Erdene Resource Development Corporation

Published : January 10th, 2018

Erdene Drilling Intersects Multiple High-Grade Gold Zones Including Highest Grade Result to Date With 2,200 g/t Gold Over 1 Metre at Bayan Khundii Gold Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Erdene Drilling Intersects Multiple High-Grade Gold Zones Including Highest Grade Result to Date With 2,200 g/t Gold Over 1 Metre at Bayan Khundii Gold Project

HALIFAX, NOVA SCOTIA--(Marketwired - Jan 10, 2018) - Erdene Resource Development Corp. (ERD.TO) ("Erdene" or "Company") is pleased to report the highest-grade gold intersection encountered to date at its 100%-owned Bayan Khundii Gold Project ("Bayan Khundii") in southwest Mongolia.

"We are excited by this intersection, not only because of the ultra high-grade nature but by the continuity that continues to be demonstrated within multiple, high-grade gold domains within a broad lower-grade halo throughout this 1.4 kilometre long system," said Peter Akerley, Erdene's President and CEO. "The continuity of these high-grade gold bearing veins, that extend from surface and up to 150 metres vertically, provides an excellent base for advancing the project. These results clearly demonstrate the continued exploration upside potential of this relatively new gold discovery. They also support further detailed exploration targeting gold bearing structures not only within the Bayan Khundii deposit area but also within the larger district which we are confident will lead to additional discoveries."

HIGHLIGHTS

(see attached plan maps, cross-sections and drill core photograph for reference)

  • Drilling in the North Midfield Zone returns highest gold result to date, 2,200 g/t gold (70.7 oz/t) and 948 g/t silver (30.5 oz/t) over 1 metre (BKD-231).
  • Drilling in the North Midfield Zone, 65 metres north of BKD-231, returns 22 metres of 8.3 g/t gold, within 36.5 metres of 5.6 g/t gold (BKD-232).
  • Drilling within the Midfield Zone returns 25 metres of 5.8 g/t gold within a 127.5 metre interval of 1.8 g/t gold (BKD-230).
  • Structural interpretation by Dr. Armelle Kloppenburg provides greater understanding of controls on gold mineralization at Bayan Khundii and improves targeting of ultra high-grade zones and district-scale targets.
  • Additional results pending for Altan Arrow and Altan Nar gold projects.

SUMMARY

The exploration program reported on herein was developed by the Erdene technical team in conjunction with an independent expert's review to identify high priority structural targets within the Bayan Khundii project area. This included: testing the recently discovered North Midfield Zone with more detailed, closer-spaced drilling and testing structural concepts and extensions at depth; testing the Midfield area for the presence of shallower zones of mineralization; testing the continuity of broad mineralized zones in the central portion of the North Midfield target area; and testing the southeast extension of the Striker Zone.

Six holes (BKD-229 to BKD-234), totalling 1,192 metres, were completed at Bayan Khundii in November and are included in this update. Three holes were completed in the Midfield Zone (BKD-229, 230, and 233), two holes were completed in the North Midfield Zone (BKD-231 and 232), and one hole was completed along the southeast end of the Striker Zone (BKD-234). Table 1 below includes drill result highlights of these six holes, followed by a description of results.

Table 1. Bayan Khundii drill highlights

Drill Hole From (m) To (m) Interval (m) (1) Gold (g/t)
BKD-229 3 8 5 2.39
and 22 30 8 0.61
and 56 156.7 100.7 0.74
incl 100 147 47 1.31
incl 113 114 1 14.4
and 133 147 14 2.41
incl 144 145 1 18.9
BKD-230 31 158.5 127.5 1.80
incl 73 98 25 5.84
incl 95 98 3 36.8
BKD-231 118 193 75 0.35
and 193 207 14 158.3
incl 193 194 1 2,200
and 207 230 23 0.34
BKD-232 90.5 127 36.5 5.62
incl 102 124 22 8.29
incl 102 112 10 11.7
incl 102 103 1 15.5
and 106 107 1 13.4
and 110 112 2 31.1
and 120 124 4 10.8
and 138.4 146 7.6 1.75
BKD-233 26 33 7 1.43
and 38 45 7 0.43
and 65 66 1 2.01
and 72 78 6 4.12
incl 72 73 1 22.5
and 94 104 10 0.49
and 113 132 19 0.72
BKD-234 3 7 4 1.54
and 40 55 15 1.03
and 76 104 28 0.84
incl 79 93 14 1.19

(1) Reported intervals are not true width. At this time, there is insufficient data with respect to the shape of the mineralized system to calculate true orientations in space. They represent drill intersection widths from holes drilled at a dip of -45 to -85 degrees and oriented to the north-northeast. The Bayan Khundii mineralization is interpreted to be moderately dipping (approximately 40 to 50 degrees to the southwest).

Two plan maps, two cross-sections, and a photograph of the high-grade intersection from hole BKD-231 have been attached for reference:

http://media3.marketwire.com/docs/Figure1_Erdene.jpg - Bayan Khundii Plan Map #1
http://media3.marketwire.com/docs/Figure2_Bayan.jpg - Bayan Khundii Plan Map #2
http://media3.marketwire.com/docs/Figure3_Bayan.jpg - Bayan Khundii Cross-Section #1 http://media3.marketwire.com/docs/Figure4_Bayan.jpg - Bayan Khundii Cross-Section #2
http://media3.marketwire.com/docs/Figure5Visible.jpg - Photograph of high-grade intersection in BKD-231

DISCUSSION OF DRILL RESULTS

NORTH OF MIDFIELD ZONE

Two holes (BKD-231 and BKD-232) were completed in the North Midfield Zone to test the down-dip extension of the high-grade gold intervals in this area.

Hole BKD-231 intersected one metre of 2,200 g/t gold and 948 g/t silver within a 14 metre interval of 158 g/t gold at 193 metres depth (140 metres vertical depth). The mineralization was hosted by multi-phase quartz-adularia-specularite veins and hematite breccia, with abundant fine-grained visible gold (see attached photo of drill core). The 14 metre interval is enveloped by a 112 metre wide interval of gold mineralization starting at 118 metres depth, ranging from 0.1 to 2.8 g/t gold. This high-grade intersection confirms strong continuity down-dip from earlier holes, including BKD-110, 30 metres north, which intersected 1 metre of 115 g/t gold and 1 metre of 108 g/t gold, and BKD-111, 30 metres northwest, which intersected 1 metre of 44 g/t gold and 1 metre of 33 g/t gold. The discovery of this high-grade vein represents an important new target area that will require additional, closer-spaced drilling in 2018.

Hole BKD-232 was completed approximately 65 metres north of BKD-231 and 100 metres north of the Midfield Zone, within an area that previously had 80-metre hole spacing and relatively lower grade results. This hole returned 22 metres of 8.3 g/t gold, and included multiple zones grading over 10 g/t gold (see Table 1 above). The top of the mineralized interval was intersected at 90.5 metres depth (74 metres vertical depth).

MIDFIELD ZONE

Three holes were completed along the south and southeast end of the Midfield Zone (BKD-229, 230 and 233). Hole BKD-230, completed near the center of Midfield, intersected a continuously mineralized 127 metre interval starting at 31 metres depth (24 metres vertical) that averaged 1.8 g/t gold, and included a 25 metre wide interval that averaged 5.8 g/t gold.

Two additional holes (BKD-229 and BKD-233) successfully intersected high-grade gold mineralization, and in the case of BKD-233, although lower grade, expanded the southeast boundary of the Midfield Zone which remains open to the east (see attached plan map for drill hole locations) while BKD-229 intersected gold mineralization at the shallowest levels to date.

STRUCTURAL INTERPRETATION

In Q4-2017, Dr. Armelle Kloppenburg conducted a comprehensive structural study of the Company's gold projects in southwest Mongolia and the broader metals district. The results of that study provide new insights into the Bayan Khundii gold project. Gold mineralizing events are believed to be late Devonian - early Caboniferous and are interpreted to exploit dilational structures in a belt-parallel extensional zone. At Bayan Khundii, northeast-trending extensional faults have intersected a northwest-trending basement structure that is proposed to be a conduit for gold-bearing fluids. In this area a relay ramp structure developed and promoted further local faulting, fracturing and dilation to focus fluid flow, and veining for mineralization. In relation to the specific high-grade domains at Bayan Khundii it is thought that the most prospective areas of these structures would typically be in proximity to the intersection of the major, deep-seated faults, and locally in the hanging wall, and at the ends of the bounding structures (fault tips or extensional stepovers). These areas were the focus of limited drilling during the Q4-2017 program but will be the focus of future drilling and of regional exploration along trend exploring for similar structural environments. District-scale targets for gold mineralization are in areas where the dilation, steepening or intersection with other major structures or more competent units occurs.

2018 TECHNICAL PROGRAM

During Q1-2018 the Company's technical team will assess results of the 2017 drill and exploration programs to determine what additional drilling may be required prior to an independent resource evaluation. Timing of the eventual resource studies for both Bayan Khundii and the Company's neighboring Altan Nar gold-polymetallic project will be influenced by that determination, however, it is anticipated that the studies will be completed in 2018.

REGIONAL DISTRICT EXPLORATION

In addition to drilling at Bayan Khundii, the Company completed significant exploration work during Q4-2017 within the larger, gold district, including the evaluation of targets within the 11.4 km long Bayan Khundii license. A particular focus was placed on the Altan Arrow (3.5 km north of Bayan Khundii) and Khundii North (3.2 km northeast of Bayan Khundii) target areas, and also on the Ulaan (immediately west of Bayan Khundii) and Altan Nar (16 km northwest of Bayan Khundii) license areas.

The northeast-trending faults outlined above are part of a larger network of regional northeast transverse faults that are present throughout the Khundii prospect area. The thoroughgoing structure at Bayan Khundii can be traced 4.6 km northeast to the untested Khundii North prospect where areas of quartz stockwork, chalcedonic quartz with hematite breccia clasts have returned rock sample results up to 22.7 g/t gold.

At Altan Arrow, detailed soil and rock chip sampling has returned highly anomalous gold assays, with up to 27 g/t in rock chips in an area south of the main northeast-trending Altan Arrow structure. The Altan Arrow gold prospect area is also located at the intersection of proposed major deep-seated structures.

A three-hole, 450 metre drill program was also completed at Altan Arrow as part of the Q4-2017 drill program. Drilling included two holes designed to test coincident soil geochemical and geophysical targets, and one hole was oriented to test a potential down-dip extension of high-grade gold mineralization encountered in the 2016 reconnaissance drilling program at Altan Arrow.

The Company also completed a three-hole, 450 metre drill program at the Altan Nar deposit as part of the Q4-2017 drill program. Holes were oriented to test lateral and down-dip extensions of gold-polymetallic mineralization within both the Discovery Zone and Maggie Zone.

Additional analytical results for Altan Nar and Altan Arrow are expected to be released by February 2018.

BACKGROUND ON BAYAN KHUNDII GOLD PROJECT

Diamond drill holes, totaling 38,072 metres. In addition to drilling, the Company has completed a comprehensive exploration program at Bayan Khundii that has included: geological mapping; soil geochemical surveys; additional surface rock chip sampling; a ground magnetic survey; gradient array and dipole-dipole induced polarization surveys. In addition to this work, a series of detailed follow-up studies have also been completed, predominantly on drill core and surface outcrop, including: petrographic and mineralogical analyses; a fluid inclusion study; SEM gold composition analysis; Short-Wave Infra-Red Analysis (SWIR); structural analysis; and overall petrogenetic analysis. Detailed studies indicate the mineralized zones can be characterized as low-sulphidation epithermal, quartz-illite-adularia type mineralization." data-reactid="54">In Q2-2015, Erdene conducted an initial exploration program on the southern portion of the Company's 100%-owned Khundii exploration license in southwest Mongolia, including an initial rock-chip sampling program which revealed multiple very high-grade surface quartz veins that returned up to 4,380 g/t gold. Since that time, drilling has revealed the presence of very high gold grades, with up to 2,200 g/t gold over 1-metre intervals, within broad mineralized zones, with up to 131 metres of 3.9 g/t gold, including 80 metres of 6.0 g/t gold. Since the first drill hole in Q4-2015, the Company has completed 234 Diamond drill holes, totaling 38,072 metres. In addition to drilling, the Company has completed a comprehensive exploration program at Bayan Khundii that has included: geological mapping; soil geochemical surveys; additional surface rock chip sampling; a ground magnetic survey; gradient array and dipole-dipole induced polarization surveys. In addition to this work, a series of detailed follow-up studies have also been completed, predominantly on drill core and surface outcrop, including: petrographic and mineralogical analyses; a fluid inclusion study; SEM gold composition analysis; Short-Wave Infra-Red Analysis (SWIR); structural analysis; and overall petrogenetic analysis. Detailed studies indicate the mineralized zones can be characterized as low-sulphidation epithermal, quartz-illite-adularia type mineralization.

In Q1-2016 and Q3-2017, the Company completed metallurgical test work on Bayan Khundii master composites that indicated gravity concentration and cyanidation of the gravity tails yield very good overall gold recoveries, with 91% to 99% gold recovery on a range of gold grades from 0.7 g/t to 25.9 g/t gold.

The Bayan Khundii license has a 2% net smelter returns royalty ("NSR Royalty") in favour of Sandstorm Gold Ltd. with a buy-back option to reduce the NSR Royalty to 1%.

QUALIFIED PERSON AND SAMPLE PROTOCOL

Michael MacDonald, P.Geo. (Nova Scotia), Vice President Exploration for Erdene, is the Qualified Person as that term is defined in National Instrument 43-101 and has reviewed and approved the technical information contained in this news release. All samples have been assayed at SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal checks by SGS Laboratory, the Company incorporates a QA/QC sample protocol utilizing prepared standards and blanks.

Diamond saw, with half of the core placed in sample bags and the remaining half securely retained in core boxes at Erdene's Bayan Khundii exploration camp. All samples were organized into batches of 30 samples including a commercially prepared standard, blank, and either a field duplicate, consisting of two 1/4 core intervals, or a laboratory duplicate. Sample batches were periodically shipped directly to SGS in Ulaanbaatar via Erdene's logistical contractor, Monrud Co. Ltd." data-reactid="59">Erdene's sampling protocol for drill core consisted of collection of samples over 1 metre or 2 metre intervals (depending on the lithology and style of mineralization) over the entire length of the drill hole, excluding minor post-mineral lithologies and un-mineralized granitoids. Sample intervals were based on meterage, not geological controls or mineralization. All drill core was cut in half with a Diamond saw, with half of the core placed in sample bags and the remaining half securely retained in core boxes at Erdene's Bayan Khundii exploration camp. All samples were organized into batches of 30 samples including a commercially prepared standard, blank, and either a field duplicate, consisting of two 1/4 core intervals, or a laboratory duplicate. Sample batches were periodically shipped directly to SGS in Ulaanbaatar via Erdene's logistical contractor, Monrud Co. Ltd.

ABOUT ERDENE

Erdene Resource Development Corp. is a Canada-based resource company focused on the acquisition, exploration, and development of base and precious metals in underexplored and highly prospective Mongolia. The Company has interests in five exploration licenses and a mining license in southwest Mongolia. In addition to the Bayan Khundii project, other deposits and prospects within these licenses include: Altan Nar - an extensive, high-grade, near-surface, gold-polymetallic project located 16 kilometres northwest of Bayan Khundii that the Company is actively advancing; Altan Arrow - an early-stage gold-silver project 3.5 kilometres north of Bayan Khundii; Ulaan - a recently acquired copper-gold porphyry prospect adjacent to Bayan Khundii; Khuvyn Khar - an early-stage, copper-silver porphyry project with multiple drill targets and significant copper intersections; Nomin Tal - a narrow, high-grade copper-gold discovery; and Zuun Mod - a large molybdenum-copper porphyry deposit. In addition to the above properties, the Company has an Alliance with Teck Resources Limited on regional copper-gold exploration in the prospective Trans Altai region of southwest Mongolia. For further information on the Company, please visit www.erdene.com. Erdene has 145,963,086 issued and outstanding common shares and a fully diluted position of 156,592,160 common shares.

FORWARD-LOOKING STATEMENTS

Certain information regarding Erdene contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Erdene believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Erdene cautions that actual performance will be affected by many factors, most of which are beyond its control, and that future events and results may vary substantially from what Erdene currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and is subject to change after that date. The Company does not assume the obligation to revise or update these forward-looking statements, except as may be required under applicable securities laws.

No Regulatory Authority Has Approved or Disapproved The Contents of This Release

Read the rest of the article at https:
Data and Statistics for these countries : Canada | Georgia | Mongolia | All
Gold and Silver Prices for these countries : Canada | Georgia | Mongolia | All

Erdene Resource Development Corporation

EXPLORATION STAGE
CODE : ERD.TO
ISIN : CA29480N2068
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Erdene is a gold and copper exploration company based in Canada.

Erdene holds various exploration projects in Canada and in Mongolia.

Its main exploration properties are DONKIN in Canada and DURVULJIN UUL, ERDENET and GALSHAR UUL in Mongolia.

Erdene is listed in Canada and in United States of America. Its market capitalisation is CA$ 57.4 millions as of today (US$ 41.8 millions, € 39.3 millions).

Its stock quote reached its highest recent level on July 06, 2007 at CA$ 2.05, and its lowest recent point on November 01, 2013 at CA$ 0.07.

Erdene has 145 390 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Erdene Resource Development Corporation
6/14/2018Erdene becomes first cross-listed firm on the Mongolian Stoc...
5/31/2018Mongolia listing boosts investors confidence in Erdene Resou...
5/10/2018Erdene soars as Altan Nar project in Mongolia proves larger ...
5/3/2018Mongolian Copper Corp considers international fight for Erde...
12/8/2017Mongolian Gov't can't nationalize Erdenet Copper Mine — cour...
Financings of Erdene Resource Development Corporation
4/23/2013Closes Private Placement
12/12/2012Announces Private Placement
12/6/2011Completes Private Placement Financing
11/28/2011Closes $1,715,000 Financing Pursuant to Private Placement Th...
6/20/2008Closes $18.6 Million Private Placement
6/2/2008Announces $15 Million Private Placement
Financials of Erdene Resource Development Corporation
8/17/2009Reports 2009 Second Quarter Financial Results and Provides P...
5/19/2009Reports 2009 First Quarter Financial Results and Provides Pr...
5/15/2008Reports First Quarter Operating and Financial Results
Project news of Erdene Resource Development Corporation
11/18/2013Completes Trenching Program on the Altan Nar Gold-Silver Pro...
8/8/2012(Donkin)Finalizes Agreement to Separate Donkin Coal and Mongolian Mi...
7/26/2012(Donkin)Provides Donkin Export Coking Coal Project Update
7/3/2012Completes US$3.35 Million Sale of the Granite Hill Quarry Pr...
6/28/2012(Donkin)to Separate into Two Public Companies focused on Donkin Coal...
1/17/2012Granite Hill Quarry Commences Production: Erdene Receives Mi...
7/27/2011(Nomin)Drill Results Confirm Continuity of Copper-Gold-Silver Sulfi...
6/30/2011(Donkin)Receives Independent Technical Report on Donkin Export Cokin...
6/1/2011(Zuun Mod Molybdenum)Receives Mining License for the Zuun Mod Molybdenum-Copper P...
3/4/2011(Zuun Mod Molybdenum)Reports Additional Results from Mongolian Copper Discovery: ...
11/28/2008(Donkin Coal Project)Provides Update on Donkin Coal Project
Corporate news of Erdene Resource Development Corporation
7/5/2016Morien Announces Appointment of CFO
11/3/2015Erdene Announces a Three Month Extension to Warrants
10/20/2015Erdene Announces Private Placement; Drilling to Commence on ...
10/15/2015RETRANSMISSION - Erdene Reports Multiple High-Grade Gold-Pol...
10/15/2015Erdene Reports Multiple High-Grade Gold-Polymetallic Interse...
10/5/2015IIROC Trade Resumption - ERD
10/5/2015Erdene Discovers Bonanza Grade Gold in Southwest Mongolia
10/5/2015IIROC Trading Halt - ERD
9/29/2015Erdene Drills 12 m of 5.3 g/t Gold Equivalent at Union North...
9/16/2015Metallurgical Testing at Erdene's Altan Nar Project Returns ...
7/15/2015Erdene and Tian Poh Amend Option Agreement; Drilling to Comm...
7/6/2015Erdene Appoints Layton Croft to the Board of Directors
4/17/2015Erdene Announces Private Placement
4/1/2015Erdene Provides Year-End Financial Results and Project Revie...
4/1/2015Provides Year-End Financial Results and Project Review
4/1/2015IIROC Trade Resumption - ERD
3/31/2015Reports Initial Resource Estimate for Altan Nar Gold-Polymet...
3/31/2015Erdene Reports Initial Resource Estimate for Altan Nar Gold-...
3/31/2015IIROC Trading Halt - ERD
2/12/2015IIROC Trade Resumption - ERD
2/12/2015Erdene Enters Agreement with Tian Poh Resources Ltd to Excha...
2/12/2015IIROC Trading Halt - ERD
2/9/2015IIROC Trade Resumption - ERD
2/9/2015Erdene Intersects Multiple High Grade Gold-Polymetallic Zone...
2/9/2015IIROC Trading Halt - ERD
1/12/2015Intersects 51 m of 2.5 g/t Gold Equivalent at Altan Nar Incl...
1/12/2015Erdene Intersects 51 m of 2.5 g/t Gold Equivalent at Altan N...
12/18/2014CWN Mining Acquisition Corporation Announces Private Placeme...
11/14/2014November 14, 2014 Erdene Secures Financing and Commences Res...
11/14/2014Erdene Secures Financing and Commences Resource Drilling on ...
10/7/2014IIROC Trade Resumption - ERD
10/6/2014Erdene Announces Private Placement; Altan Nar Gold-Polymetal...
10/6/2014IIROC Trading Halt - ERD
10/2/2014Erdene Provides Altan Nar Exploration Update
8/25/2014Erdene Provides Exploration and Corporate Update : Commences...
6/19/2014Erdene Provides Highlights of AGM and Project Updates
6/3/2014IIROC Trade Resumption - ERD
6/2/2014Erdene Intersects High Grade Gold and Base Metal Zone at Alt...
6/2/2014IIROC Trading Halt - ERD
1/23/2014Altan Nar Trenching Intersects Multiple High Grade Gold and ...
10/18/2013Announces Private Placement Altan Nar Gold Project - Explora...
10/18/2013Announces Private Placement : Altan Nar Gold Project-Explora...
10/7/2013Commences Exploration Program at Altan Nar Gold Project
7/2/2013Provides Highlights of AGM and Project Update
6/27/2013Reports Encouraging Metallurgical Results for Altan Nar Gold...
4/11/2013Establishes Strategic Alliance in Mongolia
4/3/2013Provides Year-End Financial Results and Project Review
11/9/2012and Morien Announce Completion of Plan of Arrangement and Co...
11/2/2012and APM Receive Final Court Approval for Plan of Arrangement...
10/26/2012and APM Shareholders Vote in Favor of Plan of Arrangement
10/9/2012Commences Drill Program on the Altan Nar Gold Project
10/2/2012Proposing Division into Two Public Companies
8/22/2012Provides Update on Mongolian Metals Projects
8/13/2012Morien Resources Corp. Selected as Proposed New Name and Joh...
5/30/2012Drilling Continues to Expand Altan Nar Gold Discovery
5/22/2012Announces Sale of its Land and Royalty Interest at the Grani...
5/17/2012Provides Project Updates and First Quarter Financial Results
4/26/2012(Donkin)Schedules Conference Call to Provide Update on Donkin Coal P...
3/29/2012Provides Project Updates and Reports Year End Financial Resu...
3/5/2012Announces Drilling Program for Altan Nar Gold-Silver Project
1/26/2012Confirms Continued Widespread Gold Mineralization at Altan N...
10/12/2011Drilling Confirms Significant Epithermal Gold Mineralization...
9/7/2011Announces Significant New Gold Discovery in Southwest Mongol...
8/15/2011Provides Project Updates and Second Quarter Financial Result...
7/6/2011(Nomin)Initial Drill Results Confirm Copper-Gold Sulfide Zone at Er...
6/21/20112010 Annual General Meeting-June 23, 2011
6/15/2011Provides Project Updates and First Quarter Financial Results
4/12/2011Provides Project Updates and Reports Year End Financial Resu...
2/17/2011Zuun Mod Results Continue to Enhance Potential of Copper and...
2/28/2009Concludes Reverse Takeover of Beta Minerals Inc.
9/15/2008Xstrata Coal Canada Increases Ownership in Erdene
5/29/2008Erdene Name Change Approved at Annual and Special Meeting
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ERD.TO)Other OTC (ERDGF)
0.395+1.28%210,713.380
TORONTO
CA$ 0.395
04/19 11:11 0.010
1.28%
Prev close Open
0.390 0.395
Low High
0.395 0.395
Year l/h YTD var.
0.300 -  0.410 16.18%
52 week l/h 52 week var.
0.280 -  0.410 5.33%
Volume 1 month var.
3,000 -1.25%
24hGold TrendPower© : 21
Produces
Develops
Explores for Coal
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202427.42%
20238.77%0.450.29
2022-34.48%0.500.25
20217.41%0.500.33
2020138.24%0.710.13
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.30+2.31%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.57+5.19%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.55+1.19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.92-0.84%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.22+1.55%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :