Serabi Gold Plc

Published : June 05th, 2007

Exploration results indicate new mining potential at Palito

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment


Exploration update

SERABI MINING plc ("Serabi" or "the Company)

Exploration results indicate new mining potential at Palito

 

 

Serabi Mining plc (AIM:SRB) announces ongoing exploration success at the Ruari's Ridge and Chico do Santo projects, which now provides a basis for detailed evaluation and preliminary mining to commence during the second half of the year, with the potential for full scale mining to start in 2008.

 

  • Drill and trench intersections at Ruari's Ridge confirm the presence of a major new  mineralized zone, consisting of multiple veins that Serabi expects will form the basis of a new mining area     
  • Results at Ruari's Ridge extends the inferred strike extension of high-grade gold/copper mineralisation by 300m to 950m strike and vertically by 100m to 300 metres
  • Extent and number of mineralised structures increases at the Chico do Santo project, with improved potential to establish a satellite mine in this area    
  • A detailed evaluation programme will now commence at both projects with the objective of commencing full-scale mining in 2008 

 

With increasing facilities coming into place, exploration and evaluation has been escalating during the past year across the Jardim do Ouro district, the area immediately adjacent to Serabi's Palito gold mine.  Resulting from this ongoing drill and trench results from the Ruari's Ridge and Chico do Santo projects now indicate both have good potential to be developed as satellite mines at the Palito operation.              

 

Ruari's Ridge

 

Located approximately 500m south-west of the underground mining operation established on the Palito Main Zone (PMZ) mineralisation, the Ruari's Ridge project was originally defined by a strong gold-in-soil geochemical anomaly, situated on the flank of a significant magnetic geophysical high; it is noteworthy that a similar geochemical anomaly has been identified just over 100m to the south-east but is yet to be tested.  Preliminary drill results reported in the Company's Exploration Updates of 13 September, 2006 and 26 March, 2007, identified sub-parallel zones of gold and copper mineralisation extending over 600m strike and 200m down dip.  Initial Phase-2 follow-up drill and trench results now confirm the presence of at least three or four sub-parallel zones of gold-copper mineralisation which has extended the inferred strike extension of high-grade gold/copper mineralisation to 950m along strike and 300m vertically.

 

Trenching has revealed regular intercepts of gossaniferous (1) veins along the central portion of the main soil geochemistry anomaly, confirming continuity of mineralisation over 400m strike.  In addition, the occurrence of a further gossaniferous altered outcrop returning more than 13 g/t gold some 400m south-east of these trenches and directly along strike, indicates a potential surface exposure of 800m.

 

Furthermore, positive drill intersections 150m north-west of the gossaniferous trenches, is thought to indicate a further extension of the same mineralisation, indicating a cumulative total of at least 950m of inferred strike extent of the Ruari's Ridge mineralisation.

 

 

The results from diamond drilling also indicate high-grade mineralization persists to 300m vertically beneath the mineralised trench intercepts, compared with 200m previously indicated.  This drilling also shows that parallel zones of high-grade mineralization exists in the central part of the strike, with up to 3 additional zones identified parallel to the main zone.

 

 

(1) Gossan: mass of weathered material resulting from oxidation by percolating waters of outcrops of sulphide mineral deposits

 

 

 

 

 

To date a total of 26 drill holes have been completed along the Ruari's Ridge prospect, with a number of results still outstanding. This drilling is predominately composed of diamond core drilling and some percussion drill holes, for a total of approximately 5,600 metres.

 

Previously Serabi reported the first 6 diamond drill holes into the northern portion of the prospect (PDD 255, 258, 261, 264, 271 and 289-partial) In addition to these a further 20 holes have been completed or are in progress. Results have been collated for 13 holes with complete assays pending on 7 holes.

 

Significant new drilling intercepts include:

 

Hole

               

From (m)

To

(m)

Interval (m)

Au    (g/t Au)

Cu      (%)

PDD0289

42.50

43.57

1.07

1.90

0.03

76.20

76.73

0.53

3.07

0.03

235.42

235.92

0.50

1.04

0.03

254.27

254.94

0.67

45.74

0.46

309.75

310.58

0.83

1.49

0.02

313.18

313.78

0.60

3.77

0.06

397.15

397.70

0.55

50.99

2.70

402.75

404.35

1.60

3.45

0.14

PDD0294

39.85

40.34

0.49

5.38

0.03

44.80

45.61

0.81

1.26

1.40

46.87

48.05

1.18

2.03

0.07

211.84

212.39

0.55

43.04

2.21

PDD0307*

76.4

77.02

0.62

3.64

0.77

PDD0309

34.87

35.50

0.63

1.62

0.04

PDD0311**

106.58

107.36

0.78

2.40

0.03

174.98

175.82

0.84

1.62

0.01

189.00

189.62

0.62

2.61

0.03

266.21

267.14

0.93

2.47

0.01

PDD0313**

57.85

59.45

1.60

5.92

0.06

Including

58.75

59.45

0.70

12.81

0.09

82.24

83.89

1.65

1.62

0.06

RRRB01**

26

28

2.00

10.92

0.03

RRRB02**

31

36

5

2.33

NS

Including

32

34

2

4.24

NS

 

(*) � core assays from Palito Mine Laboratory only, � core sample results are pending from SGSGeosol Laboratory in Belo Horizonte

(**) Partial results for hole received

 

Significant trench sampling intercepts include:

 

 

Hole

               

Interval (m)

Au    (g/t Au)

 

TC-27

17.2

3.23

including 0.45m @ 45.89g/t and 0.9m @ 12.93g/t

TC-28

11.4

6.00

including 3.65m @ 16.83g/t

TC-29

2.40

1.64

 

TC-30

1.20

1.32

 

0.90

2.67

 

3.75

1.02

including 0.7m @ 2.96g/t

 

Trench samples have been assayed at the Palito Mine Laboratory only.

 

Results from a further four trenches are pending.

 

 

Please see attached link to Ruari's Ridge - Plan

 

Please see attached link to Ruari's Ridge - Section 20640 N

 

 

Chico do Santo

 

Situated some 300m north-east of the current PMZ mine, very early exploration identified three mineralised structures running parallel to the PMZ associated with old garimpeiro workings.  Drilling has continued, with a further 8 holes completed for a total of 1,130m.  In addition, preliminary interpretation of a recently completed ground electromagnetic geophysics survey (EM) has enhanced the understanding of the Chico do Santo prospect. Significantly two (2) more potentially mineralised structures have been defined using the survey, bringing the total to five (5) potentially mineralised structures.  Furthermore, results now indicate that such mineralisation could extend to within just 100m of the existing underground mine at Palito.

 

Using the new information and with a better understanding of the structures at Chico do Santo, the new interpretation will enable Serabi to better target drilling on the prospect.

 

Significant new drilling intercepts include:

 

Hole

               

From (m)

To

(m)

Interval (m)

Au    (g/t Au)

Cu      (%)

PDD0292

45.03

45.64

0.61

1.41

0.01

PDD0293

118.25

119.25

1.00

1.33

0.03

143.96

144.54

0.58

1.19

0.06

PDD0296

126.03

126.55

0.52

21.47

1.1

135.63

137.26

1.63

25.76

1.23

PDD0303*

63.28

64.20

0.92

1.67

0.02

73.81

74.37

0.56

7.35

0.33

PDD0308*

136.45

137.00

0.55

10.82

1.53

RC-CS-08�

2.00

4.00

2.00

0.76

0.02

8.00

12.00

4.00

0.91

0.02

RC-CS-10�

3.00

5.00

2.00

0.55

0.01

RC-CS-11�

56.00

61.00

5.00

1.02

0.01

RC-CS-12�

55.00

58.00

3.00

25.07

1.44

 

(*) � core assays from Palito Mine Laboratory only, � core sample results are pending from SGSGeosol Laboratory in Belo Horizonte

(�) RC assays from Palito Mine Laboratory only

 

 

Please see attached link to Chico do Santo - Section 20100 N

 

Commenting on the results, Graham Roberts, the Chairman of Serabi said:

 

"The results from both projects are very exciting and confirm the wider potential of the district from which the Palito operation can be expanded.  As a completely new discovery Ruari's Ridge is particularly meaningful, being previously unknown and unworked by the garimpeiros, with major implications for such potential across the rest of the Jardim do Ouro district.

 

The challenge is now twofold. First, to fully evaluate and hopefully bring to production both these projects as satellite mines of the Palito operation.  In this regard we are fortunate as the topography at Ruaris' Ridge will enable quick underground access to the mineralisation; such development will also provide a platform from which to better exploit the nearby Palito West deposit.  Secondly, in order to ensure we arrive at the best long-term plan for the Palito Operation, it is important to understand better and quantify the full potential of the district from which more significant expansion might be achieved in the future.  In this regard we will now escalate the pace of exploration and evaluation in the area."        

 

 

 

Technical and geological information in this report has been read and approved by Serabi's Chief Geologist, Mr Chris Spurway. Mr Spurway BSc (Honours) is a graduate of the University of Sydney in Geology. He is a member of the AusIMM and has worked for over 16 years in mineral exploration including three years in Brazil.

 

 

 

 

 

 

 

Enquiries

 

Serabi Mining plc

Graham Roberts

Tel: 020 7220 9550

Chairman

Mobile: 07768 902 475

 

 

Clive Line

Tel: 020 7220 9550

Finance Director

Mobile: 07710 151 692

 

 

 

 

 

 

Numis Securities Limited

 

John Harrison

Tel: 020 7260 1000

James Black

Tel: 020 7260 1000

 

 

Parkgreen Communications

 

Clare Irvine

Tel: 020 7851 7480

Shannon Wiseman

Tel: 020 78517480

 

 

Notes to Editors

 

The Tapajos region of northern Brazil encompasses an area of approximately 100,000 km�, primarily situated in south-west Para State.  It has a significant history of alluvial gold production with estimated gold production of some 30 million ounces having being recovered, primarily from artisanal workings.

 

Present in the Tapajos since 1999, Serabi has established the only 'hard rock' mine in the region to date at its Palito gold mine, which produced 39,197 ounces of gold equivalent in 2006..  Commercial production was achieved last October at Palito, with cash costs for the fourth quarter of 2006 reported at $252 per ounce of gold equivalent. 

 

Serabi already has a significant exploration programme focused on the Tapajos region, owns and operates four surface drilling rigs and has its own assay laboratory.

 



Ruari's Ridge Plan

Ruari's Ridge - Section 20640 N

Chico do Santo - Section 20100 N

 



This content was distributed through

Hugin Group

- connecting communication professionals with their target audience. Visit us here.

Serabi Gold Plc

PRODUCER
CODE : SRB.L
ISIN : GB00B4T0YL77
CUSIP : 00B074J639
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Serabi Gold is a gold producing company based in United kingdom.

Serabi Gold holds various exploration projects in Brazil.

Its main asset in production is PALITO in Brazil and its main exploration properties are TAPAJOS - MODELO, JARDIM DO OURO, TAPAJOS - PIZON and PIAUI STRKE LENGTH in Brazil.

Serabi Gold is listed in Germany, in United Kingdom and in United States of America. Its market capitalisation is GBX 45.6 billions as of today (US$ 52.8 billions, € 49.5 billions).

Its stock quote reached its lowest recent point on October 31, 2008 at GBX 0.25, and its highest recent level on December 31, 2020 at GBX 99.55.

Serabi Gold has 700 843 570 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Serabi Gold Plc
7/1/2009- Investor Presentations
4/24/2008Corporate presentation 2008
4/5/2006Corporate presentation
Annual reports of Serabi Gold Plc
Notice of AGM and publication of Annual Report and Accounts
Financings of Serabi Gold Plc
3/30/2011 Completion of TSX Listing,C$4.95 million funding and Board ...
3/28/2011- Filing of Final Prospectus, C$4.95 million financing and B...
2/11/2011Filing of Preliminary Prospectus in Canada
Option Grants of Serabi Gold Plc
5/31/2011Awards 1.130.000 Options to its directors at C$0.60
1/28/2011Award of 1,455,000 stock options to directors
12/3/2007Award of 400,000 stock options
Nominations of Serabi Gold Plc
7/29/2013Serabi Gold plc : Appointment of new Director
1/17/2013Serabi Gold plc : Issue of 270,000,000 Ordinary Shares at 6 ...
7/4/2011(UK) - Appointment of Broker
Financials of Serabi Gold Plc
7/26/2017Strong second quarter production consolidating mid-year posi...
5/13/2016Unaudited Interim Financial Results for the three month peri...
11/14/2013Serabi Gold plc : Financial Results for the third quarter 20...
8/14/2013Serabi Gold plc : Interim Results for the 6 months to 30 Jun...
5/15/2012Serabi Gold plc : Financial Results for the First Quarter 20...
8/16/2011(UK) - INTERIM RESULTS FOR THE 6 MONTHS TO 30 JUNE 2011
5/17/2011- Release of Q1 Financial Results and Managment Discussion a...
1/21/2011 Unaudited financial results for the 9 months ended 30 Septe...
Project news of Serabi Gold Plc
4/20/2016First quarter update on gold operations at Palito and Sao Ch...
2/5/2014Serabi Gold plc - Exploration Results Continue to Reveal Pro...
1/24/2012Serabi Gold plc : Drilling Update - Upgraded Intercepts Enha...
9/12/2011(Piaui Strke Length)(UK) - Exploration Update - Piaui Strike Length could now ex...
8/11/2011(Jardim Do Ouro)(UK) - Exploration Update - New IP geophysical survey underw...
7/15/2011(Palito)(UK) - Drilling result confirms potential structural and min...
7/11/2011(UK) - Drilling update - Positive drill intersections contin...
6/14/2011(Jardim Do Ouro) - Drilling Update - High Grade Gold Intersected at Currutel...
4/7/2011- FIRST DRILL TEST OF GEOPHYSICAL TARGETS AT PIAUI INTERSECT...
2/18/2011(Palito)- IBAMA cancels US$2.2 million fine
2/22/2011(Palito)- Correction - Geochemical results from Piaui drill target a...
2/22/2011(Palito)- GEOCHEMICAL RESULTS FROM THE PIAUI DRILL TARGET AT PALITO
4/9/2010(Palito)Statement re Update on Palito Gold Project
1/28/2010(Palito)Progress Update
7/9/2008(Palito)Ore Reserve and Mineral Resource Update
10/4/2006(Palito)Commercial production at Palito
Corporate news of Serabi Gold Plc
5/17/2016Award of Share Options
3/30/2016Audited Results for the year ended 31 December 2015
1/6/2016Initial partial draw down of US$5 million convertible loan f...
12/31/2015US$5 million convertible loan facility
12/31/2015Serabi Gold Plc ("Serabi" or the "Company") US$5 million con...
10/29/2015Third quarter 2015 Operational Update
10/29/2015Serabi Gold plc ("Serabi" or the "Company") Third quarter up...
8/14/2015Financial Results for Second Quarter 2015 and Management’s D...
8/14/2015Serabi Gold plc ("Serabi" or the "Company") Unaudited Interi...
8/11/2015Serabi Gold Plc ("Serabi" or the "Company") Voting results f...
7/30/2015Cancellation of Share Premium Account and Deferred Shares
7/30/2015Serabi Gold plc ("Serabi" or the "Company") Cancellation of ...
7/28/2015Serabi Gold plc ("Serabi" or the "Company") Second quarter u...
3/31/2015Audited Results for the year ended 31 December 2014
3/31/2015Serabi Gold plc ("Serabi" or the "Company") Audited Results ...
1/28/2015Assay result of 42 g/t over 3.6 metres from Main Vein develo...
1/28/2015Serabi Gold plc ("Serabi" or the "Company") Assay result of ...
1/23/2015Award of Share Options
1/23/2015Serabi Gold plc ("Serabi" or the "Company") Award of Share O...
1/20/2015Serabi Gold plc ("Serabi" or the "Company") Operational upda...
11/25/2014Approval of Final Exploration Report for Sao Chico
2/12/2014Serabi Gold Plc - First Month of Gold Production at Palito G...
12/23/2013Serabi Gold plc : Directorate change
12/9/2013Serabi on schedule to commence commissioning of Palito plant...
10/8/2013Serabi Gold plc : Drilling at Sao Chico returns further exce...
9/5/2013Serabi Gold plc - Palito Operational Update
9/3/2013Serabi Gold plc : New High Grade Zones Discovered at Sao Chi...
7/8/2013Kenai Shareholders Approve Plan of Arrangement with Serabi G...
6/19/2013Serabi Gold plc : AGM Statement
3/28/2013Serabi Gold plc : Audited Results for the year ended 31 Dece...
1/28/2013Serabi Gold plc : Award of Share Options
1/22/2013Serabi Gold plc : Total voting rights
1/17/2013Serabi Gold plc - Operational Update
1/16/2013Serabi Gold plc : Result of General Meeting
6/18/2012Serabi Gold plc : Result of AGM
6/18/2012Serabi Gold plc : AGM Statement
6/13/2012Positive Preliminary Economic Assessment for Serabi's Palito...
5/21/2012Serabi Gold plc : Award of Share Options
3/29/2012Serabi Gold plc : Audited results for the year ended 31 Dece...
1/24/2012=?UTF-8?Q?Serabi_Gold_plc_:_Issue_of_Equity_-_Placing_of_27,...
1/24/2012Serabi Gold plc : Drilling Update - High Grade Intersections...
1/24/2012Serabi Gold plc : Issue of Equity - Proposed Placing
12/19/2011Serabi Gold plc : Directorate change
6/27/2011(UK) - Result of AGM
5/23/2011- 2011 AIRBORNE GEOPHYSICAL SURVEY RESULTS
5/16/2011- Notice of Annual General Meeting and Special Meeting
6/16/2010- Share Issue
6/16/2010- Share Subscription Agreement with Eldorado Gold Corporatio...
12/31/2009Total Voting Rights
12/21/2009Variation in Directors Terms of Employment
12/10/2009- Holding in Company
12/3/2009- Additional Placing
12/3/2009- Result of the Open Offer
12/1/2009- Total voting rights
11/20/2009- Holding(s) in Company
11/17/2009- Announcement of Open Offer
11/10/2009- Update on Placing and Issue of further Ordinary Shares
11/10/2009- Placing of Shares, Convertible Facility and Open Offer
10/15/2009- Holding(s) in Company
9/23/2009- Statement re Share Price Movement
9/15/2009- Holding(s) in Company
8/18/2009- Results of Annual General Meeting
8/18/2009- AGM Statement
7/30/2009- 2nd Quarter Investor Update
6/26/2009- Holding(s) in Company
3/9/2009- Holding in Company
2/27/2009- Change of Nomad and Broker
2/24/2009- Holding in Company
2/23/2009- Update on Corporate Events
1/28/2009- Result of General Meeting of Shareholders
1/2/2009- Circular re Proposed Capital Reorganisation
12/8/2008- Update on Strategic Review
11/4/2008- Rule 2.10 Announcement : CORRECTION
11/4/2008- Section 2.10 Announcement
11/3/2008- Announcement re: preliminary approaches
9/22/2008- Holding(s) in Company
7/30/2008- 2nd Quarter Investor Update
4/23/2008 1st Quarter Results - correction
1/14/2008Discovery of new mineralisation close to the Palito gold min...
11/23/2007Director/PDMR Shareholding
10/25/20073rd Quarter Results
9/14/2007Notification of Shareholding
9/11/2007 Exploration Release
7/26/20072nd Quarter Results
6/5/2007Exploration results indicate new mining potential at Palito
6/1/2007AGM Statement
5/17/2007Holding(s) in Company
4/11/2007Mining Final Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (SRB.L)BERLIN (B9O.BE)
65.00+0.00%0.5400
LSE
GBX 65.00
04/22 18:15 -
0%
Prev close Open
65.00 64.70
Low High
64.40 67.67
Year l/h YTD var.
38.00 -  69.50 38.89%
52 week l/h 52 week var.
21.50 -  69.50 131.73%
Volume 1 month var.
194,147 4.00%
24hGold TrendPower© : -41
Produces Gold
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024150.48%
2023-12.77%38.0021.00
2022-47.35%62.5021.36
2021-41.15%98.0053.50
202054.84%99.5542.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.87-3.12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+0.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-4.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.79-0.32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.86+0.54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.13+0.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :