First Nickel Reports Financial and Operating Results for the Three Months Ended March 31, 2015

TORONTO, ONTARIO--(Marketwired - May 8, 2015) - First Nickel Inc. ("FNI" or the "Company") (FNI.TO) announces its results for the three months ended March 31, 2015. The Company's unaudited condensed interim financial statements ("financial statements") and management's discussion and analysis ("MD&A") for the period have been filed on SEDAR and will be available at www.sedar.com and on the Company's website at www.fnimining.com. This news release should be read in conjunction with the Company's financial statements and MD&A for the period ended March 31, 2015. This news release contains forward- looking information that is subject to the risks and assumptions set out in our cautionary statement on forward -looking information, which is located at the end of this news release. (All dollar amounts herein are in Canadian funds unless otherwise indicated.)

KEY DETAILS - FIRST QUARTER OF 2015

  • Production: The Lockerby Mine produced 2.2 million pounds of contained nickel and 1.4 million pounds of contained copper during the three months ended March 31, 2015.
  • Revenue: Revenue for the three months ended March 31, 2015 was $9.7 million.
  • Total cash production costs1: Total cash production costs were $8.8 million for the three months ended March 31, 2015, or $7.72 (US$6.22) per GMV-net pound of nickel shipped.
  • Development: In the three months ended March 31, 2015, following the adoption of the Lockerby Restructuring Plan, ramp and lateral development totaled 123 metres and 147 metres, respectively.
  • Net loss: The Company had a net loss of $17.0 million for the three months ended March 31, 2015, including $4.5 million relating to the March 2015 debt restructuring ($3.8 million non-cash) and $4.1 million in foreign exchange losses on loans and borrowings.
  • At March 31, 2015, the Company's unrestricted cash balance was $3.1 million.
  • In January 2015, the Company announced the Lockerby Restructuring Plan, reducing costs, increasing exploration and recommencing the ramp development in order to extend the mine life. Site operating costs in the first quarter of 2015 were generally consistent with the previously disclosed guidance range, however, production in the first quarter was lower than planned. See section "Outlook for 2015".
  • On March 12, 2015, the Company completed a debt restructuring that resulted in the full repayment of the US$17.4 million balance under the BNS credit facility, a reduction of outstanding debt from US$37.4 million to US$28.0 million and extension of debt maturities from March 2015 to December 2016.

1 Cash production costs and cash production costs per GMV-net pound of nickel shipped are non-GAAP financial performance measures and operating cash flow before working capital adjustments is an additional GAAP financial performance measure, none of which have standardized definitions under International Financial Reporting Standards ("IFRS"). See page 19 of the Company's March 31, 2015 MD&A for further details.

Summary of Financial and Operating Results

In the three months ended March 31, 2015, the Company reported revenue of $9.7 million, cost of sales of $11.6 million and total cash production costs of $8.8 million.

Under the Company's gross-metal-value ("GMV") ore-processing agreement with Glencore Canada Corporation ("Glencore") (the "GMV Agreement"), the Company is paid for accountable gross metal value, which is determined based on the value of the metals contained in the ore delivered and a specified percentage based on the nickel grade of ore delivered. There are no specifically-identified processing costs under the GMV Agreement given that the specified GMV percentage results in revenues that are paid and recorded net of processing costs.

March 31, March 31,
Canadian $, except for share amounts, for the three months ended 2015 2014
Revenue
Revenue $ 9,708,599 $ 16,787,275
Cost of sales
Cost of sales 11,578,592 16,865,993
Depreciation 4,798,934 4,229,681
Total cost of sales 16,377,526 21,095,674
Loss from mine operations (6,668,927 ) (4,308,399 )
General and administrative 1,044,255 1,112,923
Exploration and evaluation 85,845 138,955
Loss on extinguishment of debt 4,475,794 -
Other income (477,933 ) (566,739 )
Loss from operations (11,796,888 ) (4,993,538 )
Finance expense 5,214,543 4,260,465
Loss before taxes (17,011,431 ) (9,254,003 )
Income & mining taxes - -
Net loss and comprehensive loss $ (17,011,431 ) $ (9,254,003 )
Loss per share - basic and diluted $ (0.02 ) $ (0.01 )
Weighted average number of common shares outstanding - basic 847,081,075 644,152,033

Lockerby Mine Operating Results

Safety, Health & Environment

The Company's directors, management, employees, and contractors continue to place the highest priority on safety, health and the environment. Lockerby had no lost-time incidents during the three months ended March 31, 2015.

On April 28, 2015, the Company received, and is in the process of reviewing, charges served by the Ontario Ministry of Labour ("MOL") relating to the accident at Lockerby in May 2014. The legal aspects of this matter will take their normal course, but the Company's primary focus will remain on the health and safety of its people, and on doing everything in its power to prevent a similar tragedy from ever occurring in the future.

After the accident, the Company did an extensive independent engineering investigation of the affected area of the mine and delivered a report to the MOL. All orders and recommendations made as a result of this process were implemented and the Company has fully cooperated with the MOL in its investigation.

Production

Monthly production is based on the quantity of ore hoisted to surface and the associated average grade of nickel and other contained metals, which is established by an agreed-upon third-party laboratory.

In the three months ended March 31, 2015, Lockerby produced 2.2 million pounds of contained nickel at an average grade of 2.09% Ni, and 1.4 million pounds of contained copper at an average grade of 1.30% Cu. Contained-nickel production in the first quarter of 2015 was 20% lower than the 2.7 million pounds produced in the first quarter of 2014, reflecting a 15% decrease in ore tonnes produced combined with a 5% decrease in average nickel grades mined. Contained nickel production in the first quarter was also below the levels reflected in the Lockerby Restructuring Plan for the first three months of the year. Lower tonnes mined in the first quarter mainly reflect the impact of challenges experienced with the implementation of the Lockerby Restructuring Plan, which included lower equipment availabilities experienced, and the assumption of new tasks by FNI personnel, where the work had been formerly performed by contracted labour. Nickel grade was also below expected levels, reflecting stope sequencing considerations and slightly higher ore dilution experienced. As a result of lower production realized in the first quarter, the Corporation's production outlook for 2015 is expected to change (see the section "Outlook for 2015").

March 31, March 31,
For the three months ended 2015 2014
Tonnes of ore produced 47,628 55,939
Production
Contained nickel (pounds) 2,196,015 2,727,907
Net payable nickel shipped (pounds) 1,140,512 1,561,427
Nickel head grade 2.09% 2.21%
Contained copper (pounds) 1,372,363 1,670,598
Net payable copper shipped (pounds) 715,790 856,498
Copper head grade 1.31% 1.35%
Tonnes of ore shipped 49,760 51,045

Revenue

Revenues are recorded based on the quantity of crushed ore that is delivered to Glencore and the associated average grade of nickel and other contained metals, which is established by an agreed-upon third-party laboratory. Monthly revenue is initially recorded provisionally, and settled via a final payment from Glencore approximately 90 days after the month of delivery

The Company recorded total revenue of $9.7 million in the three months ended March 31, 2015, compared to $16.8 million in the three months ended March 31, 2014. Lower revenues in the first quarter were driven by lower nickel market prices (approximately a $4.0 million impact) and lower production and GMV-net payable nickel (approximately a $3.0 million impact). Lower market nickel prices during Q1 2015 reduced final-settlement revenue by $2.5 million and resulted in a mark- to-market charge of $1.1 million as at March 31, 2015. The final settlement and mark-to-market adjustment differences can be attributed to the movement of the nickel market price from December 2014 to March 2015, a period of provisional revenue. The average nickel market price over first quarter decreased by 14%; from a December average of US$7.25 to a March average of US$6.26. During the first quarter of the prior year, nickel market prices rose by 12%. The Company may from time to time enter into forward sales agreements to mitigate provisional pricing exposure to changing nickel and copper prices.

March 31, March 31,
Canadian $, for the three months ended 2015 2014
Provisional net nickel revenue $ 9,260,943 $ 11,496,052
Nickel final settlement (1,920,919 ) 530,157
Nickel price adjustment (405,348 ) 733,035
Provisional net by-product revenue 3,288,625 4,140,854
By-product mark-to-market and final settlement adjustment (514,702 ) (112,823 )
Total revenue $ 9,708,599 $ 16,787,275

Cash production costs2

Cash production costs is a non-Generally Accepted Accounting Principles ("GAAP") measure that is based on the cost of sales less by-product revenues. Cash production costs of $8.8 million in the three months ended March 31, 2015 were $4.0 million lower than the comparative prior-year period. Cash production cost per GMV-net pound of nickel shipped was $7.74 in the first quarter of 2015, compared to $8.23 in the first quarter of 2014.

2 Cash production costs and cash production costs per GMV-net pound of nickel shipped are non-GAAP Financial performance measures, neither of which has standardized definitions under IFRS. See page 19 of the Company's March 31, 2015 MD&A for further details.

March 31, March 31,
Canadian $, except production amounts, for the three months ended 2015 2014
Cost of sales (excluding depreciation) $ 11,578,592 $ 16,865,993
Provisional by-product revenue (3,288,625 ) (4,130,180 )
By-product revenue - mark-to-market and final settlement adjustments 514,702 112,823
Total cash production costs (net of by-product credits) $ 8,804,669 $ 12,848,635
Net payable nickel shipped (pounds) 1,140,512 1,561,427
Cash production cost per GMV-net pound of nickel1 shipped - CDN $ 7.72 $ 8.23
Cash production cost per GMV-net pound of nickel1 shipped - USD $ 6.22 $ 7.46
1 Cash production cost per pound is based on cash production cost for the commercial production period divided by associated net payable nickel shipped for the same period.

Exploration

The Company's exploration strategy is focused on base metals and is guided by the objectives of increasing resources and reserves in conjunction with the development and/or acquisition of quality projects, resulting in multiple mining operations. As part of the mine restructuring plan, the Company plans to recommence exploration in 2015.

2015 Lockerby Restructuring Plan

On January 12, 2015, the Company announced that it was restructuring the Lockerby mine in order to reduce costs, increase exploration and extend the mine life in order to counter low nickel prices (the "Lockerby Restructuring Plan").

The Lockerby Restructuring Plan aims to realize productivity improvements and is expected to allow a reduction in costs while maintaining relatively consistent nickel production. The Lockerby Restructuring Plan resulted in a 30% reduction in the Company's personnel and a 75% reduction in third-party contractor personnel, for an overall workforce reduction of 45%. Costs at the Toronto corporate office were also reduced as part of the Lockerby Restructuring Plan.

As part of the Lockerby Restructuring Plan, ramp development has recommenced below the 68 level and is expected to reach the 71 level in the first half of 2016. The underlying mine plan is essentially unchanged from the 2012 Stantec Study. The plan also included the restart of exploration Diamond drilling at Lockerby, with a planned 6,300 metres of underground exploration drilling in 2015 and 7,200 metres in 2016, targeting increased resources/reserves and increasing mine life. Additionally, the Corporation continues to target mineral resources in the Lockerby East Zone. See "Outlook for 2015" section for details about the impact of the restructuring plan on 2015 production and operating costs

OUTLOOK FOR 2015

Lockerby site operating costs and capital expenditures in the first quarter of 2015 were consistent with FNI's business plan and 2015 production and cost guidance (provided by way of a January 27, 2015 press release), however, production and underground development did not meet planned rates. The combination of the operating shortfall and continued weakness in the nickel price, including a recent six -year low, has led FNI to re-evaluate the Lockerby operation.

Over the coming weeks, the Company will be evaluating a range of options from continuing the current operating plan at Lockerby to discontinuing ramp development and mining only the ore remaining on and above the 6800 level. In any scenario, expected 2015 production will be lower than, and operating costs wil l likely be different from the respective levels previously set forth in the Company's 2015 guidance. Production and cost guidance for 2015 will be updated in the coming weeks, once further information is available.

General and administrative expenses and exploration expenditures

General and administrative expenses (excluding share-based compensation) and exploration expenditures are projected to be approximately $3.6 million and $0.9 million, respectively, in 2015. The increase in expected exploration expenditures is a result of the restart of exploration Diamond drilling at Lockerby as part of the Lockerby Restructuring Plan.

Qualified Person

The foregoing scientific and technical information has been prepared under the supervision of, or reviewed and approved by Paul C. Davis, P.Geo., Vice-President Exploration of the Company. Mr. Davis is a "Qualified Person" within the meaning of NI 43-101.

The Company follows rigorous quality control practices and procedures in full compliance with NI 43-101, and these are described on the Company's website and in all technical press releases.

About FNI

FNI is a Canadian mining and exploration company. FNI's mission is to be the most dynamic North American emerging base metal mining company in which to work and invest and to be respected in the communities in which it operates. FNI owns and operates the Lockerby Mine in the Sudbury Basin in northern Ontario, which reached full production during 2013 and provides a foundation from which to grow the Company. FNI's shares are traded on the TSX under the symbol FNI.

To learn more about the Company please visit www.fnimining.com and follow us on LinkedIn and Twitter @FNI_Mining.

Cautionary Statement Regarding Forward-Looking Information

Certain statements contained in this news release may contain forward-looking information about FNI. Forward-looking information can often be identified by the use of forward-looking terminology such as "anticipate", "believe", "continue", "budget", "forecast", "estimate", "schedule", "expect", "goal", "intend", "target", "potential", "objective", "may", "plan" or "will" or the negative thereof or variations thereon or similar terminology. Forward-looking information may include, but is not limited to: the continued operation of the Lockerby Mine; expectations of obtaining financing in the near term; future financial or operating performance of the Company and its projects; the future price of metals; the long term supply and demand for nickel; continuation of exploration activities; mineral reserve and mineral resource estimates; the realization of mineral resource estimates; costs of production and key supplies; capital, operating and exploration expenditures; forecasts of sales and production; costs and timing of the development of new and existing deposits; costs and timing of future exploration; the requirements for additional capital; government regulation of mining operations; environmental risks, reclamation expenses and/or title disputes or claims.

By its nature, forward-looking information is based on certain factors and assumptions which involve known and unknown risks, uncertainties and other factors which may cause the actual results, realization of mineral resources, performance or achievements of the Company, financial position or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Accordingly, actual events may differ materially from those implied by any forward-looking information. Readers are cautioned not to place undue reliance on forward-looking information, which speak only as of the date the statements were made and readers are also advised to consider such forward-looking information while considering the risk factors set forth in the MD&A for the year ended December 31, 2014 under the heading "Risks and Uncertainties" and under the heading "Risk Factors" in the Company's Annual Information Form for the year ended December 31, 2014. The Company disclaims any intention or obligation to publicly update or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information or to explain any material difference between subsequent actual events and such forward-looking information, except as required by applicable law.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

First Nickel Inc.

DEVELOPMENT STAGE
CODE : FNI.TO
ISIN : CA33582W1068
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

First Nickel is a nickel exploration company based in Canada.

First Nickel develops nickel, cobalt, copper, gold, palladium, platinum and silver in Canada, and holds various exploration projects in Canada.

Its main assets in development are LOCKERBY MINE and PREMIERE RIDGE in Canada and its main exploration properties are RAGLAN HILLS, LANDORE/ WEST GRAHAM, MORGAN-LUMSDEN, BELMONT PROJECT, WEST GRAHAM, FOY MOUTH, KAMISKOTIA and DUNDONALD in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of First Nickel Inc.
3/12/2015Completes Debt Refinancing
3/11/2015FNI Announces Approval by Shareholders of Debt Refinancing a...
4/8/2013Completes Refinancing
9/12/2011Hires New President & CEO and Announces $500,000 Private Pla...
3/2/2011Secures Commitments for C$30 Million Senior Secured Project ...
Nominations of First Nickel Inc.
10/3/2013Names Alfred Colas as Chief Financial Officer
2/4/2013Announces Changes to the Board of Directors With the Appoint...
7/3/2012Appoints David Comba as New Chairman
4/29/2008Gerry Bilodeau Appointed as Vice President Operations
Financials of First Nickel Inc.
3/26/2015Reports Financial and Operating Results for the Year Ended D...
8/12/2013Reports Three and Six Months Financial and Operating Results...
5/15/2013Reports First Quarter 2013 Financial and Operating Results
11/13/2012Reports Third Quarter 2012 Financial and Operating Results
8/14/2012Reports Second Quarter 2012 Financial and Operating Results
5/16/2012Reports First Quarter 2012 Financial and Operating Results
8/11/2011Reports Financial and Operating Results for the Period Ended...
5/30/2011Reports Financial and Operating Results for the Period Ended...
3/30/2011Reports Financial and Operating Results for the Year Ended D...
11/11/2008Reports Financial And Operating Results For The Three And Ni...
5/14/2008Reports Financial and Operating Results for the Three Month ...
3/27/2008 Reports Financial And Operating Results For The Year Ended ...
11/14/2007 Reports Third Quarter 2007 Results
Project news of First Nickel Inc.
5/6/2014First Nickel says two workers dead at Sudbury mine
1/3/2013Reports Lockerby 2012 Nickel Production is Expected to Be Ap...
8/3/2012(Lockerby Mine)Files Optimized Lockerby Mine Plan with SEDAR
6/18/2012(Lockerby Mine)Optimizes Lockerby Mine Plan, Resulting in an $87 Million NP...
11/7/2008(West Graham)Provides an Exploration Update on Lockerby and West Graham P...
7/3/2008(Lockerby Mine)Announces the Results of the NI 43-101 Reserve Estimate and ...
6/30/2008(Premiere Ridge)Announcement Re Premiere Ridge
3/25/2008(West Graham) Intersects 86.70 Metres of 0.55% Ni and 0.43% Cu on West Gr...
1/16/2008(Lockerby Mine) Reports 289% Increase in Indicated Resources at the Lockerb...
12/11/2007(Raglan Hills)Sign Joint Venture on Raglan Hills Project
11/1/2007(Lockerby Mine)Nickel Production Increasing Additional Promising Lockerby D...
7/23/2007(Lockerby Mine)Intersects 53.30 Metres of 1.82% Ni and 1.39% Cu at Lockerby...
Corporate news of First Nickel Inc.
8/27/2015TSX Delisting Review - First Nickel Inc. (Symbol: FNI)
8/20/2015First Nickel Announces Appointment of Receiver
8/20/2015TSX Delisting Review - First Nickel Inc. (Symbol: FNI)
8/20/2015First Nickel Announces Application for Appointment of Receiv...
8/20/2015IIROC Trading Halt - FNI
8/20/2015First Nickel Reports Financial and Operating Results for the...
8/14/2015First Nickel Reports Financial and Operating Results for the...
8/4/2015First Nickel Reports Incident at Lockerby Mine
8/3/2015First Nickel Reports Incident at Lockerby Mine
7/20/2015First Nickel Announces Change to Board of Directors
7/17/2015First Nickel Announces Change to Board of Directors
6/22/2015Results of the FNI Annual General Meeting of Shareholders
3/26/2015FNI Reports Financial and Operating Results for the Year End...
3/26/2015First Nickel Reports Financial and Operating Results for the...
3/12/2015FNI Completes Debt Refinancing
3/11/2015FNI Announces Approval by Shareholders of Debt Refinancing a...
3/2/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
3/2/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
2/9/2015IIROC Trade Resumption - FNI
2/9/2015First Nickel Announces Debt Refinancing
2/9/2015IIROC Trading Halt - FNI
1/27/2015First Nickel Provides Preliminary 2014 Production Results an...
1/12/2015First Nickel Restructures the Lockerby Mine, Reducing Costs ...
1/12/2015First Nickel Restructures the Lockerby Mine, Reducing Costs ...
11/11/2014FNI Reports FInancial and Operating Results for the Three an...
11/10/2014First Nickel Reports Financial and Operating Results for the...
8/11/2014First Nickel Reports Financial and Operating Results for the...
6/11/2014Results of the FNI Annual General Meeting of Shareholders
5/12/2014First Nickel Reports Financial and Operating Results for the...
5/8/2014First Nickel Reports the Lockerby Mine Will Resume Operation...
5/6/2014First Nickel Provides Update on Lockerby Accident
5/6/2014First Nickel Reports Two Fatalities at the Lockerby Mine
5/6/2014IIROC Trade Resumption - FNI
5/6/2014First Nickel Reports Incident at the Lockerby Mine
5/6/2014IIROC Trading Halt - FNI
3/21/2014FNI Reports Financial and Operating Results for the Year End...
3/21/2014First Nickel Reports Financial and Operating Results for the...
3/19/2014FNI Positioned to Benefit from Higher Nickel Prices
9/27/2013FNI Amends Lockerby Ore Processing Agreement
7/10/2013Reports 4 Year Contract Ratified with Mine Mill 598/CAW
6/12/2013Results of the FNI Annual General Meeting of Shareholders
4/18/2013(Lockerby Mine)FNI Achieves Full Production at Lockerby Mine
4/1/2013Announces Restructuring of Indebtedness
1/16/2013FNI Arranges US$5.0 Million Loan Facility
10/19/2012Reports Lockerby Nickel Production at 80% of Full Production...
4/24/2012Provides Comment on Ministry of Labour Order
3/23/2012Announces Increase to 2012 Exploration Program
1/25/2012Announces Continued Progress at Lockerby in Q4-2011 and Prov...
12/14/2011Announces Organizational Changes
12/5/2011Hires New Head of Corporate Development
7/20/2011Completes $5 Million Private Placement
7/5/2011Enters Into C$30 Million Project Loan Facility
5/18/2011Announces $2 Million Flow-Through Private Placement
4/25/2011Provides Update on Lockerby Restart
5/6/2008Establishes Shareholder Rights Plan
4/30/2008Market Update Announcement
2/12/2008Provides 2008 Guidance
9/6/20072007 Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FNI.TO)
0.005+0.00%
TORONTO
CA$ 0.005
09/25 15:47 -
0%
Prev close Open
0.005 0.005
Low High
0.005 0.005
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.005 -50.00%
Volume 1 month var.
90,000 -50.00%
24hGold TrendPower© : -2
Produces
Develops Cobalt - Copper - Gold - Nickel - Palladium - Platinum - Silver
Explores for Cobalt - Copper - Gold - Lead - Nickel - Platinum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/4/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.68-0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.44+5.05%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-1.99%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.46+4.24%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.83+1.21%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+7.89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.86-0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.82+0.30%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :