Dear Stakeholder
Please find below a link to today?s ASX release. http://eleckramines.com.au/reports/CentralBoreSixthBatch_Final.pdf
The highlights from this announcement are:
? The final batch of assays from Central Bore have been received;
? These assay results together with the previous assay results confirmed gold mineralisation at Central Bore over 800m strike length x 300m depth;
? Highest grade assays to date from Central Bore include:
o 3m at 136g/t Au from 192m, incl. 1m at 404g.t;
o 2m at 53g/t Au from 104m, incl. 1m at 105g/t;
o 2m at 21g/t Au from 188m, incl. 1m at 40g/t;
o 2m at 41g/t Au from 201m, incl. 1m at 70g/t;
o 4m at 16g/t Au from 157m, incl. 1m at 49g/t;
o 6m at 9g/t Au from 290m; incl. 2m at 18g/t;
? 1m splits from Hann confirmed new gold discovery.
We are pleased with the results from the recently completed drilling program. It has confirmed our belief in the high prospectivity of the Yamarna greenstone belt. At Central Bore, we have outlined gold mineralisation over a strike length of approximately 800 metres and depth of 300 metres and intercepted phenomenal grades of up to 404 g/t Au. The results from Hann are also encouraging confirming the presence of multiple zones of mineralisation. The temporarily suspended
RC drilling at Hann will continue in the September 2010 program. A 10,000m RAB program is expected to commence early August 2010 to test the Central Bore North and South extension, Central Bore East elevated soil anomalies and other gold targets.
Regards
Ian Murray
Chairman: Eleckra Mines Limited
www.eleckramines.com.au
6 Altona Street
West Perth
WA 6005
Office: +61(8) 9486 4144
Fax: +61(8) 9481 6405
If you wish to be removed from our emailing list, please go to: