First Majestic Silver Corp.

Published : January 13th, 2015

First Majestic Produces a Record 4.2M Silver Eqv. Oz in Q4 and Annual Record of 15.3M Silver Eqv. Oz in 2014; Announces 2015 Production Outlook and Cost Guidance

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

First Majestic Produces a Record 4.2M Silver Eqv. Oz in Q4 and Annual Record of 15.3M Silver Eqv. Oz in 2014; Announces 2015 Production Outlook and Cost Guidance

Tue Jan 13, 2015
First Majestic Produces a Record 4.2M Silver Eqv. Oz in Q4 and Annual Record of 15.3M Silver Eqv. Oz in 2014; Announces 2015 Production Outlook and Cost Guidance
First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce the Company's fourth quarter and full year 2014 production results, as well as guidance for 2015.

Total production during 2014 reached a new record of 15,257,958 equivalent ounces of silver, representing a 19% increase over 2013. The equivalent silver production for 2014 consisted of 11,748,721 ounces of silver, 12,283 ounces of gold, 39,192,908 pounds of lead and 13,130,378 pounds of zinc.

Total production in the fourth quarter also reached a new quarterly record of 4,247,527 equivalent ounces of silver consisting of 3,074,567 ounces of silver, 3,326 ounces of gold, 11,764,160 pounds of lead and 4,580,260 pounds of zinc.

Keith Neumeyer, President & CEO, states, "Our fourth quarter production results show that our operations are back on track following a brief period of operational adjustments. We have made difficult but necessary changes to adapt to the current market environment and our recent cost cutting is beginning to be realized at the operations. We have made great strides thus far and I look forward to further cost improvements and efficiencies throughout 2015."

Production Details Table:
Q4 2014 Q3 2014 Q/Q Change Consolidated Production Results YE 2014 YE 2013 Y/Y Change
683,528 621,196 10% Ore processed/tonnes milled 2,613,411 2,741,717 -5%
4,247,527 3,523,536 21% Total production - ounces of silver equivalent 15,257,958 12,791,527 19%
3,074,567 2,680,439 15% Total silver ounces produced 11,748,721 10,641,465 10%
201 196 2% Silver grade (g/t) 206 193 7%
70 68 2% Silver recovery (%) 68 62 9%
11,764,160 9,703,792 21% Pounds of lead produced 39,192,908 26,904,093 46%
4,580,260 3,222,877 42% Pounds of zinc produced 13,130,378 8,509,097 54%
3,326 2,781 20% Gold ounces produced 12,283 10,040 22%
- 629 -100% Tonnes of Iron ore produced 1,332 14,633 -91%

Quarterly Operational Review:

The total ore processed during the quarter at the Company's five operating silver mines: La Encantada, La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 683,528 tonnes, reflecting a 3% decrease compared to the fourth quarter of 2013 and a 10% increase from the previous quarter. The increase in tonnes compared to the prior quarter was primarily due to higher throughput rates at Del Toro as the flotation circuit utilization increased to planned operating levels following a plant reconfiguration during the third quarter.

Average silver grades in the quarter for the five mines increased by 5% to 201 g/t compared to 191 g/t in the fourth quarter of 2013 and increased 2% compared with the previous quarter. Combined silver recoveries averaged 70% during the quarter, up from 64% compared to the same quarter in the prior year and a slight improvement over the third quarter average of 68%.

The Company's underground development in the fourth quarter consisted of 11,772 metres, reflecting a 6% decrease compared to 12,546 metres completed in the previous quarter.

At quarter end, six Diamond drill rigs were active at the Company's five operations. The Company completed 5,990 metres of Diamond drilling in the quarter compared to 18,335 metres in the prior quarter, representing a 67% decrease. The decrease in metres drilled was primarily due to additional budget cuts within the exploration program.

Mine by Mine Quarterly Production Table:
Mine Ore Processed  Tonnes per Day  Silver Grade (g/t)  Silver Recovery %  Silver Oz Produced  Gold Oz Produced  Pounds of Lead  Pounds of Zinc  Equivalent Silver Ounces 
La Encantada 186,411 2,026 248 53% 788,369 59  -   -  792,605
La Parrilla 175,830 1,911 142 80% 646,283 244 3,855,052 4,580,260 1,159,177
Del Toro 175,552 1,908 194 75% 817,754 158 7,909,108  -  1,264,751
San Martin 96,651 1,051 249 77% 592,698 1,451  -   -  698,605
La Guitarra 49,084 534 168 87% 229,463  1,414  -   -  332,389
Total 683,528 7,430 201 70% 3,074,567 3,326 11,764,160 4,580,260 4,247,527
The following prices were used in the calculation of silver equivalent ounces: Silver: $16.50 per ounce; Gold: $1,202 per ounce; Lead: $0.91 per pound; Zinc $1.02 per pound.

At the Del Toro Silver Mine:
  • During the quarter, Del Toro achieved a new quarterly record production of 1,264,751 silver equivalent ounces representing an increase of 77% compared to the previous quarter. The plant processed 175,552 tonnes of ore through flotation with an average silver grade of 194 g/t. The increase in production was primarily due to a 31% increase in throughput, a 14% increase in silver grades and an improvement in silver recoveries from 68% to 75%.
  • Lead production reached a new quarterly record of 7,909,108 pounds. Lead grades and recoveries averaged 3.4% and 61% respectfully in the fourth quarter, an increase of 13% and 29% compared to the previous quarter due to higher quality sulphide ore production from the Perseverancia mine.
  • Underground development completed in the quarter totaled 2,095 metres compared with 2,479 metres developed in the previous quarter.
  • At quarter end, one underground drill rig was active at Del Toro. Total exploration metres drilled in the fourth quarter amounted to 559 metres compared to 5,181 metres drilled in the previous quarter.
At the La Encantada Silver Mine:
  • During the quarter, total production consisted of 792,605 silver ounces representing a 2% decrease in silver production over the previous quarter primarily due to a 4% decrease in the silver grade offset by a 10% increase in throughput.
  • The installation process for the new 12 x 24 ball mill foundations began in December and is scheduled to be completed by the end of February. The new ball mill, crusher, two vibrating screens and a series of conveyor belts will be installed over the coming months. The plant expansion is expected to be completed by the end of June allowing for the ramp up to 3,000 tpd in July.
  • A total of 4,344 metres of underground development were completed in the fourth quarter compared to 3,537 metres of development in the previous quarter.
  • At quarter end, one underground drill rig was active at La Encantada. A total of 3,367 metres of exploration and definition drilling was completed in the fourth quarter compared to 4,496 metres of drilling in the previous quarter.
At the La Parrilla Silver Mine:
  • During the quarter, the flotation circuit processed 94,513 tonnes with an average silver grade of 163 g/t and a 91% recovery while the cyanidation circuit processed 81,317 tonnes with an average silver grade of 118 g/t and a 64% recovery.
  • Zinc production increased 42% compared to the previous quarter to 4,580,260 pounds due to higher grade production stopes within the Vacas mine.
  • Due to a reduction in underground mining contractors, the extraction of underground oxide ore within the San Marcos mine was slowed temporarily during the quarter. The Company extracted 11,024 tonnes (120 tpd) of oxide ore from San Marcos and the remaining 70,293 tonnes (764 tpd) of oxide ore came from the lower grade Quebradillas open pit and other underground production areas.
  • Underground development completed in the quarter totaled 2,378 metres compared with 2,315 metres developed in the previous quarter.
  • At quarter end, one underground drill rig was active within the La Parrilla property. A total of 685 metres were drilled in the fourth quarter compared to 2,409 metres in the previous quarter.
At the San Martin Silver Mine:
  • During the quarter, San Martin set another quarterly production record of 592,698 silver ounces and 1,451 ounces of gold representing an increase of 16% and 24%, respectively, compared to the previous quarter. The increase was primarily due to a 5% increase in silver grades and a 6% increase in silver recoveries.
  • Underground development completed in the fourth quarter totaled 1,414 metres compared with 2,333 metres of development in the previous quarter.
  • At quarter end, one underground drill rig was active within the San Martin property. Total metres drilled in the fourth quarter amounted to 943 metres compared to 2,968 metres of drilling in the previous quarter.
At the La Guitarra Silver Mine:
  • During the quarter, total production consisted of 229,463 silver ounces and 1,414 gold ounces. This represents a 40% increase in silver production over the previous quarter primarily due to a 27% increase in the silver grade as the company has completed the transition from working in the old La Guitarra zone to the newly developed El Coloso zone.
  • Mine production within the El Coloso area delivered 24,578 tonnes (267 tpd) during the quarter or 50% of total production. The Company anticipates full mine production to reach 500 tpd from El Coloso in early 2015.
  • A total of 1,541 metres of development were completed in the fourth quarter compared to 1,882 metres of development in the previous quarter.
  • At quarter end, two underground drill rigs were active within the La Guitarra property. Total metres drilled in the quarter amounted to 436 metres compared to 3,281 metres drilled in the previous quarter.
2015 Production Outlook and Cost Guidance:

For 2015, the Company anticipates 2015 silver production will range between 11.8 to 13.2 million ounces (15.3 to 17.1 million silver equivalent ounces). A majority of the projected increase will be achieved following the upgrade and expansion of the crushing and grinding area at La Encantada in the first half of 2015 to allow the processing of ore to be increased to 3,000 tpd in combination with an increase in underground mine extraction linked to the addition of bulk mining methods.

A mine-by-mine breakdown of the 2015 production guidance is included in the table below (in millions):
Mine 2014 Ag Oz 2014 Ag Eq. Oz 2015E Ag Oz 2015E Ag Eq. Oz
La Encantada 3.7 3.7 4.0 - 4.5 4.0 - 4.5
La Parrilla 2.9 4.7 2.6 - 2.9 4.3 - 4.8
Del Toro 2.7 3.7 2.6 - 2.9 3.7 - 4.2
San Martin 1.8 2.1 1.8 - 2.0 2.1 - 2.3
La Guitarra 0.6 1.1 0.8 - 0.9 1.2 - 1.3
Totals: 11.7 15.3 11.8 - 13.2 15.3 - 17.1
*Metal price assumptions for calculating equivalents are: silver: $17.00/oz, gold: $1,200/oz, lead: $0.95 /lb, zinc: $1.02 /lb.

The Company is projecting its 2015 All-In Sustaining Cost per Ounce ("AISC"), as defined by the World Gold Council, to be within a range of $13.96 to $15.48 per payable silver ounce. Excluding non-cash items, the Company anticipates its 2015 AISC to be within a range of $13.50 to $14.96 per payable silver ounce. An itemized AISC cost table is provided below:
All-In Sustaining Cost Calculation (1) FY 2015
($ /Ag oz)
Total Cash Costs per Payable Silver Ounce 8.17 - 9.09
General and Administrative Costs 1.55 - 1.73
Workers' Participation 0.16 - 0.10
Royalties and 0.5% Mining Environmental Fee 0.12 - 0.13
Sustaining Development Costs 1.51 - 1.69
Sustaining Plant, Property and Equipment Costs 1.71 - 1.91
Sustaining Exploration Costs 0.28 - 0.31
Share-based Payments (non-cash) 0.38 - 0.43
Accretion of Reclamation Costs (non-cash) 0.08 - 0.09
All-In Sustaining Costs: (WGC definition) 13.96 - 15.48
All-In Sustaining Costs: (WGC excluding non-cash items) 13.50 - 14.96
  1. AISC is a non-GAAP measure and is calculated based on guidance provided by the World Gold Council ("WGC") in June 2013. AISC is used as a comprehensive measure for the Company's consolidated operating performance. WGC is a not a regulatory industry organization and does not have the authority to develop accounting standards for disclosure requirements. Other mining companies may calculate AISC differently as a result of differences in underlying accounting principles, the definition of "sustaining costs" and the distinction between sustaining and expansionary capital costs.
In 2015, the Company plans to invest a total of $75.6 million on capital expenditures consisting of $44.7 million for sustaining requirements and $30.9 million for expansionary projects. This total represents a significant reduction in capital expenditures compared to the prior year.

The 2015 annual budget includes a total of $29.1 million to be spent towards property, plant and equipment, $37.1 million towards total development, $8.1 million in total exploration and $1.3 million towards corporate projects. Management has the option to make adjustments to the projected 2015 budget should metal prices continue to remain weak in 2015.

First Majestic is a mining company focused on silver production in México and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.
"signed"
Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2013, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

View the release in PDF format:

You can view the Previous News Releases item: Mon Dec 1, 2014, Supreme Court of Canada Dismisses Appeal Application by Hector Davila Santos

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

First Majestic Silver Corp.

PRODUCER
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

First Majestic is a silver producing company based in Canada.

First Majestic produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Canada and in Mexico.

Its main assets in production are LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN and LA ENCANTADA SILVER MINE in Mexico and its main exploration properties are REAL DE CATORCE, DEL TORO and CUITABOCA in Mexico and PITT ISLAND, PINCOURT, DOMPIERRE and DESJARDINS in Canada.

First Majestic is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.5 billions as of today (US$ 1.1 billions, € 1.0 billions).

Its stock quote reached its lowest recent point on November 02, 2001 at CA$ 0.01, and its highest recent level on December 22, 2017 at CA$ 9.99.

First Majestic has 164 340 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of First Majestic Silver Corp.
8/13/2018First Majestic shares hammered after reporting $40 million-l...
1/21/2009Follow up N° 1
Annual reports of First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financings of First Majestic Silver Corp.
8/20/2009Tranche of Non-Brokered Private Placement Closes
8/12/2009Non-Brokered Private Placement and Debt Settlement
Nominations of First Majestic Silver Corp.
4/4/2014Appoints VP of Technical Services
12/24/2013Announces Retirement of Robert Young from Board of Directors
1/5/2012Appoints Chief Information Officer
12/30/2011Names Douglas Penrose as Chairman
Financials of First Majestic Silver Corp.
2/25/2016First Majestic Announces Financial Results for Q4 and Year E...
2/3/2014Fourth Quarter and Year End Financial Results to be Released...
11/12/2013Reports Third Quarter Financial Results
10/31/2013Third Quarter Financial Results to be Released on November 1...
7/15/2013Second Quarter Financial Results to be Released on August 13...
5/15/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
5/7/2013Quarter Financial Results to be Released on May 15th
11/14/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
11/7/2012Third Quarter Financial Results to Be Released on November 1...
8/7/2012Second Quarter Financial Results to be Released on August 14...
5/10/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
5/4/2012First Quarter Financial Results to Be Released on May 10th
3/5/2012Announces New Record Earnings & Cash Flows for 2011
2/24/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
10/26/2011Third Quarter Financial Results to be Released on November 9...
8/3/2011Second Quarter Financial Results to be Released on August 11...
5/17/2011Earns a Record $23.9 million in First Quarter of 2011
5/11/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
3/1/20112010 Audited Financial Results show Record Earnings & Cash F...
3/23/2010Year End & Fourth Quarter Financial Results
11/12/2009Record Third Quarter Financial Results
8/14/2009Second Quarter Financial Results
8/15/2008Second Quarter Financial Results
5/16/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
4/18/20082007 Year End Financial Results
Project news of First Majestic Silver Corp.
1/14/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
12/4/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
4/9/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
1/9/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
9/27/2012Mine Videos - Just Released
1/24/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
1/12/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
10/13/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
9/22/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
9/13/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
3/1/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
4/8/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
11/26/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
10/13/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
10/6/2009Third Quarter Production Results
2/17/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
1/20/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
7/17/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
4/29/20081st Quarter Production Results
4/23/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
4/1/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
1/8/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
7/2/2007(La Parrilla Silver Mine)La Parilla Technical Report
Corporate news of First Majestic Silver Corp.
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/25/2016Second Quarter Financial Results to be Released on August 10
7/20/2016Here’s Why These Five Stocks Are on the Move on Wednesday
7/12/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
1/29/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
11/28/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/13/2015A Silver Lining in October 2015?
10/2/2015First Majestic Completes Acquisition of Silvercrest
10/1/2015First Majestic Completes Acquisition of SilverCrest
9/25/2015First Majestic and SilverCrest Announce Shareholder Approval...
9/15/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/11/2015First Majestic reports 2Q loss
8/11/2015First Majestic Reports Second Quarter Financial Results and ...
8/10/2015Why Earnings Season Could Be Great for First Majestic Silver...
7/30/2015Second Quarter Financial Results to be Released on August 11
7/30/2015First Majestic Silver: Second Quarter Financial Results to B...
7/27/2015First Majestic Announces Friendly Acquisition of Silvercrest...
7/27/2015announces friendly acquisition of Silvercrest Mines
7/9/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
4/23/2015NYSE stocks posting largest percentage decreases
4/23/2015First Quarter Financial Results to be Released on May 7
4/23/2015First Majestic Silver Corp. First Quarter Financial Results ...
4/22/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
4/20/2015NYSE stocks posting largest percentage decreases
4/13/2015NYSE stocks posting largest percentage decreases
4/13/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
4/9/2015NYSE stocks posting largest percentage decreases
4/6/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
4/6/2015Announces C$30 Million Bought Deal Financing
4/6/2015First Majestic Announces Promotion of Martin Palacios to Chi...
4/6/2015First Majestic Announces Acquisition of Shares of First Mini...
4/1/2015NYSE stocks posting largest percentage increases
4/1/2015First Majestic Updates Mineral Reserve and Resource Estimate...
3/31/2015Announces New La Guitarra NI 43-101 Technical Report
3/31/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
3/11/2015First Majestic Renews Share Repurchase Program
3/11/2015First Majestic Renews Share Repurchase Program
8/22/2014to List on the Mexican Stock Exchange
10/24/2013Appeal Against First Majestic Dismissed
9/30/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
7/10/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
7/2/2013Payment of CDN$14.85 million Received in Court Litigation
5/2/2013Announces Completion of La Guitarra's Expansion to 500 tpd
4/26/2013Receives Positive Judgment for US$89.6 in Court Litigation
4/17/2013Earns Socially Responsible Business Distinction Award for Fi...
4/15/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
3/11/2013Announces Share Repurchase Program
2/19/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
2/14/2013Considering Superior Offer from Coeur to Acquire Orko Silver
1/25/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
9/26/2012New Look! New Features! First Majestic Bullion Store
9/6/2012Keith Neumeyer's Interview With Minesite.com
8/27/2012Announces Appointment of VP of Exploration
8/21/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
8/16/2012Recognized as a Leader in Corporate Social Responsibility
7/17/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
7/3/2012Completes Acquisition of Silvermex Resources
6/26/2012mex Securityholders Approve Plan of Arrangement With First M...
5/22/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
4/16/2012First Quarter Production Results and Full Commencement of Co...
4/3/2012Announces Friendly Acquisition of Silvermex Resources
3/30/2012Files Form 40-F Annual Report
10/7/2011Third Quarter Production Results to Be Released on October 1...
8/11/2011Record Earnings of $30.6 million in Second Quarter
7/7/2011Another Record Quarter of Silver Production
4/8/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
8/16/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
4/22/20102nd Year Running for Mexican Distinction as a "Socially Resp...
4/12/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
1/12/2010Production Increases by 18%, Reaches New Record
11/13/2009Completes Acquisition of Normabec Mining Resources; Normabec...
9/14/2009to Acquire Normabec Mining Resources
8/13/2009Joins OTCQX
6/26/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
3/5/2009Closing of $21.2 Million Offering
11/19/2008Operations Update
9/11/2008Many Positive Developments Underway
7/15/20082nd Quarter Production Shows Continued Ramp-up
3/25/2008Closing of $45,475,000 Offering
1/17/2008Another Record Quarter of Silver Production
12/14/2007TSX Conditional Approval
12/5/2007Update on the Chalchihuites Group of Properties
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FR.TO)OTHER OTC (FRMSF)
9.31+0.00%
TORONTO
CA$ 9.31
04/24 17:00 -
0%
Prev close Open
9.31 9.22
Low High
9.20 9.43
Year l/h YTD var.
5.74 -  10.95 16.67%
52 week l/h 52 week var.
5.74 -  10.95 -3.32%
Volume 1 month var.
644,650 28.59%
24hGold TrendPower© : -17
Produces Lead - Silver - Zinc
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202422.66%
2023-32.71%9.9510.07
2022-23.32%9.9610.00
2021-13.88%30.7512.74
20209.63%9.8610.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.57+3.64%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :