First Majestic Silver Corp.

Published : July 09th, 2015

First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2'15

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2'15

Thu Jul 9, 2015
First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2'15
First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce that total production at its five operating silver mines in Mexico for the second quarter ending June 30, 2015 reached 3,802,558 equivalent ounces of silver, relatively unchanged compared to the same quarter in 2014.

Keith Neumeyer, President & CEO of First Majestic, states, "During the first half of 2015, we produced 7.7 million silver equivalent ounces, which puts us on track of achieving our annual goal of producing between 15.3 to 17.1 million silver equivalent ounces. Production at Del Toro reached a record 2.5 million silver equivalent ounces in the first half of this year, representing a 46% increase compared to the first half of 2014. This substantial increase is primarily due to the Company's decision in mid-2014 to reconfigure the plant in order to process 100% of the ore through flotation."

"During the second quarter, we finished the construction and installation of a new crushing and milling circuit at La Encantada which is currently in its ramp up phase," continued Mr. Neumeyer. "As a result of this expansion, we anticipate silver production in the second half of 2015 to increase significantly due to the 50% higher milling capacity at La Encantada. In addition, improvements in dilution and grade control at both La Guitarra and San Martin continue to have a positive impact on the mining operations."

Consolidated Production Results:

*Certain amounts shown in this news release may not add exactly to the total amount due to rounding differences.

Quarterly Operational Review:

The total ore processed during the quarter at the Company's five operating silver mines: La Encantada, La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 662,637 tonnes, relatively unchanged compared to the second quarter of the prior year and a 5% increase from the previous quarter. The increase in tonnes compared to the prior quarter was primarily due to a 13% increase in throughput rates at La Encantada.

Average silver grades in the quarter for the five mines decreased to 182 g/t compared to 212 g/t in the second quarter of 2014 and slightly decreased 2% compared with the previous quarter. Combined silver recoveries averaged 70% during the quarter, up from 68% in the same quarter of the prior year and below the first quarter average of 74%.

The Company's underground development in the second quarter consisted of 10,259 metres, a 4% increase compared to 9,828 metres completed in the previous quarter.

During the quarter, 18 Diamond drill rigs were operating at the Company's five operations. The Company completed 16,268 metres of Diamond drilling in the quarter compared to 5,425 metres in the prior quarter, representing a 200% increase primarily due to increased drilling at the La Encantada Silver Mine to support plans to release an updated NI 43-101 Technical Report in the fourth quarter of 2015.

The table below represents the operating parameters at each of the Company's five producing silver mines.

Mine by Mine Quarterly Production Table:

The following prices were used in the calculation of silver equivalent ounces: Silver: $16.39 per ounce; Gold: $1,191 per ounce; Lead: $0.88 per pound; Zinc $1.00 per pound.

At the La Encantada Silver Mine:
  • For the quarter, total silver production was 602,869 silver ounces representing an 11% increase over the previous quarter primarily due to a 13% increase in processed ore.
  • On May 31st, the commissioning of the new 12' x 24' ball mill began with a testing phase. Over a two week period, the new mill was successfully tested to ensure construction and mechanical integrity. On June 14th, mine ore was introduced into the system and initial silver production began using the new mill.
  • The ramp up to 3,000 tpd remains on schedule and is expected to be achieved before the end of August. Mine developments in the San Javier breccia, Milagros breccia and 310 ore body have been prepared for initial production to begin in the third quarter. These new production areas will utilize a variant of sub-level caving which is a low cost bulk mining method typically used in large tonnage deposits.
  • A total of 2,021 metres of underground development were completed in the second quarter compared to 2,989 metres of development in the previous quarter.
  • Five drill rigs consisting of four underground and one on surface were active at La Encantada during the quarter. A total of 5,309 metres of exploration drilling was completed in the second quarter compared to 828 metres of drilling in the previous quarter. The Company anticipates the release of an updated NI 43-101 Technical Report by the end of the fourth quarter.

At the La Parrilla Silver Mine:
  • During the quarter, the flotation circuit processed 89,241 tonnes with an average silver grade of 167 g/t and an 87% recovery while the cyanidation circuit processed 89,495 tonnes with an average silver grade of 116 g/t and a 61% recovery.
  • The lead circuit processed an average lead grade of 1.4% with recoveries of 75% for total lead production of 2,043,654 lbs, representing a 25% increase compared to the previous quarter. The increase in lead production was primarily attributed to a 23% increase in recoveries due to higher concentrations of galena in the ore feed.
  • The zinc circuit processed an average zinc grade of 2.6% with recoveries of 74% for total zinc production of 3,824,737 lbs, representing a 40% decrease compared to the previous quarter. The decrease in zinc production was primarily due to a return to normal operating grades after encountering exceptionally high zinc grades within the Vacas mine in the first quarter.
  • During the quarter, an additional 163 metres were completed at the underground ore haulage level 11. To date, a total of 2.4 kilometres have been completed on the 5.0 kilometre electrical rail system project.
  • Underground development completed in the quarter totaled 1,901 metres compared with 2,077 metres developed in the previous quarter.
  • Four underground drill rigs were active within the La Parrilla property during the quarter. A total of 4,356 metres were drilled in the second quarter compared to 1,437 metres in the previous quarter.

At the Del Toro Silver Mine:
  • For the quarter, Del Toro produced a total of 1,159,484 silver equivalent ounces representing a 13% decrease compared to the previous quarter. The decrease in total production was primarily due to a 16% decrease in silver grades and an 8% decrease in silver recoveries, however, offset by a 3% increase in throughput.
  • Lead grades and recoveries averaged 3.9% and 65%, respectively, producing a total of 9,034,581 pounds of lead, representing a 6% decrease compared to the previous quarter.
  • Underground development completed in the quarter totaled 1,813 metres compared with 1,686 metres developed in the previous quarter.
  • Four drill rigs consisting of three underground and one on surface were active in the second quarter at Del Toro. Total exploration metres drilled in the quarter amounted to 5,200 metres compared to 2,285 metres drilled in the previous quarter.

At the San Martin Silver Mine:
  • During the quarter, San Martin produced 597,328 silver ounces and 1,364 ounces of gold for a total quarterly production of 696,580 silver equivalent ounces. This represents a 4% increase in silver production and a 10% decrease in gold production compared to the previous quarter.
  • Underground development completed in the second quarter totaled 2,208 metres compared with 2,010 metres of development in the previous quarter.
  • Three underground drill rigs were active within the San Martin property during the quarter. Total metres drilled in the second quarter amounted to 833 metres compared to 266 metres of drilling in the previous quarter.

At the La Guitarra Silver Mine:
  • During the quarter, La Guitarra produced 230,499 silver ounces and 1,731 gold ounces for a total quarterly production of 356,089 silver equivalent ounces. This represents a 33% increase in total production compared to the prior quarter primarily due to a 27% increase in silver grades and a 94% increase in gold grades. Improvements in dilution and grade control have continued to support the increase of silver and gold grades.
  • The 800 metre underground drift to access the Nazareno area began in May and had advanced a total of 176 metres by the end of the quarter. Development of this drift is expected to be completed by the end of November.
  • Mine production within the El Coloso area delivered 61% of total throughput during the quarter. The Company is working towards achieving 100% of production from the El Coloso area which will include the Nazareno area once the underground drift is completed.
  • A total of 2,316 metres of development were completed in the second quarter compared to 1,066 metres of development in the previous quarter.
  • Two underground drill rigs were active in the second quarter within the La Guitarra property. Total metres drilled in the quarter amounted to 569 metres compared to 609 metres drilled in the previous quarter.

First Majestic is a mining company focused on silver production in Mexico and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

, visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer
President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2014, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

You can view the Previous News Releases item: Fri May 22, 2015, First Majestic Announces Election of Directors

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Mexico | All
Gold and Silver Prices for these countries : Mexico | All

First Majestic Silver Corp.

PRODUCER
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

First Majestic is a silver producing company based in Canada.

First Majestic produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Canada and in Mexico.

Its main assets in production are LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN and LA ENCANTADA SILVER MINE in Mexico and its main exploration properties are REAL DE CATORCE, DEL TORO and CUITABOCA in Mexico and PITT ISLAND, PINCOURT, DOMPIERRE and DESJARDINS in Canada.

First Majestic is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.6 billions as of today (US$ 1.2 billions, € 1.1 billions).

Its stock quote reached its lowest recent point on November 02, 2001 at CA$ 0.01, and its highest recent level on December 22, 2017 at CA$ 9.99.

First Majestic has 164 340 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of First Majestic Silver Corp.
8/13/2018First Majestic shares hammered after reporting $40 million-l...
1/21/2009Follow up N° 1
Annual reports of First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financings of First Majestic Silver Corp.
8/20/2009Tranche of Non-Brokered Private Placement Closes
8/12/2009Non-Brokered Private Placement and Debt Settlement
Nominations of First Majestic Silver Corp.
4/4/2014Appoints VP of Technical Services
12/24/2013Announces Retirement of Robert Young from Board of Directors
1/5/2012Appoints Chief Information Officer
12/30/2011Names Douglas Penrose as Chairman
Financials of First Majestic Silver Corp.
2/25/2016First Majestic Announces Financial Results for Q4 and Year E...
2/3/2014Fourth Quarter and Year End Financial Results to be Released...
11/12/2013Reports Third Quarter Financial Results
10/31/2013Third Quarter Financial Results to be Released on November 1...
7/15/2013Second Quarter Financial Results to be Released on August 13...
5/15/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
5/7/2013Quarter Financial Results to be Released on May 15th
11/14/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
11/7/2012Third Quarter Financial Results to Be Released on November 1...
8/7/2012Second Quarter Financial Results to be Released on August 14...
5/10/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
5/4/2012First Quarter Financial Results to Be Released on May 10th
3/5/2012Announces New Record Earnings & Cash Flows for 2011
2/24/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
10/26/2011Third Quarter Financial Results to be Released on November 9...
8/3/2011Second Quarter Financial Results to be Released on August 11...
5/17/2011Earns a Record $23.9 million in First Quarter of 2011
5/11/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
3/1/20112010 Audited Financial Results show Record Earnings & Cash F...
3/23/2010Year End & Fourth Quarter Financial Results
11/12/2009Record Third Quarter Financial Results
8/14/2009Second Quarter Financial Results
8/15/2008Second Quarter Financial Results
5/16/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
4/18/20082007 Year End Financial Results
Project news of First Majestic Silver Corp.
1/14/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
12/4/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
4/9/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
1/9/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
9/27/2012Mine Videos - Just Released
1/24/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
1/12/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
10/13/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
9/22/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
9/13/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
3/1/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
4/8/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
11/26/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
10/13/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
10/6/2009Third Quarter Production Results
2/17/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
1/20/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
7/17/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
4/29/20081st Quarter Production Results
4/23/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
4/1/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
1/8/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
7/2/2007(La Parrilla Silver Mine)La Parilla Technical Report
Corporate news of First Majestic Silver Corp.
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/25/2016Second Quarter Financial Results to be Released on August 10
7/20/2016Here’s Why These Five Stocks Are on the Move on Wednesday
7/12/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
1/29/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
11/28/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/13/2015A Silver Lining in October 2015?
10/2/2015First Majestic Completes Acquisition of Silvercrest
10/1/2015First Majestic Completes Acquisition of SilverCrest
9/25/2015First Majestic and SilverCrest Announce Shareholder Approval...
9/15/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/11/2015First Majestic reports 2Q loss
8/11/2015First Majestic Reports Second Quarter Financial Results and ...
8/10/2015Why Earnings Season Could Be Great for First Majestic Silver...
7/30/2015Second Quarter Financial Results to be Released on August 11
7/30/2015First Majestic Silver: Second Quarter Financial Results to B...
7/27/2015First Majestic Announces Friendly Acquisition of Silvercrest...
7/27/2015announces friendly acquisition of Silvercrest Mines
7/9/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
4/23/2015NYSE stocks posting largest percentage decreases
4/23/2015First Quarter Financial Results to be Released on May 7
4/23/2015First Majestic Silver Corp. First Quarter Financial Results ...
4/22/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
4/20/2015NYSE stocks posting largest percentage decreases
4/13/2015NYSE stocks posting largest percentage decreases
4/13/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
4/9/2015NYSE stocks posting largest percentage decreases
4/6/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
4/6/2015Announces C$30 Million Bought Deal Financing
4/6/2015First Majestic Announces Promotion of Martin Palacios to Chi...
4/6/2015First Majestic Announces Acquisition of Shares of First Mini...
4/1/2015NYSE stocks posting largest percentage increases
4/1/2015First Majestic Updates Mineral Reserve and Resource Estimate...
3/31/2015Announces New La Guitarra NI 43-101 Technical Report
3/31/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
3/11/2015First Majestic Renews Share Repurchase Program
3/11/2015First Majestic Renews Share Repurchase Program
8/22/2014to List on the Mexican Stock Exchange
10/24/2013Appeal Against First Majestic Dismissed
9/30/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
7/10/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
7/2/2013Payment of CDN$14.85 million Received in Court Litigation
5/2/2013Announces Completion of La Guitarra's Expansion to 500 tpd
4/26/2013Receives Positive Judgment for US$89.6 in Court Litigation
4/17/2013Earns Socially Responsible Business Distinction Award for Fi...
4/15/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
3/11/2013Announces Share Repurchase Program
2/19/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
2/14/2013Considering Superior Offer from Coeur to Acquire Orko Silver
1/25/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
9/26/2012New Look! New Features! First Majestic Bullion Store
9/6/2012Keith Neumeyer's Interview With Minesite.com
8/27/2012Announces Appointment of VP of Exploration
8/21/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
8/16/2012Recognized as a Leader in Corporate Social Responsibility
7/17/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
7/3/2012Completes Acquisition of Silvermex Resources
6/26/2012mex Securityholders Approve Plan of Arrangement With First M...
5/22/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
4/16/2012First Quarter Production Results and Full Commencement of Co...
4/3/2012Announces Friendly Acquisition of Silvermex Resources
3/30/2012Files Form 40-F Annual Report
10/7/2011Third Quarter Production Results to Be Released on October 1...
8/11/2011Record Earnings of $30.6 million in Second Quarter
7/7/2011Another Record Quarter of Silver Production
4/8/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
8/16/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
4/22/20102nd Year Running for Mexican Distinction as a "Socially Resp...
4/12/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
1/12/2010Production Increases by 18%, Reaches New Record
11/13/2009Completes Acquisition of Normabec Mining Resources; Normabec...
9/14/2009to Acquire Normabec Mining Resources
8/13/2009Joins OTCQX
6/26/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
3/5/2009Closing of $21.2 Million Offering
11/19/2008Operations Update
9/11/2008Many Positive Developments Underway
7/15/20082nd Quarter Production Shows Continued Ramp-up
3/25/2008Closing of $45,475,000 Offering
1/17/2008Another Record Quarter of Silver Production
12/14/2007TSX Conditional Approval
12/5/2007Update on the Chalchihuites Group of Properties
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FR.TO)OTHER OTC (FRMSF)
9.60+1.37%
TORONTO
CA$ 9.60
04/26 17:00 0.130
1.37%
Prev close Open
9.47 9.61
Low High
9.23 9.72
Year l/h YTD var.
5.74 -  10.95 20.30%
52 week l/h 52 week var.
5.74 -  10.95 -0.208%
Volume 1 month var.
993,481 26.65%
24hGold TrendPower© : -17
Produces Lead - Silver - Zinc
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202426.48%
2023-32.71%9.9510.07
2022-23.32%9.9610.00
2021-13.88%30.7512.74
20209.63%9.8610.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :