First Majestic Announces Financial Results for Q4 and Year End 2014

New York – AG
Toronto – FR
Frankfurt – FMV
Mexico – AG

VANCOUVER, Feb. 23, 2015 /PRNewswire/ - FIRST MAJESTIC SILVER CORP. (AG: NYSE; FR: TSX) (the "Company" or "First Majestic") is pleased to announce the consolidated financial results for the Company's fourth quarter and year ended December 31, 2014.  The full version of the financial statements and the management discussion and analysis can be viewed on the Company's web site at www.firstmajestic.com, on SEDAR at www.sedar.com and EDGAR at www.sec.gov.

Q4 Highlights

  • Silver equivalent production of 4.2 million ounces, representing a 24% increase compared Q4 2013.
  • Silver production of 3.1 million ounces, representing a 12% increase compared to Q4 2013.
  • All-in Sustaining costs of $14.43 per payable silver ounce, representing a significant 27% reduction compared to the prior quarter.
  • Revenues after smelting and refining costs amounted to $72.5 million, representing a 23% increase compared to Q4 2013.
  • Adjusted net earnings (non-GAAP) normalized for non-cash items was $4.2 million or $0.04 per share.
  • Cash flow from operations of $21.1 million or $0.18 per share (non-GAAP).
  • Non-cash impairment charge of $102.0 million related to certain non-current assets at specific mines resulting in a net loss of $64.6 million in Q4 2014.

2014 Highlights

  • Silver equivalent production of 15.3 million ounces, representing a 19% increase compared to 2013.
  • Silver production of 11.7 million ounces, representing a 10% increase compared to 2013.
  • All-in Sustaining costs of $17.71 per payable silver ounce and expected to trend substantially lower for 2015.
  • Revenues were $245.5 million representing a 2% decrease compared to 2013 despite a 19% decline in average realized silver price.
  • Adjusted net earnings were $7.9 million or $0.07 per share for the year.
  • Cash flow from operations of $74.4 million or $0.63 per share.
  • General and Administrative costs of $19.4 million, representing a 22% decrease compared to 2013.
  • Ended the year with cash and cash equivalents of $40.3 million, down from $54.8 million in 2013.

"In 2014, First Majestic delivered another year of record production totaling 15.3 million silver equivalent ounces representing a 19% increase from 2013," said Keith Neumeyer, President and CEO of First Majestic. "Our Q4 financial results demonstrate that our cost savings plan launched in 2013 is having a positive impact on operating cash flows as well as significantly reducing our all-in sustaining costs. The mines have shown tremendous operational improvements over the past year. In particular, Del Toro has become a shining star in our portfolio following the successful reconfiguration of the mill in the second and third quarter and the connection to the National power grid in late September 2014. San Martin is breaking production records following its recent expansion as mining grades and plant recoveries have exceeded expectations. For 2015, our focus will be to continue to attack costs at every level of the business by leaving no stone unturned and deliver to our shareholders another solid year of operational improvements." 

2014 ANNUAL AND FOURTH QUARTER Highlights


Fourth Quarter

Fourth Quarter


Year to Date

Year to Date


HIGHLIGHTS

2014

2013

 Change 

2014

2013

 Change 

Operating 







Ore Processed / Tonnes Milled

683,528

701,617

(3%)

2,613,411

2,741,717

(5%)

Silver Ounces Produced

3,074,567

2,746,598

12%

11,748,721

10,641,465

10%

Silver Equivalent Ounces Produced 

4,247,527

3,421,161

24%

15,257,958

12,791,527

19%

Cash Costs per Ounce(1)

$8.51

$9.66

(12%)

$9.58

$9.35

2%

All-in Sustaining Cost per Ounce(1)

$14.43

n/a

n/a

$17.71

n/a

n/a

Total Production Cost per Ounce(1)

$10.68

$11.11

(4%)

$11.68

$10.36

13%

Total Production Cost per Tonne(1)

$47.15

$42.69

10%

$49.47

$39.29

26%

Average Realized Silver Price per Ounce ($/eq. oz.)(1)

$16.30

$20.61

(21%)

$18.69

$23.08

(19%)

Financial 







Revenues ($ millions)

$72.5

$59.0

23%

$245.5

$251.3

(2%)

Mine Operating Earnings ($ millions)(2)

$5.8

$14.3

(59%)

$30.2

$92.3

(67%)

Net Loss ($ millions)

($64.6)

($81.2)

21%

($61.4)

($38.2)

(61%)

Operating Cash Flows before Movements in Working Capital
    and Income Taxes ($ millions)(2)

$21.1

$20.4

3%

$74.4

$137.3

(46%)

Cash and Cash Equivalents ($ millions)

$40.3

$54.8

(26%)

$40.3

$54.8

(26%)

Working Capital ($ millions)(1)

($2.9)

$32.8

(109%)

($2.9)

$32.8

(109%)

Shareholders







Loss per Share ("EPS") - Basic

($0.55)

($0.69)

21%

($0.52)

($0.33)

(60%)

Adjusted EPS(1)

$0.04

$0.05

(33%)

$0.07

$0.56

(88%)

Cash Flow per Share(1)

$0.18

$0.17

3%

$0.63

$1.17

(46%)

Weighted Average Shares Outstanding for the Periods

117,543,961

117,030,825

0%

117,444,276

116,935,325

0%

(1)

The Company reports non-GAAP measures which include cash costs per ounce, all-in sustaining cost per ounce, total production cost per ounce, total production cost per tonne, average realized silver price per ounce, working capital, adjusted EPS and cash flow per share.  These measures are widely used in the mining industry as a benchmark for performance, but do not have a standardized meaning and may differ from methods used by other companies with similar descriptions. 

(2)

The Company reports additional GAAP measures which include mine operating earnings and operating cash flows before movements in working capital and income taxes.  These additional financial measures are intended to provide additional information and do not have a standardized meaning prescribed by IFRS. 

FINANCIAL RESULTS

The Company generated revenues of $72.5 million in the fourth quarter of 2014, an increase of $13.5 million or 23% compared to $59.0 million in the fourth quarter of 2013. The increase in revenue was primarily due to the sale of approximately 934,000 ounces of silver that were previously held as inventory at the end of the third quarter. Revenues for the full year 2014 were $245.5 million, a decrease of $5.8 million compared to 2013, as record production in 2014 resulted in a 21% increase in payable equivalent silver ounces sold but offset by a 19% decrease in average realized silver price per ounce compared to 2013.

Mine operating earnings were $5.8 million in the fourth quarter of 2014 compared to $14.3 million in the fourth quarter of 2013. The Company recognized mine operating earnings of $30.2 million in 2014, a decrease of 67% compared to $92.3 million in 2013. The decrease in mine operating earnings was primarily attributed to a 19% decline in average realized silver price per ounce during the year, higher production cost during the ramp up of the Del Toro mine, and $17.1 million increase in depletion, depreciation and amortization expense primarily due to 123% increase in production from the new Del Toro mine.

Net loss after taxes for the fourth quarter and year end 2014 was $64.6 million and $61.4 million respectively, compared to net loss after taxes of $81.2 million and $38.2 million in the comparative periods of 2013.  Net loss in the current period was attributed to non-cash impairment charges totalling $102.0 million consisting of $58.7 million at La Guitarra, $21.7 million at San Martin and $21.6 million at Del Toro, before taxation effects.

In the fourth quarter, operating cash flows before movements in working capital and income taxes were $21.1 million ($0.18 per share), compared to $20.4 million ($0.17 per share) in the fourth quarter of 2013.  The increase in cash flow per share was primarily attributed to higher production, offset by a decrease in mine operating earnings which were affected by a 21% decline in average realized silver prices compared to the prior quarter.  For the full year 2014, operating cash flows decreased 46% from $137.3 million ($1.17 per share) in 2013 to $74.4 million ($0.63 per share) in 2014 primarily due to lower margins as a result of a 19% decrease in average annual realized silver prices.

The Company ended 2014 with a healthy $40.3 million in cash and cash equivalents compared to $54.8 million at the end of 2013. The Company is currently in open discussions with various financial partners to reduce or extend payments on certain current liabilities in order to strengthen the working capital position. Based on the Company's current operating plan, the Company believes it has sufficient financial resources, combined with cash flows from operations, to meet its ongoing requirements.

OPERATIONAL RESULTS

The Company achieved another quarterly production record totaling 3,074,567 ounces of silver and 4,247,527 of silver equivalent ounces. This compares to 2,746,598 ounces of silver and 3,421,161 of silver equivalent ounces in the fourth quarter of 2013, representing an increase of 12% and 24%, respectively. The increase in production was primarily attributed to the ramp up of the Del Toro mine and the mill expansion at San Martin; offset by a decrease in production at La Encantada due to less tonnage milled relating to the processing of only fresh mined ore versus a blend with old tailings

Annual production in 2014 reached a record of 15,257,958 of silver equivalent ounces, in line with the Company's previous guidance of 14.8 million to 15.6 million ounces of silver equivalents. On a year over year basis, annual production increased 19% compared to 12,791,527 silver equivalent ounces produced in 2013. Silver production also increased 10% to 11,748,721 ounces compared to 10,641,465 ounces of silver in 2013. Higher production for the year was primarily attributed to the ramp up of the Del Toro Silver Mine, which increased silver equivalent production by 90% compared to the prior year. In addition, the San Martin Silver Mine, which completed the expansion of its plant milling capacity in 2014, increased its silver equivalent ounces by 55% compared to the prior year.

Del Toro, the Company's newest silver mine, achieved record quarterly production of 817,754 silver ounces and 1,264,751 silver equivalent ounces, an increase of 65% and 77%, respectively, compared to the previous quarter. The mine had a challenging year as it encountered numerous operational issues during ramp up such as metallurgical issues with transitional ores, a delay in connecting the new power line, and higher production costs due to lower than expected production. With the decision to process all ore through the flotation plant to improve economics, cost cutting measures and successful completion of the power line at the end of September, Del Toro is back on track and is estimated to produce 3.7 to 4.2 million equivalent silver ounces including 2.6 to 2.9 million silver ounces in 2015 at a cash cost per ounce of $9.39 to $9.96 per ounce.

At San Martin, the Company completed its mill expansion in 2014 and achieved milling throughput of 1,051 tpd during the fourth quarter of 2014. As a result of improvements in throughput, head grade and recoveries, San Martin achieved a record production of 2,118,261 equivalent ounces in 2014, a 55% increase from the 1,370,890 equivalent ounces in the prior year.

COSTS AND CAPITAL EXPENDITURES

Consolidated cash costs per ounce in the fourth quarter were $8.51 compared to $9.66 in the fourth quarter of 2013. The decrease in cash cost per ounce compared to the prior year was primarily attributed to economies of scale from higher production at the Del Toro and San Martin mines. For the full year, cash costs increased slightly to $9.58 per ounce compared to $9.35 per ounce in 2013, or 5% higher than annual guidance. The increase in cash costs was primarily due to higher production costs at La Encantada due to the increased extraction rate of high-grade underground mine ore  versus the mining costs associated with reprocessing low-grade old tailings in the prior year. Also, additional diesel and generator rental costs were incurred in the first nine months of the year at Del Toro due to delays in the connection of the 115 kV power line and higher than expected smelting and refining costs due to penalty costs for impurities as the mill refined its metallurgical process.    

All-in Sustaining costs (AISC) for the fourth quarter and full year 2014 were $14.43 and $17.71 per ounce, respectively. Quarter over quarter, consolidated AISC decreased to $14.43 per payable silver ounce, representing a significant 27% reduction compared to $19.89 per ounce in the third quarter of 2014. This major improvement is a result of economies of scale attributed to production improvements from Del Toro, San Martin and La Guitarra mines. In addition, the Company has started to see cost savings materialized from the new power line at Del Toro and ongoing re-negotiation with suppliers and contractors plus continued lay-offs.

The following table is an AISC summary of the quarter over quarter improvement by mine and full year 2014:


All-in Sustaining Costs (per Payable Silver Ounce)


Mine

Q4 2014

Q3 2014

Q/Q change

FY 2014

La Encantada

$17.76

$17.32

3%

$15.50

La Parrilla

$11.09

$11.77

-6%

$11.54

Del Toro

$10.16

$25.39

-60%

$18.79

San Martin

$9.54

$14.11

-32%

$14.01

La Guitarra

$17.21

$27.74

-38%

$21.16

Total:

$14.43

$19.89

-27%

$17.71

Del Toro has shown significant improvements compared to the previous quarter. During the fourth quarter, Del Toro's AISC was reduced significantly to $10.16 per ounce, representing a dramatic decrease of 60% compared to the prior quarter, as the mine realized consistent and efficient energy fully sourced from the new 115 kV power line. This has resulted in lower costs, higher production and improved economics with the decommissioning of portable diesel power generation units. In addition, the use of new reagents and implementation of the new regrinding circuit has dramatically improved metallurgical recoveries for both silver and lead.

Capital expenditures in the fourth quarter were $24.4 million, primarily consisting of $9.8 million at La Encantada, $7.1 million at Del Toro, $2.9 million at La Parrilla, $2.9 million at La Guitarra and $1.1 million at San Martin. Compared to the previous quarter, capital expenditures decreased 18% due to cost cutting measures.

Throughout 2014, the Company's total capital expenditures were $113.5 million which consisted of mine development, exploration, construction and expansion projects and acquisitions of new mining equipment. As previously announced, the Company plans to invest a total of $75.6 million in 2015 on sustaining and expansionary capital.  The 2015 annual budget implies an estimated 33% reduction in total capital expenditures following the completion of numerous capital intensive growth projects in 2014.

2015 GUIDANCE

In 2015, First Majestic aims to maintain its status as one of silver industry's purest and highest margin producers. The focus of the Company will be on operational efficiency and cash flow generation to ensure profitability in a low silver price environment. Based on the fourth quarter results and managements improved outlook, the Company is projecting its 2015 AISC to be within a range of $13.96 to $15.48 per ounce, or $13.50 to $14.96 per ounce after excluding non-cash items such as share-based payments and accretion of reclamation costs. Annual silver production is expected to increase to a new record range of 11.8 million to 13.2 million ounces (or 15.3 million to 17.1 million silver equivalent ounces), due to the following:

  • Del Toro is expected to reach 3.7 to 4.2 million silver equivalent ounces with improvements to optimize throughput and metallurgical recoveries, compared to 3.7 million silver equivalent ounces in 2014;
  • An upgrade and expansion of the crushing and grinding area at La Encantada is expected to increase operations to 3,000 tpd and production to 4.0 to 4.5 million silver equivalent ounces; and
  • At La Guitarra, the underground development of the El Coloso area is expected to result in higher silver grades to be extracted and processed in 2015.

The following is a summary of the Company's 2015 outlook by producing mines:

Anticipated Operating Parameters

La Encantada

La Parrilla

Del Toro

San Martin

La Guitarra

Total

Tonnes processed ('000s)

 839 - 938 

 645 - 721 

 556 - 622 

 347 - 388 

 160 - 179 

 2,547 - 2,848 








Silver ounces ('000s)

 4,028 - 4,502 

 2,624 - 2,933 

 2,555 - 2,856 

 1,774 - 1,982 

 794 - 887 

 11,775 - 13,160 

Gold ounces

-

595 - 662

-

3,909 - 4,368

5,030 - 5,622

9,534 - 10,652

Pounds of lead ('000s)

-

15,142 - 16,924

21,014 - 23,486

-

-

36,156 - 40,410

Pounds of zinc ('000s)

-

13,515 - 15,105

-

-

-

13,515 - 15,105

Silver equivalent ounces ('000s)

 4,028 - 4,502 

 4,326 - 4,835 

 3,733 - 4,172 

 2,049 - 2,291 

 1,149 - 1,284 

 15,285 - 17,084 








Average silver grade (g/t)

249

156

199

209

182

205

Average recoveries (%)

60%

79%

72%

76%

85%

71%








Cash cost per ounce

$8.73 - $9.11

$5.72 - $6.36

$9.39 - $9.96

$9.43 - $10.15

$8.18 - $9.83

$8.29 - $9.22

Sustaining capital per ounce

$2.25 - $2.51

$5.34 - $5.96

$2.94 - $3.29

$3.25 - $3.63

$5.11 - $5.72

$3.49 - $3.91

Expansionary capital per ounce

$1.90 - $2.13

$2.41 - $2.69

$2.24 - $2.50

$1.70 - $1.90

$5.97 - $6.67

$2.41 - $2.70

Production cost per tonne

$39.07 - $40.89

$40.29 - $42.66

$51.28 - $53.76

$58.74 - $62.36

$53.48 - $61.22

$45.63 - $49.82

*Metal average price assumptions for calculating equivalents:  Silver $17.00/oz, Gold $1,200/oz, Lead $0.95/lb, Zinc $1.02/lb

CONFERENCE CALL AND WEBCAST

A conference call and webcast will be held Wednesday, February 25, 2015 at 11:00 a.m. PST (2:00 p.m. EST) to review and discuss the financial results.  To participate in the conference call, please dial the following:

Toll Free Canada & USA:

1-800-319-4610

Outside of Canada & USA:

1-604-638-5340

Toll Free Germany: 

0800 180 1954

Toll Free UK: 

0808 101 2791

Participants should dial in 10 minutes prior to the conference.

Click on WEBCAST on the First Majestic homepage as a simultaneous audio webcast of the conference call will be posted at www.firstmajestic.com.

First Majestic is a mining company focused on silver production in México and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

FIRST MAJESTIC SILVER CORP.
"signed"
Keith Neumeyer, President & CEO

SPECIAL NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release includes certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "schedule" and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral reserve and resource estimates and estimates of future production and costs of production at our properties; estimated production rates for silver and other payable metals produced by us, the estimated cost of development of our development projects; the effects of laws, regulations and government policies on our operations, including, without limitation, the laws in Mexico which currently have significant restrictions related to mining; obtaining or maintaining necessary permits, licences and approvals from government authorities; and continued access to necessary infrastructure, including, without limitation, access to power, land, water and roads to carry on activities as planned.

These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in the spot and forward price of silver, gold, base metals or certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in the currency markets (such as the Canadian dollar and Mexican peso versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments in Canada, Mexico; operating or technical difficulties in connection with mining or development activities; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inability to obtain adequate insurance to cover risks and hazards; and the presence of laws and regulations that may impose restrictions on mining, including those currently enacted in Mexico; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses, permits and approvals from government authorities; diminishing quantities or grades of mineral reserves as properties are mined; the Company's title to properties; and the factors identified under the caption "Risk Factors" in the Company's Annual Information Form, under the caption "Risks Relating to First Majestic's Business".

Investors are cautioned against attributing undue certainty to forward-looking statements or information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Canada | Germany | Mexico | All
Gold and Silver Prices for these countries : Canada | Germany | Mexico | All

First Majestic Silver Corp.

PRODUCER
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

First Majestic is a silver producing company based in Canada.

First Majestic produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Canada and in Mexico.

Its main assets in production are LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN and LA ENCANTADA SILVER MINE in Mexico and its main exploration properties are REAL DE CATORCE, DEL TORO and CUITABOCA in Mexico and PITT ISLAND, PINCOURT, DOMPIERRE and DESJARDINS in Canada.

First Majestic is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.5 billions as of today (US$ 1.1 billions, € 1.0 billions).

Its stock quote reached its lowest recent point on November 02, 2001 at CA$ 0.01, and its highest recent level on December 22, 2017 at CA$ 9.99.

First Majestic has 164 340 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of First Majestic Silver Corp.
8/13/2018First Majestic shares hammered after reporting $40 million-l...
1/21/2009Follow up N° 1
Annual reports of First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financings of First Majestic Silver Corp.
8/20/2009Tranche of Non-Brokered Private Placement Closes
8/12/2009Non-Brokered Private Placement and Debt Settlement
Nominations of First Majestic Silver Corp.
4/4/2014Appoints VP of Technical Services
12/24/2013Announces Retirement of Robert Young from Board of Directors
1/5/2012Appoints Chief Information Officer
12/30/2011Names Douglas Penrose as Chairman
Financials of First Majestic Silver Corp.
2/25/2016First Majestic Announces Financial Results for Q4 and Year E...
2/3/2014Fourth Quarter and Year End Financial Results to be Released...
11/12/2013Reports Third Quarter Financial Results
10/31/2013Third Quarter Financial Results to be Released on November 1...
7/15/2013Second Quarter Financial Results to be Released on August 13...
5/15/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
5/7/2013Quarter Financial Results to be Released on May 15th
11/14/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
11/7/2012Third Quarter Financial Results to Be Released on November 1...
8/7/2012Second Quarter Financial Results to be Released on August 14...
5/10/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
5/4/2012First Quarter Financial Results to Be Released on May 10th
3/5/2012Announces New Record Earnings & Cash Flows for 2011
2/24/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
10/26/2011Third Quarter Financial Results to be Released on November 9...
8/3/2011Second Quarter Financial Results to be Released on August 11...
5/17/2011Earns a Record $23.9 million in First Quarter of 2011
5/11/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
3/1/20112010 Audited Financial Results show Record Earnings & Cash F...
3/23/2010Year End & Fourth Quarter Financial Results
11/12/2009Record Third Quarter Financial Results
8/14/2009Second Quarter Financial Results
8/15/2008Second Quarter Financial Results
5/16/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
4/18/20082007 Year End Financial Results
Project news of First Majestic Silver Corp.
1/14/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
12/4/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
4/9/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
1/9/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
9/27/2012Mine Videos - Just Released
1/24/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
1/12/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
10/13/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
9/22/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
9/13/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
3/1/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
4/8/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
11/26/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
10/13/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
10/6/2009Third Quarter Production Results
2/17/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
1/20/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
7/17/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
4/29/20081st Quarter Production Results
4/23/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
4/1/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
1/8/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
7/2/2007(La Parrilla Silver Mine)La Parilla Technical Report
Corporate news of First Majestic Silver Corp.
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/25/2016Second Quarter Financial Results to be Released on August 10
7/20/2016Here’s Why These Five Stocks Are on the Move on Wednesday
7/12/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
1/29/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
11/28/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/13/2015A Silver Lining in October 2015?
10/2/2015First Majestic Completes Acquisition of Silvercrest
10/1/2015First Majestic Completes Acquisition of SilverCrest
9/25/2015First Majestic and SilverCrest Announce Shareholder Approval...
9/15/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/11/2015First Majestic reports 2Q loss
8/11/2015First Majestic Reports Second Quarter Financial Results and ...
8/10/2015Why Earnings Season Could Be Great for First Majestic Silver...
7/30/2015Second Quarter Financial Results to be Released on August 11
7/30/2015First Majestic Silver: Second Quarter Financial Results to B...
7/27/2015First Majestic Announces Friendly Acquisition of Silvercrest...
7/27/2015announces friendly acquisition of Silvercrest Mines
7/9/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
4/23/2015NYSE stocks posting largest percentage decreases
4/23/2015First Quarter Financial Results to be Released on May 7
4/23/2015First Majestic Silver Corp. First Quarter Financial Results ...
4/22/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
4/20/2015NYSE stocks posting largest percentage decreases
4/13/2015NYSE stocks posting largest percentage decreases
4/13/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
4/9/2015NYSE stocks posting largest percentage decreases
4/6/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
4/6/2015Announces C$30 Million Bought Deal Financing
4/6/2015First Majestic Announces Promotion of Martin Palacios to Chi...
4/6/2015First Majestic Announces Acquisition of Shares of First Mini...
4/1/2015NYSE stocks posting largest percentage increases
4/1/2015First Majestic Updates Mineral Reserve and Resource Estimate...
3/31/2015Announces New La Guitarra NI 43-101 Technical Report
3/31/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
3/11/2015First Majestic Renews Share Repurchase Program
3/11/2015First Majestic Renews Share Repurchase Program
8/22/2014to List on the Mexican Stock Exchange
10/24/2013Appeal Against First Majestic Dismissed
9/30/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
7/10/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
7/2/2013Payment of CDN$14.85 million Received in Court Litigation
5/2/2013Announces Completion of La Guitarra's Expansion to 500 tpd
4/26/2013Receives Positive Judgment for US$89.6 in Court Litigation
4/17/2013Earns Socially Responsible Business Distinction Award for Fi...
4/15/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
3/11/2013Announces Share Repurchase Program
2/19/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
2/14/2013Considering Superior Offer from Coeur to Acquire Orko Silver
1/25/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
9/26/2012New Look! New Features! First Majestic Bullion Store
9/6/2012Keith Neumeyer's Interview With Minesite.com
8/27/2012Announces Appointment of VP of Exploration
8/21/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
8/16/2012Recognized as a Leader in Corporate Social Responsibility
7/17/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
7/3/2012Completes Acquisition of Silvermex Resources
6/26/2012mex Securityholders Approve Plan of Arrangement With First M...
5/22/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
4/16/2012First Quarter Production Results and Full Commencement of Co...
4/3/2012Announces Friendly Acquisition of Silvermex Resources
3/30/2012Files Form 40-F Annual Report
10/7/2011Third Quarter Production Results to Be Released on October 1...
8/11/2011Record Earnings of $30.6 million in Second Quarter
7/7/2011Another Record Quarter of Silver Production
4/8/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
8/16/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
4/22/20102nd Year Running for Mexican Distinction as a "Socially Resp...
4/12/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
1/12/2010Production Increases by 18%, Reaches New Record
11/13/2009Completes Acquisition of Normabec Mining Resources; Normabec...
9/14/2009to Acquire Normabec Mining Resources
8/13/2009Joins OTCQX
6/26/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
3/5/2009Closing of $21.2 Million Offering
11/19/2008Operations Update
9/11/2008Many Positive Developments Underway
7/15/20082nd Quarter Production Shows Continued Ramp-up
3/25/2008Closing of $45,475,000 Offering
1/17/2008Another Record Quarter of Silver Production
12/14/2007TSX Conditional Approval
12/5/2007Update on the Chalchihuites Group of Properties
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FR.TO)OTHER OTC (FRMSF)
9.31+0.00%
TORONTO
CA$ 9.31
04/24 17:00 -
0%
Prev close Open
9.31 9.22
Low High
9.20 9.43
Year l/h YTD var.
5.74 -  10.95 16.67%
52 week l/h 52 week var.
5.74 -  10.95 -3.32%
Volume 1 month var.
644,650 28.59%
24hGold TrendPower© : -17
Produces Lead - Silver - Zinc
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202422.66%
2023-32.71%9.9510.07
2022-23.32%9.9610.00
2021-13.88%30.7512.74
20209.63%9.8610.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :