the previously discussed recent decrease in grade being mined and the temporary disruption to gold processing operations while the tailings facility was being expanded, coupled with upcoming concession fee and taxation payments coming due to the Ecuadorean Government, the Company deemed it prudent to enter into a short term loan with Valorium International Inc. ("Valorium") so that it can meet these obligations without reallocating funds which could potentially cause delays in the main decline development.

Valorium, a company managed by the Company's Chief Executive Officer and President, has agreed to lend the Company up to $1 million (the "Loan"). The Loan will be used for working capital and general corporate purposes while the Company focuses expenditures on mine development. The Loan is payable upon demand, is non-interest bearing and is not convertible, exchangeable or repayable into equity or voting securities of the Company. The Loan is secured by the Company's equipment, inventory, accounts receivable and other intangibles. The Loan has been approved by the Company's Board of Directors who have determined that the Loan is on reasonable commercial terms that are not less advantageous to the Company than if the Loan were obtained from a person dealing at arm's length with the Company.

Ecuadorean Ministry of Mines

The government of Ecuador recently formed a Ministry of Mines and appointed Mr. Javier Cordova as the Minister of Mines which we believe to be a positive development which will not only raise the profile of the Ecuadorian mining industry domestically and internationally but also help facilitate the growth of the industry which has the potential to be an important contributor to the future national economy of Ecuador.

About Dynasty Metals & Mining

Dynasty Metals & Mining Inc. is a Canadian based mining company involved in the exploration and development of mineral properties in Ecuador. The Company is currently focused on developing its Zaruma Gold Project, at which the Company is engaged in intermittent production. The Company also has the following non-producing assets: the Jerusalem Project and Dynasty Goldfield Project.

Brian Speechly, a Fellow of AusIMM (Australian Institute of Mining and Metallurgy), a director of the Company and a ¡§qualified person¡¨ within the definition of that term in the National Instrument 43-101, has supervised the preparation of and has verified the technical information contained in this news release.

For further information please visit the Company's website at www.dynastymining.com, or please contact:

Dynasty Metals & Mining Inc.
Nick Furber
Toll Free: 1 888-735-3881 (North America only)
Tel: (604) 687-7810
Email: [email protected]
Brisco Capital Partners Corp.
Scott Koyich
Tel: (403) 262-9888
Email: [email protected]

Forward-Looking Information

This news release contains statements which are, or may be deemed to be, "forward-looking information" which are prospective in nature. Often, but not always, forward-looking information can be identified by the use of forward-looking words such as "plans", "expects" or "does not expect", "is expected", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. Such information in this news release includes, without limitation, statements regarding Dynasty's future plans and expectations relating to the Zaruma mine development and mineral extraction. Forward-looking information is not based on historical facts, but rather on then current expectations, beliefs, assumptions, estimates and forecasts about the business and the industry and markets in which the Company operates, including assumptions relating to the Company's ability to continue progress through its declines with minimal or no interruption, that the Company will be able to continue its progress in respect of its mines as planned, that the Company will continue to sell processed gold and silver at levels that allow it to fund the continued development of its mining projects and sustain its operations, that the Company will have access to capital if required, that all necessary approvals and arrangements will be obtained, renewed and/or finalized in a satisfactory manner in order to continue developing the Company's projects, and that the Company's equipment will operate at expected levels. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause Dynasty's actual results, revenues, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Important risks that could cause Dynasty's actual results, revenues, performance or achievements to differ materially from Dynasty's expectations include, among other things: (i) risks related to prior mining activity at its mines and declines, (ii) uncertainties relating to mineral resource estimates (iii) risks related to availability of capital on satisfactory terms, (iv) risks related to being an early stage producer; (v) risks related to Dynasty's lack of history in producing metals from Dynasty's mineral exploration properties and its ability to successfully establish mining operations or profitably produce precious metals; (vi) that Dynasty will be unable to successfully negotiate agreements with the holders of surface rights on areas covered by Dynasty's project concessions; (vii) changes in the market prices of gold, silver, and other minerals, which, in the past, have fluctuated widely and which could affect the profitability of Dynasty's operations and financial condition; (viii) risks related to governmental regulations, including taxation statutes; (ix) risks related to Dynasty's primary properties being located in Ecuador, including political, economic, and regulatory instability; (x) uncertainty in Dynasty's ability to obtain and maintain certain permits necessary to the Company's current and anticipated operations; and other risks found in Dynasty's Annual Information Form for the year ended December 31, 2014, which is available on SEDAR at www.sedar.com. Other than in accordance with its legal or regulatory obligations, Dynasty is not under any obligation and Dynasty expressly disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Chile | Ecuador | All
Gold and Silver Prices for these countries : Chile | Ecuador | All

Dynasty Metals and Mining Inc

PRODUCER
CODE : DMM.TO
ISIN : CA26813S1002
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Dynasty Metals is a gold and silver development stage company based in Canada.

Dynasty Metals develops gold, silver, copper and zinc in Ecuador, and holds various exploration projects in Ecuador.

Its main asset in production is ZARUMA in Ecuador, its main assets in development are JERUSALEM and JERUSALEM in Ecuador and its main exploration property is DYNASTY in Ecuador.

Dynasty Metals is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 28.1 millions as of today (US$ 20.7 millions, € 19.0 millions).

Its stock quote reached its highest recent level on August 17, 2007 at CA$ 9.50, and its lowest recent point on April 22, 2016 at CA$ 0.10.

Dynasty Metals has 87 810 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Dynasty Metals and Mining Inc
6/9/2006Follow up N° 6
Annual reports of Dynasty Metals and Mining Inc
Annual Report 2007
Financings of Dynasty Metals and Mining Inc
10/21/2009$6,000,000 bought deal financing
Nominations of Dynasty Metals and Mining Inc
1/9/2013Announces Director Resignation
5/17/2011Appoints New Director
3/12/2008APPOINTS NEW DIRECTOR
7/31/2007Ecuador Appoints New Undersecretary Of Mines
7/25/2007 ECUADOR APPOINTS NEW MINISTER OF MINES & PETROLEUM
6/28/2007Management Appointments
Financials of Dynasty Metals and Mining Inc
8/15/2013Reports Financial Results for the Three and Six Months Ended...
5/16/2013Reports Financial Results for the Three Months Ended March 3...
3/29/2013Reports Financial Results for the Year Ended December 31, 20...
8/15/2012Reports Financial Results for the Three and Six Months Ended...
4/2/2012Releases 2011 Financial Statements
Project news of Dynasty Metals and Mining Inc
7/23/2012(Zaruma)Announces Armed Robbery at Zaruma Gold Project
1/21/2011(Zaruma)Commences Formal Contract Negotiations
2/2/2010(Zaruma)President's Update on Zaruma
9/28/2009(Zaruma)Dynasty Pours First Gold
8/20/2009(Zaruma)Provides update on ecuador gold projects
4/17/2007RECEIVES FINAL PERMITTING TO CONSTRUCT AND OPERATE ZARUMA GO...
Corporate news of Dynasty Metals and Mining Inc
7/29/2016Dynasty Receives Forbearance Period on Vertex One Asset Mana...
7/9/2016Dynasty Provides Corporate Update
7/6/2016Dynasty Announces Annual General Meeting Voting Results
6/15/2016Dynasty Provides Corporate Update
5/31/2016Dynasty Mining Engages a Financial Advisor to the Special Co...
5/17/2016Dynasty Reports Financial Results for the Quarter Ended Marc...
4/27/2016Dynasty Metals & Mining Announces Dynasty Goldfield Project ...
4/20/2016Dynasty Reports 2,785 Ounces of Gold Sold and 2,221 Ounces o...
4/11/2016Dynasty Announces Temporary Work Delay at the Zaruma Gold Pr...
4/5/2016Dynasty Provides Corporate Update
1/23/2016Dynasty Reports 5,634 Ounces of Gold Sold and 4,133 Ounces o...
11/2/2015DYNASTY ANNOUNCES AMENDMENTS TO THE TERMS OF DEBT FINANCING
10/14/2015DYNASTY REPORTS 6,285 OUNCES OF GOLD PRODUCED IN Q3 2015 & P...
9/15/2015DYNASTY SETTLES US$1.44 MILLION OF SHORT TERM DEBT BY WAY OF...
9/14/2015Dynasty Settles US$1.44 Million of Short Term Debt By Way of...
8/14/2015DYNASTY REPORTS FINANCIAL RESULTS FOR THE SIX AND THREE MONT...
6/22/2015DYNASTY CLOSES US$4 MILLION DEBT FINANCING & PROVIDES OPERAT...
4/13/2015DYNASTY METALS AND MINING ANNOUNCES THE APPOINTMENT OF NAOMI...
4/8/2015Dynasty Metals and Mining Announces the Appointment of Naomi...
4/8/2015Announces the Appointment of Naomi Nemeth to the Role of Vic...
4/1/2015DYNASTY REPORTS FINANCIAL RESULTS FOR THE YEAR ENDED DECEMBE...
1/24/2015DYNASTY ANNOUNCES GOLD PRODUCTION OF 25,868 OUNCES AND GOLD ...
1/18/2015Dynasty Announces Gold Production of 25,868 Ounces and Gold ...
11/14/2014DYNASTY REPORTS FINANCIAL RESULTS FOR THE THREE AND NINE MON...
11/14/2014Dynasty Reports Financial Results for the Three and Nine Mon...
11/6/2014DYNASTY ANNOUNCES UPDATED DYNASTY GOLDFIELD PROJECT AND JERU...
11/6/2014Dynasty Announces Updated Dynasty Goldfield Project and Jeru...
9/18/2014Dynasty Announces Updated Zaruma Gold Project Resource Estim...
8/15/2014Dynasty Reports Financial Results for the Three and Six Mont...
6/30/2014Dynasty Provides Update on Preparation of Revised Technical ...
6/25/2014Dynasty Announces Annual General Meeting Voting Results
6/2/2014Dynasty Provides Update on Preparation of Revised Technical ...
5/16/2014Dynasty Reports Financial Results for the Three Months Ended...
5/2/2014DYNASTY PROVIDES UPDATE ON PREPARATION OF REVISED TECHNICAL ...
4/30/2014Dynasty Provides Update on Preparation of Revised Technical ...
4/21/2014Dynasty Reports Mine Incident
4/1/2014Dynasty Reports Financial Results for the Year Ended Decembe...
6/20/2013Announces Annual General and Special Meeting Voting Results
10/16/2012(Zaruma)Qualifies Key Zaruma Concessions for Small Scale Mining Lice...
9/6/2012Insurance Claim Settled
10/7/2011(Dynasty)Director Retires From Dynasty's Board
11/30/2009Comments on Ecuadorian Mining Regulations
11/3/2009Completes $6,000,000 equity financing
7/7/2009Welcomes Ecuador Vice Minister of Mines to Its Zaruma Gold P...
7/1/2009Dynasty and IAMGOLD Extend Option Period
3/3/2009CEO Interviewed on BNN
12/17/2008 plans to commission gold plant by the end of March
4/28/2008WELCOMES ECUADOR PRESIDENT TO ITS ZARUMA PROJECT
4/25/2008COMMENTS ON RECENT DEVELOPMENTS IN ECUADOR
4/23/2008 SEEKS CLARIFICATION ON NEW MINING MANDATE
4/15/2008ENTERS INTO REVISED AGREEMENT
3/10/2008Completes $18,750,000 Equity Financing
2/20/2008SPROTT ASSET MANAGEMENT TO INCREASE ITS DYNASTY STAKE TO 22....
1/29/2008PRESIDENT'S UPDATE
1/25/2008CONCESSIONS IN GOOD STANDING
12/18/2007Exercises Option to Buy Back Royalty at Its Near Production ...
12/12/2007MOURNS PASSING OF DIRECTOR PAUL MACNEILL
11/20/2007Increases Gold and Silver Resource Estimate
10/25/2007 RECEIVES CONDITIONAL APPROVAL OF COPPER DUKE SPIN-OFF
8/1/2007To Trade On The Toronto Stock Exchange
7/18/2007New Optimized Zaruma Plant Design
7/16/2007Receives Conditional Approval to Trade on Toronto Stock Exch...
6/12/2007 Provides Zaruma Gold Project Update
2/24/2007Engages Brisco Capital Partners
10/1/2005Follow up N° 4
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (DMM.TO)OTC BB (DMMIF)
0.320-3.03%0.267+4.21%
TORONTO
CA$ 0.320
04/26 13:46 -0.010
-3.03%
Prev close Open
0.330 0.320
Low High
0.320 0.320
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.320 -%
Volume 1 month var.
8,150 -%
24hGold TrendPower© : 2
Produces Gold
Develops Gold
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/5/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :