Eldorado Gold Corporation

Published : June 15th, 2015

Eldorado Gold Announces Positive Feasibility Study on Tocantinzinho Gold Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Eldorado Gold Announces Positive Feasibility Study on Tocantinzinho Gold Project

(all figures in US dollars unless otherwise noted)

ELD No. 15-09TSX: ELD NYSE: EGO

VANCOUVER , June 15, 2015 /CNW/ - Eldorado Gold Corporation ("Eldorado" or the "Company"), is pleased to announce the completion of the Feasibility Study ("FS" or the "Study") with its wholly owned subsidiary Brazauro Recursos Minerais S/A (Brazauro) for the Tocantinzinho Gold Project ("Tocantinzinho" or the "Project").  The Study was led by an internal team with technical support provided by various Canadian and Brazilian consultants. The Tocantinzinho project is located in the State of Pará, Northern Brazil .

"The Study results reflect the continued refinement of engineering and cost estimation on the Tocantinzinho Project. The Company has successfully operated in Brazil since 1996 and the significant experience of our technical team in Brazil contributes to the integrity of the results. We will continue to further refine the development plan and complete the outstanding permitting in advance of a construction decision," stated Paul N. Wright , Chief Executive Officer of Eldorado Gold.

Highlights

  • 1.7 million oz of gold produced over the life of the project
  • Using conventional open pit mining methods, mining a total of 41.1 million tonnes (Mt) of ore with a strip ratio of 3.5:1 over the mine life.
  • Recoveries of 90.1% for primary ore and 75.0% for saprolite ore, utilizing a simple comminution, flotation and leaching process.
  • Initial capital cost estimated at $466 million and sustaining capital, including closure costs, estimated at $64 million .
  • Cash operating costs of $572 /oz.
  • Generation of a positive NPV of $245 million at a 5% discount rate and an IRR of 13.5%.

Major Assumptions

  • Gold price of $1,250 /oz
  • Effective Tax Rate of 15.25%
  • Royalty Rate of 2.5%
  • Transport & refining cost of $15.00 /oz Au
  • Discount rate of 5%
  • Exchange rate of US$1 = 2.7 BRL

Mineral Resources and Reserves

The mineral resources and reserves of the Tocantinzinho deposit were classified using logic consistent with the CIM definitions referred to in National Instrument 43-101.

The mineral resource block model, which serves as the basis of the Mineral Resources and Mineral Reserves in the Study, were developed utilizing 3D lithology models.  Table 1 summarizes the Mineral Resources for the Tocantinzinho project as of December 31 , 2014.  The mineral resource is reported at a 0.3 g/t Au cut-off grade.

Table 1 – Tocantinzinho Mineral Resources

Mineral Resource Category

Tonnes
(x 1000)

Grade
(Au g/t)

In Situ Gold
(oz x 1000)

Measured

17,530

1.51

851

Indicated

31,202

1.26

1,264

Measured+Indicated

48,732

1.35

2,115

Inferred

2,395

0.90

69

The pit optimization was produced using Minesight software which utilizes the industry standard Lerchs Grossman algorithm for analysis. Updated cost and recovery inputs in conjunction with new geotechnical parameters and ramp design from the prefeasibility study were incorporated in the final pit design process.

The base case $1,250 gold shell was selected for the ultimate pit design. The final pit contains approximately 41.1 Mt of ore consisting of 1.9 Mt of saprolite ore and 39.2 Mt of primary ore, with 145.0 Mt of waste resulting in an overall strip ratio of 3.5:1.

Table 2 summarizes the Project Mineral Reserves effective as of June 15 , 2015.  Reserves were calculated using a $1,250 per oz gold price and the corresponding cut-off grade of 0.41 g/t for primary ore and 0.43 g/t for saprolite ore.

Table 2 – Tocantinzinho Mineral Reserves

Mineral Reserve Category

Tonnes
(x 1000)

Grade
(Au g/t)

In Situ Gold
(oz x 1000)

Proven

17,173

1.53

847

Probable

23,918

1.35

1,040

Total Proven+Probable

41,091

1.43

1,887

Mining

The deposit is projected to be mined utilizing owner-operated conventional open pit mining methods. Mining will be completed using 5 meter benches in the saprolite zone and 10 meter benches in the primary zone.  Updated pit wall angle designs and Brazilian mining regulations were incorporated into the mine plan.

The mine is estimated to produce sufficient ore to maintain a steady state of feed to the process of 4 million tonnes per annum (tpa) for 10 years, stockpiling a small amount of saprolite ore to be processed in year 11. 

Mineral Processing

The process design for the Tocantinzinho Project is based on extensive metallurgical testwork. Results from the work have established that high gold recoveries can be achieved with a conventional process of comminution, gravity concentrate, flotation and flotation concentrate leaching.

Tocantinzinho ore is projected to be treated at a rate of 4.0 Mt per annum through a three stage crushing and ball mill comminution circuit.  Overall recoveries from the flotation and cyanide leach circuits are expected to be 90% and 75% for primary ore and saprolite ore, respectively.  Over the life of the mine an average of 165,000 oz Au per annum will be produced as doré.

Project Economics

Cost estimates were developed to a feasibility level of accuracy. Budget quotations for mobile and plant equipment were obtained from international suppliers.  Unit rates for material commodities (earthworks, concrete, and steel) in the Para State area were verified by Brazilian contractor and supplier quotations. Construction and labour costs applicable for the region were built up from first principles for salaries, burdens and overhead. Contingency was applied to each item based on the source and accuracy of the estimate data, resulting in an overall initial contingency of 13%. The Initial Capital Cost Summary is included in Table 3.

Table 3 – Initial Capital Cost Summary

Area

Description

Initial

($ x 1,000)

A

Overall Site

12,958

B

Mine

90,393

D

Process Plant

107,689

E

Tailings

19,062

H

Infrastructure

23,780

J

Ancillary Facilities

16,324

K

Off Site Infrastructure

36,438

Total Direct Costs

306,644

Indirect Costs

91,909

Owner's Costs

14,741

Contingency

53,064

Total Installed Cost

466,358

Operating costs were also developed from first principles, inclusive of labour, consumables, fleet maintenance and repair, and general and administration costs, and data from current operations in Amapa State. The estimated Operating Cost is summarized in Table 4.

Table 4 – Operating Cost Summary

Operating Costs

Units

LOM Average

Mining Cost (mined)

$/t mined

2.21

Mining Cost (ore)

$/t ore

9.24

Processing Cost

$/t ore

10.38

G&A

$/t ore

3.41

Direct Operating Cost

$/t ore

23.03

The Project economic analysis has been carried out for a range of gold prices with $1,250 per ounce selected as the base case.  The analysis demonstrates that the Project is expected to generate a positive NPV at a 5% discount rate of $245 million and a positive IRR of 13.5%.  Sensitivity of the Project to fluctuations in gold price are illustrated in Figure 1 below.  Figure 1 demonstrates that the project is expected to realize a significant increase in both the IRR and NPV with a modest increase in the price of gold.  At a $1,400 per ounce gold price, the Project NPV increases by 63% to $400 million and the IRR increases to 18%.

Click here to view Figure 1 - Sensitivity to Gold Price

Sensitivity of the NPV and IRR to changing capital or operating costs for the base case is illustrated in Table 5 and Table 6 below.  While the base case demonstrates a positive return at the Feasibility capital and operating costs, the tables demonstrate further opportunities for improving the economics of the Project by investigating Capital and Operating cost savings.   Tables 5 and 6 indicate a 10% decrease in initial capital will result in a 16% increase in NPV and a 15% increase in IRR, while a 10% decrease in Operating cost realizes a significant increase of 38% in NPV and 22% in IRR.  Eldorado is confident that the capital and operating costs can be further optimized, improving the value of the project. 

Table 5 – Sensitivity of NPV to Capital and Operating Costs








NPV 5%

CAPEX

373

420

466

513

560

OPEX


80%

90%

100%

110%

120%

18.43

80%

504.2

464.6

425.0

385.4

345.8

20.73

90%

418.1

378.5

338.8

299.1

259.4

23.03

100%

324.7

284.9

245.1

205.3

165.4

25.34

110%

223.7

183.7

143.8

103.7

63.5

27.64

120%

114.8

74.5

34.0

-7.5

-52.2

Table 6 – Sensitivity of IRR to Capital and Operating Costs








IRR

CAPEX

373

420

466

513

560

OPEX

80%

90%

100%

110%

120%

18.43

80%

25.1%

22.0%

19.4%

17.2%

15.3%

20.73

90%

21.8%

19.0%

16.6%

14.6%

12.8%

23.03

100%

18.1%

15.6%

13.5%

11.6%

10.0%

25.34

110%

14.1%

11.9%

10.0%

8.4%

6.9%

27.64

120%

9.7%

7.8%

6.2%

4.8%

3.4%

Permitting

The permitting process for the Tocantinzinho Project continues to advance with positive support of the local communities and government authorities of Itaituba Municipality and State of Para. The Environmental Impact Assessment (EIA) was approved in September 2012 , with the granting of the Preliminary Environmental License, which includes the mining, ore processing and support infrastructure.

The next step in the permitting process is to obtain the Installation License and the approval of the Economic Exploitation Plan.  The preparation of documents for these permits will be completed during the engineering phase of the Project.  Granting of the Installation License allows construction on site to commence.  The approval of the Installation License and the Economic Exploitation Plan documents is a condition to receiving the Exploitation Concession and the Operation License which will allow operation to commence.

Summary

Eldorado is pleased to have demonstrated a positive economic performance for the Tocantinzinho Project.  The remote location of the project presents challenges to the costs; however, a conventional approach to mining and processing provides a solid platform on which to develop this well-defined gold deposit.  Opportunities to improve the economics and value of the project have been identified during the course of the study.  These areas will continue to be investigated as development of the project continues. 

About Eldorado Gold

Eldorado is a leading low cost gold producer with mining, development and exploration operations in Turkey , China , Greece , Romania and Brazil.  The Company's success to date is based on a low cost strategy, a highly skilled and dedicated workforce, safe and responsible operations, and long-term partnerships with the communities where it operates.  Eldorado's common shares trade on the Toronto Stock Exchange (ELD.TO) and the New York Stock Exchange (EGO).

Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements or information herein include, but are not limited to the Positive Feasibility Study on Tocantinzinho.

Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information.  We have made certain assumptions about the forward-looking statements and information and even though our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statement or information will prove to be accurate.  Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information.  These risks, uncertainties and other factors include, among others, the following:  gold price volatility; discrepancies between actual and estimated production, mineral reserves and resources and metallurgical recoveries; mining operational and development risk; litigation risks; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; currency fluctuations; speculative nature of gold exploration; global economic climate; dilution; share price volatility; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the sections entitled "Forward-Looking Statements" and "Risk Factors" in the Company's Annual Information Form & Form 40-F dated March 27, 2015 .

There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein.  Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

Cautionary Note Regarding Mineral Reserves and Mineral Resources

The terms "Mineral Reserve", "Proven Mineral Reserve" and "Probable Mineral Reserve" used in this release are Canadian mining terms as defined in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council on August 20, 2000 as may be amended from time to time by the CIM.  These definitions differ from the definitions in the United States Securities & Exchange Commission ("SEC") Guide 7.  In the United States , a mineral reserve is defined as a part of a mineral deposit which could be economically and legally extracted or produced at the time the mineral reserve determination is made.

The terms "Mineral Resource", "Measured Mineral Resource", "Indicated Mineral Resource", "Inferred Mineral Resource" used in this release are Canadian mining terms as defined in accordance with National Instruction 43-101 – Standards of Disclosure for Mineral Projects under the guidelines set out in the CIM Standards. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability.

For a detailed discussion of resource and reserve estimates and related matters see the Company's reports, including the Annual Information Form and Form 40-F dated March 27, 2015 and technical reports filed under the Company's name at www.sedar.com and www.sec.gov respectively.

Cautionary Note to US Investors Concerning Estimates of Measured, Indicated and Inferred Resources

Note to U.S. Investors.  While the terms "mineral resource", "measured mineral resource," "indicated mineral resource", and "inferred mineral resource" are recognized and required by Canadian regulations, they are not defined terms under standards in the United States and normally are not permitted to be used in reports and registration statements filed with the SEC.  As such, information contained in this report concerning descriptions of mineralization and resources under Canadian standards may not be comparable to similar information made public by U.S companies in SEC filings.  With respect to "indicated mineral resource" and "inferred mineral resource" there is a great amount of uncertainty as to their existence and a great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of an "indicated mineral resource" or "inferred mineral resource" will ever be upgraded to a higher category.  Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves.

There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein.  Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

SOURCE Eldorado Gold Corporation

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Brazil | Canada | China | Greece | Romania | Turkey | All
Gold and Silver Prices for these countries : Brazil | Canada | China | Greece | Romania | Turkey | All

Eldorado Gold Corporation

PRODUCER
CODE : ELD.TO
ISIN : CA2849021035
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Eldorado Gold is a gold producing company based in Canada.

Eldorado Gold produces gold, iron in Brazil, in China, in Mexico and in Turkey, develops gold and silver in China and in Greece, and holds various exploration projects in Brazil and in China.

Its main assets in production are KISLADAG and EFEMÇUKURU in Turkey, LA TRINIDAD - ELDORADO in Mexico, JIANCHALING, JINFENG, TANJIANSHAN, WHITE MOUNTAIN and BEYINHAR in China and VILA NOVA in Brazil, its main assets in development are EASTERN DRAGON in China and PERAMA HILL in Greece and its main exploration properties are HEI-SHAN (SHANDONG) and ZHANGJIASHAN in China and TOCANTINZINHO in Brazil.

Eldorado Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 14.8 billions as of today (US$ 11.8 billions, € 10.3 billions).

Its stock quote reached its lowest recent point on August 03, 2001 at CA$ 0.21, and its highest recent level on April 17, 2024 at CA$ 20.60.

Eldorado Gold has 716 820 032 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Eldorado Gold Corporation
11/27/2018Eldorado Gold's Bolcana project has 6.5m ounces of gold
1/30/2012Announces Receipt of Interim Court Order and Mailing of Meet...
7/30/2008Eldorado Gold Corporation Announces Sale of Sao Bento Mine
Financings of Eldorado Gold Corporation
4/2/2012KENAI ANNOUNCES PRIVATE PLACEMENT WITH ELDORADO GOLD CORP. P...
1/10/20122011 Operating Results / 2012 Operating Guidance Dividend ...
10/13/2011Announces New Credit Facility; $280 Million Revolver
Option Grants of Eldorado Gold Corporation
7/27/2012Announces Dividend Payment of CDN $0.06 per share
1/20/2012Announces Dividend Payment of CDN $0.09 Per Share
7/28/2011Announces Dividend Payment of CDN $0.06 per Share
Nominations of Eldorado Gold Corporation
5/25/2011Directors and Senior Management Announcement
Financials of Eldorado Gold Corporation
7/30/2015Reports 2015 Second Quarter Financial and Operational Result...
2/19/2015Reports 2014 Year-End and Fourth Quarter Financial and Opera...
11/8/20132013 Third Quarter Financial and Operating Results
8/2/20132013 Second Quarter Financial and Operating Results
5/3/20132013 First Quarter Financial and Operating Results
2/22/2013Reports Year-End and Fourth Quarter Financial and Operationa...
10/26/20122012 Third Quarter Financial and Operating Results
7/27/20122012 Second Quarter Financial and Operating Results
5/3/20122012 First Quarter Financial and Operating Results; Profits ...
10/13/2011Operational Update. Record Quarterly Production - 179,195 oz...
10/13/2011Operational Update
5/8/2011Q1, 2011 Financial and Operating Results
3/17/2011 Gold Reserves Increase by 24% to 18.7 Million Ounces
2/18/2011Q4, 2010 Financial and Operating Results Earnings increased ...
5/7/2010Q1, 2010 Financial and Operating Results
3/19/20102009 Year End Financial Results Gold sales up 29 percent; Ca...
10/30/2009Q3, 2009 Financial And Operating Results 2009 Production Gui...
7/31/2009Q2, 2009 Financial and Operating Results - 2009 Production a...
2/19/2009Q4 2008 Financial and Operating Results Revenue increased 15...
8/1/2008Q2 2008 Financial and Operating Results
4/3/2008First Quarter 2008 Operating Results
3/27/20082007 Financial Results
10/10/2007Gold Announces 2007 Third Quarter Financial and Operating Re...
Project news of Eldorado Gold Corporation
10/2/2015Eldorado to call Greek gold mine workers back to work after ...
10/2/2015Canadian firm fights gold mine ban by leftist Greek governme...
9/25/2015Greek govt to meet Eldorado over gold mine closure on Monday
9/15/2015Greek court postpones ruling over Eldorado Gold mine closure
8/27/2015Eldorado scores legal win over disputed Greek goldmine proje...
8/19/2015Greece halts activity at Canadian-run gold mine
8/19/2015Greece halts activity at Canadian-run gold mine-minister
6/29/2015(Eastern Dragon)Receives Project Permit Approval for the Eastern Dragon Proj...
4/16/2015Greek gold miners protest against government decision to rev...
4/16/2015Greek miners protest against government decision threatening...
4/5/2015Supporters, opponents of Greek gold mine clash
4/3/2015Canadian miner and Greek minister clash over projects
1/31/2015New Greek govt. ‘absolutely against’ Eldorado Gold mine, sha...
1/20/2015Achieves Record Annual Production with All-In-Sustaining-Cos...
2/24/2014(Eastern Dragon)Partners with CDH Investments in Eastern Dragon Project
1/16/20142013 Gold Production Increases by 10 percent while Cash Cost...
10/30/2013Announces Friendly Transaction with Glory Resources Limited ...
9/9/2013Certej and Olympias Resources Update
4/2/2013(Vila Nova)Vila Nova Mine Update
2/18/2013Skouries Greece Project Update
9/28/2012(Tocantinzinho)Announces Approval of the Preliminary Environmental License...
6/27/2012Exploration Update
4/12/2012Growth Continues; Annual Gold Production to reach 1.7 M oz. ...
2/24/2012Correction - Eldorado Gold Corporation Completes Acquisition...
2/22/2012(Perama Hill)Receives Approval for Preliminary Environmental Impact Study...
1/5/2012(Kisladag)Kisladag Concentrate Treatment Plant Startup
8/19/2011(Kisladag)Announces Results of the Kisladag Expansion Study, Higher Pr...
6/30/2011(Efemçukuru)Announces Start-up of the Efemcukuru Gold Mine in Turkey
6/14/2011(Efemçukuru)Achieves Two Key Permitting Milestones in Turkey
5/8/2011(Tocantinzinho)Tocantinzinho Positive Technical Study
2/18/2011(White Mountain)(angl) Production for 2010
2/18/2011(Kisladag)(angl) Production for 2010
2/18/2011(Tanjianshan)(angl) Production for 2010
2/18/2011(Jinfeng)(angl) Production for 2010
7/21/2010(Tocantinzinho)Initial Resource Estimate & Plans to Move Forward at TZ Proj...
10/30/2009(Efemçukuru)Update - Mineral Reserves Increase by 23%
10/28/2009(Kisladag)Significant Mineral Resource Increase at Kisladag
8/5/2009(Vila Nova)Consolidates Ownership of Vila Nova Iron Ore Project
1/6/2009(Efemçukuru)Efemçukuru North Ore Shoot Drilling Continues to Grow Deposi...
8/29/2008(Efemçukuru)Efemçukuru Project Update
3/17/2008(Vila Nova)Vila Nova Iron Ore Project
3/6/2008(Kisladag)Kisladag Mine Re-opens
2/11/2008(Kisladag)Kisladag Mine Update
8/1/2007(Efemçukuru)Efemçukuru Positive Feasibility Study
7/31/2007(Vila Nova)Gold Announces Decision to Develop the Vila Nova Iron Ore De...
Corporate news of Eldorado Gold Corporation
9/15/2016Is Eldorado Gold Now the Perfect Speculative Gold Stock?
7/29/2016Eldorado Gold reports 2Q loss
7/28/2016Eldorado Reports Second Quarter 2016 Results
7/25/2016Gold Analysts Duel Over Yamana and Eldorado
7/21/2016Coverage Initiated on Canadian Gold Miners Barrick Gold, Kin...
2/2/2016Integra Gold Corp. Signs Share Purchase Agreement With Eldor...
2/1/2016Eldorado Gold: The Worst-Performing Gold Miner in January
1/26/2016Negative Free Cash Flow Isn’t That Bad for Some Gold Miners
1/25/2016UPDATE 1-Eldorado sees up to $1.6 bln charge from Greece wri...
1/25/2016Eldorado sees charge of as much as $1.6 bln from Greece writ...
1/25/2016Eldorado Announces Preliminary 2015 Operational Results and ...
1/21/2016How Do Intermediate Gold Miners Rank Based on Their Costs?
1/20/2016Eldorado Gold wins appeal over Greek mining ban
1/20/2016Greek court annuls government ban on Eldorado's mining licen...
1/12/2016What Is Going On With These 4 Plunging Stocks?
11/23/2015Is China Biologic Products Inc (CBPO) A Good Stock To Buy?
11/6/2015Weighing Liquidity against Leverage for Intermediate Gold Mi...
11/3/2015Greece says will respect court ruling due on Eldorado's mini...
11/3/2015Eldorado Gold Corporation - Greece Update
11/3/2015Greece says will respect court ruling due on Eldorado's mini...
11/2/2015Greek judges annul government ban on Eldorado's mining licen...
11/2/2015Greek court annuls govt decision to suspend Eldorado's minin...
10/30/2015Edited Transcript of ELD.TO earnings conference call or pres...
10/30/2015Why Growth in Gold Production Is Important for Gold Miners
10/30/2015Eldorado Gold reports 3Q loss
10/30/2015Eldorado Reports 2015 Third Quarter Financial and Operationa...
10/29/2015Weighing Liquidity against Leverage for Intermediate Gold Mi...
10/23/2015Eldorado Gold Corporation - Q3 2015 Financial and Operationa...
10/19/2015Is there more gold in Eldorado?
10/5/2015Eldorado Gold Provides Greece Update
10/2/2015Eldorado Gold Announces Q3 2015 Financial and Operational Re...
10/2/2015Greek court rules Eldorado Gold can resume mining in norther...
9/22/2015Eldorado Gold says "quietly optimistic" about new Greek govt...
9/1/2015Greece Halts Eldorado Gold’s Mining Activity
8/31/2015Integra Gold Closes $14.6 Million Private Placement With Eld...
8/20/2015Eldorado Gold to suspend operations in northern Greece
8/20/2015Eldorado Gold Provides Greece Update
8/18/2015Integra Gold Announces $14.6 Million Investment by Eldorado ...
8/13/2015Eldorado Gold Provides Greece Update
7/31/2015Edited Transcript of ELD.TO earnings conference call or pres...
7/30/2015Eldorado Reports 2015 Second Quarter Financial and Operation...
7/30/2015Q2 2015 Financial and Operational Results Release Date and C...
7/29/2015Is a Surprise Coming for Eldorado Gold (EGO) This Earnings S...
7/27/2015Strike Gold With These 3 Gold Miners - Earnings ESP
7/9/2015Q2 2015 Financial and Operational Results Release Date and C...
4/24/2015Lower Profits, Output on Tap for Barrick, Goldcorp -- Earnin...
4/15/2015Q1 2015 Financial and Operational Results Release Date and C...
3/31/2015PRESS DIGEST- Canada - March 31
3/3/2015Eldorado Gold - Greece Update
3/2/2015Canada Stocks to Watch: BlackBerry, Eldorado, Transition The...
3/2/2015Eldorado Gold says Greece has revoked key Skouries approval
3/2/2015Eldorado Gold - Greece Update
2/20/2015Canada Stocks to Watch: Bombardier, Enbridge, Fairfax, Eldor...
1/21/2015Canada Stocks to Watch: Husky, Eldorado, Celestica, Richmont...
2/21/2014Reports 2013 YE and Q4 Financial and Operational Results
10/9/2013Announces Third Quarter 2013 Financial and Operating Results...
7/2/2013Announces Second Quarter 2013 Financial and Operating Result...
4/17/2013Announces Renewal of Normal Course Issuer Bid
4/9/2013Announces First Quarter 2013 Financial and Operating Results...
3/15/2013Announces Increase to Its Normal Course Issuer Bid
1/24/2013Announces Year End 2012 Financial Results Release Date and C...
1/9/20132012 Operating Results and 2013 Operating Guidance
12/10/2012Announces Pricing of $600 Million Senior Notes Offering
11/12/2012Announces Launch of US$500 Million Senior Notes Offering
10/25/2012New Drilling Results and Mineral Resource Update for Certej ...
9/25/2012Exploration Update
9/14/2012Confirms Certej Permit Granted in Full Compliance With Roman...
7/24/2012Council of State Revokes Suspension Order in Greece
7/4/2012Court Decision Provisionally Suspends Tree Cutting in Halkid...
6/22/2012Announces Senior Management Promotions
6/21/2012Announces 2012 Second Quarter Financial and Operating Result...
5/30/2012to De-List From Australian Securities Exchange
4/5/2012Announces Normal Course Issuer Bid
3/22/2012Greece Activity Update
2/23/2012and European Goldfields Limited Announce Court Approval for ...
2/21/2012European Goldfields Limited and Eldorado Gold Corporation An...
2/7/2012and European Goldfields Limited Announce Recommendation By L...
12/19/2011to Acquire European Goldfields and Create the Leading Growth...
10/7/2011Announces Exploration Programs Update
9/29/2011Announces 2011 Third Quarter Financial and Operating Release...
6/20/2011Announces 2011 Second Quarter Financial Results Release Date...
4/8/2011Acquires Units of Serabi Mining plc
3/29/2011Announces Normal Course Issuer Bid
1/31/2011Dividend Payment of CDN $0.05 per share
6/17/2010Exploration Programs Update
5/12/2010Friendly Transaction With Brazauro Resources Corporation By ...
1/28/2010Mineral Resources and Reserves
9/14/2009And Sino Gold Satisfaction Of Due Diligence Conditions
8/13/2009New Gold Zone Identified at Tanjianshan
7/28/2009Closes Acquisition Of Stake In Sino Gold
7/21/2009Files Final Short Form Prospectus to Qualify Shares Issued i...
7/16/2009Disposes Of Non-Core Asset
7/15/2009Amends Agreement to Acquire Gold Field's Stake in Sino Gold
6/6/2009Acquires Gold Field's Stake in Sino Gold
2/24/2009Announces Public Offering of Common Shares
1/30/2009Efem=E7ukuru Receives Positive High Court Decision
1/22/20092008 Year End Update and 2009 Guidance Record Performance in...
10/1/2008Exploration Update
9/9/2008announces successful repatriation of funds from China
9/3/2008Perama Update
8/5/2008Acquires Shares of Brazauro
7/30/2008Acquires Units Of Brazauro
7/17/2008Increases Stake In Frontier To Over 95%
7/9/2008Brazauro And Eldorado To Partner On The Tocantinzinho Projec...
7/3/2008Bid for Frontier Successful
6/20/2008Issues Notice Of Variation And Extension - Offer Extended To...
6/18/2008And Frontier Reach Agreement On Acquisition - Eldorado'S Off...
6/16/2008Confirms Best And Final Offer For Frontier Will Expire On Ju...
6/4/2008Offer To Frontier Shareholders Continues To Be Full And Fair
6/2/2008Commences Efem=E7ukuru Construction
5/9/2008Mails Offer To Frontier Pacific Shareholders
4/23/2008 Announces Offer For Frontier Pacific Mining Corporation
2/22/20082007 Mineral Reserves and Mineral Resources
11/1/2007Q3 2007 Financial and Operational Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ELD.TO)NYSE (EGO)
20.60-1.06%14.96-0.66%
TORONTO
CA$ 20.60
04/17 17:00 -0.220
-1.06%
Prev close Open
20.82 20.88
Low High
20.49 21.27
Year l/h YTD var.
13.78 -  21.33 22.55%
52 week l/h 52 week var.
11.50 -  21.33 36.24%
Volume 1 month var.
377,508 16.52%
24hGold TrendPower© : 5
Produces Gold - Iron
Develops Gold - Silver
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/11/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202451.03%
202320.81%16.4011.19
2022-6.54%9.8210.01
2021-28.39%9.9910.02
202069.38%9.9910.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :