Entree Gold Inc

Published : January 21st, 2015

Entree Gold Reports Initial Results of Pre-Feasibility Drilling at Ann Mason, Nevada

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Gold | Molybdenum | Mongolia | Recovery | Silver | Storage | Water |

Entree Gold Reports Initial Results of Pre-Feasibility Drilling at Ann Mason, Nevada

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan 21, 2015) - Entrée Gold Inc. (ETG.TO)(NYSE MKT:EGI)(EKA.F) ("Entrée" or the "Company") has received complete assay results from the first 20 holes of the previously announced pre-feasibility drill program at its 100% owned Ann Mason project in the Yerington district of Nevada.

Highlights from initial drill results include: EG-AM-14-041 with 390 metres of 0.35% copper, EG-AM-14-050 with 176 metres of 0.35% copper, EG-AM-14-046, the eastern-most drill hole, with 112.3 metres of 0.34% copper, EG-AM-14-057 with 327.4 metres of 0.38% copper, and EG-AM-14-065 with 150 metres of 0.38% copper.

Greg Crowe, President and CEO of Entrée stated, "The assay results received to date from our in-fill drill program look very promising, and will be used to upgrade the current mineral resources to the Measured and Indicated categories. Ann Mason is revealing itself to be a large, uniform copper deposit with very consistent grades, located in one of the best mining jurisdictions in the world. This drill program represents a significant step towards pre-feasibility, and advances Ann Mason along a development timeline. The next step will be to complete an updated resource estimate and PEA in the first half of 2015, and commence updated metallurgy studies."

The infill drill program commenced in August 2014 and, with the final hole in progress, will be completed by the end of January 2015. The program comprised 40 holes and a total of approximately 19,200 metres combined reverse circulation ("RC") pre-collars and core. Assay results on the last 20 holes are pending. The work is designed to upgrade the mineral resources contained in the 2012 Preliminary Economic Assessment Phase 5 pit ("2012 PEA" - see News Release of October 24, 2012) from Indicated and Inferred to a mix of Measured and Indicated categories. An updated drill plan and a table of detailed drill hole information is available on www.entreegold.com.

The 2012 PEA envisions a 24 year conventional open pit mine and sulphide flotation mill operating at a throughput rate of 100,000 tonnes per day and is based on mineralization contained within the Phase 5 pit. Over the life of mine, the 2012 PEA estimates average copper recovery of approximately 93%, producing a clean, 30% copper concentrate with average annual production of 214 million pounds of copper. There is potential to increase the mine life of Ann Mason through additional drilling and engineering studies.

The 2012 PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 2012 PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Discussion of Results

Results are reported in Table 1 below for the first 20 holes of the 40 hole program and largely completes infill drilling in the west-half of the deposit. Holes with pending assays are mainly located in the east-half of the deposit. RC pre-collars were largely restricted to barren, overlying volcanics. Drilling changed to HQ diameter core continually sampled over 2 metre intervals once mineralized rocks of the Yerington batholith were encountered or hole conditions dictated the change to core. Depths of holes ranged from 274.9 metres to 884.9 metres, depending on position within the Phase 5 pit, and hole angles varied from -60 to -90 degrees. It is important to note that 13 of the 20 holes reported in this press release ended in mineralization (copper values greater than the 0.15% copper cut-off). Only one hole (EG-AM-14-049) failed to return any significant results, and this hole was drilled along the northernmost border of the Phase 5 pit, in an area where mineralization was not expected.

Drill result highlights include:

  • EG-AM-14-041, located near the centre of the deposit, with 390 metres of 0.35% copper;
  • EG-AM-14-046, with 112.3 metres of 0.34% copper;
  • EG-AM-14-050, with 176 metres of 0.35% copper; and
  • EG-AM-14-057, with 327.4 metres of 0.38% copper, including 0.42% copper and 0.12 grams per tonne ("g/t") gold over 200 metres.

Most of the reported drill hole intervals include sections with higher copper grades, many in the 0.40% to 0.60% copper range, as reported in Table 1. In addition, several holes returned intervals with higher than average gold (0.09 to 0.15 g/t) and silver grades (1.21 to 2.77 g/t), including holes EG-AM-14-041, 045, 046, 056, and 057. Finally, several holes intersected higher than average molybdenum grades, further outlining the molybdenum domain previously discussed in the 2012 PEA.

Table 1. Significant intercepts from 2014 Ann Mason drill holes.

Hole From
(m)
To
(m)
Interval (m) Cu
(%)
Au
(g/t)
Ag
(g/t)
Mo
(%)
EG-AM-12-031* 214.0 270.0 56.0 0.27 0.04 0.54 0.017
and 298.0 342.0 44.0 0.18 0.02 0.35 0.007
and 406.0 462.1 56.1 0.17 0.03 0.57 0.015
EG-AM-14-040* 186.0 643.8 457.8 0.31 0.02 0.62 0.005
Including 246.0 312.0 66.0 0.36 0.03 0.54 0.003
Including 370.0 462.0 92.0 0.39 0.02 0.78 0.003
including 520.0 584.0 64.0 0.39 0.03 0.61 0.007
EG-AM-14-041 290.0 680.0 390.0 0.35 0.05 0.84 0.003
including 350.0 410.0 60.0 0.55 0.06 0.74 0.004
including 472.0 520.0 48.0 0.50 0.07 1.05 0.002
including 540.0 574.0 34.0 0.44 0.14 2.15 0.001
including 600.0 644.0 44.0 0.38 0.09 1.73 0.001
EG-AM-14-042* 147.8 581.9 434.1 0.28 0.02 0.50 0.002
including 198.0 266.0 68.0 0.46 0.05 0.83 0.001
EG-AM-14-045 232.0 412.0 180.0 0.30 0.06 1.21 0.006
including 350.0 396.0 46.0 0.58 0.15 2.77 0.007
EG-AM-14-046* 271.3 383.6 112.3 0.34 0.05 1.21 0.011
including 302.0 372.0 70.0 0.40 0.07 1.66 0.012
EG-AM-14-047 324.0 406.0 82.0 0.24 0.01 0.29 0.003
EG-AM-14-048* 306.0 517.3 211.3 0.34 0.02 0.46 0.007
including 342.0 378.0 36.0 0.37 0.02 0.48 0.005
including 402.0 432.0 30.0 0.41 0.02 0.49 0.014
including 448.0 517.3 69.3 0.43 0.02 0.59 0.008
EG-AM-14-049 No significant results
EG-AM-14-050 234.0 410.0 176.0 0.35 0.02 0.46 0.004
including 276.0 330.0 54.0 0.42 0.01 0.44 0.004
including 384.0 410.0 26.0 0.50 0.05 1.31 0.009
and 522.0 558.0 36.0 0.35 0.10 1.70 0.003
EG-AM-14-051 286.0 300.0 14.0 0.20 0.01 0.29 0.001
and 314.0 324.0 10.0 0.22 0.01 0.22 0.018
EG-AM-14-052* 140.2 224.0 83.8 0.24 0.02 0.25 0.002
and 266.0 296.0 30.0 0.65 0.02 0.60 0.002
and 364.0 499.9 135.9 0.40 0.02 0.36 0.005
including 416.0 494.0 78.0 0.51 0.03 0.43 0.006
EG-AM-14-053* 174.0 204.0 30.0 0.19 0.02 0.34 0.005
and 234.0 274.9 40.9 0.22 0.02 0.40 0.002
EG-AM-14-054* 256.0 268.0 12.0 0.23 0.01 0.35 0.001
and 316.0 325.5 9.5 0.20 0.01 0.32 0.003
EG-AM-14-056* 204.1 451.7 247.6 0.32 0.06 1.38 0.004
including 322.0 451.7 129.7 0.44 0.10 2.31 0.003
EG-AM-14-057* 197.5 524.9 327.4 0.38 0.08 1.48 0.003
including 197.5 240.0 42.5 0.49 0.03 0.68 0.007
including 304.0 504.0 200.0 0.42 0.12 2.02 0.001
EG-AM-14-058 115.0 234.0 119.0 0.22 0.01 0.24 0.001
and 296.0 396.0 100.0 0.35 0.01 0.31 0.002
including 306.0 350.0 44.0 0.58 0.01 0.50 0.004
EG-AM-14-062* 48.8 86.0 37.2 0.18 0.01 0.50 0.001
and 108.0 160.0 52.0 0.20 0.01 0.36 0.001
and 214.0 280.0 66.0 0.28 0.01 0.17 0.002
and 294.0 434.0 140.0 0.26 0.02 0.41 0.009
including 296.0 358.0 62.0 0.33 0.02 0.37 0.007
EG-AM-14-063* 193.5 212.0 18.5 0.30 0.01 0.33 0.012
and 296.0 572.0 276.0 0.27 0.05 0.85 0.006
including 358.0 394.0 36.0 0.35 0.07 1.08 0.002
including 406.0 468.0 62.0 0.33 0.08 1.20 0.004
including 540.0 568.0 28.0 0.33 0.07 1.24 0.009
EG-AM-14-065* 221.0 884.9 663.9 0.29 0.04 0.75 0.004
including 221.0 264.0 43.0 0.33 0.02 0.42 0.004
including 298.0 380.0 82.0 0.38 0.03 0.82 0.002
including 510.0 604.0 94.0 0.44 0.05 0.82 0.003
including 674.0 824.0 150.0 0.38 0.09 1.54 0.007

Notes:

  • Holes marked with "*" ended in mineralization.
  • Drill holes were not drilled in numerical order and those not listed in the table still have pending analytical results.
  • Drill intersections are based on drilled core lengths and may not reflect the true width of mineralization.
  • Hole EG-AM-12-031 and EG-AM-14-065 were pre-collared in 2012 and completed in 2014.

Holes EG-AM-14-049, 051, 053, 054 were all drilled on the margins of the deposit within the limits of the Phase 5 pit and intersected minor, weak mineralization as predicted by previous drilling and by the 2012 PEA block model.

QUALITY ASSURANCE AND CONTROL

RC chips and split core samples were prepared at Acme Analytical Laboratories (ACME) in Elko and Reno, Nevada and shipped by ACME to their lab in Vancouver, Canada for analyses. Prepared standards, blanks and duplicates are inserted at the project site to monitor the quality control of the assay data. Entrée has a chain of custody program to ensure sample security during all stages of sample collection, cutting, shipping and storage.

Drill intersections described in this news release are based on drilled core lengths and may not reflect the true width of mineralization.

2012 PEA AND QUALIFIED PERSON

Robert Cinits, P.Geo., Entrée's Vice-President, Corporate Development, a Qualified Person as defined by National Instrument 43-101, has approved the technical information in this release.

The 2012 PEA titled "Amended and Restated Preliminary Economic Assessment on the Ann Mason Project, Nevada, U.S.A." with an effective date of October 24, 2012, amended October 15, 2014, was prepared by AGP Mining Consultants Inc. and is available on SEDAR at www.sedar.com.

ABOUT ENTRÉE GOLD INC.

Entrée Gold Inc. is a Canadian mineral exploration company balancing opportunity and risk with key assets in Nevada and Mongolia. Entrée has been advancing its Ann Mason project in one of the world's most favourable mining jurisdictions, Nevada. The Ann Mason project hosts the Ann Mason copper-molybdenum deposit as well as the Blue Hill copper deposit within the rejuvenated Yerington copper camp.

Additionally, as a joint venture partner with a carried interest on a portion of the Oyu Tolgoi mining project in Mongolia, Entrée has a unique opportunity to participate in one of the world's largest copper-gold projects managed by one of the premier mining companies - Rio Tinto. Oyu Tolgoi, with its series of deposits containing copper, gold and molybdenum, has been under exploration and development since the late 1990s.

Sandstorm Gold, Rio Tinto and Turquoise Hill Resources are major shareholders of Entrée, holding approximately 12%, 11% and 9% of issued and outstanding shares, respectively.

This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws.

Forward-looking statements include, but are not limited to, statements with respect to completion of a pre-feasibility study on Ann Mason; the preparation and release of an updated resource estimate and preliminary economic assessment; the potential development of Ann Mason; the estimation of mineral reserves and resources; the realization of mineral reserve and resource estimates; anticipated future production, cash flows and mine life; the potential impact of future exploration results on Ann Mason mine design and economics; anticipated capital and operating costs; potential types of mining operations; potential metallurgical recoveries and grades; plans for future exploration and/or development programs and budgets; anticipated business activities; corporate strategies; uses of funds; and future financial performance. In certain cases, forward-looking statements and information can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budgeted", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate" or "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" "will be taken", "occur" or "be achieved". While the Company has based these forward-looking statements on its expectations about future events as at the date that such statements were prepared, the statements are not a guarantee of Entrée's future performance and are subject to risks, uncertainties, assumptions and other factors which could cause actual results to differ materially from future results expressed or implied by such forward-looking statements and information. Such factors and assumptions include, amongst others, that the size, grade and continuity of deposits and resource and reserve estimates have been interpreted correctly from exploration results; that the results of preliminary test work are indicative of what the results of future test work will be; that the prices of copper, gold, molybdenum and silver will remain relatively stable; the effects of general economic conditions, changing foreign exchange rates and actions by government authorities; the availability of funding on reasonable terms; the impact of changes in interpretation to or changes in enforcement of, laws, regulation and government practices, including laws, regulation and government practices with respect to mining, foreign investment, royalties and taxation; the terms and timing of obtaining necessary environmental and other government approvals, consents and permits; the availability and cost of necessary items such as power, water, and appropriate smelting and refining arrangements; uncertainties associated with legal proceedings and negotiations; and misjudgments in the course of preparing forward-looking statements.
In addition, there are also known and unknown risk factors which may cause the actual results, performances or achievements of Entrée to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements and information. Such factors include, among others, risks related to international operations; risks associated with changes in the attitudes of the governments to foreign investment; discrepancies between actual and anticipated production, mineral reserves and resources and metallurgical recoveries; global financial conditions; changes in project parameters as plans continue to be refined; inability to upgrade inferred mineral resources to indicated or measured mineral resources; inability to convert mineral resources to mineral reserves; conclusions of economic evaluations; future prices of copper, gold, silver and molybdenum; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining government approvals, permits or licences or financing or in the completion of development or construction activities; environmental risks; title disputes; limitations on insurance coverage; as well as those factors discussed in the section entitled "Risk" in the Company's most recently filed Management's Discussion and Analysis and in the Company's Annual Information Form for the financial year ended December 31, 2013, dated March 27, 2014 filed with the Canadian Securities Administrators and available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements and information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements and information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements and information. Except as required under applicable securities legislation, the Company undertakes no obligation to publicly update or revise forward-looking statements and information, whether as a result of new information, future events, or otherwise. Accordingly, readers should not place undue reliance on forward-looking statements and information.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Canada | Mongolia | All
Gold and Silver Prices for these countries : Canada | Mongolia | All

Entree Gold Inc

EXPLORATION STAGE
CODE : ETG.TO
ISIN : CA29383G1000
CUSIP : 29383G100
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Entree Gold is a gold exploration company based in Canada.

Entree Gold holds various exploration projects in Australia and in Mongolia.

Its main exploration properties are BLUE ROSE, SENTINEL, CORK TREE, ARRINO, BLUE HILLS, BISBEE and LORDSBURG in Australia, MANLAI, EMPIRICAL EAST, EMPIRICAL WEST, HUGO NORTH EXTENSION, ANN MASON, HERUGA (LOOKOUT HILL), WESTERN MELS and OYU TOLGOI MONGOLIA in Mongolia and HUAIXI and BLACKJACK PROPERTY in China.

Entree Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 265.9 millions as of today (US$ 194.0 millions, € 181.2 millions).

Its stock quote reached its lowest recent point on February 16, 2001 at CA$ 0.16, and its highest recent level on July 13, 2007 at CA$ 3.67.

Entree Gold has 171 570 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Entree Gold Inc
Annual report 2007
Financings of Entree Gold Inc
2/15/2013Entr=E9e Gold Secures US$55 Million Financing Package From S...
12/1/2011Entrée Gold Closes Financing
Nominations of Entree Gold Inc
6/28/2013Entr=E9e Gold Announces The Appointment Of Lord Howard As No...
6/22/2012Entrée Gold Welcomes Gorden Glenn to its Board of Directors
3/10/2011Entrée Gold Appoints Mr. Alan Edwards to the Board of Direc
1/21/2011Entrée Gold Appoints New CFO
Financials of Entree Gold Inc
8/12/2016Entree Gold Announces Second Quarter 2016 Results
11/14/2013Reports on Third Quarter 2013
8/8/2013Entr=E9e Gold Reports on Second Quarter 2013
5/10/2013Entr=E9e Gold Reports On First Quarter 2013
8/15/2012Entrée Gold Reports on Second Quarter 2012
8/14/2012Reports on Second Quarter 2012
5/11/2012Reports on First Quarter 2012
5/16/2011Entrée Gold Announces First Quarter 2011 Results
Project news of Entree Gold Inc
5/9/2016(Oyu Tolgoi Mongolia)Notice to Proceed Approval for Underground Development at Oy...
4/19/2016(Ann Mason)Entrée Gold - Entree Gold Receives
11/12/2013(Ann Mason)Entr=E9e Gold Presents the Ann Mason Project Video
9/9/2013Entr=E9e Gold to Exhibit and Present at the Toronto Resource...
5/23/2013Entr=E9e Gold to Exhibit and Present at the World Resource I...
5/17/2013Entr=E9e Gold to Exhibit and Present at the World Resource I...
11/13/2012(Ann Mason)s Ann Mason and Blue Hill Surface Exploration, Nevada
10/29/2012Entrée Gold Reports First Resource Estimate For The Blue Hi
10/24/2012(Ann Mason)Preliminary Economic Assessment of Entrée Gold?s Ann Mason
7/30/2012(Ann Mason)Entrée Gold Extends Ann Mason Deposit 100 Metres West
3/27/2012(Ann Mason)Entrée Gold Upgrades And Expands Resources At Ann Mason
3/27/2012(Ann Mason)Upgrades and Expands Resources at Ann Mason
3/20/2012Entrée Gold Announces Best Drill Results To Date For Ann Ma
3/20/2012(Ann Mason)Announces Best Drill Results to Date for Ann Mason
3/1/2012(Ann Mason)Entrée Gold Intersects 759 Metres Of 0.45% Cu At Ann Mason;
2/28/2012(Ann Mason)Drilling Extends Northern Boundary At Entree Gold's Ann Maso...
1/11/2012Correction From Source: Entrée Discovers New High Grade Gol
12/15/2011Entrée Intersects Gold On Its 100%-Owned Shivee West Proper
7/14/2011(Ann Mason)Entrée Gold Ann Mason Project Drilling Returns Over 700 Met
7/14/2011(Ann Mason)Ann Mason Project Drilling Returns Over 700 Metres of 0.49% ...
5/9/2011Entrée Gold To Acquire Remaining Interest In Blackjack Prop
5/9/2011(Blackjack Property)to Acquire Remaining Interest in Blackjack Property, Nevada
4/29/2011(Ann Mason)CORRECTION FROM SOURCE: Entree Gold Further Extends Minerali...
4/29/2011(Ann Mason)Entrée Gold Further Extends Mineralization At Ann Mason, Ne
3/20/2011(Oyu Tolgoi Mongolia)Entrée Gold Announces $7 Million Budget For Joint Venture W
3/15/2011(Oyu Tolgoi Mongolia)Additional Mineralization Discovered North Of Entrée Gold
6/16/2010(Hugo North Extension)Files NI 43-101 Technical Report on Hugo North Exten
4/1/2010(Heruga (lookout Hill))Announces Increased Heruga Resource
1/27/2010Defines NI 43-101 Inferred Resource of 7.1 Billion P
11/24/2009(Heruga (lookout Hill))ZEUS IP Survey Outlines Additional Potential at Entrée?s He
10/8/2009 Intersects 60m of 0.44% copper equivalent at Lordsbu
Corporate news of Entree Gold Inc
5/2/2017Entrée Gold - Annual General & Spec
7/1/2016July 2016 Corporate Presentation
6/24/2016Entrée Gold Announces Results of Annual General Meeting
5/10/2016Entrée Gold Announces First Quarter 2016 Results
5/9/2016Entrée Gold Welcomes Notice to Proceed Approval for Undergro...
4/19/2016Entrée Gold Receives Positive Decision on Clean Water Act Pe...
3/30/2016Entrée Gold Announces Fiscal Year 2015 Results and Reviews C...
3/22/2016Entrée Gold Announces Appointment of Stephen Scott as Presid...
12/15/2015Entrée Gold Welcomes Signing of US$4.4 Billion Project Finan...
10/23/2015Entree Gold Files Updated Preliminary Economic Assessment fo...
9/9/2015Entree Gold Updates Preliminary Economic Assessment for the ...
7/31/2015Entree Gold Announces Second Quarter 2015 Results
7/20/2015Candente Copper enters Royalty Agreement on Cañariaco Projec...
7/20/2015Entree Gold Enters Into Agreement to Acquire NSR Royalty Fro...
7/14/2015Entree Gold Appoints Anna Stylianides to Board of Directors
6/29/2015Entrée Gold Provides Results of AGM
3/31/2015Entrée Gold Announces Fiscal Year 2014 Results and Reviews C...
3/10/2015Entree Gold Reports Additional Results of Pre-Feasibility Dr...
1/21/2015Entree Gold Reports Initial Results of Pre-Feasibility Drill...
11/13/2014Entree Gold Announces Third Quarter 2014 Results
11/3/2014Nov 3, 2014 Entrée Gold Reports Results From 2014 Oyu Tolgoi...
11/3/2014Entree Gold Reports Results From 2014 Oyu Tolgoi Feasibility...
10/15/2014Oct 15, 2014 Entrée Gold Files Amended Technical Report And ...
10/15/2014Entrée Gold Files Amended Technical Report and Provides Upda...
9/22/2014Entree Gold Provides Oyu Tolgoi Feasibility Study Update
8/7/2014Entree Gold Announces Second Quarter 2014 Results
7/16/2014Entrée Gold Commences Pre-Feasibility Drilling at Ann Mason,...
7/3/2014Entrée Gold Provides Results of AGM
5/13/2014Entree Gold Announces First Quarter 2014 Results
3/27/2014Entree Gold Announces Fiscal Year 2013 Results and Reviews C...
2/24/2014=?iso-8859-1?Q?Entr=E9e_Gold_to_Exhibit_and_Present_at_the_U...
1/29/2014Entr=E9e Gold to Present and Exhibit at World Outlook Financ...
1/22/2014Join Us in Wishing Lindsay Bottomer a Happy Retirement
1/14/2014Entr=E9e Gold to Exhibit and Present January 19 ? 20 at the ...
12/12/2013Holiday Greetings from Entr=E9e Gold
11/22/2013Entr=E9e Gold to Exhibit and Present at the San Francisco Me...
11/15/2013Entr=E9e Gold to Present and Exhibit at the Mongolia 2013 In...
10/23/2013Entr=E9e Gold to Present and Exhibit at Michael Campbell?s M...
10/1/2013Provides Update on Joint Venture Licences in Mongolia
9/25/2013(Ann Mason)2013 Drill Results Extend Ann Mason Mineralization
7/29/2013Entrée Gold Provides Oyu Tolgoi Funding Update
7/9/2013Entr=E9e Gold Welcomes News Of First Copper Concentrate Ship...
6/19/2013Entr=E9e Gold Notice of Annual General Meeting
5/17/2013Entr=E9e Gold Adopts Advance Notice Policy
5/17/2013Adopts Advance Notice Policy
4/2/2013Announces Fiscal Year 2012 Results and Reviews Corporate Hig...
1/17/2013=?iso-8859-1?Q?Entr=E9e_Gold_Welcomes_Back_Monica_Hamm,_Mana...
11/13/2012Entrée Gold to Exhibit at the San Francisco Hard Assets Inv
11/13/2012(Ann Mason)Entrée Gold Updates Ann Mason And Blue Hill Surface Explora
11/5/2012Entrée Gold Provides Update on Oyu Tolgoi Power Purchase Ag
10/19/2012Entrée Gold Provides Corporate Update
7/26/2012Entrée Gold Reports High Copper Recoveries From Its Blue Hi
7/10/2012Confirms High Grade Gold on Argo Zone at Shivee West, Mongol...
5/11/2012Entrée Gold Reports on FirstQuarter 2012
4/25/2012.: Heruga Continues to Grow; 0.80% CuEq Over 590 Metres Dril...
4/20/2012Entrée Gold?s Mongolia Operations Continue To Advance
4/19/2012Mongolia Operations Continue to Advance
3/31/2012Entrée Gold Announces FiscalYear 2011 Results And Reviews
2/8/2012Entrée Gold Exhibiting at the World Outlook Financial Confe
1/12/2012Greg Crowe, President & CEO – Interview with the Wall Street...
1/10/2012Discovers New High Grade Gold Zone at Shivee West, Mongolia
1/4/2012Entrée Gold Closes Over-Allotment Option
12/31/2011Announces Exercise of Over-Allotment Option
12/16/2011Holiday Wishes from Entrée Gold Inc.
12/13/2011Entrée Gold Provides Update On Arbitration Between Rio Tint
12/13/2011Provides Update on Arbitration Between Rio Tinto and Ivanhoe...
9/22/2011(Ann Mason)Further Positive Drill Results From Entrée Gold's Ann Mason ...
9/6/2011(Ann Mason)Entrée Gold Continues To Advance Ann Mason
9/6/2011(Ann Mason)Continues to Advance Ann Mason
8/5/2011Entrée Gold Announces SecondQuarter 2011 Results
7/28/2011.: Blue Hill Drill Results Define Thick Zone of Copper Oxide...
5/10/2011Entrée Gold Reports Sale Of Non-Core Assets
5/10/2011Message to Shareholders
8/5/2010Budgets $3.7 Million For Nevada Exploration
7/6/2010Receives New Coal Mining Licence, Mongolia
6/16/2010Receives Green Light for Merger with PacMag Metals
6/8/2010Commences Drill Program On Blackjack And Roulet
6/4/2010Entrée-PacMag Schemes of Arrangement Overwhelmingly Support
4/13/2010Provides Exploration Update for 2010
4/1/2010Oyu Tolgoi Investment Agreement Finalized
12/21/20092009 Explorationand Corporate Update
10/26/2009Receives Mongolian Mining Licences
10/6/2009Oyu Tolgoi Investment Agreement Signed
10/5/2009Signing Date Set for Investment Agreement - The Next Stage f
9/25/2009Option Agreement in Yerington Distric
9/11/2009Entrée Gold to Attend DenverGold Forum 2009
7/23/2009Option Agreement with HoneyBadger Exp
1/19/2009 Entrée Makes New Porphyry Copper Discovery at Lordsburg
9/19/2008Expands Coal Exploration
9/17/2008Increases Exploration at Lordsburg, New Mexico
7/16/2008Forms Joint Venture with Ivanhoe Mines
5/5/2008Budgets $7 Million for 2008 Exploration
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ETG.TO)FRANKFURT (EKA.F)
1.55+0.00%1.05+0.00%
TORONTO
CA$ 1.55
04/25 11:15 -
0%
Prev close Open
1.55 1.55
Low High
1.55 1.55
Year l/h YTD var.
1.17 -  1.62 31.36%
52 week l/h 52 week var.
1.14 -  1.62 13.97%
Volume 1 month var.
10,300 11.51%
24hGold TrendPower© : 18
Produces
Develops
Explores for Copper - Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202416.54%
202315.65%1.451.10
202236.90%1.220.73
202150.00%1.050.47
202045.45%0.580.23
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.27+3.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-1.45%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48+4.20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.61+1.89%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85+4.52%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.68-0.80%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :