Ivanhoe Mines Ltd.

Published : November 21st, 2017

First blast marks start of development of twin declines at Kakula Copper Discovery to provide access to ultra-high-grade resources

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

First blast marks start of development of twin declines at Kakula Copper Discovery to provide access to ultra-high-grade resources

New Kamoa-Kakula preliminary economic assessment 
of two mines, with projected, combined production 
of 12 million tonnes per year, nearing completion

New Kakula resource estimate based on the entire current
strike length expected early in January 2018; discovery remains
open for significant expansion

14 drill rigs continue to operate at Kamoa-Kakula

KOLWEZI, Democratic Republic of Congo, Nov. 21, 2017 (GLOBE NEWSWIRE) -- Ivanhoe Mines (IVN.TO) (IVPAF) Executive Chairman Robert Friedland and Chief Executive Officer Lars-Eric Johansson today announced that the Kamoa-Kakula mine development team has celebrated the first blast marking the start of work on the twin declines at the ultra-high-grade Kakula Copper Discovery on the company’s Tier One Kamoa-Kakula Copper Project, near the mining centre of Kolwezi in the Democratic Republic of Congo (DRC).

The Kakula box cut was successfully completed on October 26, 2017, and the first blast for the twin declines at Kakula took place on November 16, 10 days ahead of schedule. The Kakula decline development work is being undertaken by JMMC, a DRC subsidiary of JCHX Mining Management of Beijing, China. Depending on ground conditions, the 3,600-metre decline development contract is scheduled for completion in approximately one year.

In response to the spectacular exploration success at the Kakula Discovery, Ivanhoe Mines and Zijin Mining are fast-tracking the mine development program at Kakula. The Kakula Copper Deposit is a gently-dipping blanket of thick, chalcocite-rich copper mineralization. Initial mine development is planned to begin in the flat, near-surface zone which, at a 3% cut-off, is between 7.1 metres and 11.7 metres thick and with copper grades between 8.11% and 10.35% along the deposit’s axis.

Fourteen rigs are continuing to drill at Kamoa-Kakula, including 10 rigs focused on expanding and upgrading the resources in the Kakula high-grade zone along trend to the west and southeast. A fresh resource estimate for Kakula is being prepared and is expected to result in a major upgrade and expansion of the Kakula Mineral Resources.

The area encompassed by the May 2017 Kakula Mineral Resource and the location of the Kakula box cut and declines are shown in Figure 1.

Preparing for the first blast for the twin declines at the Kakula box cut
– November 15, 2017.

Abraham Li (left), Deputy General Manager of Kamoa Copper,
and Mark Farren (right), Ivanhoe’s Executive Vice President, Operations,
celebrate the successful first blast on November 16, 2017.

Drilling support holes for the Kakula service decline – November 17, 2017.

Drilling support holes for Kakula service decline following the first blast.

Figure 1.   Location plan showing grade and thickness at Kakula resource area superimposed on 2% composite grade thickness contours. The Kakula box cut and direction of the twin declines are shown in upper right corner.

New expanded-case Kamoa-Kakula preliminary economic assessment
(PEA) scheduled for completion this quarter

The new Kamoa-Kakula Project PEA is progressing well and is expected to be completed this quarter. The PEA is based on an initial mine capacity of six million tonnes per annum (Mtpa) at Kakula, using the May 2017 Mineral Resource estimate, with an additional six-Mtpa mine at Kansoko, serving a centralized concentrator at Kakula, for a projected mine production of approximately 12 Mtpa from the presently delineated Kamoa and Kakula deposits.

In addition to the new PEA study, preliminary work is underway on a six-Mtpa pre-feasibility study at Kakula that will be based on the upcoming, January 2018 resource model. The study will be considered as the base case for the first phase of development at Kamoa-Kakula. In light of the successful step-out drilling at Kakula West, the Kamoa-Kakula development plans will be reassessed and amended as the project moves forward.

Potential phased mine developments of up to 18 Mtpa also are being assessed for the Kamoa-Kakula copper complex.

Exploration geologists examining Kakula drill core at the Kamoa camp facility.

The new drill results are expected to result in a major upgrade
and expansion of the Kakula Mineral Resource

Results from drill holes completed to the end of October 2017 will form the basis of the planned updated mineral resource estimate encompassing the entire strike length of the Kakula Discovery, which now extends to at least 12 kilometres. This would represent an increase of approximately 60% in the strike length that will be used to calculate the new resource estimate, as compared to the 7.7-kilometre strike length covered by Kakula’s May 2017 resource estimate. The updated resource estimate is expected to be issued in January 2018.

“We’re looking forward to providing our shareholders and all Kamoa-Kakula stakeholders with another substantial resource expansion soon after the coming holiday season,” said Mr. Friedland.

About the Kamoa-Kakula Project

The Kamoa-Kakula Project is a very large, stratiform copper deposit with adjacent prospective exploration areas within the Central African Copperbelt, located approximately 25 kilometres west of the town of Kolwezi and about 270 kilometres west of Lubumbashi. The Kamoa Copper Deposit was discovered by Ivanhoe Mines (then named Ivanhoe Nickel & Platinum) in 2008, followed by the discovery of the Kakula Deposit in early 2016.

Based on a May 2017 Mineral Resource estimate prepared under the direction of Dr. Harry Parker and Gordon Seibel of Amec Foster Wheeler, the combined Kamoa-Kakula Indicated Mineral Resources total approximately one billion tonnes grading 3.02% copper, containing 66 billion pounds of copper, plus another 191 million tonnes of Inferred Resources at 2.37% copper, at a 1.4% copper cut-off grade.

In August 2012, the DRC government granted mining licences to Ivanhoe Mines for the Kamoa-Kakula Project that cover a total of 397 square kilometres. The licences are valid for 30 years and can be renewed at 15-year intervals. Mine development work at the project began in July 2014 with construction of a box cut for the decline ramps for the planned Kansoko Sud Mine.

Ivanhoe Mines and Zijin Mining each hold an indirect 39.6% interest in the Kamoa-Kakula Project, Crystal River Global Limited holds an indirect 0.8% interest and the DRC government holds a direct 20% interest.

Qualified Person and Quality Control and Assurance 

The scientific and technical information in this release has been reviewed and approved by Stephen Torr, P.Geo., Ivanhoe Mines’ Vice President, Project Geology and Evaluation, and a Qualified Person under the terms of National Instrument 43-101. Mr. Torr, who is not independent of Ivanhoe Mines, has verified the technical data disclosed in this news release.

Ivanhoe Mines maintains a comprehensive chain of custody and QA-QC program on assays from its Kamoa-Kakula Project. Half-sawn core is processed at Kamoa-Kakula’s on-site preparation laboratory and prepared samples then are shipped by secure courier to Bureau Veritas Minerals (BVM) Laboratories in Australia, an ISO17025-accredited facility. Copper assays are determined at BVM by mixed-acid digestion with ICP finish. Industry-standard certified reference materials and blanks are inserted into the sample stream prior to dispatch to BVM. For detailed information about assay methods and data verification measures used to support the scientific and technical information, please refer to the Kakula 2017 Resource Update, June 2017 technical report available on the SEDAR profile of Ivanhoe Mines at www.sedar.com or under technical reports on the Ivanhoe Mines website at www.ivanhoemines.com.

About Ivanhoe Mines 

palladium-gold-nickel-copper discovery on the Northern Limb of South Africa’s Bushveld Complex; 2) mine development and exploration at the Tier One Kamoa-Kakula copper discovery on the Central African Copperbelt in the Democratic Republic of Congo; and 3) upgrading at the historic, high-grade Kipushi zinc-copper-silver-germanium mine, also on the DRC’s Copperbelt. For details, visit www.ivanhoemines.com." data-reactid="45">Ivanhoe Mines is advancing its three principal projects in Southern Africa: 1) Mine development at the Platreef platinum-palladium-gold-nickel-copper discovery on the Northern Limb of South Africa’s Bushveld Complex; 2) mine development and exploration at the Tier One Kamoa-Kakula copper discovery on the Central African Copperbelt in the Democratic Republic of Congo; and 3) upgrading at the historic, high-grade Kipushi zinc-copper-silver-germanium mine, also on the DRC’s Copperbelt. For details, visit www.ivanhoemines.com.

Cautionary statement on forward-looking information

Certain statements in this release constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws, including without limitation: (1) statements regarding the scheduled completion of the 3,600-metre decline development contract in approximately one year, depending on ground conditions; (2) statements regarding initial mine development is planned to begin in the flat, near-surface zone which, at a 3% cut-off, is between 7.1 metres and 11.7 metres thick and with copper grades between 8.11% and 10.35% along the deposit’s axis; (3) statements regarding the expectation that a new expanded-case Kamoa-Kakula preliminary economic assessment is scheduled for completion this quarter; and (4) statements regarding the expectation to issue an updated Kamoa-Kakula resource estimate in January 2018 and the expectation that the new estimate will result in a major upgrade and expansion of the Kakula Mineral Resources.

All such forward-looking information and statements are based on certain assumptions and analyses made by Ivanhoe Mines’ management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believe are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information or statements including, but not limited to, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts to perform as agreed; social or labour unrest; changes in commodity prices; unexpected failure or inadequacy of infrastructure, or delays in the development of infrastructure, and the failure of exploration programs or other studies to deliver anticipated results or results that would justify and support continued studies, development or operations. Other important factors that could cause actual results to differ from these forward-looking statements also include those described under the heading “Risk Factors” in the company’s most recently filed MD&A as well as in the most recent Annual Information Form filed by Ivanhoe Mines. Readers are cautioned not to place undue reliance on forward-looking information or statements. The factors and assumptions used to develop the forward-looking information and statements, and the risks that could cause the actual results to differ materially are set forth in the “Risk Factors” section and elsewhere in the company’s most recent Management’s Discussion and Analysis report and Annual Information Form, available at www.sedar.com.

This news release also contains references to estimates of Mineral Resources. The estimation of Mineral Resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral Resource estimates may have to be re-estimated based on, among other things: (1) fluctuations in copper or other mineral prices; (2) results of drilling; (3) results of metallurgical testing and other studies; (4) changes to proposed mining operations, including dilution; (5) the evaluation of mine plans subsequent to the date of any estimates; and (6) the possible failure to receive required permits, approvals and licences.

Although the forward-looking statements contained in this news release are based upon what management of the company believes are reasonable assumptions, the company cannot assure investors that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the company does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this news release.

Read the rest of the article at https:
Data and Statistics for these countries : Australia | China | Georgia | South Africa | All
Gold and Silver Prices for these countries : Australia | China | Georgia | South Africa | All

Ivanhoe Mines Ltd.

PRODUCER
CODE : IVN.TO
CUSIP : 46579N 103
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ivanhoe Mines is a gold and copper development stage company based in Singapore.

Ivanhoe Mines produces gold, copper, iron in Australia and in Kazakhstan, develops copper and gold in Mongolia, and holds various exploration projects in Australia.

Its main assets in production are SAVAGE RIVER in Australia and BAKYRCHIK in Kazakhstan, its main asset in development is OYU TOLGOI in Mongolia and its main exploration properties are MONYWA in Myanmar and CLONCURRY in Australia.

Ivanhoe Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 14.5 billions as of today (US$ 10.6 billions, € 9.9 billions).

Its stock quote reached its lowest recent point on January 29, 2016 at CA$ 0.53, and its highest recent level on April 24, 2024 at CA$ 18.51.

Ivanhoe Mines has 785 229 952 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Ivanhoe Mines Ltd.
11/14/2018Ivanhoe Mines jumps as it finds new copper-rich area in Cong...
Annual reports of Ivanhoe Mines Ltd.
Annual Report 2007
Financings of Ivanhoe Mines Ltd.
9/23/2013announces non-brokered private placement
7/27/2012closes successful rights offering yielding US$1.8 billion i...
7/27/2012Closes Successful Rights Offering Yielding US$1.8 Billion in...
6/8/2012Files Final Prospectus for Rights Offering
5/23/2012Files Preliminary Prospectus for Rights Offering and Amends ...
4/19/2012announces agreement to proceed with a US$1.8 billion rights ...
1/18/2012Negotiates an Additional US$1.8 Billion Bridge Financing as ...
Nominations of Ivanhoe Mines Ltd.
6/29/2012shareholders appoint two new directors and approve new compa...
5/11/2012appoints new chairman and additional director
5/8/2012Appoints Four New Directors and Accepts Resignation of Three...
5/2/2012Board of Directors appoints new chief executive officer and ...
1/27/2012Expects to Maintain a Majority of Independent Directors on t...
7/14/2011Announces Appointment of Rio Tinto Executive Dan Larsen to C...
Financials of Ivanhoe Mines Ltd.
11/16/2015Announces Financial Results And Review Of Operations For The...
11/12/2013Announces Financial Results and Review of Operations for the...
5/16/2012announces financial results and review of operations for the...
3/20/2012Announces 2011 Financial Results and Review of Operations
8/16/2011Announces Financial Results and Review of Operations for the...
5/16/2011Announces Financial Results and Review of Operations for the...
3/29/2011Announces 2010 Financial Results and Review of Operations
5/15/2010Announces Financial Results and Review of Operations for the...
3/29/2008Announces 2007 Financial Results and Review of Operations
3/31/20072006 Financial Results
Project news of Ivanhoe Mines Ltd.
7/5/2016(Kamoa Copper)Excellent copper recoveries and concentrate grades confirmed...
6/20/2016June 20th, 2016 Exceptional grades and widths of mineralizat...
5/19/2016(Kamoa Copper)Kamoa Copper Project initiates major drilling program at the...
5/19/2016May 19th, 2016 Kamoa Copper Project initiates major drilling...
4/19/2016April 6th, 2016 Ivanhoe Mines announces an accelerated infil...
4/6/2016Ivanhoe Mines announces an accelerated infill drilling progr...
3/30/2016Ivanhoe Mines files NI 43-101 technical report for the indep...
1/25/2016Ivanhoe Mines’ exploration team makes major new copper disco...
1/25/2016Ivanhoe Mines’ exploration team makes major new copper disco...
1/25/2016Ivanhoe Mines’ exploration team makes major new copper disco...
9/9/2015Ivanhoe Mines, Laurentian University and the University of L...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
6/17/2015Ivanhoe Mines addresses concern of two D.R. Congo ministers ...
5/26/2015Zijin strikes deals with western miners
4/13/2015Ivanhoe Mines reports additional high-grade zinc, copper, si...
3/23/2015China-based Zijin Mining Group to acquire a 9.9% stake in Iv...
1/29/2015Ivanhoe Mines and Ivanplats expand challenge of errors and m...
1/12/2015Ivanhoe Mines backlashes report on its Platreef platinum min...
1/12/2015Ivanhoe Mines and Ivanplats challenge Globe & Mail story abo...
12/18/2013reports dewatering progress at historic Kipushi Mine in D.R....
10/30/2013reports ongoing dewatering at historic Kipushi Mine
10/16/2013reports unprecedented 90-metre intersection of 4.51 grams of...
9/9/2013to begin sinking bulk-sample shaft at its Platreef platinum-...
8/2/2012and Chalco Agree to 30-day Extension for Proportional Takeov...
4/2/2012Aluminum Corporation of China announces its intention to mak...
8/22/2011(Oyu Tolgoi)Gold and Silver to Generate up to 50% of Total Annual Revenu...
8/3/2011(Monywa)Receives Proceeds of US$103 Million from Monywa Trust
6/9/2011(Oyu Tolgoi)by Ivanhoe Mines Reports Construction of the Oyu Tolgoi Copp...
3/14/2011(Oyu Tolgoi)New copper-molybdenum-gold zone discovered on Ivanhoe Mines-...
3/3/2011(Oyu Tolgoi)Silver Production at Ivanhoe Mines' Oyu Tolgoi Project is Ex...
2/22/2011(Bakyrchik)Altynalmas Gold Announces a 50% Increase in Indicated Minera...
2/3/2011(Oyu Tolgoi)Successful Ivanhoe Mines rights offering yields US$1.18 bill...
3/12/2008(Oyu Tolgoi)Reports an Initial 760 Million Tonne Inferred Resource Estim...
3/31/2007(Oyu Tolgoi)Oyu Tolgoi Mineral Reserves and Resources March 2007
Corporate news of Ivanhoe Mines Ltd.
7/11/2016July 11th, 2016 Ivanhoe Mines receives second US$41.2 millio...
7/5/2016July 5th, 2016 Excellent copper recoveries and concentrate g...
6/24/2016June 24th, 2016 Ivanhoe Mines files NI 43-101 technical repo...
5/27/2016May 27th, 2016 Ivanhoe Mines files NI 43-101 technical repor...
5/20/2016May 19th, 2016 Ivanhoe Mines announces results of voting for...
5/19/2016May 19th, 2016 Ivanhoe Mines condemns promotion of false and...
5/12/2016May 12th, 2016 Ivanhoe Mines Announces Financial Results and...
5/2/2016May 2nd, 2016 Ivanhoe Mines announces a positive preliminary...
4/19/2016March 30th, 2016 Ivanhoe Mines files NI 43-101 technical rep...
4/19/2016March 24th, 2016 Ivanhoe Mines Issues 2015 Year-End Results ...
3/24/2016Ivanhoe Mines Issues 2015 Year-End Results And Review Of Ope...
1/27/2016Ivanhoe Mines reports Independent Mineral Resource estimate ...
1/27/2016Ivanhoe Mines reports Independent Mineral Resource estimate ...
1/27/2016Ivanhoe Mines Reports Independent Mineral Resource Estimate ...
1/25/2016Ivanhoe Mines' Exploration Team Makes Major New Copper Disco...
1/22/2016Ivanhoe Mines to release final tranche of locked-up shares
1/19/2016Ivanhoe congratulates Robert Friedland for his induction int...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
12/10/2015Ivanhoe Mines and Zijin Mining Group complete deal for Zijin...
9/23/2015Ivanhoe Mines welcomes DR Congo Government's support for Iva...
9/22/2015Congo drops objections to Ivanhoe Mines' copper deal
8/31/2015Ivanhoe Mines, Fio Corporation and Chemonics International j...
8/12/2015Ivanhoe Mines Announces Financial Results and Review of Oper...
8/4/2015Ivanhoe Mines and Zijin Mining Group extend completion date ...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
5/26/2015Ivanhoe Mines and China's Zijin Mining Group sign landmark a...
4/20/2015China-based Zijin Mining Group completes private placement a...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results And Review Of Ope...
3/27/2015Ivanhoe Mines Issues 2014 Year-End Results and Review of Ope...
3/26/2015Ivanhoe Mines appoints Livia Mahler as an independent direct...
3/24/2015CANADA STOCKS-TSX futures up as weak U.S. dollar lifts commo...
3/23/2015China-Based Zijin Mining Group to Acquire a 9.9% Stake in Iv...
3/3/2015' Exploration Team Receives the 2015 Thayer Lindsley Interna...
3/3/2015Ivanhoe Mines' Exploration Team Receives the 2015 Thayer Lin...
2/17/2015Ivanhoe Mines Reports Additional High-Grade Zinc, Copper, Si...
2/11/2015Ivanplats Is Platinum Sector's Top Performer in South Africa...
1/28/2015Ivanhoe Mines and Ivanplats Expand Challenge of Errors and M...
1/26/2015Ivanhoe Mines comments on share price
1/26/2015Ivanhoe Mines Comments on Share Price
1/16/2015Ivanhoe Mines files NI 43-101 prefeasibility study technical...
1/16/2015Ivanhoe Mines Files NI 43-101 Prefeasibility Study Technical...
1/12/2015OPEN LETTER: Ivanhoe Mines and Ivanplats Challenge Globe & M...
1/8/2015Ivanhoe Mines Releases Positive Results of Independent Pre-F...
12/9/2014Total job creation exceeds 650 following the resumption of s...
11/18/2013announces updated independent
Preliminary Economic Asses...
9/3/2013The New Ivanhoe Mines begins trading under the symbol IVN on...
8/28/2013Ivanplats changes its name to Ivanhoe Mines
8/3/2012changes name to Turquoise Hill ResourcesNew trading symbol "...
7/16/2012Rights to Cease Trading on New York Stock Exchange and NASDA...
6/27/2012"Regular Way" Trading of Ivanhoe Mines Rights Begins in the ...
6/13/2012Trading in Ivanhoe Mines Rights Begins June 14, 2012
4/25/2012Chalco and Ivanhoe Mines Note Status Of SouthGobi Resources
4/18/2012Photobook of Operations 2011
2/27/2012Altynalmas Gold Announces a Feasibility Mineral Reserve Esti...
2/22/2012CEO Robert Friedland a Keynote Speaker At International Mini...
12/13/2011receives decision in arbitration with Rio Tinto
10/3/2011Joint response from Ivanhoe Mines and Rio Tinto delivered to...
9/21/2011(Oyu Tolgoi)Challenges Unauthorized Remarks by Rio Tinto Representatives...
6/21/2011to Receive US$502 Million from Rio Tinto's Exercise of All O...
4/12/2011New Ivanhoe Mines Photobook of Operations
1/27/2011announces successful completion of rights offering
8/5/2008Australia Completes A$125 Million IPO
3/31/2008SouthGobi Energy Resources Receives Permit to Mine for the O...
8/2/2007issues clarification on Oyu Tolgoi Investment Agreement appr...
4/10/2007And Mongolian Government Reach Agreement In Principle On Dra...
3/19/2007Google Earth virtual tour of Ivanhoe's Oyu Tolgoi Copper & G...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (IVN.TO)FRANKFURT (IHM.F)
18.51+2.04%0.688+5.20%
TORONTO
CA$ 18.51
04/24 11:01 0.370
2.04%
Prev close Open
18.14 18.26
Low High
18.24 18.60
Year l/h YTD var.
12.83 -  19.36 44.27%
52 week l/h 52 week var.
9.94 -  19.36 57.00%
Volume 1 month var.
215,252 15.18%
24hGold TrendPower© : 34
Produces Gold - Iron
Develops Copper - Gold
Explores for Copper - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/1/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202453.10%
202312.99%14.0110.24
20228.35%9.9810.05
202143.95%9.9910.00
202068.97%6.961.80
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.94-1.53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.58+5.09%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.45-0.81%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.48+1.51%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+4.47%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.04-1.02%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :