Erdene Resource Development Corporation

Published : March 28th, 2018

Erdene Provides Project Review and Year-End Financial Results; Announces Q2 Drill Program at Bayan Khundii and Regional Gold-Copper Projects

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Erdene Provides Project Review and Year-End Financial Results; Announces Q2 Drill Program at Bayan Khundii and Regional Gold-Copper Projects

HALIFAX, Nova Scotia, March 28, 2018 (GLOBE NEWSWIRE) -- Erdene Resource Development Corp. (ERD.TO) ("Erdene" or "Company"), is pleased to provide a review of its 2017 activities and an outlook for 2018, including plans for the Company’s principle gold projects in southwest Mongolia.  This release should be read in conjunction with the Company’s 2017 Financial Statements, MD&A and AIF on the Company’s website or on SEDAR.

“The past year was very successful in establishing the potential for substantial, high-grade, near-surface gold mineralization at both our Bayan Khundii and Altan Nar projects, while adding new exploration opportunities with high-grade drill intercepts on other targets within the Bayan Khundii licence area,” said Peter Akerley, Erdene’s President and CEO. “Our objectives are clear, advance our core gold projects through the various studies required to support development, balanced with exploration designed to bring growth through refining the potential of the known prospect areas and identifying new targets.  We will also be opportunistic regarding the acquisition of additional land that compliments and brings value to our current portfolio.”

Project and Financial Highlights (see map for reference)

Bayan Khundii Gold Project – 100% Erdene

  • Exploration to date has established a gold mineralized body spread over a 1.4 kilometre long trend, locally coming to surface, up to 400 metres wide and 250 metres deep. 
  • Of the 234 holes completed, 31% have reported visible gold, with 18% intersecting greater than one ounce of gold over 1 to 2 metre intervals.
  • The 2017 drill program discovered significant new zones including Midfield, Midfield North, Striker West, and between Midfield and Striker, with the following drill highlights:
  • Midfield North Zone:
    • Step-out drilling north of the Midfield Zone extended mineralization for up to 280 metres, returning:
    • 2200 g/t gold over 1 metre, within 14 metres of 158 g/t gold (BKD-231);
    • 108 metres of 2.8 g/t gold, including 20 metres of 7.2 g/t gold (BKD-110);
    • 40 metres of 3.3 g/t gold (BKD-179);
    • 120 metres of 1.14 g/t gold including 3 metres of 33 g/t gold (BKD-188); and
    • 22 metres of 8.3 g/t gold, within 36.5 metres of 5.6 g/t gold (BKD-232).  
  • Midfield Zone:
    • Drilling established strong continuity of high-grade zones and confirmed greater depth potential, with results including:
    • 80 metres of 6.0 g/t gold (BKD-98);
    • 56 metres of 6.1 g/t gold (BKD-99); and
    • 25 metres of 5.8 g/t gold (BKD-230).
    • While most of the drilling in the Midfield Zone focused on extending the northern limits of mineralization, hole BKD-210, located 80 metres east of Midfield’s eastern boundary, returned 43 metres of 1.8 g/t gold and included gold values up to 44.8 g/t.
  • Striker-Midfield Zone Connection:
    • 2017 drilling successfully demonstrated continuity of Midfield down dip, vertically below the surface exposure of Striker, and has also begun to define a new, near-surface, high-grade zone between Striker and Midfield;
    • BKD-222 intersected 23 metres of 6.7 g/t gold with individual samples (1 metre) up to 139 g/t gold within 50 metres of surface with earlier, adjacent holes (BKD-86 and BKD-153) returning individual samples of 94.8 g/t gold and 31.4 g/t gold, respectively, within wider mineralized intervals up to 150 metres of 1.5 g/t gold, again within 50 metres of surface.
    • Prior to the 2017 exploration season, limited drilling had taken place in the 200-metre wide zone, separating Striker from Midfield.
  • West Striker Zone:
    • 27 holes have been completed in the area west of the Striker Zone at 20 to 80 metre spacing, over a 375 by 250 metre area.  Of the 27 holes, 26 have intersected anomalous gold mineralization, with 13 returning high-grade intervals of greater than 10 g/t gold.
    • In Q4-2017, step-out drilling 250 metres west of the Striker Zone returned the best intersection to date in this area with 15 metres of 9.2 g/t gold, including 1 metre of 116 g/t gold (BKD-220), further establishing the potential that exists at West Striker.
  • Striker Zone:
    • While all 51 holes within the Striker Zone have intersected anomalous gold, approximately 70% have returned intervals of greater than 10 g/t gold, and up to 306 g/t gold (1 metre).
    • Closer-spaced drilling to establish continuity of a very high-grade domain returned multiple, high-grade intervals (1 metre) of between 19 g/t and 111 g/t gold, within a broader interval of 61 metres averaging 4.2 g/t gold (BKD-227), supporting continuity of the very high-grade zone intersected in adjacent holes.
  • During 2017, Erdene completed 138 drill holes at Bayan Khundii, totalling 25,567 metres, bringing the total drilled since the Q4-2015 discovery hole to 234 Diamond drill holes, totalling 38,072 metres.
  • Metallurgical testing in 2017 on two master composites yielded similar results to previous metallurgical testing, indicating Bayan Khundii is free milling and amenable to conventional processing techniques, with recoveries ranging from 91% to 99%.

* Reported intervals at Bayan Khundii are not true width. At this time, there is insufficient data with respect to the shape of the new mineralized zones to calculate true orientations in space.

Altan Nar Gold-Polymetallic Project – 100% Erdene (16 kilometres north of Bayan Khundii)

  • Exploration has established 18 gold-silver-base metal target areas within a 5.6 by 1.5 kilometre mineralized corridor. 
  • Drilling in 2017 focussed on further defining and expanding the two most advanced targets, Discovery Zone (“DZ”) and Union North (“UN”), while completing limited drilling on other high priority targets.
  • Drilling at the DZ deposit intersected high-grade gold-polymetallic zones including 5 metres of 29.7 g/t gold within a 20 metre interval of 10.3 g/t gold (TND-110). This zone remains open at depth.
  • In 2017, Erdene completed 31 Diamond holes at Altan Nar totalling 5,794 metres.

Altan Arrow and Khundii North Gold Prospects – 100% Erdene

  • Significant exploration was completed during 2017 within the 11.4 kilometre long Bayan Khundii license, with a focus on the Altan Arrow and Khundii North target areas.
  • The Altan Arrow prospect, 3.5 kilometres north of Bayan Khundii, is a 0.5 by 1 kilometre epithermal gold target area with multiple zones of epithermal quartz veining.
  • 2017 drilling at Altan Arrow returned 70 g/t gold over 2 metres (AAD-12), and drilling of a new target area 300 metres west of AAD-12 returning 39 g/t gold over 1 metre, near-surface (AAD-11).
  • The Khundii North target, 2.5 kilometres east of Altan Arrow, has now been traced over 1 kilometre through gold-in-soil anomalism with rock chips samples returning values up to 22 g/t gold.

Ulaan Copper-Gold Porphyry Prospect – 51% Erdene

  • In Q3-2017 Erdene announced the acquisition of a 51% interest, with the option to acquire up to 100%, in the Ulaan license, located immediately west of its Bayan Khundii license.
  • Ulaan hosts a very large, 3-kilometre diameter, intense alteration zone with characteristics thought to be related to a porphyry complex at depth as well as epithermal gold targets peripheral to the porphyry centre. 
  • In 2017 Erdene conducted an initial exploration program at Ulaan, consisting of geological mapping, prospecting, rock chip sampling, soil-grid geochemical sampling, and an induced polarization geophysical survey, which has produced several drill targets.

Water, Energy, Permitting and HSEC

  • Water: In 2017, a preliminary water resource was identified approximately 15 kilometres from Altan Nar, which is believed to be sufficient to meet the processing needs of both projects (Altan Nar and Bayan Khundii). Additional work will be required in 2018-19 to better define the water resource.
  • Energy: Through an initiative of the International Finance Corporation, the Company is participating in a co-financed study of renewable energy supply options at Bayan Khundii and Altan Nar, which is expected to result in a site-specific business case for renewable energy and the potential co-benefits of integrating renewables into future mine planning.
  • Permitting: In 2017, Erdene engaged several consulting firms in preparation of anticipated resource estimates and preliminary economic studies, mining license applications, and geological modeling and targeting for the Bayan Khundii and Altan Nar projects. Erdene also continued to update the baseline surveys at Bayan Khundii and Altan Nar to fulfill Mongolian regulatory requirements for registering mineral resources.
  • HSEC: In 2017, Erdene approved contributions for over ten different initiatives at the county and province levels focused on improving local livelihoods, basic education and public health. 

Teck-Erdene Alliance

  • Separate from its 100%-owned gold projects, Erdene continued to be active through its Alliance with Teck Resources Limited (“Teck”) in assessing regional base and precious metal opportunities in southwest Mongolia’s prolific Tian Shan copper-gold belt.
  • With the completion of a $500,000 private placement by Teck and the renewal of the Alliance agreement on March 21, 2017, the Alliance’s 2017 exploration program commenced in Q2-2017, consisting of follow-up work to assess anomalous targets identified during the 2016 exploration program.

Corporate Update

  • In Q1-2018, Erdene strengthened its Board with the addition of Cameron McRae and Byambasaikhan Bayanjargal;
    • Mr. McRae brings 28 years experience with Rio Tinto including the role of President for Oyu Tolgoi LLC where he led the construction and start-up of the Oyu Tolgoi copper-gold mine. 
    • Mr. Bayanjargal is a prominent Mongolian businessman with an impressive background, both in Mongolia and central Asia, including serving as the former CEO of Erdenes Mongol, Mongolia’s state-owned resource development company.

Financial Performance - Year-End Financial Results Summary

  • Erdene's year-end 2017 Financial Statements, Management Discussion & Analysis and Annual Information Form were filed with regulatory authorities on March 27, 2018 and are available on the Company's website and on SEDAR
  • For the year ended December 31, 2017, the Company recognized a net loss of $4,027,465, or $0.03 per share, compared to a loss of $2,499,739, or $0.02 per share in 2016.
  • Exploration expenditures, including capitalized costs, totalled $10,244,775 in 2017 compared with $4,664,490 in 2016, an increase of 120%. The Bayan Khundii project represented $6,109,190 or 60% of total 2017 exploration expenditures. Together, the Bayan Khundii and Altan Nar projects represented $7,589,759 or 74% of total 2017 exploration expenditures.
  • Excluding non-cash share-based compensation and depreciation, the 2017 corporate and administrative expenses were $1,495,106 compared with $1,093,111 in 2016 and the corresponding cash exploration expenditures were $9,625,936 in 2017 and $4,468,154 in 2016. The corporate and administrative cash expenses represented 16% of cash exploration expenditures incurred in 2017 compared with 24% in 2016.

Financial Position and Financing

The Company funded its 2017 operations as follows:

  • Proceeds from a bought deal private placement financing in February 2017 for net proceeds of $12.8 million (gross proceeds of $13.8 million); and
  • Proceeds from a non-brokered private placement financing with Teck in April 2017 for net proceeds of $0.5 million.
  • The Company has a current working capital position of $2.3 million.

Outlook

Erdene has discovered a new gold district (“The Khundii Gold District”) in southwest Mongolia that includes seven targets, two of which are considered significant prospects for development: Bayan Khundii and Altan Nar.  Over the past two years Bayan Khundii has rapidly advanced from the discovery of very high-grade gold samples at surface to the Company’s flagship asset. Drilling and surface exploration have also defined multiple targets in the surrounding areas, adjacent to and further north on the Bayan Khundii license, that have significant potential for additional gold resources.  The near-term objectives of the Company are to complete the necessary drilling to allow for the completion in Q3-2018 of a maiden resource estimate at Bayan Khundii and an updated resource estimate for Altan Nar, while continuing to advance exploration on various targets within the larger Khundii Gold District, most importantly Altan Arrow, Khundii North and Ulaan.

In Q2-2018, Erdene will commence a 5,400 metre drill program at Bayan Khundii to establish continuity and extent of recent high-grade intersections identified in 2017. This will be followed by a 1,000 metre drill program at Ulaan and an approximately 1,000 metre drill program at Altan Arrow to follow-up on recent high-grade zones discovered in 2017.  Results of the Q2 Bayan Khundii drilling will be included in the anticipated Q3 maiden resource estimate.  Following the completion of the resource estimates the Company will advance the projects into the studies phase for both scoping through feasibility and for securing the necessary licenses and permits to move the projects toward commercial production.

In addition the Company will continue with its regional, district-scale exploration program to identify additional high-grade precious and base metal projects and will consider opportunities to consolidate the district with future acquisitions like the Ulaan acquisition in Q3-2017. 

Qualified Person and Sample Protocol

Michael MacDonald, P.Geo. (Nova Scotia), Vice President Exploration for Erdene, is the Qualified Person as that term is defined in National Instrument 43-101 and has reviewed and approved the technical information contained in this news release. All samples have been assayed at SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal checks by SGS Laboratory, the Company incorporates a QA/QC sample protocol utilizing prepared standards and blanks.

Diamond saw, with half of the core placed in sample bags and the remaining half securely retained in core boxes at Erdene’s Bayan Khundii exploration camp. All samples were organized into batches of 20 samples including a commercially prepared standard, blank and either a field duplicate, consisting of two, quarter-core intervals, or a laboratory duplicate.  Sample batches were periodically shipped directly to SGS in Ulaanbaatar via Erdene’s logistical contractor, Monrud Co. Ltd." data-reactid="79">Erdene’s sampling protocol for drill core consisted of collection of samples over 1 m or 2 m intervals (depending on the lithology and style of mineralization) over the entire length of the drill hole, excluding minor post-mineral lithologies and un-mineralized granitoids. Sample intervals were based on meterage, not geological controls or mineralization. All drill core was cut in half with a Diamond saw, with half of the core placed in sample bags and the remaining half securely retained in core boxes at Erdene’s Bayan Khundii exploration camp. All samples were organized into batches of 20 samples including a commercially prepared standard, blank and either a field duplicate, consisting of two, quarter-core intervals, or a laboratory duplicate.  Sample batches were periodically shipped directly to SGS in Ulaanbaatar via Erdene’s logistical contractor, Monrud Co. Ltd.

About Erdene

Erdene Resource Development Corp. is a Canada-based resource company focused on the acquisition, exploration, and development of base and precious metals in underexplored and highly prospective Mongolia. The Company has interests in five exploration licenses and a mining license in southwest Mongolia, where exploration success has led to the discovery and definition of several prospects and deposits including: Bayan Khundii – the Company’s flagship and newly discovered, high-grade, near-surface gold project; Altan Nar – an extensive, high- grade, near-surface, gold-polymetallic project located 16 kilometres northwest of Bayan Khundii; Altan Arrow – an early-stage, high-grade gold-silver project 3.5 kilometres north of Bayan Khundii; Ulaan – a recently acquired copper-gold porphyry prospect adjacent to Bayan Khundii; Khuvyn Khar – an early-stage, copper-silver porphyry project; Nomin Tal – a narrow, high-grade copper-gold discovery; and Zuun Mod – a large molybdenum-copper porphyry deposit. In addition to the above projects, Erdene has an Alliance with Teck Resources Limited on regional copper-gold exploration in the prospective Trans Altai region of southwest Mongolia. The Bayan Khundii and Altan Nar licenses have a 2% net smelter returns royalty (“NSR Royalty”) in favour of Sandstorm Gold Ltd. with a buy-back option to reduce the NSR Royalty to 1%. For further information on the Company, please visit www.erdene.com. Erdene has 146,400,586 issued and outstanding common shares and a fully diluted position of 156,792,160 common shares.

Forward-Looking Statements

Certain information regarding Erdene contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Erdene believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Erdene cautions that actual performance will be affected by a number of factors, most of which are beyond its control, and that future events and results may vary substantially from what Erdene currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and is subject to change after that date. The Company does not assume the obligation to revise or update these forward-looking statements, except as may be required under applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE CONTENTS OF THIS RELEASE

Erdene Contact Information
Peter C. Akerley, President and CEO
or
Ken W. MacDonald, Vice President and CFO
Phone:             (902) 423-6419
E-mail:            info@erdene.com
Website:          www.erdene.com
Twitter:           https://twitter.com/ErdeneRes

A map accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/fd258254-d6eb-4b58-a65d-6c0852075f1b

Read the rest of the article at https:
Data and Statistics for these countries : Canada | Georgia | Mongolia | All
Gold and Silver Prices for these countries : Canada | Georgia | Mongolia | All

Erdene Resource Development Corporation

EXPLORATION STAGE
CODE : ERD.TO
ISIN : CA29480N2068
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Erdene is a gold and copper exploration company based in Canada.

Erdene holds various exploration projects in Canada and in Mongolia.

Its main exploration properties are DONKIN in Canada and DURVULJIN UUL, ERDENET and GALSHAR UUL in Mongolia.

Erdene is listed in Canada and in United States of America. Its market capitalisation is CA$ 59.6 millions as of today (US$ 43.5 millions, € 40.6 millions).

Its stock quote reached its highest recent level on July 06, 2007 at CA$ 2.05, and its lowest recent point on November 01, 2013 at CA$ 0.07.

Erdene has 145 390 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Erdene Resource Development Corporation
6/14/2018Erdene becomes first cross-listed firm on the Mongolian Stoc...
5/31/2018Mongolia listing boosts investors confidence in Erdene Resou...
5/10/2018Erdene soars as Altan Nar project in Mongolia proves larger ...
5/3/2018Mongolian Copper Corp considers international fight for Erde...
12/8/2017Mongolian Gov't can't nationalize Erdenet Copper Mine — cour...
Financings of Erdene Resource Development Corporation
4/23/2013Closes Private Placement
12/12/2012Announces Private Placement
12/6/2011Completes Private Placement Financing
11/28/2011Closes $1,715,000 Financing Pursuant to Private Placement Th...
6/20/2008Closes $18.6 Million Private Placement
6/2/2008Announces $15 Million Private Placement
Financials of Erdene Resource Development Corporation
8/17/2009Reports 2009 Second Quarter Financial Results and Provides P...
5/19/2009Reports 2009 First Quarter Financial Results and Provides Pr...
5/15/2008Reports First Quarter Operating and Financial Results
Project news of Erdene Resource Development Corporation
11/18/2013Completes Trenching Program on the Altan Nar Gold-Silver Pro...
8/8/2012(Donkin)Finalizes Agreement to Separate Donkin Coal and Mongolian Mi...
7/26/2012(Donkin)Provides Donkin Export Coking Coal Project Update
7/3/2012Completes US$3.35 Million Sale of the Granite Hill Quarry Pr...
6/28/2012(Donkin)to Separate into Two Public Companies focused on Donkin Coal...
1/17/2012Granite Hill Quarry Commences Production: Erdene Receives Mi...
7/27/2011(Nomin)Drill Results Confirm Continuity of Copper-Gold-Silver Sulfi...
6/30/2011(Donkin)Receives Independent Technical Report on Donkin Export Cokin...
6/1/2011(Zuun Mod Molybdenum)Receives Mining License for the Zuun Mod Molybdenum-Copper P...
3/4/2011(Zuun Mod Molybdenum)Reports Additional Results from Mongolian Copper Discovery: ...
11/28/2008(Donkin Coal Project)Provides Update on Donkin Coal Project
Corporate news of Erdene Resource Development Corporation
7/5/2016Morien Announces Appointment of CFO
11/3/2015Erdene Announces a Three Month Extension to Warrants
10/20/2015Erdene Announces Private Placement; Drilling to Commence on ...
10/15/2015RETRANSMISSION - Erdene Reports Multiple High-Grade Gold-Pol...
10/15/2015Erdene Reports Multiple High-Grade Gold-Polymetallic Interse...
10/5/2015IIROC Trade Resumption - ERD
10/5/2015Erdene Discovers Bonanza Grade Gold in Southwest Mongolia
10/5/2015IIROC Trading Halt - ERD
9/29/2015Erdene Drills 12 m of 5.3 g/t Gold Equivalent at Union North...
9/16/2015Metallurgical Testing at Erdene's Altan Nar Project Returns ...
7/15/2015Erdene and Tian Poh Amend Option Agreement; Drilling to Comm...
7/6/2015Erdene Appoints Layton Croft to the Board of Directors
4/17/2015Erdene Announces Private Placement
4/1/2015Erdene Provides Year-End Financial Results and Project Revie...
4/1/2015Provides Year-End Financial Results and Project Review
4/1/2015IIROC Trade Resumption - ERD
3/31/2015Reports Initial Resource Estimate for Altan Nar Gold-Polymet...
3/31/2015Erdene Reports Initial Resource Estimate for Altan Nar Gold-...
3/31/2015IIROC Trading Halt - ERD
2/12/2015IIROC Trade Resumption - ERD
2/12/2015Erdene Enters Agreement with Tian Poh Resources Ltd to Excha...
2/12/2015IIROC Trading Halt - ERD
2/9/2015IIROC Trade Resumption - ERD
2/9/2015Erdene Intersects Multiple High Grade Gold-Polymetallic Zone...
2/9/2015IIROC Trading Halt - ERD
1/12/2015Intersects 51 m of 2.5 g/t Gold Equivalent at Altan Nar Incl...
1/12/2015Erdene Intersects 51 m of 2.5 g/t Gold Equivalent at Altan N...
12/18/2014CWN Mining Acquisition Corporation Announces Private Placeme...
11/14/2014November 14, 2014 Erdene Secures Financing and Commences Res...
11/14/2014Erdene Secures Financing and Commences Resource Drilling on ...
10/7/2014IIROC Trade Resumption - ERD
10/6/2014Erdene Announces Private Placement; Altan Nar Gold-Polymetal...
10/6/2014IIROC Trading Halt - ERD
10/2/2014Erdene Provides Altan Nar Exploration Update
8/25/2014Erdene Provides Exploration and Corporate Update : Commences...
6/19/2014Erdene Provides Highlights of AGM and Project Updates
6/3/2014IIROC Trade Resumption - ERD
6/2/2014Erdene Intersects High Grade Gold and Base Metal Zone at Alt...
6/2/2014IIROC Trading Halt - ERD
1/23/2014Altan Nar Trenching Intersects Multiple High Grade Gold and ...
10/18/2013Announces Private Placement Altan Nar Gold Project - Explora...
10/18/2013Announces Private Placement : Altan Nar Gold Project-Explora...
10/7/2013Commences Exploration Program at Altan Nar Gold Project
7/2/2013Provides Highlights of AGM and Project Update
6/27/2013Reports Encouraging Metallurgical Results for Altan Nar Gold...
4/11/2013Establishes Strategic Alliance in Mongolia
4/3/2013Provides Year-End Financial Results and Project Review
11/9/2012and Morien Announce Completion of Plan of Arrangement and Co...
11/2/2012and APM Receive Final Court Approval for Plan of Arrangement...
10/26/2012and APM Shareholders Vote in Favor of Plan of Arrangement
10/9/2012Commences Drill Program on the Altan Nar Gold Project
10/2/2012Proposing Division into Two Public Companies
8/22/2012Provides Update on Mongolian Metals Projects
8/13/2012Morien Resources Corp. Selected as Proposed New Name and Joh...
5/30/2012Drilling Continues to Expand Altan Nar Gold Discovery
5/22/2012Announces Sale of its Land and Royalty Interest at the Grani...
5/17/2012Provides Project Updates and First Quarter Financial Results
4/26/2012(Donkin)Schedules Conference Call to Provide Update on Donkin Coal P...
3/29/2012Provides Project Updates and Reports Year End Financial Resu...
3/5/2012Announces Drilling Program for Altan Nar Gold-Silver Project
1/26/2012Confirms Continued Widespread Gold Mineralization at Altan N...
10/12/2011Drilling Confirms Significant Epithermal Gold Mineralization...
9/7/2011Announces Significant New Gold Discovery in Southwest Mongol...
8/15/2011Provides Project Updates and Second Quarter Financial Result...
7/6/2011(Nomin)Initial Drill Results Confirm Copper-Gold Sulfide Zone at Er...
6/21/20112010 Annual General Meeting-June 23, 2011
6/15/2011Provides Project Updates and First Quarter Financial Results
4/12/2011Provides Project Updates and Reports Year End Financial Resu...
2/17/2011Zuun Mod Results Continue to Enhance Potential of Copper and...
2/28/2009Concludes Reverse Takeover of Beta Minerals Inc.
9/15/2008Xstrata Coal Canada Increases Ownership in Erdene
5/29/2008Erdene Name Change Approved at Annual and Special Meeting
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ERD.TO)Other OTC (ERDGF)
0.410+2.50%210,713.380
TORONTO
CA$ 0.410
04/24 16:47 0.010
2.5%
Prev close Open
0.400 0.400
Low High
0.395 0.410
Year l/h YTD var.
0.300 -  0.410 20.59%
52 week l/h 52 week var.
0.280 -  0.410 5.13%
Volume 1 month var.
363,300 -%
24hGold TrendPower© : 21
Produces
Develops
Explores for Coal
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202432.26%
20238.77%0.450.29
2022-34.48%0.500.25
20217.41%0.500.33
2020138.24%0.710.13
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :