Batero Extends Continuity of Higher Grade Core of Oxidized Gold Mineralization
Published : November 15, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Nov. 15, 2012) - Batero Gold Corp. ("Batero," "the Company") (News - Market indicators)(FRANKFURT:68B)(PINKSHEETS:BELDF) is pleased to report results from the final 28 holes drilled at the La Cumbre deposit ("La Cumbre") at the Company's 100% owned Batero-Quinchia project ("the Project"), located in Risaralda, Colombia. These 28 holes represent the conclusion of the Company's 2012 development drill program.

La Cumbre Drill Highlights:

  • LC070: from 6.5 m to 150 m (end of hole) grading 1.36 g/t gold and 2.58 g/t silver (compare LC023, LC017)
  • LC057: vertical drill hole from 4.00 m to 100.00 m (end of hole) grading 1.20 g/t gold and 2.16 g/t silver, including from 94.00 m to 100.00 m (end of hole) grading 1.69 g/t gold and 3.66 g/t silver
  • LC061: from 0.0 m to 82.7 m (hole terminated due to technical issues) grading 1.07 g/t gold and 3.40 g/t silver
  • All drill holes reported ended in gold mineralization

See Figure 1, Figure 2 and Figure 3 at the end of this release for a Plan View Map and Long Sections of 2012 Drill Hole Locations.

See Table 1 for 2012 Drill Hole Results and Table 2 for Drill Hole Specifications.

Current infill drill results at La Cumbre continue to outline additional volumes in the deposit's core of higher grade oxidized gold mineralization, which grades in excess of 1.0 g/t gold and occurs near and at surface. Infill drilling results also extend the trend of La Cumbre's high grade core to the northwest and to the southeast. Drill hole LC070 comprises the highest gold grades reported to date at the Project and LC057 comprise the second highest gold grades reported to date at the Project located on the north side of the high grade central core at La Cumbre. The total 2012 drill program consisted of 35 holes over 4,947 metres. These holes are located within a 600 metre northwest-southeast strike length zone of continuous gold mineralization located from surface. All drill holes reported ended in gold mineralization.

"We are pleased that the results from our 2012 drill program continue to outline grades of over 1+ g/t gold in the large continuous zones of mineralization at La Cumbre," stated Brandon Rook, Batero's President and Chief Executive Officer. "These positive drill results serve as encouraging signs for the future of the Batero-Quinchia project. As a result of our alliance with Consorcio Minero Horizonte, we now possess the financial and technical capabilities required to move this project forward."

With the 2012 drill plan complete, Batero is working towards the preparation of an updated resource estimate, focusing only on La Cumbre's high grade oxidized gold mineralization at surface as the basis of a comprehensive technical report that will encompass all of the work completed to date at La Cumbre. Remodeling of the La Cumbre oxidized deposit and resources are expected to be completed in early 2013. The high grade core at La Cumbre is expected to improve both the average grade and ounces in an updated mineral resource estimate, as the 1+ g/t gold core is well above the average grade of the oxide mineral resource estimate previously reported in the initial resource estimate (see below).

The Company is currently evaluating the most efficient and cost effective mine scenario, including a leach processing circuit and the optimum starter pit production rate from the high grade oxidized mineralization at La Cumbre. The Company will also include La Cumbre's transition zone, which was not included in the initial oxide resource estimate, in its evaluation. This mine scenario is anticipated to be the first stage of a potentially larger mine plan.

Batero is focused on accelerating the La Cumbre deposit towards a development decision. Engineering, environmental impact assessment, archaeological studies, and social baseline studies are all sufficiently advanced to support any development option. Pending the positive results of the technical report, the Company will assess the merits of advancing the development of the La Cumbre deposit.

Batero recently announced a $20.0 million financing deal and the formation of a strategic alliance with Consorcio Minero Horizonte ("Horizonte"), a privately owned Peruvian company with annual production exceeding 200,000 gold ounces, the fifth largest gold producer in Peru. Horizonte will provide technical expertise as the Company advances La Cumbre deposit through to a production decision. Complete details of this transaction are available within the Company's news release dated November 1, 2012.

Given the positive results from the infill drill program, a revision and updating of the mineral resources at La Cumbre should maintain or better the categorization of the resources in this deposit. The initial mineral resource estimate of the La Cumbre deposit (effective January 25, 2012) at a 0.3 g/t gold cut-off grade and within a Whittle pit shell are as follows (see www.sedar.com for Technical Report amended on April 19, 2012):

  • Indicated resources containing 2.3 million ounces gold in 131.0 million tonnes averaging 0.56 g/t gold
  • Inferred resources containing 0.7 million ounces gold in 39.0 million tonnes averaging 0.52 g/t gold

The initial oxide resource estimate of the La Cumbre deposit (effective January 25, 2012) at a 0.16 g/t gold cut-off grade and within a Whittle pit shell are as follows (see www.sedar.com for Technical Report amended on April 19, 2012):

  • Indicated resources containing 275,000 ounces gold in 15.4 million tonnes averaging 0.56 g/t gold
  • Inferred resources containing 81,000 ounces gold in 6.7 million tonnes averaging 0.37 g/t gold

La Cumbre Deposit Highlights

  • Large continuous zones of at and near surface oxidized gold mineralization grading >0.7 g/t gold
  • 2012 drill program indicates expansion of 1+ g/t gold in central core area
  • Greater than 1.0 g/t gold intercepts occur within the oxide zone of gold mineralization that extends from surface to a depth of up to 70 metres and through the underlying transition zone that exists over a vertical distance of 150 metres to 250 metres
  • Metallurgical bottle role testing in 2012 yielded gold recoveries of 93% and 94% for gold mineralization in the oxide zone and recoveries from 82% to 86% in the transition zone
  • Topography and location of gold mineralization suggest a low strip ratio
  • Permitting process to initiate exploitation activity is ongoing
  • 100% ownership of surface rights at La Cumbre deposit

Ongoing Work Programs

Metallurgical samples from the 2012 drilling have been submitted to SGS (Lima) for gold deportment studies, column leach tests, and supporting bottle roll tests. The Company anticipates all results to be released in the first quarter of 2013. Review of geotechnical results associated with orientated drilling in approximately 50% of the 2012 drill holes will feed into a preliminary open pit design and associated engineering to support a development decision at the La Cumbre deposit.

Drill Hole Program Results

The 2012 development drill program commenced on July 15, 2012 and was completed on September 25, 2012. The drill program was designed to (i) infill the areas of interpolated higher grade mineralization along a northwest-southeast trending corridor, (ii) step out to the northwest and southeast to extend the areas of interpolated higher grade mineralization, and (iii) step out to the north of La Cumbre towards the El Centro zone to test near surface higher grade linkage between the deposits. The drill hole lengths vary from 100 metres to 200 metres, and were multitasked to provide both geological and geotechnical information and sample material for metallurgical test work. Fresh samples of drill core material have been submitted for bottle roll and column leach testing.

Infill Drilling at La Cumbre - North, Central and Southeast

(LC041, 052, 057; LC056, 058, 059, 060, 061, 070; LC066, 067, 068, 069)

Drilling confirmed and delimited the near and at surface high grade mineralization, +1 g/t gold, that starts in the oxidized zone and continues at depth through a low total sulphur transition zone. All holes ended in gold mineralization. 

Step Out Drilling at La Cumbre - Northwest and Southeast

(LC044, 046, 047, 050, 055; LC062, 063, 064, 065)

Drilling confirmed continued mineralization along both step out directions. To the northwest the near surface mineralization is limited by a fault structure and non-mineralized volcanic breccia. However, mineralization was encountered at depth across the fault and remains open to the northwest at depth. To the southeast mineralization above 0.5 g/t gold was confirmed to continue in trend and supported by narrow high grade, +1g/t gold, veinlet systems.

Step out Drilling towards El Centro

(LC045, 048, 049, 051, 053, 054)

Results from drilling near El Centro indicate there is little near surface high grade mineralization across the Amarillo Structural Corridor, but confirm narrow high grade epithermal style mineralization located above the deeper porphyry style mineralization previously drilled at El Centro. Further interpretation of the drill data in this sector is required to properly establish the epithermal/ porphyry target at El Centro. This will be further evaluated in 2013.

Table 1 - 2012 Drill Hole Results


Infill Drilling - North
Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
 (%)
LC041 0.00 150.00 150.00 0.64 1.70 0.12
including 0.00 46.00 46.00 0.97 1.45 0.15
subinterval 5.60 28.00 22.40 1.18 0.76 0.19
including 50.00 56.00 6.00 0.53 1.72 0.10
including 63.80 78.60 14.80 0.65 1.80 0.12
including 85.20 110.00 24.80 0.60 2.10 0.12
including 116.00 122.00 6.00 0.53 2.28 0.10
             
LC052 2.00 170.00 168.00 0.49 1.09 0.07
including 2.00 33.80 31.80 1.00 1.45 0.09
subinterval 14.00 22.00 8.00 1.38 1.58 0.09
subinterval 28.00 32.00 4.00 1.23 1.70 0.06
including 40.20 47.20 7.00 0.55 1.33 0.06
including 52.25 53.40 1.15 0.58 2.55 0.20
including 93.27 95.00 1.73 0.71 1.48 0.11
including 119.80 121.28 1.48 0.83 1.73 0.13
including 133.00 139.86 6.86 0.88 1.34 0.09
subinterval 135.00 138.60 3.60 0.99 1.27 0.09
including 151.00 153.00 2.00 0.76 2.02 0.13
including 168.00 170.00 2.00 0.55 0.93 0.07
             
LC057 4.00 100.00 96.00 1.20 2.16 0.15
including 25.00 39.00 14.00 1.59 1.81 0.17
including 43.00 66.05 23.05 1.24 1.93 0.16
including 74.50 86.00 11.50 1.32 2.96 0.18
including 94.00 100.00 6.00 1.69 2.88 0.25

Infill Drilling- Central
Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
 (%)
LC056 6.50 200.00 193.50 0.59 1.86 0.10
including 75.50 76.50 1.00 4.47 35.60 0.34
including 113.60 200.00 86.40 0.90 2.43 0.16
including 179.00 200.00 21.00 1.09 2.60 0.18
             
LC058 9.25 200.00 190.75 0.64 2.20 0.14
including 9.25 137.00 127.75 0.76 2.24 0.15
subinterval 11.00 23.30 12.30 1.25 1.87 0.09
subinterval 15.50 19.00 3.50 1.52 1.48 0.11
including 150.00 170.00 20.00 0.63 2.36 0.13
             
LC059 6.45 160.00 153.55 0.76 2.06 0.15
including 6.45 30.00 23.55 1.13 1.21 0.12
subinterval 6.45 22.50 16.05 1.23 1.77 0.17
including 32.00 55.20 23.20 0.69 2.35 0.17
including 61.00 97.00 36.00 0.62 2.20 0.16
including 103.00 160.00 57.00 0.82 1.96 0.15
subinterval 115.00 140.45 25.45 1.00 1.94 0.17
subinterval 115.00 116.28 1.28 2.43 3.01 0.28
             
LC060 3.00 150.00 147.00 0.92 2.05 0.17
including 23.00 150.00 127.00 0.99 2.05 0.18
subinterval 25.00 66.00 41.00 1.57 2.83 0.26
subinterval 44.00 49.50 5.50 4.28 5.76 0.56
including 90.50 95.00 4.50 1.03 2.48 0.21
             
LC061 0.00 82.70 82.70 1.07 3.40 0.18
including 54.00 82.70 28.70 1.46 3.37 0.23
subinterval 66.00 82.70 16.70 1.70 3.48 0.27
             
LC070 6.50 150.00 143.50 1.36 2.58 0.17
including 6.50 15.50 9.00 1.80 1.15 0.13
including 20.00 150.00 130.00 1.36 2.71 0.17
subinterval 28.00 34.00 6.00 1.47 2.64 0.08
subinterval 44.00 112.00 68.00 1.65 3.11 0.18
and 48.20 66.00 17.80 2.24 3.53 0.16
and 86.00 104.00 18.00 1.92 2.68 0.22
subinterval 120.00 131.70 11.70 1.58 3.20 0.23

Infill Drilling - Southeast
Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
 (%)
LC066 0.00 200.00 200.00 0.51 2.01 0.12
including 0.00 14.00 14.00 0.68 4.23 0.07
including 53.00 67.00 14.00 0.75 2.10 0.16
including 104.00 115.20 11.20 0.65 2.21 0.14
including 120.50 130.00 9.50 0.71 2.26 0.13
including 162.00 177.70 15.70 0.65 1.70 0.12
including 187.00 200.00 13.00 0.66 2.93 0.15
             
LC067 0.00 100.00 100.00 0.49 2.23 0.08
including 0.00 30.60 30.60 0.74 3.74 0.06
including 70.00 100.00 30.00 0.64 1.99 0.12
             
LC068 1.23 100.00 98.77 0.60 2.31 0.13
including 1.23 11.30 10.07 0.86 2.63 0.15
including 37.00 51.60 14.60 0.62 2.76 0.13
including 57.00 84.00 27.00 0.79 2.33 0.13
             
LC069 0.00 100.00 100.00 0.45 4.03 0.30
including 0.00 31.00 31.00 0.58 2.90 0.12

Step Out Drilling - Northwest
Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
 (%)
LC044 4.00 100.00 96.00 0.32 1.30 0.03
including 19.00 27.00 8.00 0.57 1.52 0.04
including 32.10 38.00 5.90 0.97 1.80 0.05
including 67.00 73.70 6.70 0.87 2.32 0.13
             
LC046 2.00 150.00 148.00 0.08 0.47 0.01
including 98.00 102.00 4.00 0.63 1.80 0.07
             
LC047 0.00 150.00 150.00 0.03 0.44 0.00
             
LC050 2.00 170.00 168.00 0.24 0.64 0.03
including 25.50 27.00 1.50 1.76 0.87 0.02
including 31.00 34.60 3.60 1.10 1.09 0.01
including 117.00 127.00 10.00 0.84 1.12 0.09
             
LC055 3.00 200.00 197.00 0.52 1.24 0.07
including 26.00 28.00 2.00 0.58 1.37 0.05
including 33.70 37.00 3.30 0.60 0.87 0.06
including 41.00 43.00 2.00 14.70 2.00 0.04
including 70.00 72.00 2.00 0.51 1.78 0.11
including 83.60 87.00 3.40 0.58 1.09 0.09
including 111.00 115.00 4.00 0.58 1.17 0.11
including 127.00 139.00 12.00 0.62 1.53 0.11
including 155.00 168.50 13.50 0.80 2.44 0.15
including 188.00 192.00 4.00 0.53 1.22 0.09
including 196.00 200.00 4.00 0.52 1.79 0.13

Step Out Drilling - Southeast
Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
 (%)
LC062 0.00 200.00 200.00 0.53 2.33 0.14
including 59.50 69.50 10.00 0.65 2.57 0.12
including 79.00 88.00 9.00 0.80 2.78 0.19
including 174.00 192.00 18.00 0.65 1.22 0.10
             
LC063 2.00 200.00 198.00 0.40 1.40 0.07
including 2.00 7.00 5.00 1.01 1.57 0.06
including 13.90 25.00 11.10 0.60 1.19 0.11
including 43.10 45.40 2.30 4.79 1.83 0.22
including 51.00 55.00 4.00 1.13 0.87 0.07
             
LC064 0.00 200.00 200.00 0.43 1.80 0.12
including 20.00 22.00 2.00 1.80 2.11 0.13
including 69.00 74.00 5.00 0.69 2.19 0.17
including 111.00 132.00 21.00 0.54 1.90 0.12
             
LC065 0.00 200.00 200.00 0.45 1.14 0.08
including 16.00 34.00 18.00 0.69 2.01 0.11
including 65.50 76.20 10.70 0.76 2.03 0.19
including 88.80 103.00 14.20 0.65 1.02 0.11
including 167.00 169.00 2.00 1.58 0.87 0.05

El Centro Drilling
Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
 (%)
LC045 0.00 100.00 100.00 0.12 0.26 0.01
             
LC048 0.00 100.00 100.00 0.17 0.82 0.04
including 0.00 6.85 6.85 0.74 0.30 0.01
             
LC049 0.00 100.00 100.00 0.37 1.65 0.02
including 26.50 32.30 5.80 0.82 0.76 0.03
including 36.80 41.00 4.20 0.54 0.49 0.03
including 45.60 53.00 7.40 0.76 0.60 0.02
including 68.50 73.00 4.50 0.88 27.16 0.03
             
LC051 0.00 100.00 100.00 0.15 1.07 0.03
             
LC053 0.00 150.00 150.00 0.14 0.86 0.03
             
LC054 2.80 150.00 147.20 0.29 1.24 0.05
including 2.80 9.00 6.20 0.83 0.39 0.05
subinterval 100.00 103.00 3.00 0.82 1.49 0.07

* Interval length represents downhole length. Intervals are selected using a cut-off grade of 0.5g/t and may include a maximum dilution of one sample interval under cut-off. Sample intervals are typically 2 metres.

Table 2 - Current 2012 Drill Hole Specifications

Drill Hole Easting Northing Elevation
(m)
Azimuth Dip Depth
(m)
Infill Drilling - North
LC041 420826 585437 1910 57 -75 150.00
LC052 420750 585450 1938 0 -90 170.00
LC057 420842 585496 1888 0 -90 100.00
Infill Drilling - Central
LC056 420885 585307 1874 57 -60 200.00
LC058 420858 585344 1884 237 -60 200.00
LC059 420844 585379 1892 57 -60 160.00
LC060 420897 585349 1884 57 -60 150.00
LC061 421025 585250 1824 57 -65 82.70
LC070 421081 585315 1854 57 -85 150.00
Infill Drilling - Southeast
LC066 420950 585190 1824 57 -65 200.00
LC067 421000 585190 1796 57 -60 100.00
LC068 421115 585157 1760 0 -90 100.00
LC069 421100 585190 1780 0 -90 100.00
Step Out Drilling - Northwest
LC044 420660 585502 1960 0 -90 100.00
LC046 420675 585587 1944 57 -60 150.00
LC047 420675 585587 1944 237 -60 150.00
LC050 420717 585529 1964 0 -90 170.00
LC055 420759 585540 1952 0 -90 200.00
Step Out Drilling - Southeast
LC062 420900 585149 1802 57 -65 200.00
LC063 421009.7 585033.7 1720 57 -60 200.00
LC064 421000 585110 1776 57 -60 200.00
LC065 421000 585110 1776 237 -60 200.00
El Centro Drilling
LC045 421000 585620 1860 0 -90 100.00
LC048 421000 585800 1800 0 -90 100.00
LC049 420930 585730 1852 0 -90 100.00
LC051 421090 585750 1800 0 -90 100.00
LC053 421079 585794 1764 237 -65 150.00
LC054 421105 585715 1820 57 -65 150.00

To see all maps, figures and strip logs please visit www.baterogold.com

Sample Preparation, Assays, and Quality Assurance/Quality Control

Core is collected and logged (geological & geotechnical), cut and sampled at Batero Gold's drilling camp at the project area. All QC samples are introduced before shipment to ALS Minerals' sample preparation facilities in Medellin, Colombia. Prepared samples are then shipped to ALS Minerals' analytical facilities in Lima, Peru for analyses. Gold is fire-assayed using a 50 gram aliquot sample and Atomic Absorption finish. Multi-element analysis is achieved by Four Acid Digestion and an Induced Coupled Plasma- Emission Spectroscopy finish.

The Company's QA/QC program includes the regular insertion of blanks, multiple certified assay standards and duplicate samples into the sample shipments. These QC samples are inserted in every assay batch, each batch comprising 24 samples. Monitoring of these QC samples is a critical part of Batero Gold Corp's QA/QC protocols that involve the re-analyses of a minimum of 10 samples bounding any failed control sample. A third party check laboratory receives 5% of all samples to verify the original assay analyses.

Darryl Lindsay, Ph.D., P.Geo., Senior Vice President and Chief Operating Officer at Batero Gold, is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information provided in this release and all future news releases.

ON BEHALF OF THE BOARD OF BATERO GOLD CORP.

Brandon Rook, President & CEO

ABOUT BATERO GOLD 

Batero Gold Corp. is a precious and base metals exploration and development company focused in the emerging and prolific Mid-Cauca porphyry gold and copper belt in the Quinchia district of Colombia. Batero has a 100% interest in the Batero-Quinchia gold project and is currently focused on advancing La Cumbre deposit toward a production decision optimizing the most efficient leach processing circuit. The Company is first targeting the near and at surface higher grade oxidized gold mineralization. Batero has assembled a strong management and technical team that have contributed to significant discoveries and mineral development programs in Colombia and South America. Batero plans to leverage its strategic share structure with strong local and regional relationships, and long-term financial partners, to develop its Batero-Quinchia exploration project into a gold producing operation. Shares of the Vancouver-based company trade on the Toronto Venture Exchange under the symbol BAT.

FORWARD-LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" or "forward-looking information" Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information.

Forward-looking statements or information relate to, among other things: developing the most efficient and cost-effective leach processing circuit for the Cumbre gold deposit, the timing and scope of expected Diamond drilling; resource estimate, grades on the Batero-Quinchia project; scope of mineralization within the Batero-Quinchia project; timing of receipt of permits and regulatory approvals; the sufficiency of the Company's capital to finance the Company's operations; geological interpretations and potential mineral recovery processes.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuations in the spot and forward price of gold or certain other commodities; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada, Colombia or other countries in which the Company may carry on business in the future; the uncertainties involved in interpreting geological data; business opportunities that may be presented to, or pursued by, the Company; operating or technical difficulties in connection with mining activities; the speculative nature of gold exploration and development, including the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks).

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Filing Statement dated as of June 22, 2010 under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.

To view Figure 1 - Plan View of La Cumbre showing Current Release Drill Holes, please visit the following link: http://media3.marketwire.com/docs/Bat-F1.pdf

To view Figure 2 - Long Section Showing Current Release Drill Holes, please visit the following link: http://media3.marketwire.com/docs/Bat-F2.pdf

To view Figure 3 - Long Section Showing Histograms, please visit the following link: http://media3.marketwire.com/docs/Bat-F3.pdf

Please visit http://www.baterogold.com/en/maps/la-cumbre-plan-and-section-maps if you are unable to view these maps.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Batero Gold Corp.
604.568.6378
info@baterogold.com
www.baterogold.com
Data and Statistics for these countries : Canada | Colombia | Peru | All
Gold and Silver Prices for these countries : Canada | Colombia | Peru | All

Batero Gold Corp

EXPLORATION STAGE
CODE : BAT.V
ISIN : CA0705051021
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Batero Gold is a gold exploration company based in Canada.

Its main exploration property is BATERO QUINCHIA in Colombia.

Batero Gold is listed in Canada. Its market capitalisation is CA$ 6.3 millions as of today (US$ 5.1 millions, € 4.4 millions).

Its stock quote reached its highest recent level on March 04, 2011 at CA$ 6.57, and its lowest recent point on September 08, 2023 at CA$ 0.02.

Batero Gold has 115 182 383 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Batero Gold Corp
11/2/2012Announces Private Placement of $17.8 Million at 46% Premium ...
4/30/2012Closes $6.3 Million Special Warrant Financing
4/16/2012Announces Upsize to Proposed Special Warrant Financing for G...
11/28/2011Announces Closing of C$7.2 Million Bought Deal Private Place...
Option Grants of Batero Gold Corp
2/21/2011Grants Options
Nominations of Batero Gold Corp
6/29/2012Announces Appointments to Advisory Board and Director Resign...
6/28/2012Appoints Leonard (Len) Harris to Board of Directors
12/14/2011Announces Appointment of Dr. Darryl Lindsay to Senior Vice P...
10/5/2011Appoints Dr. Darryl Lindsay as Chief Operating Officer
Project news of Batero Gold Corp
9/13/2012Expands Higher Grade Core of Oxidized Gold Mineralization at...
7/26/2012Reports Additional Metallurgical Results from La Cumbre Depo...
7/20/2012Commences Drill Program at La Cumbre Deposit
7/18/2012Announces Work Program to Assess Development of La Cumbre De...
3/22/2012Reports Preliminary Oxide Resource Potential and Metallurgic...
2/27/2012Initial 43=2D101 Resource Estimate
1/13/2012RELEASES FINAL DRILL RESULTS FROM 55=2C755 METRE DRILL PROGR...
12/15/2011Extends Mineralization
12/13/2011secures 100 percent ownership of surface rights in immediate...
12/7/2011Drill Results News Release
9/16/2011Drills Vertical Hole Intersecting 751.00 metres Grading 0.54...
5/10/2011Completes 100% Acquisition of Two Historic Gold Mines on Bat...
4/1/2011PDAC- Toronto March 2011 - Batero-Quinchia Project Colombia ...
3/7/2011(Batero Quinchia)Intersects 460.00 Metres Grading 0.70 g/t Gold and 0.12% Cop...
2/17/2011(Batero Quinchia)Intersects 519.70 Metres Grading 0.80 G/T Gold and 0.14% Cop...
2/11/2011Initiates Preliminary Metallurgical Testing on the Batero-Qu...
Corporate news of Batero Gold Corp
12/1/2015Batero Gold Corp. Appoints Juan David Uribe as Chairman
11/6/2015Batero Gold Corp. Closes Private Placement With CB Gold
10/15/2015Batero Gold Corp. Appoints Mr. Felipe Ferraro as President a...
10/8/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. Pur...
10/6/2015Batero Acquires All CB Gold Common Shares Deposited to the B...
9/24/2015Batero to Acquire All Shares Tendered to Its Superior Offer ...
9/18/2015Batero Remains Committed to Its Superior Offer and Extends B...
9/15/2015Batero Bid Remains the Best Option for CB Gold Shareholders
9/15/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
9/12/2015Red Eagle's Allegations Dismissed by BCSC -- Batero's Bid Re...
9/9/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
9/9/2015Batero Mails Increased Offer to Acquire CB Gold and Acquires...
9/8/2015Batero Announces Entering Into of a Letter of Intent for Pro...
9/5/2015Batero Significantly Raises Offer to Acquire CB Gold
9/4/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
9/1/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
8/27/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
8/25/2015Batero Gold Corp. Reaffirms Superior Proposal to Acquire All...
8/25/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. in ...
8/21/2015Batero Gold Corp. Acquires Common Shares of CB Gold Inc. Thr...
8/12/2015Batero Gold Corp. Commences Offer To Acquire CB Gold Inc.
8/11/2015Batero Gold Corp. Commences Offer to Acquire CB Gold Inc.
7/24/2015IIROC Trading Resumption - BAT
7/24/2015Batero Gold Announces Friendly Acquisition of CB Gold
7/24/2015IIROC Trading Halt - BAT
7/9/2015Batero Samples 2.64 g/t Au in La Cumbre Oxide
3/24/2015Investors See A Silver Lining In Europe's Plain Packaging La...
3/1/2015Batero Provides Exploration and Corporate Update
1/28/2015Batero Reports Results of Oxide Sampling Program
12/18/2014Batero Provides Corporate Update
6/3/2014Batero Provides Corporate Update
4/8/2014Batero Launches Corporate Shared Value Alliance Program In Q...
11/5/2013Announces Preliminary Economic Assessment for the Batero-Qui...
10/2/2013Receives Confirmation of Registration of Concession Contract
9/19/2013Provides Corporate Update
9/19/2013PRESIDENT AND CEO STEPS DOWN
6/18/2013to Commence Drilling On Two New Oxide Targets at La Cumbre
5/14/2013Provides Corporate Update
3/21/2013Releases 2012 CSR Report=2C Outlines Key Programs Integral T...
1/7/2013Announces Conversion of Subscription Receipts and New Board ...
7/5/2012Adopts Shareholder Rights Plan
6/18/2012Announces Receipt for Final Prospectus for the Qualification...
5/15/2012Clarifies Technical Disclosure
3/14/2012Files NI 43=2D101Technical Report and Announces 2012 Plans
3/14/2012Files 43=2D101 on Sedar and Provides Update
1/18/2012in Globe and Mail Newspaper + Presentation Invitation
1/16/2012Concession Agreement Confirmation
10/12/2011Reports Further Drilling Results from Batero-Quinchia Projec...
8/30/2011Reports Further Drilling Results from Batero-Quinchia Projec...
5/19/2011Drills Deepest Mineralized Intercept to Date in Vertical Hol...
5/5/2011Provides Corporate Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BAT.V)
0.055+0.00%
TSX-V
CA$ 0.055
04/17 14:15 -
0%
Prev close Open
0.055 0.055
Low High
0.055 0.055
Year l/h YTD var.
0.030 -  0.060 83.33%
52 week l/h 52 week var.
0.020 -  0.060 37.50%
Volume 1 month var.
14,000 83.33%
24hGold TrendPower© : -17
Produces
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024120.00%
202325.00%0.040.02
2022-73.33%0.110.02
2021-31.82%0.160.06
202083.33%0.130.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :