UEX Corp

Published : May 27th, 2008

expands Horseshoe Deposit intersecting 0.87% U(3)O(8) over 10.3 metres and reports further continuit

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Diamond | Japan | K Street | Uranium |

Attention Business Editors:

UEX expands Horseshoe Deposit intersecting 0.87% U(3)O(8) over 10.3 metres and reports further continuity of mineralization at the Raven Deposit intersecting 0.38% U(3)O(8) over 37.3 metres

     VANCOUVER, May 27 /CNW/ - UEX Corporation ("UEX") is pleased to announce
the results from the first 93 Diamond drill holes which were completed during
the winter 2008 program on UEX's 100% owned Hidden Bay property in northern
Saskatchewan. The program comprised mainly definition and stepout drilling at
the Horseshoe and Raven Deposits ("Horseshoe" and "Raven"). In total,
20,371 metres of drilling were completed in 77 holes at Horseshoe, and
18,314 metres in 72 holes were completed at Raven between January and April,
2008, of which the first 47 holes from Horseshoe (HU-180 to HU-226) and first
46 holes from Raven (RU-059 to RU-104) are reported here. Results include
intercepts of 0.87% U(3)O(8) over 10.3 metres at Horseshoe in hole HU-182, and
0.38% U(3)O(8) over 37.3 metres at Raven in hole RU-095. Drill holes for which
assays have not yet been returned will be released when results are received.
     "The Raven, Horseshoe and West Bear Deposits at Hidden Bay are adding
significant value to shareholders" said Stephen Sorensen President and CEO of
UEX. "2008 will be an important year for UEX at Hidden Bay. Geotechnical,
metallurgical and environmental baseline studies are ongoing at both Raven and
Horseshoe, and compliant resource estimates slated for completion this year
should allow us to complete final feasibility studies at both deposits in
2009." Sorensen went on to say that "we expect the final feasibility study for
West Bear to be delivered this year, and once received fast track the deposit
through to production."
     Given the competent host rock and depths to mineralization at the Raven
and Horseshoe Deposits, UEX has requested that Golder Associates Ltd.
("Golder") of Saskatoon, SK. assess the cost of developing the shallower Raven
Deposit as a Tailings Management Facility under the assumption that the
deposit will be mined by way of open pit. UEX will need tailings capacity to
deal with the anticipated future mining of Raven and Horseshoe. Raven could
provide this tailing capacity for UEX and others in the area.
     The close proximity of UEX's Raven and Horseshoe Deposits to Cameco's
Rabbit Lake Mill could create an opportunity for the companies to capitalize
on each other's assets. "The concept of access to future milling capacity for
UEX in exchange for access to future tailings capacity for Cameco would appear
to make economic sense for both companies" said Sorensen.

     Horseshoe Deposit Results

     The 2008 drilling, combined with results from previous drilling programs
in 2006 and 2007, has now defined the Horseshoe Deposit over a strike length
of approximately 550 metres. Throughout this area, mineralization occurs in
several stacked, linear and shallow dipping, east-northeast plunging zones.
These have now been defined continuously to the limits of mineralization at a
drill spacing of 15 to 30 metres. The winter 2008 drilling results represent
the final data needed for a National Instrument 43-101 ("N.I. 43-101")
compliant resource calculation at Horseshoe which is expected to be delivered
in the summer of 2008 by Golder. The drilling spacing should be sufficient to
place much of this resource in at least an indicated resource category,
enabling a feasibility study.
     The 2008 drilling was concentrated mainly in the Horseshoe South area
which lies under swampy low ground that prevented drilling in the summer of
2007. Drill holes composited to grades of at least 0.05% U(3)O(8) with a
grade-thickness product of greater than 0.1 are listed in Table 1. Several
holes reported in Table 1 lacked any significant intercepts because they
tested the limits of mineralized zones and consequently provide boundaries for
resource modeling purposes. The most significant of the intercepts are listed
below and except for holes HU-180, HU-208 and HU-212, which were drilled in
the B West Zone where some additional infill holes were required, all of the
holes listed below were drilled in the Horseshoe South area:

     -   0.32% U(3)O(8) over 18.6 metres in hole HU-180 (BW zone, section
         4710N)
     -   0.87% U(3)O(8) over 10.3 metres in hole HU-182 (section 4490N)
     -   0.28% U(3)O(8) over 14.3 metres in hole HU-184 (section 4516N)
     -   0.25% U(3)O(8) over 7.1 metres in hole HU-188 (section 4490N)
     -   0.18% U(3)O(8) over 11.1 metres in hole HU-189 (section 4490N)
     -   0.60% U(3)O(8) over 3.5 metres in hole HU-194 (section 4540N)
     -   0.21% U(3)O(8) over 13.2 metres in hole HU-199 (section 4516N)
     -   0.23% U(3)O(8) over 13.6 metres in hole HU-208 (BW zone, section
         4724N)
     -   2.81% U(3)O(8) over 0.8 metres in hole HU-209 (section 4385N)
     -   0.34% U(3)O(8) over 19.6 metres in hole HU-212 (BW zone, section
         4724N)
     -   0.22% U(3)O(8) over 10.4 metres in hole HU-216 (section 4735N)
     -   0.29% U(3)O(8) over 18.1 metres in hole HU-217 (section 4385N)
     -   0.27% U(3)O(8) over 34.0 metres in hole HU-220 (section 4516N)
     -   0.16% U(3)O(8) over 20.9 metres in hole HU-221 (section 4735N)
     -   0.23% U(3)O(8) over 26.6 metres in hole HU-223 (section 4516N)
     -   0.39% U(3)O(8) over 7.1 metres in hole HU-225 (section 4593N)

     No zone names have been assigned yet to drill hole intersections in the
Horseshoe South area since further modeling will be necessary before the
outline of mineralized zones can be fully interpreted. The B West Zone and an
unnamed zone which lies above the B West Zone pass through this area and
extend through the previous drilling continuously to the northeast end of the
deposit. Other zones, including the large A Zone, which will host much of the
Horseshoe resource, also extend though the Horseshoe South area either
continuously, or as a series of sub-zones which extend off its southwestern
end. Many of the intercepts reported here lie beyond the limits of previous
drilling and have, as with previous drilling programs, significantly extended
the overall footprint of the deposit. The true thickness of each of these
intercepts has yet to be determined since interpretation of the results is
continuing, although the shallow dipping zones in many holes appear to have
been intersected at close to true width of the lens-shaped, shallow plunging
mineralized zones. The mineralization in the Horseshoe South area lies at
depths of 80 to 250 metres below surface, shallower than other parts of the
deposit to the northeast.
     In addition to the results reported above, geochemical results have now
been received from metallurgical holes HU-156 and HU-157, which are currently
undergoing metallurgical processing at SGS Lakefield Research ("Lakefield")
under the supervision of Melis and Associates of Saskatoon, SK. Previously,
only probe results were released from these holes since the whole core was
sent to Lakefield for processing. Geochemical data from holes HU-156, in the
Horseshoe A Zone returned 1.01% U(3)O(8) over 18.2 metres between 168.8 and
187.0 metres, including 2.2% U(3)O(8) over 5.2 metres. This compares closely,
although is higher in grade than previously released probe results of 0.90%
eU(3)O(8) over 19.7 metres. This intercept upgrades this part of the A Zone,
having higher grades and widths than adjacent holes. Hole HU-157 intersected
0.13% U(3)O(8) over 34.9 metres between 285.5 and 320.4 metres, which is
closely comparable to the 0.14% eU3O8 over 34.8 metres previously reported
from probe grades. The very good correlation between values obtained from
probe and geochemical grades allow independent verification of geochemical
results to be used in the resource calculation, in addition to other quality
assurance and quality control procedures routinely undertaken by UEX.
Processing and metallurgical testing on these holes are currently underway.
     Additional mineralization intersected by Gulf Minerals Canada ("Gulf")
historically at Horseshoe is present to the northeast of the resource area.
This area will be tested by drilling during the summer of 2008, and additional
resources could be delineated there.

     Raven Deposit Results

     The winter 2008 drilling program at the Raven Deposit continued to expand
along 30 metre step-out cross sections along strike, with some infill drilling
where necessary to provide a minimum 30 metre drill spacing for resource
calculation. Apart from some infill holes which will be required early during
the summer 2008 program, drilling at Raven is sufficient to proceed with the
planned fall, 2008 timeline for completion of a resource estimate. Recent and
historical drilling suggest that mineralization is still open in some areas to
the east, and these areas will be further tested later in the summer program.
     Drill holes from the initial winter 2008 drill holes at Raven which
composited to grades of at least 0.05% U(3)O(8) with a grade-thickness product
of greater than 0.1 are listed in Table 2. The most significant of these
intercepts include the following:

     -   0.09% U(3)O(8) over 22.2 metres in hole RU-068 (section 5385E)
     -   0.09% U(3)O(8) over 20.0 metres, and
         0.30% U(3)O(8) over 11.0 metres in hole RU-071 (section 5630E)
     -   0.21% U(3)O(8) over 8.0 metres in hole RU-077 (section 5630E)
     -   0.22% U(3)O(8) over 8.1 metres in hole RU-085 (section 5385E)
     -   0.17% U(3)O(8) over 13.5 metres, and
         0.21% U(3)O(8) over 8.5 metres in hole RU-087 (section 5360E)
     -   0.16% U(3)O(8) over 11.0 metres in hole RU-091 (section 5360E)
     -   0.39% U(3)O(8) over 4.3 metres in hole RU-092 (section 5506E)
     -   0.38% U(3)O(8) over 37.3 metres, including
         0.82% U(3)O(8) over 9.4 metres in hole RU-095 (section 5445E)
     -   0.51% U(3)O(8) over 7.0 metres in hole RU-103 (section 5360E)
     -   1.04% U(3)O(8) over 1.9 metres in hole RU-104 (section 5506E)

     To date, mineralization has been defined over a strike length of
approximately 600 metres in a horizontal, cylindrically-shaped zone fringing
an area of intense clay alteration that is developed in the hanging wall of a
steeply dipping fault. Mineralization occurs near the axis of the Raven
syncline at depths of 50 to 275 metres below surface. Highest grades typically
occur in its upper northern and central margins, where intersections such as
seen in hole RU-095 are locally developed. Areas of lower grade
mineralization, which typically grade between 0.05% and 0.15% U(3)O(8), may be
developed over widths of several tens of metres, defining several
sub-horizontal, elongated zones that are controlled by the distribution of
lithologic units.
     One metallurgical drill hole, hole RU-130, was completed at Raven late
during the winter program utilizing HQ diameter rods. The core is currently
being prepared for metallurgical testing by Melis and Associates, and will be
utilized in future economic assessment of the deposit.

     Summer 2008 Drilling Program

     Drilling during the summer of 2008 is planned to commence in early June
and will consist of a three stage drilling program comprised of the following:

     1)  Further infill and step-out drilling at Raven, and testing of
         historically known mineralization northeast of Horseshoe to be
         conducted during June and July utilizing three drills;

     2)  Helicopter supported drilling of outlying targets such as Tent-Seal,
         Rhino, Shamus and Rabbit West, to be conducted during August and
         September utilizing two drills, where previously alteration and
         mineralization have been intersected in several holes; and

     3)  Further ground drill testing of targets in the Raven-Horseshoe and
         Telephone Lake areas to be conducted late during the program.

     The regional drilling program will be complemented by high resolution
airborne radiometric and magnetic surveys which will be flown during June 2008
over much of the southern and central portions of the Hidden Bay Project by
Geo Data Solutions Inc. (GDS).

     About the Raven and Horseshoe Deposits

     Mineralization at Horseshoe comprises shallow dipping zones of
hematization with disseminated and veinlet pitchblende-boltwoodite-uranophane
that are hosted by folded arkosic quartzite gneiss. Mineralization defined to
date occurs in at least five dominant zones termed A, BW, BE, A1 and A2, which
define two different styles comprised of: a) disseminated
pitchblende-chlorite-hematite, and b) narrower, higher grade nodular and
veinlet pitchblende in hematite-clay alteration. To view maps and cross
sections of Raven and Horseshoe, please access UEX's website at
www.uex-corporation.com under "Projects-Hidden Bay".
     Horseshoe and the adjacent Raven Deposit are located less than
5 kilometres south of Cameco Corporation's Rabbit Lake operations, and
12 kilometres southeast of AREVA Resources Canada Inc.'s ("AREVA") McClean
Lake operations. Both deposits are hosted by competent basement rocks that
could be amenable to both open-pit and conventional underground ramp access
mining methods, pending a positive feasibility study. Using widely spaced
drill holes, in 1980 Gulf estimated a total resource at Raven and Horseshoe of
6.7 million tonnes at an average grade of 0.16% U(3)O(8), representing
approximately 22.82 million contained pounds of U(3)O(8) (13.2 million pounds
grading 0.17% U(3)O(8) at Horseshoe, and 9.62 million pounds grading 0.14%
U(3)O(8) at Raven). These historical resource estimates were not calculated
using current Canadian Institute of Mining, Metallurgy and Petroleum
standards. As a result, they are not compliant with N.I. 43-101, and should
not be relied upon.

     Sample Handling and Quality Assurance

     Drill core geochemical samples are selected with the aid of a hand-held
scintillometer to identify areas of above-background radioactivity. Samples
are split, with half remaining in the core box, and the remainder shipped to
Saskatchewan Research Council Geoanalytical Laboratories ("SRC") where they
are crushed and ground to minus 106 microns. The pulp is digested in aqua
regia leach and analyzed by ICP for uranium and other elements. In addition to
the geochemical analyses, down-hole probe radiometric results, obtained for
all drill holes on completion of drilling, provide an independent check of the
geochemical data. Probe results can be used for grade calculations where poor
ground conditions occur and drill core recoveries are low, although at Raven
and Horseshoe recoveries are generally at, or close to, 100%. UEX routinely
inserts sample blanks and uranium standards of several grades into the sample
stream. In addition, repeat analyses are routinely analyzed, laboratory
standards are inserted by SRC, and selected sample pulps have been submitted
to other independent laboratories for check analyses to assess sample
repeatability and accuracy of the SRC results. Core loss in mineralized zones
within the Horseshoe and Raven deposits is minimal, and geochemical results
are highly repeatable.
     The technical information in this news release regarding Raven and
Horseshoe has been compiled by David Rhys, P. Geo., a Qualified Person as
defined by N.I. 43-101.

     About UEX

     UEX is a Canadian uranium exploration and development company actively
involved in 19 uranium projects, including seven that are 100% owned and
operated by UEX, one joint venture with AREVA that is operated by UEX, ten
joint-ventured with AREVA and one under option from Japan-Canada Uranium
Company, Limited, which are operated by AREVA. The 19 projects, totaling
385,452 hectares (952,450 acres), are located in the eastern, western and
northern perimeters of the Athabasca Basin, the world's richest uranium belt,
which accounts for approximately 23% of the global primary uranium production.
UEX is currently developing several uranium deposits in the Athabasca Basin
which include the Anne and Kianna Deposits at its Shea Creek Uranium Project,
a joint venture with AREVA in the western Athabasca Basin, and the West Bear,
Raven and Horseshoe deposits located at its 100% owned Hidden Bay Project in
the eastern Athabasca Basin. UEX's exploration and development budgets for
2008 are estimated at approximately $40 million, of which UEX will be
responsible for approximately $30 million.

            ON BEHALF OF THE BOARD OF DIRECTORS OF UEX CORPORATION

                              Stephen H. Sorensen
                              President & C.E.O.

     Forward-Looking Statements

     This news release contains "forward-looking statements" that are based on
UEX's current expectations, estimates, forecasts and projections. These
forward-looking statements include statements regarding UEX's outlook for our
future operations, plans and timing for the commencement or advancement of
exploration activities on our properties, and other expectations, intention
and plans that are not historical fact. The words "estimates", "projects",
"expects", "intends", "believes", "plans", or their negatives or other
comparable words and phrases are intended to identify forward-looking
statements. Such forward-looking statements are subject to risks,
uncertainties and other factors that could cause actual results to differ
materially from future results expressed or implied by such forward-looking
statements. Many of these factors are beyond the control of UEX. Consequently,
all forward-looking statements made in this news release are qualified by this
cautionary statement and there can be no assurance that actual results or
developments anticipated by UEX will be realized. For the reasons set forth
above, investors should not place undue reliance on such forward-looking
statements. UEX disclaims any intention or obligation to update or revise
forward-looking information, whether as a result of new information, future
events or otherwise.


                                   Table 1.
                    Winter 2008 Horseshoe Drilling Program
               Intersections from Drill Holes HU-180 to HU-226.

     Only intervals with composite grades greater than 0.05% U(3)O(8) and a
grade-thickness product greater than 0.1 are listed below. All analyses were
performed by Saskatchewan Research Council by ICP. No intervals greater than
0.05% and a grade thickness product higher than 0.1 were intersected in holes
HU-181, 186, 187, 191, 196, 202, 203, 204, 206, 207, 210, 211, 215, 218, 219,
222, and 224.

     -------------------------------------------------------------------------
              Section  Depth of Hole  From        To       Length  Avg. Grade
     Hole     (North)     (metres)  (metres)   (metres)   (metres)   (% U3O8)
     -------------------------------------------------------------------------
     HU-180      4710       344       216.0       217.4        1.4      0.090
     HU-180                           220.8       221.7        0.9      0.077
     HU-180                           244.1       252.4        8.3      0.103
     HU-180                           261.0       279.6       18.6      0.322
     -------------------------------------------------------------------------
     HU-182      4490       200       172.7       183.0       10.3      0.871
     -------------------------------------------------------------------------
     HU-183      4710       341       106.9       112.7        5.8      0.166
     HU-183                           115.9       117.0        1.1      0.196
     HU-183                           240.9       243.0        2.1      0.085
     HU-183                           269.3       275.3        6.0      0.215
     -------------------------------------------------------------------------
     HU-184      4516       221       181.5       195.8       14.3      0.277
     -------------------------------------------------------------------------
     HU-185      4490       209       182.4       186.7        4.3      0.308
     -------------------------------------------------------------------------
     HU-188      4490       220       166.2       173.3        7.1      0.254
     -------------------------------------------------------------------------
     HU-189      4490       207       164.5       166.0        1.5      0.115
     HU-189                           176.9       188.0       11.1      0.177
     -------------------------------------------------------------------------
     HU-190      4540       220        96.2        97.7        1.5      0.147
     HU-190                           120.5       127.1        6.6      0.151
     HU-190                           192.5       194.1        1.6      0.189
     -------------------------------------------------------------------------
     HU-192      4540       237       166.0       167.0        1.0      0.129
     HU-192                           192.5       194.5        2.0      0.203
     -------------------------------------------------------------------------
     HU-193      4490       242       176.0       176.8        0.8      0.200
     HU-193                           200.1       201.9        1.8      0.777
     HU-193                           206.5       207.2        0.7      0.447
     -------------------------------------------------------------------------
     HU-194      4540       240       146.0       149.0        3.0      0.100
     HU-194                           153.0       156.5        3.5      0.604
     HU-194                           179.0       180.5        1.5      0.486
     -------------------------------------------------------------------------
     HU-195      4411       222       195.7       196.6        0.9      0.433
     -------------------------------------------------------------------------
     HU-197      4465       211       135.0       138.2        3.2      0.216
     -------------------------------------------------------------------------
     HU-198      4411       219       155.0       157.0        2.0      0.105
     HU-198                           166.8       168.5        1.7      0.073
     HU-198                           209.8       210.4        0.6      0.733
     -------------------------------------------------------------------------
     HU-199      4516       224       111.8       125.0       13.2      0.211
     HU-199                           205.8       206.7        0.9      0.376
     -------------------------------------------------------------------------
     HU-200      4465       260        99.5       100.0        0.5      0.653
     HU-200                           140.0       142.0        2.0      0.127
     HU-200                           221.7       230.2        8.5      0.151
     -------------------------------------------------------------------------
     HU-201      4411       240       214.7       216.0        1.3      0.186
     -------------------------------------------------------------------------
     HU-205      4490       200       167.9       168.8        0.9      0.537
     -------------------------------------------------------------------------
     HU-208      4724       326       243.7       248.0        4.3      0.116
     HU-208                           288.5       302.1       13.6      0.232
     -------------------------------------------------------------------------
     HU-209      4385       241       210.5       211.3        0.8      2.806
     -------------------------------------------------------------------------
     HU-212      4724       307       137.0       138.5        1.5      0.116
     HU-212                           211.0       212.6        1.6      0.387
     -------------------------------------------------------------------------
     HU-212                           243.0       245.6        2.6      0.083
     HU-212                           252.8       272.4       19.6      0.344
     -------------------------------------------------------------------------
     HU-213      4385       249       135.8       136.9        1.1      0.165
     -------------------------------------------------------------------------
     HU-214      4570       215       131.2       132.2        1.0      0.644
     HU-214                           137.9       139.5        1.6      0.869
     HU-214                           171.3       173.0        1.7      0.177
     -------------------------------------------------------------------------
     HU-216      4735       347       122.0       123.4        1.4      0.082
     HU-216                           237.0       245.2        8.2      0.158
     HU-216                           257.0       259.0        2.0      0.120
     HU-216                           274.6       285.0       10.4      0.218
     HU-216                           320.0       320.6        0.6      0.205
     -------------------------------------------------------------------------
     HU-217      4385       246       187.4       205.5       18.1      0.290
     -------------------------------------------------------------------------
     HU-220      4516       230       122.0       156.0       34.0      0.268
     -------------------------------------------------------------------------
     HU-221      4735       323       134.9       137.0        2.1      0.117
     HU-221                           278.5       281.5        3.0      0.087
     HU-221                           286.7       307.6       20.9      0.155
     -------------------------------------------------------------------------
     HU-223      4516       200       104.5       131.1       26.6      0.228
     -------------------------------------------------------------------------
     HU-225      4593       256       155.7       162.8        7.1      0.390
     HU-225                           183.3       184.2        0.9      0.766
     -------------------------------------------------------------------------
     HU-226      4516       215       185.8       189.3        3.5      0.363
     -------------------------------------------------------------------------

                                   Table 2.
                      Winter 2008 Raven Drilling Program
               Intersections from Drill Holes RU-059 to RU-104.

     Only intervals with composite grades greater than 0.05% U(3)O(8) and a
grade-thickness product greater than 0.1 are listed below. All analyses were
performed by SRC by ICP. No intervals greater than 0.05% and a grade thickness
product higher than 0.1 were intersected in holes RU-059, 061, 062 066, 074,
082, 086, 088, 089, 101, and 102.

     -------------------------------------------------------------------------
              Section  Depth of Hole  From        To       Length  Avg. Grade
     Hole      (East)     (metres)  (metres)   (metres)   (metres)   (% U3O8)
     -------------------------------------------------------------------------
     RU-060      5580       242        71.0        71.5        0.5      0.355
     RU-060                           141.4       150.0        8.6      0.084
     RU-060                           164.5       166.1        1.6      0.059
     -------------------------------------------------------------------------
     RU-063      5580       272       206.0       208.5        2.5      0.063
     RU-063                           212.0       213.0        1.0      0.153
     RU-063                           231.7       234.6        2.9      0.054
     RU-063                           242.7       243.6        0.9      0.121
     RU-063                           246.0       253.0        7.0      0.079
     -------------------------------------------------------------------------
     RU-064      5385       297       139.1       140.5        1.4      0.097
     RU-064                           142.6       143.9        1.3      0.080
     RU-064                           145.9       153.4        7.5      0.093
     RU-064                           158.0       163.0        5.0      0.086
     RU-064                           187.9       204.3       16.4      0.092
     -------------------------------------------------------------------------
     RU-065      5580       272       209.0       213.0        4.0      0.089
     RU-065                           218.7       223.0        4.3      0.098
     -------------------------------------------------------------------------
     RU-067      5580       242       153.7       155.7        2.0      0.133
     RU-067                           188.0       195.5        7.5      0.096
     -------------------------------------------------------------------------
     RU-068      5385       302       108.0       130.2       22.2      0.093
     RU-068                           207.2       210.0        2.8      0.068
     -------------------------------------------------------------------------
     RU-069      5580       246       205.0       205.5        0.5      0.391
     -------------------------------------------------------------------------
     RU-070      5664       244       179.1       180.1        1.0      0.533
     RU-070                           194.5       199.2        4.7      0.112
     RU-070                           225.5       226.7        1.2      0.206
     -------------------------------------------------------------------------
     RU-071      5630       302        63.0        64.0        1.0      0.540
     RU-071                           113.0       114.0        1.0      0.203
     RU-071                           121.0       141.0       20.0      0.088
     RU-071                           146.0       147.0        1.0      0.199
     RU-071                           167.0       178.0       11.0      0.304
     RU-071                           185.0       186.0        1.0      0.354
     -------------------------------------------------------------------------
     RU-072      5385       251       164.1       165.3        1.2      0.247
     RU-072                           182.5       186.4        3.9      0.120
     RU-072                           192.5       194.2        1.7      0.225
     -------------------------------------------------------------------------
     RU-073      5664       239       162.3       165.1        2.8      0.097
     -------------------------------------------------------------------------
     RU-075      5630       302       121.0       143.0       22.0      0.067
     RU-075                           160.0       161.0        1.0      0.193
     RU-075                           169.0       184.5       15.5      0.090
     RU-075                           268.3       269.0        0.7      0.191
     -------------------------------------------------------------------------
     RU-076      5664       239        62.7        64.0        1.3      0.081
     RU-076                           127.0       128.6        1.6      0.071
     RU-076                           148.0       149.1        1.1      0.097
     RU-076                           154.4       156.2        1.8      0.264
     -------------------------------------------------------------------------
     RU-077      5630       302        93.0       101.0        8.0      0.208
     -------------------------------------------------------------------------
     RU-078      5385       232       106.3       111.6        5.3      0.119
     RU-078                           197.0       199.8        2.8      0.086
     -------------------------------------------------------------------------
     RU-079      5360       341       117.7       120.5        2.8      0.054
     RU-079                           133.0       137.0        4.0      0.067
     RU-079                           141.8       144.5        2.7      0.085
     RU-079                           160.0       169.0        9.0      0.074
     RU-079                           188.0       196.0        8.0      0.073
     RU-079                           223.0       225.0        2.0      0.117
     -------------------------------------------------------------------------
     RU-080      5630       247       129.9       132.5        2.6      0.100
     RU-080                           216.3       219.6        3.3      0.211
     -------------------------------------------------------------------------
     RU-081      5630       200        32.1        33.1        1.0      0.253
     RU-081                           110.4       113.6        3.2      0.173
     RU-081                           129.5       133.5        4.0      0.070
     -------------------------------------------------------------------------
     RU-083      5360       341       123.0       132.0        9.0      0.077
     -------------------------------------------------------------------------
     RU-084      5630       200        93.5        96.9        3.4      0.078
     -------------------------------------------------------------------------
     RU-085      5385       302       102.0       109.8        7.8      0.051
     RU-085                           127.9       128.9        1.0      0.100
     RU-085                           157.2       165.3        8.1      0.222
     -------------------------------------------------------------------------
     RU-087      5360       240        98.0       111.5       13.5      0.172
     RU-087                           133.0       138.0        5.0      0.058
     RU-087                           237.0       245.5        8.5      0.214
     -------------------------------------------------------------------------
     RU-090      5664       161        42.0        44.1        2.1      0.336
     RU-090                            68.6        69.1        0.5      0.163
     RU-090                           120.4       122.7        2.3      0.357
     RU-090                           131.6       132.7        1.1      0.272
     -------------------------------------------------------------------------
     RU-091      5360       300       152.5       167.0       14.5      0.100
     RU-091                           187.0       198.0       11.0      0.163
     RU-091                           210.0       220.0       10.0      0.065
     -------------------------------------------------------------------------
     RU-092      5506       278       186.3       186.6        0.3      0.863
     RU-092                           194.0       198.3        4.3      0.390
     RU-092                           209.4       212.6        3.2      0.091
     RU-092                           217.6       222.3        4.7      0.080
     -------------------------------------------------------------------------
     RU-093      5695       317        65.3        67.3        2.0      0.157
     RU-093                           103.7       117.8       14.1      0.076
     -------------------------------------------------------------------------
     RU-094      5360       360        87.6        88.2        0.6      0.259
     RU-094                            97.5       100.5        3.0      0.127
     RU-094                           113.0       118.5        5.5      0.072
     RU-094                           125.0       126.5        1.5      0.084
     RU-094                           137.0       146.5        9.5      0.100
     RU-094                           227.0       228.5        1.5      0.067
     RU-094                           241.0       245.0        4.0      0.094
     RU-094                           260.0       263.0        3.0      0.094
     -------------------------------------------------------------------------
     RU-095      5445       242       117.0       154.3       37.3      0.377
     RU-095         including         120.4       129.8        9.4      0.816
     RU-095                           160.8       162.2        1.4      0.131
     RU-095                           185.4       186.1        0.7      0.403
     -------------------------------------------------------------------------
     RU-096      5360       263       183.0       185.0        2.0      0.162
     RU-096                           188.0       191.0        3.0      0.055
     -------------------------------------------------------------------------
     RU-097      5695       251        58.8        61.6        2.8      0.061
     RU-097                           178.6       181.5        2.9      0.073
     -------------------------------------------------------------------------
     RU-098      5445       239        93.9        95.2        1.3      0.180
     RU-098                           124.4       125.0        0.6      0.173
     -------------------------------------------------------------------------
     RU-099      5360       242       107.0       108.5        1.5      0.323
     RU-099                           158.4       179.0       20.6      0.072
     -------------------------------------------------------------------------
     RU-100      5695       251        89.7        92.5        2.8      0.051
     RU-100                           234.3       241.8        7.5      0.065
     -------------------------------------------------------------------------
     RU-103      5360       301       117.5       125.0        7.5      0.145
     RU-103                           157.0       164.0        7.0      0.507
     RU-103                           193.5       194.0        0.5      0.307
     RU-103                           206.5       208.0        1.5      0.160
     -------------------------------------------------------------------------
     RU-104      5506       179        79.0        80.9        1.9      1.036
     -------------------------------------------------------------------------

     %SEDAR: 00017609E
For further information: UEX CORPORATION, Suite 1007 - 808 Nelson Street,
Vancouver, B.C., Canada, V6Z 2H2, PH: (604) 669-2349, FAX (604) 669-1240,
Website: www.uex-corporation.com, email: uex@intergate.ca

.
Data and Statistics for these countries : Canada | Japan | All
Gold and Silver Prices for these countries : Canada | Japan | All

UEX Corp

EXPLORATION STAGE
CODE : UEX.TO
ISIN : CA9026661061
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

UEX is a gold and copper exploration company based in Canada.

UEX holds various exploration projects in Canada.

Its main exploration properties are BLACK LAKE, RIOU LAKE, BEATTY RIVER, DOUGLAS, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, FOND DU LAC, SHEA CREEK, HIDDEN BAY, ALEXANDRA, BRANDER LAKE PROJECTS and JAMES CREEK PROJECTS in Canada.

UEX is listed in Canada and in Germany. Its market capitalisation is CA$ 158.0 millions as of today (US$ 126.3 millions, € 126.7 millions).

Its stock quote reached its lowest recent point on August 15, 2003 at CA$ 0.05, and its highest recent level on November 09, 2007 at CA$ 9.30.

UEX has 319 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of UEX Corp
5/18/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
6/5/2013Announces Closing of Private Placement
5/25/2013Announces $3.175 Million Private Placement
2/23/2012Announces $3 Million Private Placement
Nominations of UEX Corp
12/19/2013Announces the Appointment of Roger Lemaitre as President and...
4/29/2011appoints Ed Boney as Chief Financial Officer
5/27/2010Appoints Walter Segsworth and David Rhys to its Management A...
Financials of UEX Corp
11/6/2013Third Quarter 2013 Financial Results and MD&A
Project news of UEX Corp
1/7/20142014 Joint Venture Exploration Programs Commence
6/4/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
4/10/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
3/20/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
2/13/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
4/26/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
2/16/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
11/30/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
8/9/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
2/24/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
2/18/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
1/27/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
1/6/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
7/23/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
2/25/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
1/12/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
1/5/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
9/29/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
6/18/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
1/17/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
1/15/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
12/5/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
12/4/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
11/14/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
10/18/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
9/4/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
8/21/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
7/23/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
7/12/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
6/14/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
2/8/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Corporate news of UEX Corp
8/18/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
7/11/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
6/24/2016High Grade Zone Extended at Christie Lake
6/13/2016Drill Turning at Christie Lake
6/8/2016UEX Corporation Reports Results of Annual General Shareholde...
5/25/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
5/17/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
5/2/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
4/28/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
4/13/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
1/22/2016UEX Closes $2.0 Million Private Placement
1/19/2016Final Option Agreement Signed - Drill Program to Commence Im...
1/19/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
12/22/2015UEX Announces $2.0 Million Private Placement
10/26/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
9/21/2015Uranium companies could take the cake
4/21/2015UEX Announces $2.5 Million Private Placement
4/10/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
2/27/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
6/5/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
4/2/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
11/28/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
8/6/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
6/4/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
3/21/2013(Beatty River)Announces Completion of Beatty River Earn-in
8/8/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
6/8/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
5/31/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
5/7/2012Terminates Shareholder Rights Plan
5/1/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
2/17/2012Announces $8 Million Bought Deal
12/16/2011Comments by David Talbot on UEX Corporation in the Energy Re...
12/7/2011Adopts Shareholder Rights Plan
12/6/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
6/24/2011Board Re-elected
4/28/2011appoints Nan Lee as Vice-President of Project Development
3/17/2010Significant Unconformity Intersections at Shea Creek's 58B A...
9/23/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
6/10/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
11/26/2008Announces Minimum $16.5 Million Budget for 2009
4/9/2008 reports final results of 2007 Horseshoe and Raven drilling,...
3/26/2008Eaton Joins UEX Board
1/22/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
1/14/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
12/14/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
7/11/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
4/23/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
2/28/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0.495+16.47%0.385+2.67%
TORONTO
CA$ 0.495
08/24 16:59 0.070
16.47%
Prev close Open
0.425 0.400
Low High
0.440 0.500
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.495 -%
Volume 1 month var.
9,418,620 -%
24hGold TrendPower© : 44
Produces
Develops
Explores for Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202230.26%0.510.24
202146.15%0.600.25
2020108.00%0.280.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :