Sphinx Resources

Published : November 23rd, 2009

Expanded Winter Drill Progam Initiated at Matagami

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Marketwire

 

 

 

 

Donner Metals Ltd.

TSX VENTURE:

DON

 

 

FRANKFURT:

D4M

 

 

 

 

Other Recent News

 

November 23, 2009

Donner Metals Ltd.: Expanded Winter Drill Progam Initiated at Matagami as Bracemac-McLeod Definition Drilling Proceeds Ahead of Schedule

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Nov. 23, 2009) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports new results from the feasibility definition drill program on the Bracemac-McLeod Deposit and a significantly expanded winter drill program for exploration of the Matagami Camp.

Bracemac-McLeod - Accelerated Feasibility Program (Xstrata Zinc-funded)

Xstrata Zinc is ahead of schedule and under budget on the definition drilling at the Bracemac-McLeod Deposit (NI 43-101, indicated resource of 3.63 Mt grading 11.52% zinc, 1.60% copper, 31.55g/t silver and 0.49g/t gold) and has provided the new assay results listed in Table 1. The attached Table 3 lists all drill results and descriptions of intersections received to date. This drilling will support a revised resource calculation that will form the basis of the Accelerated Feasibility Study scheduled for completion in the second quarter of 2010. Xstrata Zinc awarded the contract for the feasibility study to Genivar Engineering of Quebec City in September and the project is rapidly advancing through its scheduled objectives. Three drills are active on the feasibility drilling and presently focused on defining the three Bracemac zones at 25 metre pierce point spacings.

Regional Exploration (Donner-funded)

The joint Xstrata Zinc/Donner management committee for exploration of the Matagami Camp has approved an expanded program and budget for the upcoming winter season. This program has been initiated and will focus on high potential Matagami-type targets (zinc, copper, silver and gold), as well as the newly discovered Daniel Belt which hosts copper-gold mineralization.
Two drills are currently active on exploration drilling and a third drill will be brought to site when access permits.

Matagami-type targets have been developed at 15 locations within the Matagami Camp, each with multiple drill targets. Recent studies in the North Flank indicate that past production from the Norita, Norita East and New Hosco mines was from mineralization within the stratigraphic hanging wall to the Key Tuffite, indicating potential for discovery at the Key Tuffite marker horizon. The identification of the hanging wall rocks west of New Hosco potentially extends Matagami Camp stratigraphy by 6 kilometres to the west of the past producing New Hosco Mine (1.82 Mt grading 1.73% zinc, 1.73% copper, 10.29g/t silver, 0.34g/t gold). Targets have also been identified in the West Camp and within the in the vicinity of the PD deposits which occur at both the Key Tuffite level and within its stratigraphic hanging wall. A 22.4 kilometre InfiniTEM survey is currently underway to refine the PD targets and to investigate the Key Tuffite in this area.

The 20 kilometre long Daniel Belt is very poorly explored and is characterized by pyroclastic rocks that are more typical of the Noranda Camp to the south. The belt hosts newly discovered copper and gold mineralization in the Daniel-1 area that is characterized by massive copper-rich sulphides (DDH DAN-09-10: 2.20% copper, 0.09% zinc, 8.8g/t silver, 0.25g/t gold over 3.95 metres) with associated disseminated gold mineralization from nearby historical drilling (DDH DAN-03-07: 5.4g/t gold over 0.95 metres). BHEM (borehole electromagnetic) and surface electromagnetic anomalies have been detected immediately along strike of this mineralization. A drill will be mobilized to follow up these targets as soon as access permits.

Recent Exploration Results:

A total of seven diamond drill holes have been completed on targets along the South Flank and results are summarized in the following Table 2.

Diamond drill hole BAS-09-57 was drilled 1.8 kilometres southeast of the former producing Bell Allard Mine (produced 3.59 Mt grading 13.67% zinc, 1.25% copper, 40.55g/t silver, 0.69g/t gold), in an area with untested BHEM geophysical targets and anomalous base metal values in the Key Tuffite returned by previous drilling. The hole intersected 8.5 metres of mineralized Key Tuffite inter-layered with strongly altered rhyolite. Sulfide mineralization was dominated by pyrrhotite with lesser base metal sulphides. An in-hole BHEM response was detected.

Diamond drill hole BRA-09-01 tested an area down-dip from the former producing Bell Allard South Pit Mine (0.23Mt grading 9.24% zinc, 1.14% copper 37g/t silver, 0.51g/t gold). The hole was targeted on untested BHEM targets with strongly anomalous base metal shows in the Key Tuffite. The hole intersected chloritized footwall rhyolite, however the Key Tuffite was not present. A weak BHEM off-hole anomaly was detected.

BRA-09-02 was drilled 1 kilometre southeast of the Bell Allard South Pit to test mineralized Key Tuffite and an off-hole BHEM response returned from BRC-95-11 (6.3% zinc over 10.40 metres, ETW: 3.23m). The hole intersected mineralized Key Tuffite followed by 46.8 metres of strong alteration and stringer sulphide mineralization in the footwall rhyolite. An off-hole BHEM response was detected.

BRA-09-03 tested a surface MegaTEM anomaly immediately northwest of the surface projection of the Bracemac Key Tuffite zone. The hole intersected mineralized Key Tuffite and strongly altered footwall rhyolite. The MegaTEM anomaly was not explained.

Diamond drill hole MCL-09-01 was designed as a stratigraphic step-out 0.5 kilometres northwest of the lower portions of the McLeod Zone. The targeted Key Tuffite sequence was occupied by a gabbro sill. Strongly altered footwall rhyolite was intersected below the sill. BHEM surveying is in progress.

A single drill hole was completed 1.25 kilometres northwest of Xstrata's producing Perseverance Mine to determine the location of the Key Tuffite down-plunge from Perseverance. DJV-09-82 intersected an unmineralized rhyolite sequence representing the Key Tuffite interval. BHEM surveying did not detect an anomaly.

SUMMARY

A total of 257 drill holes have been completed on the Matagami Project since the activity under the Option and Joint Venture Agreement began in late 2006. This includes a total of 53 drill holes that have been completed on the Advanced Feasibility Drilling on Bracemac-McLeod. A total of five drills are currently active on the project, two investigating exploration targets and three on feasibility definition drilling at Bracemac/McLeod.

Based on the Indicated Resource of 3,623,000 tonnes grading 11.52% zinc, 1.60% copper, 31.55g/t silver and 0.49g/t gold at Bracemac-McLeod, Xstrata Zinc is presently conducting an "Accelerated Feasibility Study." Additional geological information, including maps and sections, is available at www.donnermetals.com.

PROJECT OVERVIEW

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $25 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn-back a 15% interest in each area by incurring up to $20 million on a bankable feasibility study. By electing to conduct a bankable feasibility study on Bracemac-McLeod, Xstrata has triggered its back-in right in the South Flank project area, subject to Donner completing its earn-in requirements by May 31, 2011.

The Matagami Project has an area of mutual interest of 4,750 square kilometres and presently includes 3,340 mineral claims covering 801 square kilometres. The project covers the Matagami Mining Camp which is a world-class mining district, with 18 known VMS deposits including 10 past producers of varying sizes, including the giant Matagami Lake Deposit (25.64 million tonnes of 8.2% zinc, 0.56% copper, 20.91g/t silver and 0.41g/t gold) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8,600 million pounds of zinc and 853 million pounds of copper. The Matagami area is well serviced by established infrastructure including the town of Matagami, power, a permitted tailings facility, railway, airport and well developed road and highway networks. Xstrata Zinc is currently producing from its low-cost and wholly-owned Perseverance Deposit which feeds its refurbished 2,600 t/day Matagami mill complex. Any future development under the Donner-Xstrata agreement will benefit from the established infrastructure and facilities. Zinc concentrates produced at Matagami are refined at the Noranda Income Fund zinc refinery in Valleyfield, Quebec. Copper concentrates are smelted at Xstrata's Horne smelter in Rouyn-Noranda and refined at Xstrata's Canadian Copper Refinery in Montreal, Quebec.

The Company's strategy is to explore for and discover zinc-copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date, Donner has discovered new mineralization at Bracemac-McLeod and at Bell Channel. Within the extensive project area there are numerous exploration targets with excellent potential for additional discoveries.

Support of Exploration and Mining from the Gouvernement du Quebec: The discovery and advancement of Bracemac-McLeod, as well as the ongoing exploration in the Matagami Camp is supported by the Gouvernerment du Quebec through their exploration incentive programs. Donner Metals has consistently used the rebates to advance the Matagami Project which in turn supports the regional community and employment. Through this support, additional opportunity for new discoveries is made possible with potential for long-term impact on the Abitibi region.

SUPPLEMENTARY INFORMATION

Xstrata Zinc is the project operator for the Matagami Project the Accelerated Feasibility Study. Xstrata Zinc is responsible for both fieldwork and resource evaluation including, but not limited to, sampling, submittal of samples for assay, assay verification, metallurgical evaluation and QA/QC. Sample preparation and assaying of samples that form the basis of the resource calculation were carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures).

Robin Adair, VP of Exploration for the Company, is the Qualified Person for Donner Metals Ltd. and is responsible for the technical information reported in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer

To view the tables accompanying this news release please click on the following link: http://media3.marketwire.com/docs/don1123.pdf


NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.

 

CONTACT INFORMATION:

Donner Metals Ltd.
Andrea Magee
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
donner@bed-rock.com
www.donnermetals.com

INDUSTRY: Financial Services - Investment Opinion, Financial Services - Investment Services and Trading, Financial Services - Personal Finance

 

 

Footer

 

Sphinx Resources

EXPLORATION STAGE
CODE : SFX.V
ISIN : CA8484221012
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sphinx is a zinc and copper development stage company based in Canada.

Sphinx develops zinc, copper, gold and silver in Canada.

Its main asset in development is PD1 in Canada and its main exploration properties are SOUTH VOISEY BAY, WEST RAGLAN and MATAGAMI in Canada.

Sphinx is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 838 700 as of today (US$ 670 585, € 638 839).

Its stock quote reached its highest recent level on August 26, 2016 at CA$ 0.14, and its lowest recent point on December 06, 2022 at CA$ 0.01.

Sphinx has 83 870 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Sphinx Resources
8/8/2013Announces Second Closing of Private Placement
8/8/2013=3A Donner Metals announces closing of private placement
7/9/2013=3A Financing Update
6/24/2013Announces Financing
11/14/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
2/28/2012Increases Private Placement Financing
2/27/2012Announces C$10,000,000 Private Placement Financing
10/27/2011Announces C$2,440,000 of Private Placement Financings
7/27/2011$3 Million Private Placement
7/25/2011Funds Received, Private Placement Closed
7/13/2011Financing News
2/15/2010Additional Private Placement Closings
11/16/2009Private Placements close
5/14/2009Non-Brokered Financing
1/7/2008 $3.2 Million Private Placement Closed
12/17/2007 Private Placement Increased to $3.2 Million
12/7/2007 $2.0 Million Private Placement
Project news of Sphinx Resources
12/10/2013Donner Metals Acquires Option on Valmond Gold Property from ...
10/30/2013(Matagami)Matagami Exploration Joint Ventures Update
9/3/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
8/13/2013=3A Donner Metals Bracemac=2DMcLeod Interest
8/13/2013Bracemac-McLeod Interest
7/31/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
7/12/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
7/12/2013Update on Bracemac-McLeod Production
5/22/2013More High-Grade at McLeod Deep
5/16/2013Production has started!
5/16/2013Production Commences at Bracemac-McLeod
11/1/2012Development and Exploration Update
9/5/2012Bracemac-Mcleod Continues on Target
7/6/2012Provides Exploration Drilling Update
7/6/2012=3A Higher Production at Bracemac=2DMcLeod
7/5/2012Higher Production at Bracemac-McLeod
2/22/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
1/16/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
10/25/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
4/26/2011(Matagami)Completes Earn-In on the Matagami Project
3/6/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
2/10/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
7/12/2010(Matagami)Drilling Extends McLeod Deep Discovery
3/7/2010(Matagami)Bracemac-McLeod Update
2/16/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
11/23/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
10/1/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
7/15/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
6/5/2009(Matagami)on BNN and Matagami Project Details
5/25/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
2/26/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
2/26/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
2/11/2009(Matagami)featured on Minesite.com
1/26/2009(Matagami)NI43-101 Resource
1/23/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
11/12/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
9/5/2008Provides Initial Results From a Single Drill Hole Program on...
5/27/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
5/9/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
4/11/2008High Grade Discovered Between Bracemac and McLeod
3/3/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
1/9/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Corporate news of Sphinx Resources
12/30/2013Announces Completion of Share Consolidation
12/13/2013Announces Results From AnnualGeneral and Special Meeting and...
11/14/2013Annual and Special General Meeting
7/18/2013Announces Closing of C$2,807,010 Placement
7/8/2013=3A Copper Stream with Sandstorm Amended
7/8/2013Donner Metals Copper Stream With Sandstorm Amended
3/14/2013Announces Financial Support from Quebec Institutions
1/15/2013Stock Options Granted
11/1/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/4/2012Underground photos and video updates from Donner Metals
9/19/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
8/28/2012=3A President's Message
4/17/2012Normand Champigny Appointed President of Donner Metals
2/23/2012Sandstorm Partners With Donner Metals
2/22/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
2/22/2012News Release
1/20/2012Join us at at the Vancouver Resource Show and Exploration Ro...
9/1/2011September Video update from Donner Metals
7/13/2011Sandstorm Provides US$25 Million Senior Financing
4/14/2010Definition Drill Program Completed at Bracemac-McLeod
2/3/2010$2,409,930 Financing Closed
1/30/2010Financing Increased
9/8/2009engineering contract and fast-tracked feasibility
8/24/2009Two Near Term Production Stories
6/22/2009Industrial Alliance Features Report on Donner Metals
5/19/2009A "Green Shoot" Rising
5/14/2009Is At The Starting Gate
2/26/2009Hotsheet
2/18/2009positioned for success
2/9/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
12/4/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
11/25/2008$1.0 Million Financing
11/18/2008Donner Metals has fast-track potential says Reinhard
7/31/2008 Drilling Continues toDelineate and Expand Mineralization at...
8/1/2008Hotsheet for 7/31/2008
5/28/2008$3 Million Debenture Offering
5/27/2008Hotsheet for 5/27/2008
4/11/2008Hotsheet for 4/11/2008
3/20/2008March Chairman's Letter
3/5/2008Hotsheet for 3/5/2008
2/1/2008Engages Mau Capital to Provide Investor Relations
1/8/2008Hotsheet for 1/8/2008
12/7/2007Chairman's Letter
11/28/2007Expands Interest in Matagami Camp
11/8/2007Join us at the San Francisco Hard Assets Investment Conferen...
10/22/2007 Hotsheet for 10/21/2007
8/2/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
6/14/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
6/7/2007Bracemac Yields Additional Results With New Mineralization I...
4/11/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SFX.V)
0.010+0.00%
TSX-V
CA$ 0.010
12/06 09:30 -
0%
Prev close Open
0.010 0.010
Low High
0.010 0.010
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.010 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -9
Produces
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :