MINOTAUR EXPLORATION LIMITED ACN 108 483 601 ASX: MEP

MINOTAUR

EXPLORATION

Release

21 April 2015

www.minotaurexploration.com.au

ELOISE COPPER JV REPORT


HIGHLIGHTS

• Joint venture partner GFR undertakes to resume payments and continue with exploration expenditure contributions
• Joint Venture will resume field work upon receipt of final payment from GFR pursuant to agreed payment plan
• Results for six Diamond drill holes testing Artemis copper-gold-zinc mineralisation reported herein
• Analysis of Artemis drill data indicates host structure continues at depth
• Down-hole EM survey detects drill-ready off-hole conductor below drill hole EL15D05
• Drill targets identified below adjacent Sandy Creek deposit
• Ground reconnaissance of remaining regional VTEM
conductors completed with 5 targets identified for

Joint Venture Arrangements

The JV work plan was temporarily suspended in March1 due to financing limitations affecting joint venture partner GFR's ability to fund its obligations under the JV. Minotaur issued GFR with a Notice of Default requiring remedy by 20 April 2015. GFR represents that it has put arrangements in place that resolve its difficulties and
has undertaken to recommence payments according to joint venture terms and conditions. Minotaur, as Manager, has provided GFR with an extension of time in which to complete its payments under an agreed specific payment plan. That plan comprises several payments totaling $3.3 million through May - mid
June 2015, upon the satisfaction of which Minotaur will re-commence field exploration activity, and not prior thereto. As consideration for stay of termination of the JV by Minotaur, GFR agreed that its beneficial interest
in the tenements is reduced to 0%. GFR's interest will become 25% upon receipt by Minotaur of payments aggregating $2.3 million (excluding accrued interest). Should GFR default on the payment plan prior to gaining
25% interest and should Minotaur elect to terminate the JV GFR's interest will be maintained at 0%. Otherwise, and on completion of the payment plan GFR's interest will increase to 50%.

1 Eloise Copper JV, MEP report to ASX dated 5 March 2015

LEVEL 1, 8 BEULAH ROAD, NORWOOD, SOUTH AUSTRALIA 5067 T +61 8 8132 3400 F +61 8 8132 3499 E [email protected] www.minotaurexploration.com.au

ASX RELEASE 21 APRIL 2015

Artemis Drilling

Drilling resumed at the Artemis copper-gold-zinc-silver prospect, located 20km west of the Eloise copper-gold mine (Figure 1) on 1 February. Six Diamond drill holes (EL15D01 to EL15D06) were completed (Figure 2, Table
1) up to 9 March when drilling activities were suspended due to delays in receipt of funds from joint venture partner GFR.
Holes EL15D01 to EL15D04 targeted dip extensions
to mineralisation. Drill spacing for holes EL15D02 and EL15D03, was not optimal due to trajectory issues encountered during drilling. Holes EL15D05 and EL15D06 were planned as step-out holes to drill along strike north and south respectively below the Artemis lode, targeting similar lenses of massive sulphide mineralisation.
Downhole EM surveys were conducted in drill holes EL15D05 and EL15D06 to assist with targeting future drill holes.
Assay results for all six Diamond drill holes are presented in Table 2.

Figure 1: Location of the Artemis Prospect within the Eloise Copper Joint Venture and in relation to other Minotaur Cu-Au prospective tenements in the Cloncurry region.

Drill Results and Analysis

Drill hole EL15D01 intersected two zones of mineralisation. The first zone lies in the hangingwall approximately 40m up-hole of the Artemis massive sulphide mineralisation. This zone has two intercepts comprising 5.35m @ 0.6% Cu, 0.19g/t Au, 2.8% Zn, 1.1% Pb and 36g/t Ag from 246.65m, and 2.32m @ 1.1% Cu,
0.49g/t Au, 2.9% Zn, 1.7% Pb and 61g/t Ag from 254m and is in a similar position above the massive sulphide lode as that intersected in hole EL14D35 drilled in late
2014.
The second zone of mineralisation in EL15D01 is pyrrhotite-rich massive sulphide mineralisation representing the main contact and comprises 2.6m @
0.74% Cu, 0.2g/t Au and 6.5% Zn from 286.2m. The lower grade and narrower width of mineralisation suggests
this massive sulphide lode pinches out down dip, a view supported by drill holes EL15D02, EL15D03 and EL15D04 that all failed to intersect mineralisation of any significance at the targeted lode position below EL15D01 (Figure 3).
Drill hole EL15D02 intersected mineralisation in a similar hangingwall position down-dip from hole EL15D01, of
3m @ 0.1% Cu and 0.46g/t Au from 251m and 5m @ 0.2% Cu and 0.52g/t Au from 259m.
Drill hole EL15D05 intersected the contact zone at the anticipated position around -140m elevation and approximately 150m north of EL14D34 which is not mineralised. A downhole EM survey was conducted to search for possible mineralisation at the contact away from EL15D05 and a moderate-strength EM response was detected off-hole. Modelling of the data indicates
an untested conductive source that may be up to 100m x

100m in dimension below and south of EL15D05 (Figure 3).

PAGE 2

ASX RELEASE 21 APRIL 2015


Drill hole EL15D06 intersected the contact zone
100m vertically above its intended position at approximately 0m elevation (Figure 3). A narrow zone of massive pyrrhotite mineralisation occurs at the contact that returned 2.55m @ 0.69% Cu and 0.07g/t Au. The contact is east of its expected position and appears likely to have been offset
by a later fault, however the implications of possible fault displacement to mineralisation is not yet known. A downhole EM survey detected a strong off-hole response north and above the hole that is consistent with the position of the massive sulphide lode.
Significant assay results are presented in Tables 2 and 3 with QAQC discussed in the Appendix.

Assessment of the Artemis Deposit

Evaluation of the data shows the massive sulphide body at Artemis is fault controlled where mineralisation has focused in a dilation zone, or jog, within a fault developed adjacent to a major lithological boundary.
Data indicates the massive sulphide lode pinches out up and down dip and potentially along strike however alteration, typical of that associated with the sulphide, continues at depth on or immediately adjacent the lithological boundary suggesting the system is prospective along this contact at depth. Drill hole EL14D34 (Figure 3), supports this interpretation and indeed contains a 1.1m wide zone of semi- massive sulphide in a 4m wide zone of mafic alteration at this lithological contact that could be indicative of further mineralisation developed at depth associated, potentially, in another
fault jog. Minotaur plans to test this concept with additional drilling (see future work section below).

Hole ID

Easting (m)

Northing (m)

Dip

Azimuth (T)

Depth (m)

EL15D01

479214

7680007

-67

290

318.2

EL15D02

479225

7680030

-73

290

385

EL15D03

479230

7680057

-70

290

382

EL15D04

479230

7680057

-67

290

349

EL15D05

479264

7680180

-70

290

429.5

EL15D06

479171

7679893

-70

290

297.6

Table 1: Collar details for recent Minotaur drill holes at the Artemis Prospect. All coordinates refer to GDA94 datum, Zone 54. All holes are located by handheld GPS.

HOLE

FROM

TO

INTERVAL

m

Cu

%

Au g/t

Zn

%

Ag g/t

Pb

%

ZONE

EL15D01

246.65

252.00

5.35

0.60

0.19

2.84

36

1.12

HW

and

254.00

256.32

2.32

1.08

0.49

2.92

61

1.68

HW

and

286.20

288.80

2.60

0.74

0.20

6.46

1

Main

EL15D02

251.00

254.00

3.00

0.13

0.46

0.11

1

HW

and

259.00

264.00

5.00

0.25

0.55

0.19

2

0.01

HW

EL15D06

232.00

234.55

2.55

0.69

0.07

0.02

Main

Table 2: Key mineralised intervals for holes EL15D01, EL15D02 and

EL15D06. Depths tabulated are downhole depths. HW = Hangingwall.


Figure 2: Plan of the Artemis Prospect with Minotaur and historic drill holes shown. Recent Minotaur drill hole traces are shown in red.

PAGE 3

ASX RELEASE 21 APRIL 2015

Figure 3: Long section of "Main Zone" at Artemis (looking WNW along 290 true bearing) showing intersection points of Minotaur drill holes and historic drill holes.

Future work on the Eloise Copper Joint

Venture

Field work will resume once GFR's compliance with the agreed payment plan is complete (by mid June at the latest). The main contact zone at Artemis, which hosts massive sulphide mineralisation, will continue to be the focus of further drill testing.
A number of holes are planned to test down
dip and along strike of existing drilling aimed at defining extensions to known mineralisation and to test for massive sulphide along the prospective lithological boundary hosting Artemis (Figure 3). Drilling will be aided by down-hole EM surveys to examine the contact away from the holes to give a wider search area.

Table 3: Analytical data for holes EL15D01, EL15D02 and EL15D06. Samples with

A review of the Sandy Creek mineral resource2, located just
350m east of Artemis, is advanced. Sandy Creek appears to share some features with Artemis; in particular there are notable zones of strongly elevated zinc with copper-gold mineralisation that may suggest the systems have a common link. Sandy Creek remains open in the southern portion of the deposit. Modelling of historic data suggests mineralisation plunges south below the existing drilling (Figure 4), representing valid targets at depth for drill testing.

2 Sandy Creek Inferred Resource, comprising 2Mt @ 1.32% Cu and 0.3g/t Au, was previously reported according to JORC 2004 by Breakaway Resources Ltd. Minotaur advises that the data has not been re-estimated according to JORC 2012 as the information has not changed in any material aspect.

PAGE 4


Figure 4: Oblique long section view of Sandy Creek Cu-Au deposit showing interpreted direction where deposit remains open. Coloured blocks show Cu >1.5% as estimated from the historic resource2

model. Artemis mineralisation is represented for spatial comparison purposes.

Regional Exploration

Field reconnaissance of the remaining VTEM anomalies was completed recently. Five anomalies have been selected
for further work (Figure 5) that is to include detailed soil sampling and/or IP-resistivity geophysical surveying,

with the view of defining new drill targets for testing. The targeted mineralisation style is Iron Sulphide Copper Gold (ISCG) similar to that developed at Eloise, Artemis and Sandy Creek.

ASX RELEASE 21 APRIL 2015


About the Eloise Copper Joint Venture

The Eloise Copper JV (JV ) is managed and operated by
Minotaur Exploration on behalf of joint venture
partner Golden Fields Resources Pty Ltd (GFR) who, upon expenditure of $6 million, may earn a 50% beneficial
joint venture interest in the tenements (EPM 17838 and EPM 18442, but excluding those parts subject to the Altia joint venture with Sandfire Resources NL). As at
31 December 2014 GFR had earned 14% interest in the tenements.

COMPETENT PERSON'S STATEMENT Information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Glen Little, who

is a full-time employee of the Company and a

Member of the Australian Institute of Geoscientists

(AIG). Mr Little has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity that he

is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr

Little consents to inclusion in this document of the information in the form and context in which it

appears.

Figure 5: VTEM conductivity image showing remaining 5 targets to be followed up (yellow dots).


2 ibid

Andrew Woskett

(Managing Director)

Tony Belperio

(Director, Business Development)

Minotaur Exploration Ltd

T +61 8 8132 3400 www.minotaurexploration.com.au

PAGE 5

APPENDIX

Table 4

JORC Code, 2012 Edition

Section 1: Sampling Techniques and Data

Criteria JORC Code explanation Commentary

Sub-sampling techniques and sample preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub- sampling stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/ second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

The cores from drill holes EL15D01 to EL15D06 were cut and quarter core samples were collected as generally 1 metre composites, however some samples were not whole metres. The sampled intervals were selected based upon visual observations of lithologies and perceived zones of alteration and mineralisation. Unsampled core intervals are expected to be unmineralised.

Each laboratory submission sample was collected in an industry-standard calico bag with sample number written in black on the bag and sample number ticket inserted into the bag.

Samples were placed in large plastic polyweave bags, labeled with the sample number range and secured with a plastic cable tie for direct transport to ALS Laboratories in Mount Isa by a Minotaur representative.

Quality of assay data and laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument

make and model, reading times, calibrations factors applied and their derivation, etc.

Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of

accuracy (i.e. lack of bias) and precision have been established.

Results reported in the body of this Report pertain to quarter core samples from drill holes EL15D01 to EL15D06 analysed by ALS Laboratories. A

48-element suite including Cu, Zn, Pb, Ag was analysed by four acid digest and ICP-MS/ICP-AES finish (ALS method ME-MS61): a four acid digest is considered a near total digest and appropriate for resource appraisal.

Cu, Zn, Pb and Ag results above the upper detection limit of ALS method ME- MS61 were repeated with ALS method OG46 (aqua regia digest and AAS finish): an appropriate method for evaluation of ore/high grade material.

Gold content analysed by fire assay with AAS finish (ALS method Au-AA25).

ALS analysed regular blanks (around 1 in 15), regular standards (around 1 in 12) and regular duplicates (around 1 in 15) when analysing the samples from drill holes EL15D01 to EL15D06.

Four different commercially-sourced standards were submitted by Minotaur to ALS simultaneously with drill core samples from EL15D01 to EL15D06.

Ten packets of standard pulps were submitted representing around 1 in 12 samples.

Eight coarse basalt blanks (around 1 in 15 samples) were also submitted to ALS as part of Minotaur's quality control procedure; assay results for blanks have been within expected limits.

Nine duplicate quarter core samples (around 1 in 15 samples) were submitted to ALS as part of Minotaur's quality control procedure. Duplicate sample assays compare well to alpha samples.

For the laboratory results received and reported in the body of this Report an acceptable level of accuracy and precision has been confirmed by Minotaur's QAQC protocols.

PAGE 7

APPENDIX

Table 4

JORC Code, 2012 Edition

Section 1: Sampling Techniques and Data continued

Criteria JORC Code explanation Commentary

Verification of sampling and assaying

The verification of significant intersections by either independent or alternative company personnel.

The use of twinned holes.

Documentation of primary data, data entry proce- dures, data verification, data storage (physical and electronic) protocols.

Discuss any adjustment to assay data.

All drilling data including collar coordinates, hole orientation, total depth, sampling intervals and lithological logging were recorded using OCRIS Mobile logging software with inbuilt data validation.

Significant intersections have been verified by Minotaur's Project Geologists: laboratory assays are consistent with mineralised intervals highlighted by geological logging.

No twinned holes were undertaken.

No adjustments to assay data were undertaken.

Location of data points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

Drillhole collar locations (GDA94, MGA Zone 54) of holes EL15D01 to EL15D06 have been located using a handheld GPS unit pending DGPS location as soon as possible. The drill collars are considered to be located with an appropriate level of accuracy for early-stage mineralisation appraisal.

DDH1 Drilling used a digital survey system every ~30m downhole to determine hole orientation during Diamond drilling, this data have been used to the plot drillhole traces and intercept positions for EL15D01 to EL15D06.

Data spacing and distribution

Orientation of data in relation to geological structure

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral

Resource and Ore Reserve estimation procedure(s)

and classifications applied.

Whether sample compositing has been applied.

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

Results reported in the body of this Report pertain to quarter core samples from drill holes EL15D01 to EL15D06 analysed by ALS Laboratories. Typically

1 metre intervals coincident with mineralisation and alteration selected for downhole geochemical sampling. Same samples were not whole metre intervals. The total intervals sampled in drill holes EL15D01 to EL15D06 are considered appropriate for the perceived degree of mineralisation present.

Historic exploration drilling is of insufficient density to determine extents of mineralisation along strike or at depth from Minotaur drillholes.

No mineral resource or ore reserve estimation has been undertaken.

Drillhole orientation was optimized to intersect the centre of the target geophysical anomalies.

No orientation-based sampling bias has been identified.

Sample security

The measures taken to ensure sample security.

All drill samples were stored at a secure location and delivered to the Laboratory for analysis by Minotaur personnel. Remnant drill core and laboratory pulps from EL15D01 to EL15D06 have been retained by Minotaur.

Audits or reviews

The results of any audits or reviews of sampling techniques and data.

No independent audit or review undertaken.

PAGE 8

APPENDIX

Table 5

JORC Code, 2012 Edition

Section 2: Reporting of Exploration Results

Criteria JORC Code explanation Commentary

Mineral tenement and land tenure status

Exploration done by other parties

Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

Acknowledgment and appraisal of explo- ration by other parties.

The drilling reported herein was conducted on tenement EPM17838 which forms part of the Eloise Copper Joint Venture between Levuka Resources Pty Ltd, Breakaway Resources Ltd (both subsidiaries of Minotaur Exploration Limited) and Golden Fields Resources Pty Ltd. Exploration activities are managed by Minotaur Exploration under a jointly agreed work program.

There are no existing impediments to any tenement within the Eloise Joint

Venture.

Ground disturbing activities require consultation with regard to appro- priate aboriginal heritage site avoidance. All drillsites within the current program have been cleared for drilling.

Extensive historical exploration by other companies across the JV tene- ments includes surface rock chip analyses, geological mapping, airborne magnetic surveys, gravity surveys, induced polarization (IP) survey, EM surveys, RC drilling and Diamond drilling.

Historic exploration drill hole data and down-hole geophysical data have been re-assessed, but are of insufficient density to determine the extent of mineralisation along strike or at depth from Minotaur holes.

Geology

Deposit type, geological setting and style of mineralisation.

Within the eastern portion of Mt Isa Block targeted mineralisation styles include: IOCG-style mineralisation associated with ~1590-1500Ma granitic intrusions and fluid movement along structural contacts e.g. Eloise Cu-Au; and sediment-hosted Zn+Pb+Ag±Cu±Au deposits e.g. Mt Isa, Cannington.

Drill hole Information

A summary of all information material

to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

• easting and northing of the drill hole collar

• elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

• down hole length and interception depth

• hole length.

If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does

not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

Full drill collar details for drill holes EL14D32, EL14D33, EL14D34, EL14D35, EL14D36 and EL14D37 including location coordinates, orientation and

final depth are provided in the Table 1 of the Appendix of this Report. Assay results are reported in Tables 2-3 of the Appendix of this Report.

PAGE 9

APPENDIX

Table 5

JORC Code, 2012 Edition

Section 2: Reporting of Exploration Results continued

Criteria JORC Code explanation Commentary

Data aggregation methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly stated.

Assay results reported in the body of this Report pertain to quarter core samples from drill holes EL14D32, EL14D33, EL14D34, EL14D35, EL14D36 and EL14D37 analysed by ALS Laboratories.

Drill holes EL14D32-EL14D35 were drilled between -61 and 70 degrees towards azimuth of 290-309 degrees (True bearing) to intersect the interpreted mineralised zone at a moderately high angle.

No maximum and/or minimum grade truncations have been used. Most (but not all) assays are for 1 metre representative splits, therefore intervals and grade reported EL14D32, EL14D33, EL14D34, EL14D35, EL14D36 and EL14D37 include weighted averages based upon down-hole distance

were appropriate.

Relationship between mineralisation widths and intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').

All depths and intervals are reported as downhole measurements. True widths are estimated to be approximately 85% of downhole intervals lengths for EL14D32, EL14D33, EL14D34, EL14D35, 80% for EL14D36 and

75% for EL14D37.

Diagrams

Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

See Figures 4 and 5 of this Report.

Balanced reporting

Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

All results of significance have been reported within this Report.

PAGE 10

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Minotaur Exploration Limited

DEVELOPMENT STAGE
CODE : MEP.AX
ISIN : AU000000MEP8
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Minotaur Expl. is a exploration company based in Autralia.

Minotaur Expl. develops kaolin in Australia, and holds various exploration projects in Australia and in Chile.

Its main asset in development is POOCHERA - CAREY'S WELL in Australia and its main exploration properties are GAWLER CRATON, CURNAMONA CRATON, TUNKILLIA - LAKE EVERARD, DOUGLAS CREEK and ACROPOLIS/ROXBY in Australia, NAVALMEDIO in Spain and COPIAPO in Chile.

Minotaur Expl. is listed in Australia and in United States of America. Its market capitalisation is AU$ 43.5 millions as of today (US$ 31.4 millions, € 28.9 millions).

Its stock quote reached its highest recent level on September 03, 2010 at AU$ 0.38, and its lowest recent point on March 20, 2020 at AU$ 0.02.

Minotaur Expl. has 212 390 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Minotaur Exploration Limited
7/25/2007Builds resources investments
Nominations of Minotaur Exploration Limited
11/27/2007Business Development Manager Appointed
8/22/2007Appointment of New Director to Minotaur
Project news of Minotaur Exploration Limited
7/29/2016Inaugural JORC resource for Chameleon gold deposit, Kalgoorl...
6/22/2016Drilling progress report for Chameleon gold deposit, Kalgoor...
9/10/2015• Gold exploration to commence at Spargos Reward
12/4/2013Minotaur adds former Breakaway Resources Chairman to its Boa...
11/20/2013Minotaur keen for more acquisitions
10/21/2013Minotaur moves to compulsory acquisition of Breakaway
7/29/2013Minotaur completes acquisition of WA gold-nickel tenements
5/20/2013ADDITIONAL MINOTAUR COMMENT ON WA ACQUISITION ANNOUNCED TODA...
7/27/2012Cashed up Minotaur eyeing WA gold acquisition opportunities
7/1/2009(Douglas Creek)Drilling Programs Update
5/25/2007(Tunkillia - Lake Everard)Study to commence mining operations
Corporate news of Minotaur Exploration Limited
7/27/2016Quarterly Report Ended 30 June 2016
7/4/2016Attractive gold assays from Chameleon Deposit, Kalgoorlie
6/30/2016Roger Higgins joins Minotaur Board
6/30/2016Change of Company Secretary
6/29/2016CHILEAN METALS ENTER STRATEGIC ADVISORY AGREEMENT WITH MINOT...
6/20/2016Progress report for Eloise JV
5/2/2016BOARDROOM RADIO INTERVIEW - Minotaur identifies new targets ...
4/29/2016Minotaur identifies new targets near Prominent Hill
3/31/2016Minotaur to distribute tax credits to shareholders
1/27/2016Quarterly Report Period Ended 31 December 2015
9/9/2015MEP: SFR continues earn-in at Altia project, Cloncurry
9/3/2015New Exploration Agreement with Minotaur on Corkwood Copper-G...
7/14/2015VTEM Survey Underway at Merléac to Identify New Deposits
4/21/2015Eloise Copper JV report
3/11/2015Minotaur Stands Out Amongst Junior Miners, Presentation Febr...
1/29/2015Quarterly Report Ending 31 December 2014
10/22/201422 Oct 14 – 22 October - Drilling underway at Artemis Prospe...
10/21/201421 Oct 14 – Successful closure of Share Purchase Plan and Ad...
10/20/201420 Oct 14 – Agreed sale of Gypsum Project new!
10/21/2013Minotaur commences new 4-hole copper-gold campaign near Clon...
8/1/2013Minotaur lodges formal bid for WA's Breakaway with Norilsk b...
8/1/201301 Aug 13 – Bidders Statement to acquire Breakaway Resources...
8/20/2012Canadian IOCG drill push accelerated by Australia's Minotaur
7/11/2012Japan's JOGMEC and Minotaur in new copper-gold drill push no...
9/5/2011Minotaur discovers large copper-gold system in western Queen...
4/29/2011Minotaur Exploration Quarterly Report
4/22/2010Minotaur in $6.6m exploration spend in 2010 across three sta...
10/2/2009Drilling commences Cowra and Boorowa Joint Venture Projects,...
8/27/2008 restarts drilling at Tunkillia, S.A.
6/12/2008Terramin-Zinifex-Minotaur in new SA minerals search
3/18/2008 announces encouraging IOCG results near Olympic Dam
3/18/2008Update on Australian Drilling Projects
2/20/2008NAVALMEDIO ANNOUNCEMENT CORRECTION
10/30/2007Quarterly Activities Report
10/5/2007Mitsubishi buys into Minotaur's NSW copper gold project near...
9/11/2007Trafford in new SA minerals deal
8/30/2007Expands Copper Gold Exploration into Eastern Canada
5/22/2007Sumitomo joins Minotaur in Australian minerals venture
2/21/2007JV with PlatSearch
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (MEP.AX)Other OTC (MURXF)
0.205+0.00%0.100+0.00%
AUSTRALIA
AU$ 0.205
03/08 10:00 -
0%
Prev close Open
0.205 0.205
Low High
0.205 0.205
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.205 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -13
Produces
Develops Kaolin
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/30/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20222.50%0.280.18
202121.21%0.220.09
2020251.06%0.220.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.93-0.09%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54+0.19%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.70+0.37%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.91+1.99%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.23-2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.93+3.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.22-0.73%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :