VANCOUVER, April 27, 2016 /CNW/ - GOLDCORP INC. (TSX: G, NYSE: GG) today reported its first quarter 2016 results. Adjusted operating cash flows were $330 million, compared to adjusted operating cash flows of $366 million, in the first quarter of 2015. The decrease in adjusted operating cash flows were primarily attributable to lower cash flow from Alumbrera and Pueblo Viejo. Net earnings for the quarter were $80 million, or $0.10 per share, compared to a net loss of $87 million, or $0.11 per share, in the first quarter of 2015.

First Quarter 2016 Highlights

  • Solid first quarter production. Production of 783,700 ounces at all-in sustaining costs ('AISC') of $836 per ounce.
  • Reconfirmed 2016 guidance. Gold production is expected to be between 2.8 and 3.1 million ounces with total cash costs between $500 and $575 per ounce on a by-product basis, and AISC between $850 and $925 per ounce.
  • Advancing organic pipeline. Hoyle Pond Deep project completed in early April; Peñasquito Pyrite Leach and Musselwhite Materials Handling projects on track for investment decisions around the middle of the year.
  • Further efficiency efforts underway. Over the next two years, targeting $250 million per year in mine site and corporate efficiencies through the initiative to decentralize the organization, drive ownership and accountability down to the individual mine sites and maximize the net asset value of the existing business.

'We delivered a solid first quarter of production at low all-in sustaining costs,' said David Garofalo, President and CEO. 'Éléonore and Cerro Negro continued their ramp-up with underground mine development advancing well at both assets. With a focus on NAV per share accretion, we plan to drive further productivity improvements at current operations and to leverage our existing mining camps by advancing low capital intensity, high rate of return internal growth opportunities.'

FINANCIAL RESULTS REVIEW

(millions except where noted)

Three Months ended March 31

2016

2015

Gold production (ounces)

783,700

724,800

Gold sales (ounces)

799,400

827,500

Adjusted operating cash flows

$330

$366

Free cash flow

($101)

($321)

Net earnings (loss)

$80

($87)

Net earnings (loss) per share

$0.10

($0.11)

AISC (per ounce)

$836

$885

By-product cash costs (per ounce)

$557

$585

Net earnings of $80 million, or $0.10 per share, in the first quarter of 2016 were affected by the following non-cash or non-recurring items that are not reflective of the performance of the underlying operations:

(millions except where noted)

Pre-tax

After-tax

Per share
($/share)

Positive deferred tax effects of foreign
exchange on tax assets and liabilities
and losses

$-

($40)

($0.05)

Unrealized foreign exchange loss on
Argentine peso denominated Value
Added Tax receivable from construction

$17

$17

$0.02

Restructuring costs

$23

$16

$0.02

AISC for the first quarter of 2016 were $836 per ounce, compared to $885 per ounce in the first quarter of 2015. The lower AISC was primarily a result of lower production costs from favorable foreign exchange impacts at the Canadian, Mexican and Argentine operations. Total cash costs on a by-product basis for the first quarter of 2016 were $557 per ounce compared to $585 per ounce for the first quarter of 2015.

LIQUIDITY REVIEW

While the Company generated negative free cash flow of $101 million in the first quarter of 2016, compared to negative $321 million in 2015, we are expected to be substantially free cash flow positive for 2016. Similar to 2015, first quarter free cash flow was impacted by a working capital increase, which is expected to reverse over the balance of the year. The improvement in the first quarter of 2016 as compared to 2015 was due to lower capital expenditures with the completion of the construction of Éléonore and Cerro Negro mines.

As of March 31, 2016, the Company had total liquidity of approximately $3.2 billion, including $0.5 billion in cash, cash equivalents and money market investments and $2.7 billion in available credit lines. The drawdown on the revolving credit facility was as a result of timing of working capital changes for Mexican tax payments and receipt of metal concentrate sale proceeds.

OPERATIONS REVIEW

The Company today reconfirmed 2016 production guidance between 2.8 and 3.1 million ounces despite expected lower second quarter production of approximately 15% compared to the first quarter. During the second quarter, gold production will be negatively impacted by planned lower grade mining sequences in most mines and a 10-day mill shutdown for preventative maintenance at Peñasquito.

The Company is also on track to meet its operating and capital cost guidance. AISC is expected to be between $850 to $925 per ounce, higher costs are expected in the second quarter compared to the first quarter as a result of higher sustaining capital and lower gold production. The third and fourth quarter will see AISC normalize as compared to the second quarter as a result of increasing gold production.

Growth capital during 2016 is expected to be approximately $100 million to advance the organic growth projects through their various study phases.

2016 Guidance

Guidance

Gold production (million ounces)

2.8 to 3.1

AISC (per gold ounce)

$850 to $925

By-product cash costs (per gold ounce)

$500 to $575

Sustaining capital expenditures (millions)

$700 to $800

Exploration expenditures (millions)

$135

Corporate administration* (millions)

$150

Depreciation and depletion (per gold ounce)

$390 to $420

Effective tax rate

40% to 45%

*excludes share based compensation expense of $68 million.

Peñasquito, Mexico (100%-owned)

First quarter gold production totaled 124,700 ounces at an AISC of $1,004 per ounce. Production declined compared to the first quarter of 2015 with mining taking place in a lower grade portion of the pit. The lower grades will persist through the year and a 10-day maintenance shutdown is scheduled in the second quarter. Construction of the Northern Well Field project continued to progress during the quarter and is on track to be completed in late-2016.

Cerro Negro, Argentina (100%-owned)

First quarter gold production totaled 115,400 ounces at an AISC of $503 per ounce. Increased production compared to the first quarter of 2015 was a result of higher grades, recoveries and a reduction of in-circuit inventory. As ore stockpiles were depleted at the end of 2015, the ramp-up is now focused on the underground development and mining at Eureka and Mariana Central, with an average mill and mine throughput of 3,500 tonnes per day expected during 2016. Exploration during the first quarter was focused on resource expansion from surface drilling. A life of mine study is underway that is focused on developing an optimal mine design, development execution plan and production schedule which yields the best value for the Cerro Negro operations. The short-term plan is to enable ore production from Marianas Norte in 2017 to add to the current production from the Marianas Central and Eureka underground mines. The study is expected to be completed by the end of 2016.

The new Argentine government has made positive changes since taking office in December 2015, including the removal of import restrictions and certain taxes, which have contributed to improvements in the economics of the mine.

Pueblo Viejo, Dominican Republic (40%-owned)

First quarter gold production totaled 114,300 ounces at an AISC of $443 per ounce. Production increased compared to the first quarter of 2015 as a result of higher plant throughput and grade. The higher plant throughput in the first quarter of 2016 was due to higher autoclave availability. Temporary air compressors for the oxygen plant were used during the quarter to enable full capacity. The repairs to the first two electric motors has been completed and the third electric motor is undergoing preventative maintenance and is nearing completion.

Éléonore, Quebec (100%-owned)

First quarter gold production totaled 66,700 ounces at an AISC of $965 per ounce. Gold production increased as a result of the continued ramp-up in mine development with four horizons compared to two horizons in the first quarter of 2015. Recovery improvements were the result of optimization of the sulphide circuit and an average recovery of 91% was achieved in March. Work on the production shaft continued and is on track to be operational by the end of 2016, which will increase efficiencies and reduce operating costs.

Red Lake, Ontario (100%-owned)

First quarter gold production totaled 78,800 ounces at an AISC of $842 per ounce. Mining efficiencies and operating costs are improving following the progress on conversion to bulk mining. However, these improvements were offset by lower grades due to lower tonnes mined from the High Grade Zone ('HGZ') as expected, resulting in lower production compared to the first quarter of 2015. During the first quarter, exploration focused on infill and expansion drilling of the HGZ, Upper R Zone and Party Wall area.

Porcupine, Ontario (100%-owned)

First quarter gold production totaled 74,200 ounces at an AISC of $837 per ounce. Production increased over the first quarter of 2015 as a result of higher tonnage processed and the draw down of in-circuit inventory. The Hoyle Deep project, which is an internal winze in the Hoyle Pond operation, focused on commissioning of the new hoist, shaft and material handling systems. Full commissioning and hand over to the operations team was completed in April 2016. This project is expected to contribute to significant efficiency and productivity improvements in the movement of materials and people at the Hoyle Pond underground operation.

Musselwhite, Ontario (100%-owned)

First quarter gold production totaled 67,700 gold ounces at an AISC of $553 per ounce. Gold production increased compared to the first quarter of 2015 as a result of higher grades and higher mill throughput. Mill throughput increased from improvements in mine sequencing which resulted in an increase in stope availability and tonnes mined. Higher grades were realized as planned. Exploration in the first quarter focused on reserve replacement, resource definition and testing the near surface potential of the West Limb mineralization.

ORGANIC PROJECT PIPELINE REVIEW

Peñasquito District

The pre-feasibility study for the Pyrite Leach Project ('PLP') continued to advance during the quarter with a capital cost estimate of approximately $417 million. This estimate continues to be refined and following an investment decision mid-year final capital costs, recoveries and a production schedule will be provided. If approved, the PLP is expected to be in production in the first quarter of 2019.

At Camino Rojo (100%-owned), located approximately 50 kilometres from Peñasquito, the pre-feasibility study on the oxide resource continues to advance and is on track to be completed by the fourth quarter of 2016.

Musselwhite Materials Handling

The feasibility study for the Materials Handling System continued during the quarter and is on track to be completed by mid-2016. The project will enable hoisting of ore through an underground winze and associated infrastructure. This will result in reduced reliance on high-cost truck haulage by shortening the underground hauling distance, leading to improved energy efficiency, reduced mining costs, enhanced production profile and longer mine life.

Borden

The Borden project (100%-owned), located 160 kilometres west of Porcupine, has the potential to further enhance the long-term economics of Porcupine. A pre-feasibility study is underway to determine the optimization of a combined Borden-Porcupine operation and is expected to be completed during the first quarter of 2017. An advanced exploration permit is expected to be received by late 2016. The permit would allow for the construction of a ramp into the deposit and the extraction of a 30,000 tonne bulk sample, providing an underground platform for exploration drilling on a deposit that still remains open at depth and laterally. Exploration is focused on discovery of additional resources along strike from the known Borden deposit and evaluation of the large regional land package. Drilling is also testing for high-grade up to one kilometer down-plunge from the current resource limit.

Red Lake

At the HG Young deposit (100%-owned), a high-grade exploration discovery near the Red Lake operation, a concept study is advancing and expected to be completed in the fourth quarter of 2016. Assuming a positive business case from the concept study, a pre-feasibility study is expected to commence in the first half of 2017. Exploration is continuing to focus on the evaluation of underground development options for the core area of the high-grade defined to date.

At Cochenour (100%-owned), the focus during the first quarter was on exploration drilling. Drilling in the core area of the deposit (3990 foot level) continues to increase data density and is improving the understanding of projections and orientations of mineralization. Exploration development has cross-cut the mineralization on a sub-level below the 3990L and preparations are advancing towards development of sills, later in 2016, along the structure on two levels. A rigorous sampling program is being devised that will enable reconciliation with the mined material and validated through the use of a sampling tower.

About Goldcorp

Goldcorp is a global senior gold producer focused on responsible mining practices with safe, low-cost production from a high-quality portfolio of mines.

This release should be read in conjunction with Goldcorp's first quarter 2016 interim consolidated financial statements and Management's Discussion and Analysis ('MD&A') report on the Company's website, in the 'Investor Resources - Reports & Filings' section under 'Quarterly Reports'.

Conference Call and Webcast

Date:

Thursday, April 28, 2016

Time:

10:00 a.m. (PDT)

Webcast:

www.goldcorp.com

Dial-in:

1-800-355-4959 (toll-free) or 1-416-340-2216 (outside Canada and the US)

Replay:

1-800-408-3053 (toll-free) or 1-905-694-9451 (outside Canada and the US)

Passcode:

5644646

The conference call replay will be archived on the website until May 29, 2016.

Footnotes

1.

The Company has included non-GAAP performance measures on an attributable basis (Goldcorp share) throughout this document. Attributable performance measures include the Company's mining operations and projects and the Company's share from Alumbrera, Pueblo Viejo and Project Corridor subsequent to the formation of the joint venture on November 24, 2015. The inclusion of Project Corridor in the Company's non-GAAP performance measures only impacts the Company's free cash flow metric at this time as it is a development stage project.

2.

Adjusted operating cash flows are a non-GAAP performance measure which comprises Goldcorp's share of operating cash flows before working capital changes. Refer to page 31 of the Q1 MD&A for a reconciliation of adjusted operating cash flows to reported net cash provided by operating activities.

3.

Free cash flows is a non-GAAP performance measure which the Company believes, in addition to conventional measures prepared in accordance with GAAP, the Company and certain investors use to evaluate the Company's ability to generate cash flows. Refer to page 31 of the Q1 MD&A for a reconciliation of free cash flows to reported net cash provided by operating activities.

4.

All-in sustaining cost is a non-GAAP performance measure that the Company believes more fully defines the total costs associated with producing gold. Refer to pages 29-30 of the Q1 MD&A for a reconciliation of all-in sustaining costs.

5.

The Company has included a non-GAAP performance measure - total cash costs: by-product throughout this document. Refer to pages 27-28 of the Q1 MD&A for a reconciliation of total cash costs: by-product to reported production costs.

6.

The estimated effective tax rate is on net income exclusive of share-based compensation, the effects of foreign currency translation of deferred tax balances, impacts of foreign exchange fluctuation on tax losses and deductions and balances and other discrete events.

Cautionary Note Regarding Forward Looking Statements

This press release contains 'forward-looking statements', within the meaning of Section 27A of the United States Securities Act of 1933, as amended, Section 21E of the United States Exchange Act of 1934, as amended, or the United States Private Securities Litigation Reform Act of 1995 and 'forward-looking information' under the provisions of applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of Goldcorp. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold, silver, copper, lead and zinc, the estimation of Mineral Reserves (as defined above) and Mineral Resources (as defined above), the realization of Mineral Reserve estimates, the timing and amount of estimated future production, costs of production, targeted cost reductions, capital expenditures, free cash flow, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of words such as 'plans', 'expects', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', 'believes' or variations of such words and phrases or statements that certain actions, events or results 'may', 'could', 'would', 'might' or 'will', 'occur' or 'be achieved' or the negative connotation thereof.

Forward-looking statements are necessarily based upon a number of factors that, if untrue, could cause the actual results, performances or achievements of Goldcorp to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which Goldcorp will operate in the future, including the price of gold and other by-product metals, anticipated costs and ability to achieve goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, among others, gold and other by-product metals price volatility, discrepancies between actual and estimated production, mineral reserves and mineral resources and metallurgical recoveries, mining operational and development risks, litigation risks, regulatory restrictions (including environmental regulatory restrictions and liability), changes in national and local government legislation, taxation, controls or regulations and/or change in the administration of laws, policies and practices, expropriation or nationalization of property and political or economic developments in Canada, the United States and other jurisdictions in which the Company does or may carry on business in the future, delays, suspension and technical challenges associated with capital projects, higher prices for fuel, steel, power, labour and other consumables, currency fluctuations, the speculative nature of gold exploration, the global economic climate, dilution, share price volatility, competition, loss of key employees, additional funding requirements and defective title to mineral claims or property. Although Goldcorp believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.

Forward-looking statements are subject to known and unknown risks, uncertainties and other important factors that may cause the actual results, level of activity, performance or achievements of Goldcorp to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to international operations including economic and political instability in foreign jurisdictions in which Goldcorp operates; risks related to current global financial conditions; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; environmental risks; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold and other by-product metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; risks related to the integration of acquisitions; accidents, labour disputes; delays in obtaining governmental approvals or financing or in the completion of development or construction activities and other risks of the mining industry, as well as those factors discussed in the section entitled 'Description of the Business - Risk Factors' in Goldcorp's most recent annual information form available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. Although Goldcorp has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Forward-looking statements are made as of the date hereof and, accordingly, are subject to change after such date. Except as otherwise indicated by Goldcorp, these statements do not reflect the potential impact of any non-recurring or other special items or of any dispositions, monetizations, mergers, acquisitions, other business combinations or other transactions that may be announced or that may occur after the date hereof. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of the Company's operating environment. Goldcorp does not intend or undertake to publicly update any forward-looking statements that are included in this document, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.

SUMMARIZED RESULTS AND FINANCIAL STATEMENTS FOLLOW

SUMMARIZED FINANCIAL RESULTS

(in millions of United States dollars, except per share amounts and where noted)

Three Months Ended

March 31

Goldcorp's share

2016

2015

Revenues

1,156

1,270

Gold produced (thousands of ounces)

784

725

Gold sold (thousands of ounces)

799

827

Silver produced (thousands of ounces)

7,700

8,500

Silver sold (thousands of ounces)

7,900

10,500

Copper produced (thousands of pounds)

17,200

9,200

Copper sold (thousands of pounds)

19,100

15,000

Lead produced (thousands of pounds)

29,000

36,700

Lead sold (thousands of pounds)

30,200

39,500

Zinc produced (thousands of pounds)

71,100

82,500

Zinc sold (thousands of pounds)

73,100

82,600

Average realized gold price (per ounce)

$

1,203

$

1,217

Average London spot gold price (per ounce)

$

1,181

$

1,219

Average realized silver price (per ounce)

$

13.61

$

15.30

Average London spot silver price (per ounce)

$

14.83

$

16.72

Average realized copper price (per pound)

$

2.11

$

2.45

Average London spot copper price (per pound)

$

2.12

$

2.64

Average realized lead price (per pound)

$

0.77

$

0.81

Average London spot lead price (per pound)

$

0.79

$

0.82

Average realized zinc price (per pound)

$

0.79

$

0.91

Average London spot zinc price (per pound)

$

0.76

$

0.94

Total cash costs - by-product (per gold ounce)

$

557

$

585

Total cash costs - co-product (per gold ounce)

$

604

$

670

All-in sustaining costs (per gold ounce)

$

836

$

885

All-in costs (per gold ounce)

$

891

$

1,210

Production Data:

Peñasquito:

Tonnes of ore mined (thousands)

10,867

10,011

Tonnes of waste removed (thousands)

35,152

33,057

Tonnes of ore milled (thousands)

9,233

9,532

Average head grade (grams per tonne) - gold

0.68

0.81

Average head grade (grams per tonne) - silver

22.53

24.65

Average head grade (%) - lead

0.22

0.27

Average head grade (%) - zinc

0.53

0.61

Gold produced (thousands of ounces)

125

156

Silver produced (thousands of ounces)

4,714

5,095

Lead produced (thousands of pounds)

29,000

36,700

Zinc produced (thousands of pounds)

71,100

82,500

Total cash costs - by-product (per ounce)

$

513

$

457

Total cash costs - co-product (per ounce of gold)

$

707

$

681

All-in sustaining costs (per ounce)

$

1,004

$

702

Cerro Negro:

Tonnes of ore milled (thousands)

277

281

Average mill head grade (grams per tonne) - gold

12.59

11.64

Average mill head grade (grams per tonne) - silver

135.30

207.40

Gold produced (thousands of ounces)

115

93

Silver produced (thousands of ounces)

1,156

1,501

Total cash costs - by-product (per ounce)

$

381

$

603

Total cash costs - co-product (per ounce)

$

464

$

691

All-in sustaining costs (per ounce)

$

503

$

704

Pueblo Viejo (40% share):

Tonnes of ore mined (thousands)

2,096

705

Tonnes of waste removed (thousands)

2,117

2,324

Tonnes of ore processed (thousands)

764

744

Average grade (grams per tonne) - gold

5.34

4.30

Average grade (grams per tonne) - silver

21.9

31.5

Gold produced (thousands of ounces)

114

90

Silver produced (thousands of ounces)

256

194

Copper produced (thousands of pounds)

600

-

Total cash costs - by-product (per gold ounce)

$

359

$

465

Total cash costs - co-product (per gold ounce)

$

386

$

498

All-in sustaining costs (per gold ounce)

$

443

$

573

Red Lake:

Tonnes of ore milled (thousands)

162

134

Average mill head grade (grams per tonne)

16.27

26.04

Gold produced (thousands of ounces)

79

107

Total cash costs - by-product (per ounce)

$

546

$

494

All-in sustaining costs (per ounce)

$

842

$

799

Éléonore:

Tonnes of ore milled (thousands)

387

265

Average mill head grade (grams per tonne)

5.65

4.63

Gold produced (thousands of ounces)

67

33

Total cash costs - by-product (per ounce)

$

804

$

-

All-in sustaining costs (per ounce)

$

965

$

-

Porcupine:

Tonnes of ore milled (thousands)

910

761

Average mill head grade (grams per tonne)

2.63

2.65

Gold produced (thousands of ounces)

74

56

Total cash costs - by-product (per ounce)

$

624

$

874

All-in sustaining costs (per ounce)

$

837

$

1,185

Musselwhite:

Tonnes of ore milled (thousands)

289

271

Average mill head grade (grams per tonne)

7.65

6.71

Gold produced (thousands of ounces)

68

57

Total cash costs - by-product (per ounce)

$

447

$

759

All-in sustaining costs (per ounce)

$

553

$

956

Los Filos:

Tonnes of ore mined (thousands)

3,997

4,506

Tonnes of waste removed (thousands)

5,695

11,487

Tonnes of ore processed (thousands)

3,948

4,475

Average grade processed (grams per tonne)

0.90

0.58

Gold produced (thousands of ounces)

81

61

Total cash costs - by-product (per ounce)

$

763

$

891

All-in sustaining costs (per ounce)

$

839

$

1,164

Marlin:

Tonnes of ore milled (thousands)

293

346

Average mill head grade (grams per tonne) - gold

3.84

4.24

Average mill head grade (grams per tonne) - silver

171

172

Gold produced (thousands of ounces)

35

45

Silver produced (thousands of ounces)

1,542

1,730

Total cash costs - by-product (per ounce)

$

728

$

435

Total cash costs - co-product (per ounce)

$

858

$

685

All-in sustaining costs (per ounce)

$

940

$

1,011

Alumbrera (37.5% share):

Tonnes of ore mined (thousands)

2,937

3,616

Tonnes of waste removed (thousands)

2,773

3,232

Tonnes of ore milled (thousands)

3,192

3,221

Average mill head grade (grams per tonne) - gold

0.35

0.24

Average mill head grade (%) - copper

0.28

0.19

Gold produced (thousands of ounces)

26

16

Copper produced (thousands of pounds)

16,600

9,200

Total cash costs - by-product (per gold ounce)

$

1,036

$

751

Total cash costs - co-product (per gold ounce)

$

876

$

814

All-in sustaining costs (per gold ounce)

$

1,115

$

971

Financial Data (including discontinued operations):

Cash flows from operating activities

$

59

$

58

Adjusted operating cash flows (Goldcorp's share)

$

330

$

366

Free cash flows

$

(101)

$

(321)

Net earnings (loss)

$

80

$

(87)

Net earnings (loss) per share - basic

$

0.10

$

(0.11)

Weighted average shares outstanding (000's)

830,977

816,909

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF EARNINGS (LOSS)

(In millions of United States dollars, except for per share amounts - Unaudited)

Three Months Ended March 31

2016

2015

Revenues

$

944

$

1,017

Mine operating costs

Production costs

(528)

(620)

Depreciation and depletion

(271)

(322)

(799)

(942)

Earnings from mine operations

145

75

Exploration and evaluation costs

(10)

(14)

Share of net earnings of associates and joint venture

36

35

Corporate administration

(57)

(55)

Restructuring costs

(23)

-

Earnings from operations, associates and joint venture

91

41

Gain (loss) on derivatives, net

1

(42)

Finance costs

(34)

(27)

Other (expenses) income, net

(18)

18

Earnings (loss) from continuing operations before taxes

40

(10)

Income tax recovery (expense)

40

(129)

Net earnings (loss) from continuing operations

80

(139)

Net earnings from discontinued operation

-

52

Net earnings (loss)

$

80

$

(87)

Net earnings (loss) per share from continuing operations

Basic

$

0.10

$

(0.17)

Diluted

0.10

(0.17)

Net earnings (loss) per share

Basic

$

0.10

$

(0.11)

Diluted

0.10

(0.11)

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME (LOSS)

(In millions of United States dollars - Unaudited)

Three Months Ended March 31

2016

2015

Net earnings (loss)

$

80

$

(87)

Other comprehensive income (loss), net of tax

Items that may be reclassified subsequently to net earnings (loss):

Unrealized gains on available-for-sale securities

19

1

Reclassification adjustment for impairment losses on available-for-sale

securities recognized in net loss

-

3

Reclassification adjustment for realized gains on disposition of available-

for-sale securities recognized in net earnings (loss)

(4)

(1)

Reclassification of cumulative unrealized gains on shares of Probe Mines

Ltd. ('Probe') on acquisition

-

(3)

15

-

Items that will not be reclassified to net earnings (loss):

Remeasurements on defined benefit pension plans

-

(2)

Total other comprehensive income (loss), net of tax

15

(2)

Total comprehensive income (loss)

$

95

$

(89)

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS

(In millions of United States dollars - Unaudited)

Three Months Ended March 31

2016

2015

Operating activities

Net earnings (loss) from continuing operations

$

80

$

(139)

Adjustments for:

Dividends from associates

-

3

Reclamation expenditures

(8)

(14)

Items not affecting cash:

Depreciation and depletion

271

322

Share of net earnings of associates and joint venture

(36)

(35)

Share-based compensation

26

15

Unrealized (gains) losses on derivatives, net

(2)

26

Revision of estimates and accretion of reclamation and closure cost obligations

7

28

Deferred income tax (recovery) expense

(74)

75

Other

1

(10)

Change in working capital

(206)

(220)

Net cash provided by operating activities of continuing operations

59

51

Net cash provided by operating activities of discontinued operation

-

7

Investing activities

Acquisition of mining interest, net of cash acquired

-

(39)

Expenditures on mining interests

(173)

(393)

Interest paid

(9)

(30)

Purchases of money market investments and available-for-sale securities, net

-

(1)

Other

(3)

-

Net cash used in investing activities of continuing operations

(185)

(463)

Net cash provided by investing activities of discontinued operation

-

100

Financing activities

Debt repayments

(2)

(3)

Credit facility drawdown, net

250

300

Finance lease payments

(1)

-

Dividends paid to shareholders

(51)

(122)

Common shares issued

2

13

Other

1

-

Net cash provided by financing activities of continuing operations

199

188

Effect of exchange rate changes on cash and cash equivalents

2

-

Increase (decrease) in cash and cash equivalents

75

(117)

Cash and cash equivalents, beginning of the period

326

482

Cash and cash equivalents, end of the period

$

401

$

365

CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS

(In millions of United States dollars - Unaudited)

At March 31
2016

At December 31
2015

Assets

Current assets

Cash and cash equivalents

$

401

$

326

Money market investments

57

57

Accounts receivable

519

346

Inventories

447

469

Income taxes receivable

36

67

Other

60

66

1,520

1,331

Mining interests

Owned by subsidiaries

17,550

17,630

Investments in associates and joint venture

1,882

1,839

19,432

19,469

Investments in securities

73

51

Deferred income taxes

39

50

Inventories

243

255

Other

199

272

Total assets

$

21,506

$

21,428

Liabilities

Current liabilities

Accounts payable and accrued liabilities

$

560

$

680

Debt

208

212

Income taxes payable

56

104

Other

51

53

875

1,049

Deferred income taxes

3,665

3,749

Debt

2,727

2,476

Provisions

801

775

Finance lease obligations

266

267

Income taxes payable

158

161

Other

99

103

Total liabilities

8,591

8,580

Equity

Shareholders' equity

Common shares, stock options and restricted share units

17,627

17,604

Accumulated other comprehensive income (loss)

9

(6)

Deficit

(4,721)

(4,750)

12,915

12,848

Total liabilities and shareholders' equity

$

21,506

$

21,428

SOURCE Goldcorp Inc.

Lynette Gould, Director, Investor Relations, Goldcorp Inc., Telephone: (604) 695-1446, E-mail: [email protected], www.goldcorp.com

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Argentina | Canada | Dominican Republic | Georgia | Mexico | All
Gold and Silver Prices for these countries : Argentina | Canada | Dominican Republic | Georgia | Mexico | All

Goldcorp Inc.

PRODUCER
CODE : G.TO
ISIN : CA3809564097
CUSIP : 380956409
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Goldcorp is a gold producing company based in Canada.

Goldcorp produces gold, copper, lead, molybdenum, silver and zinc in Argentina, in Canada, in Guatemala, in Honduras and in Mexico, develops copper, gold, lead, molybdenum, silver and zinc in Argentina, in Canada, in Chile, in Dominican Republic, in Guatemala and in Mexico, and holds various exploration projects in Argentina and in Canada.

Its main assets in production are ALUMBRERA in Argentina, CAMPBELL MINE, PORCUPINE, MUSSELWHITE, RED LAKE and DOME MINE in Canada, SAN MARTIN in Honduras, MARLIN in Guatemala and LOS FILOS, WHARF, MARIGOLD, EL SAUZAL, PEÑASQUITO, EL ORO, LUISMIN, PORCUPINE PAMOUR and NUKAY in Mexico, its main assets in development are DEE PROJECT and EL LIMON in Mexico, PUEBLO VIEJO in Dominican Republic, ELEONORE in Canada, AGUA RICA in Argentina, CERRO BLANCO in Guatemala and EL MORRO in Chile and its main exploration properties are COCHENOUR (1939-1971), HALLNOR (PAMOUR), MCKENZIE RED LAKE (1935-1966), MCFAULD'S LAKE - PROBE, ELEONORE SOUTH, RAHILL-BONANZA, CORVET EST, EAST BAY, FESTIVAL, WABAMISK, WEST RED LAKE, BAIRD, TIMMINS - WHITNEY TOWNSHIP, GOLDEN BEAR, PAYMASTER, BLACK CREEK CANADA, SIDACE LAKE (RED LAKE EAST), SOUTH ARTURO, BRISTOL TOWNSHIP and BORDEN LAKE in Canada, VILLA DE RAMOS, SANTA MONICA, ZULOAGA and EL CANDELERO in Mexico and LAS MELLIZAS, LA ESPERANZA PROJECT, SAN AUGUSTIN and CERRO NEGRO ARGENTINA in Argentina.

Goldcorp is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 956.3 millions as of today (US$ 694.7 millions, € 651.7 millions).

Its stock quote reached its highest recent level on December 31, 2001 at CA$ 9.88, and its lowest recent point on September 15, 2023 at CA$ 0.62.

Goldcorp has 853 809 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Goldcorp Inc.
3/15/2019Funds blast Goldcorp chair's 'terrible' $12 million package
3/9/2019Glencore, Goldcorp and Yamana ink agreement to integrate Arg...
11/30/2018Goldcorp pours first doré from Pyrite Leach at Penasquito
10/25/2018Goldcorp 'miserable quarter' sends shares to 16-year low
9/23/2018How Goldcorp managed to decrease complaints about its flagsh...
7/1/2018Richest man in Mexico partners with Goldcorp
6/6/2018#DisruptMining 2018 winner Acoustic Zoom closes deal with Go...
5/23/2018Goldcorp says Peru and Nevada would make portfolio perfect
4/27/2018Goldcorp to pay $3.7 million for stake in newly formed explo...
11/28/2017Canada's Goldcorp challenges you to disrupt mining
3/24/2017How Goldcorp's new COO plans to disrupt the mining industry
11/20/2014Goldcorp to open Argentina's Cerro Negro gold, silver mine i...
9/18/2012Goldcorp Golden Buying Opportunity
Financings of Goldcorp Inc.
8/7/2012Primero - Primero Announces Issuance of Shares to Goldcorp i...
7/9/2010Completes Private Placement In Evolving Gold Corp.
5/21/2007Announces New Credit Facility
5/3/2007Private Placement Closes, Drilling Planned for Red Lake
Option Grants of Goldcorp Inc.
10/5/2011Declares Tenth Monthly Dividend Payment For 2011
9/8/2011Declares Ninth Monthly Dividend Payment For 2011
8/10/2011Declares Eighth Monthly Dividend Payment For 2011
5/4/2011Declares Fifth Monthly Dividend Payment For 2011
Nominations of Goldcorp Inc.
5/15/2013Announces Election of Directors
Financials of Goldcorp Inc.
10/30/2014Announces Third Quarter Operating and Financial Results
7/31/2014Announces Strong Second Quarter Financial Results
5/1/2014Reports 2014 First Quarter Results; Annual Guidance Reconfir...
7/25/2013reports 2013 second quarter results
7/25/2013reports 2013 second quarter results
5/2/2013Reports 2013 First Quarter Results; Annual Guidance Reconfir...
7/27/2011Revenues Increase 62%
7/6/2011Goldcorp Declares Seventh Monthly Dividend Payment For 2011
2/24/2011Achieves Record Cash Flow; Earnings More Than Double
2/9/2011Gold Reserves Increase 23%
4/28/2010Reports Increase In First Quarter Gold Production
11/5/2009Cash Flow Increases 35% In The Third Quarter; Strong Product...
7/29/2009Meets Production Targets, Cash Flow Increases 22% In The Sec...
1/12/2009to Release 2008 Fourth Quarter Results on February 19th
9/30/2008to Release 2008 Third Quarter Results on October 31st
8/1/2008Reports Second Quarter Results
6/27/2008To Release 2008 Second Quarter Results On July 31st
5/5/2008First Quarter Earnings Increase 84%
4/8/2008 to Release 2008 First Quarter Results on May 5th
2/21/2008Reports Record Net Earnings in Fourth Quarter
11/9/2007 Reports Third Quarter Earnings
10/3/2007to Release 2007 Third Quarter Results on November 9th
7/5/2007Second Quarter 2007 Results Release - August 9th
5/11/2007First Quarter Net Earnings Increase 32 Percent
Project news of Goldcorp Inc.
10/4/2016Goldcorp suspends operations at largest Mexican gold mine
11/26/2015Goldcorp suspends Musselwhite mine in Canada after death
11/25/2015Goldcorp completes acquisition of New Gold's 30% interest in...
11/24/2015Goldcorp completes acquisition of New Gold's 30% interest in...
10/29/2015Goldcorp sees later production ramp-up at Cochenour mine
10/29/2015Goldcorp says Eleonore issues may impact mine's 2015 output
10/21/2015Normal operations maintained at Goldcorp's Cerro Negro mine ...
10/20/2015Goldcorp agrees to improve labor conditions at Argentina min...
10/5/2015Goldcorp says work resumes at Argentina mine after union wor...
10/5/2015Goldcorp announces resumption of work at its Cerro Negro min...
10/2/2015Goldcorp announces work stoppage at its Cerro Negro mine
9/22/2015Goldcorp confident in future of Quebec mine despite hiccups
9/8/2015Goldcorp cuts production forecast at Eleonore mine in Canada
8/27/2015Goldcorp acquires New Gold's 30% interest in the El Morro pr...
8/27/2015Canada's Goldcorp, Teck team up to develop Chile mine projec...
7/31/2015Goldcorp inc. officially inaugurates its Éléonore Mine, a wo...
7/31/2015Media Advisory - Goldcorp Inc. officially inaugurates its Él...
7/30/2015Achieves Record Quarterly Gold Production; Updates 2015 Cost...
4/16/2015CANADA STOCKS-TSX slides as resources, bank stocks lead sell...
4/12/2015AngloGold in talks to sell part, all of U.S. mine
4/6/2015Goldcorp announces sale of its interest in the South Arturo ...
4/6/2015(South Arturo)announces sale of its interest in the South Arturo Mine Proj...
4/1/2015Éléonore Achieves Commercial Production, Effective April 1, ...
3/16/2015Goldcorp completes sale of Wharf mine
3/16/2015Goldcorp completes acquisition of Probe Mines Limited
3/16/2015Three Goldcorp miners found dead in troubled Mexico state
3/13/2015Goldcorp completes acquisition of Probe Mines Limited
3/7/2015Four workers at Mexico Goldcorp mine missing, may be kidnapp...
3/6/2015CANADA STOCKS-TSX steady as gold miners drop, banks gain
2/20/2015(Wharf)completes sale of Wharf mine
11/7/2014(El Morro)withdraws Environmental Impact Study for El Morro project
10/2/2014Éléonore achieves first gold production
7/25/2014Cerro Negro Achieves First Gold Production
1/8/2013achieves 2012 gold production and cash cost forecast; Five-y...
8/10/2012(El Oro)Mexico Elects to Continue as a 30% Participating Partner on ...
9/1/2011(Agua Rica)Xstrata Copper, Goldcorp And Yamana Finalize Four-Year Optio...
7/15/2011(Musselwhite)Forest Fires Prompt Evacuation At Goldcorp’s Musselwhite Min...
5/29/2011(Pueblo Viejo)Major Rainfall Event Affects Pueblo Viejo Joint Venture Proj...
4/8/2011(Cerro Negro Argentina)Announces Expansion Of Cerro Negro Project; Proven And Proba...
3/13/2011(Agua Rica)Minera Alumbrera Shareholders Enter Agreement For A Four-Yea...
2/21/2011(Eleonore)Cree Nation Of Wemindji, Grand Council Of The Cree
1/25/2011(Peñasquito)Announces Power Delivery Agreement With InterGen
8/6/2010(San Dimas)Completes Sale Of San Dimas Mine
6/24/2010(Marlin)Guatemalan Government Responds to Marlin Mine Suspension Req...
6/10/2010(Marlin)Reports Action Regarding Marlin Mine
6/8/2010(Escobal)Completes Sale Of Escobal Silver Deposit
6/2/2010(San Dimas)Announces Sale Of San Dimas Mine
2/2/2010(Musselwhite)Musselwhite Mine Is First Gold Mine In Canada To Receive Int...
11/16/2009(Peñasquito)Expands Peñasquito Area Holdings With Acquisition
10/13/2009(Peñasquito)Announces First Production Of Concentrates At Penasquito Min...
8/13/2009(Marlin)Marlin Mine Receives International Cyanide Code Certificatio...
7/13/2009(Peñasquito)Achieves Mechanical Completion At Peñasquito Proje
12/8/2008(Peñasquito)Provides Positive Peñasquito Project Update
7/5/2008(Marlin)Provides Information on Marlin Power Supply Interruptions
5/13/2008(Peñasquito)Pours First Gold at Peñasquito Project
3/31/2008(El Sauzal)El Sauzal Mine Receives International Cyanide Certification
2/27/2008(Pueblo Viejo)REPORTS PROGRESS AT PUEBLO VIEJO PROJECT
2/19/2008(Peñasquito)Announces 9% Increase in Gold Reserves
12/3/2007(Peñasquito) Approves Peñasquito Mine Expansion
9/4/2007to Host Analyst Tour of Red Lake Gold Mines
12/31/2006(Golden Bear)2006 sustainabllity report
French Corporate News of Goldcorp Inc.
7/13/2016Kaminak Receives Securityholder Approval of Acquisition by G...
Corporate news of Goldcorp Inc.
7/28/2016Today’s Trending Stocks: Pioneer, Ariad, Hershey, and 2 More
7/28/2016Goldcorp Reports Second Quarter 2016 Results; Expansions App...
7/27/2016Goldcorp Reports Second Quarter 2016 Results; Expansions App...
7/27/2016Goldcorp reports 2Q loss
7/27/2016How to View Gold Mining Earnings for Barrick, Goldcorp, Kinr...
6/27/2016Goldcorp releases 2015 Sustainability Report
6/20/2016Goldcorp Inc. - Investment in Independence Gold
6/18/2016Goldcorp to Release 2016 Second Quarter Results on July 27th...
6/6/2016Goldcorp Declares Second Quarter Dividend Payment for 2016
5/12/2016Goldcorp Announces Acquisition of Kaminak Gold Corporation
5/11/2016Goldcorp provides updated information on Dividend Reinvestme...
4/29/2016Goldcorp announces voting results from Annual Shareholders M...
4/27/2016Goldcorp beats 1Q profit forecasts
4/27/2016Goldcorp Reports First Quarter 2016 Results
4/17/2016Goldcorp provides update on Marlin accident
4/14/2016Goldcorp reports serious accident at its Marlin Mine
4/8/2016Goldcorp Announces Investment in Probe Metals
3/24/2016Goldcorp to Release 2016 First Quarter on April 27th; Confer...
2/25/2016Goldcorp reports 4Q loss
2/1/2016Goldcorp Declares Second Monthly Dividend Payment For 2016
1/22/2016Codexis, Morgan Stanley, Goldcorp, Turquoise Hill Resources ...
1/21/2016Strike Gold This Earnings Season with 3 Stocks
1/21/2016Goldcorp attracts bulls before earnings
1/19/2016Why trader is selling calls in Goldcorp
1/15/2016Goldcorp to Release 2015 Fourth Quarter/Full-year Results on...
1/13/2016Top Analyst Upgrades and Downgrades: Amex, Cheniere, Goldcor...
1/9/2016Where Can You Find Free Cash Flow Upside for Gold Stocks in ...
1/4/2016Goldcorp Declares First Monthly Dividend Payment for 2016
12/29/2015Barrick: The Worst Financial Leverage of Senior Gold Miners?
12/28/2015Goldcorp Decommissions El Sauzal Mine as per ICMC Rules
12/24/2015Goldcorp's El Sauzal Mine Achieves Cyanide Code Decertificat...
12/16/2015Five Gold Mining Stocks to Own Now
12/16/2015Goldcorp Announces Sunset Clause Expiry Date on Outstanding ...
12/1/2015Here is What Hedge Funds Think About Textron Inc. (TXT)
11/30/2015Goldcorp Completes El Morro Stake Buy, Teck Transaction
11/27/2015Should You Buy Goldcorp Inc. (USA) (GG)?
11/26/2015Goldcorp Reports Fatality at its Musselwhite Mine
11/26/2015What Does Pueblo Viejo’s Production Mean for Gold Companies?
11/24/2015Goldcorp and Teck Complete Combination of El Morro and Relin...
11/23/2015Is MGM Resorts International (MGM) A Good Stock To Buy?
11/4/2015Spread bets on Goldcorp rebound
11/3/2015Goldcorp (GG) Posts Loss in Q3, Beats Revenue Estimates
11/2/2015Short-term calls target Goldcorp
10/29/2015Edited Transcript of G.TO earnings conference call or presen...
10/29/2015Goldcorp reports bigger 3rd-qtr loss on writedown, weaker pr...
10/29/2015Goldcorp reports 3Q loss
10/29/2015Goldcorp reports bigger loss on writedown, weaker prices
10/23/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
10/22/2015Premier Gold Mines May Have a Perfect Storm of Gold Prospect...
10/9/2015Comp: A Look at Gold Miners’ 2Q15 Production Profile
10/6/2015Work Resumes at Goldcorp's (GG) Cerro Negro Mine
10/6/2015Why Gold Prices Are Not Getting Support from Miners’ Cost Cu...
10/5/2015Goldcorp declares tenth monthly dividend payment for 2015
9/30/2015The 52-Week Low Club for Wednesday
9/30/2015Comp: Is Barrick Gold’s High Debt a Cause for Concern?
9/29/2015Comp: Which Gold Miners Expect Production Growth Going Forwa...
9/25/2015Comp: A Look at Gold Miners’ 2Q15 Production Profile
9/25/2015Comparative Analysis: How Have Gold Miners Performed This Ye...
9/18/2015Goldcorp to release 2015 third quarter results and host conf...
9/14/2015Can Goldcorp Withstand the Lower Gold Price Environment?
9/11/2015How Is Goldcorp Doing in the Weak Commodity Price Environmen...
9/11/2015How Could Project Corridor Impact Goldcorp’s Production Prof...
9/9/2015Goldcorp Provides Revised Production Outlook for Eleonore
9/9/2015Goldcorp Acquires New Gold’s 30% Interest in the El Morro Pr...
9/8/2015Goldcorp Investor Tour to Provide Update on Éléonore Mine Ra...
9/8/2015Is the Market Excited about Goldcorp’s Recent Moves?
9/4/2015Goldcorp declares ninth monthly dividend payment for 2015
8/28/2015Goldcorp to Buy New Gold's Interest in El Morro Project
8/27/2015Goldcorp Inc. (USA) (GG) And Teck Resources Ltd (USA) (TCK) ...
8/27/2015Goldcorp and Teck combine El Morro and Relincho projects in ...
8/19/2015Investors Are Excited about Barrick Gold’s 2Q15 Results, but...
8/12/2015What Lies Ahead for Goldcorp after 2Q15
8/12/2015Goldcorp’s FCF Growth Could Strengthen Its Balance Sheet
8/11/2015Goldcorp Expects Production Growth from Cerro Negro and Eleo...
8/11/2015Peñasquito Helps Achieve Record Quarterly Production for Gol...
8/11/2015How Goldcorp is Managing in a Volatile Gold Price Market
8/11/2015Improved Cost Outlook Bodes Well for Goldcorp’s Future
8/10/2015Goldcorp declares eighth monthly dividend payment for 2015
8/7/2015Goldcorp’s Production Growth Starts to Deliver in 2Q15
8/7/2015How Goldcorp Beat Estimates in Its 2Q15 Earnings
8/7/2015What Awaits Gold Mining ETFs Post Mixed-to-Better Earnings -...
8/4/2015Goldcorp (GG) Q2 Earnings, Revenues Beat Estimates - Analyst...
7/31/2015How are Gold Miners Performing with Declining Asset Prices?
7/31/2015Edited Transcript of G.TO earnings conference call or presen...
7/30/2015Goldcorp cuts dividend, expects improved 2015 output
7/30/2015Goldcorp Achieves Record Quarterly Gold Production; Updates ...
7/30/2015Goldcorp tops Street 2Q forecasts
7/30/2015Goldcorp reports lower profit, jump in production
7/9/2015Goldcorp Extends Canadian Tax Election Filing Deadline for F...
7/6/2015Goldcorp Declares Seventh Monthly Dividend Payment for 2015
7/6/2015Goldcorp Reinstated At Outperform By Credit Suisse, Sees Cas...
7/2/2015Goldcorp (GG) Closes Secondary Offering of Tahoe Shares - An...
6/30/2015announces closing of secondary offering of shares of Tahoe R...
6/24/2015Releases 2014 Sustainability Report
6/23/20152 Big Gold Stock Upgrades by Different Analysts
6/19/2015The Grand Council of the Cree (Eeyou Istchee), the Cree Nati...
6/17/2015Goldcorp to Release 2015 Second Quarter Results and Host Con...
5/26/2015Goldcorp Inc. (USA) (GG), Rio Tinto plc (ADR) (RIO) Among Bi...
4/27/2015Foreign Exchange and Fuel Tailwinds Could Help Newmont in 1Q...
4/27/2015In Argentina, $5 Billion of Mine Projects Is Riding on Elect...
4/24/2015Lower Profits, Output on Tap for Barrick, Goldcorp -- Earnin...
4/16/2015Goldcorp’s Immediate Focus Will Be on Organic Growth
4/16/2015Goldcorp Maintains Annual Production Guidance in 1Q15
4/14/2015UPDATE 3-Canada's Alamos Gold, AuRico merger may spark rival...
4/13/2015Canada's Alamos Gold, AuRico merger may spark rival bids
4/9/2015Goldcorp will hold Investor Day on April 9, 2015; announces ...
4/8/2015Fluor Wins Contract to Serve Mining Projects of Goldcorp - A...
4/6/2015Canada Stocks to Watch: TransCanada, Goldcorp and More
4/1/2015CANADA STOCKS-TSX steady as a resource gains offset by banks
3/30/2015Goldcorp to Release 2015 First Quarter Results and Host Conf...
3/25/2015CANADA STOCKS-TSX rises with resource stocks as commodity pr...
3/20/2015CANADA STOCKS-TSX advances as resource shares climb
3/18/2015CANADA STOCKS-TSX up after U.S. Fed comments ease market con...
3/16/2015Goldcorp subsidiary Minera Peñasquito reaches settlement wit...
3/16/2015Goldcorp Announces Quarterly and Annual Financial Results; P...
3/16/2015Goldcorp declares third monthly dividend payment for 2015
3/16/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
3/12/2015Goldcorp subsidiary Minera Peñasquito reaches settlement wit...
3/10/2015CANADA STOCKS-TSX set to open lower as strong dollar hits go...
3/6/2015CANADA STOCKS-TSX drops as U.S. jobs data sparks rate hike f...
3/5/2015Canada gold assets regaining lost luster, helped by soft C$
2/19/2015Canada Stocks to Watch: Barrick, Goldcorp, SNC-Lavalin and m...
12/1/2014declares twelfth monthly dividend payment for 2014
11/24/2014named to NASDAQ Global Sustainability Index
9/26/2014to Release 2014 Third Quarter Results and Host Conference Ca...
9/8/2014declares ninth monthly dividend payment for 2014
8/11/2014Declares Eighth Monthly Dividend Payment for 2014
6/16/2014Announces Sunset Clause Expiry Date on Outstanding Gold Eagl...
6/4/2014Announces Pricing of US$1.0 Billion Notes Offering
4/21/2014will not amend its offer for Osisko
3/27/2014to release 2014 first quarter results and host conference ca...
3/21/2014announces extension of date to acquire common shares of Osis...
3/3/2014announces settlement of Osisko litigation
2/13/2014announces record quarterly and full-year gold production; Pr...
1/30/2014responds to Osisko Circular and legal proceedings
1/20/2014Osisko Board Recommends Shareholders Reject Goldcorp's Oppor...
1/6/2014declares first monthly dividend payment for 2014
12/9/2013provides update on land claim settlement progress with Cerro...
12/2/2013declares twelfth monthly dividend payment for 2013
11/11/2013Investor Presentation Now Available for On-demand Viewing at...
11/4/2013declares eleventh monthly dividend payment for 2013
10/7/2013declares tenth monthly dividend payment for 2013
9/17/2013to release 2013 third quarter results and host conference ca...
8/19/2013Lac Seul First Nation and Goldcorp Inc. Sign Collaboration A...
8/12/2013Declares Eighth Monthly Dividend Payment for 2013
7/4/2013Forest fires prompt evacuation at Éléonore Project
6/10/2013Declares Sixth Monthly Dividend Payment for 2013
4/8/2013Declares Fourth Monthly Dividend Payment for 2013
2/14/2013announces strong quarterly cash flow and earnings; Gold rese...
2/4/2013declares second monthly dividend payment for 2013
1/11/2013Download the Mines and Money Hong Kong main brochure now - C...
9/18/2012Announces Secondary Offering of Primero Mining Shares
6/7/2011Declares Sixth Monthly Dividend Payment For 2011
6/1/2011Named to NASDAQ Global Sustainability Index
4/5/2011Declares Fourth Monthly Dividend Payment For 2011
3/20/2011Extends Canadian Tax Election Deadline For Former Andean Res...
3/13/2011Declares Third Monthly Dividend Payment For 2011
2/24/2011Increases Dividend
2/24/2011Expands Canadian Gold Growth Projects
2/9/2011Sells Osisko Investment
2/7/2011Declares Second Monthly Dividend Payment For 2011
12/1/2010Declares Twelfth Monthly Dividend Payment For 2010
8/9/2010Declares Eighth Monthly Dividend Payment For 2010
7/28/2010Achieves Record Operating Cash Flow In Second Quarter
7/15/2010Supports Thompson Creek Acquisition of Terrane Metals
7/5/2010Declares Seventh Monthly Dividend Payment For 2010
6/30/2010To Implement Human Rights Assessment Recommendations; Commit...
6/7/2010Declares Sixth Monthly Dividend Payment For 2010
5/17/2010Announces Receipt Of Human Rights Assessment Report
5/3/2010Declares Fifth Monthly Dividend Payment For 2010
4/10/2010Analyst Tour to Highlight Strong Progress at Peñas
4/5/2010Declares Fourth Monthly Dividend Payment For 2010
3/1/2010Declares Third Monthly Dividend Payment For 2010
2/16/2010Completes Acquisition Of 70% Interest In El Morro Project
2/4/2010Secures Key Strategic Asset Near Peñasquito With C
2/1/2010Declares Second Monthly Dividend Payment For 2010
1/13/2010Receives Statement Of Claim Filed By Barrick
1/4/2010Declares First Monthly Dividend Payment For 2010
12/23/2009Has the Right to Match Competing Proposal to Acquire Canplat...
12/1/2009Declares Twelfth Monthly Dividend Payment For 2009
12/2/2009 Agreement For Sale Of Minority Interest In Morelos Project
11/24/2009Provides Update On 2009 Exploration Program
11/2/2009Declares Eleventh Monthly Dividend Payment For 2009
10/5/2009Declares Tenth Monthly Dividend Payment For 2009
9/8/2009Declares Ninth Monthly Dividend Payment For 2009
8/10/2009Acquires Investment In Osisko
8/10/2009Declares Eight Monthly Dividend Payment For 2009
7/6/2009Declares Seventh Monthly Dividend Payment For 2009
6/3/2009Exercise Of Over-Allotment Option For Convertible Note Offer...
6/1/2009Declares Sixth Monthly Dividend Payment For 2009
6/1/2009Announces $750 Million Offering of Convertible Senior Notes
2/2/2009Declares Second Monthly Dividend Payment For 2009
1/14/2009Extends Tax Election Deadline For Former Gold Eagle Sharehol...
1/8/2009Achieves Record Quarterly Gold Production; Forecasts Five Ye...
1/5/2009Declares First Monthly Dividend Payment For 2009
12/12/2008CEO to Retire; Board Names Successor
12/1/2008Declares Twelfth Monthly Dividend Payment For 2008
11/3/2008Declares Eleventh Monthly Dividend Payment For 2008
9/25/2008Announces Closing Of Gold Eagle Transaction
9/9/2008Declares Ninth Monthly Dividend Payment For 2008
8/11/2008Declares Eighth Monthly Dividend Payment For 2008
7/31/2008Consolidates Red Lake District with $1.5 Billion Acquisition...
7/9/2008Regarding Francisco Gold Corp. Shares
7/7/2008Declares Seventh Monthly Dividend Payment For 2008
6/2/2008Declares Sixth Monthly Dividend Payment For 2008
5/20/2008To Host Investor Day
5/5/2008Declares Fifth Monthly Dividend Payment For 2008
4/7/2008 Declares Fourth Monthly Dividend Payment For 2008
4/1/2008's 2007 Audited Financial Statements and 40F Available
3/3/2008 Declares Third Monthly Dividend Payment For 2008
2/14/2008 Completes Sale Of Silver Wheaton Shares
2/4/2008 Declares Second Monthly Dividend Payment for 2008
2/1/2008 Announces Secondary Offering Of Silver Wheaton Shares
1/8/2008 Achieves Record Gold Production in 2007; Further Growth For...
1/7/2008 Declares First Monthly Dividend Payment For 2008
12/21/2007 Completes Transaction for Full Ownership of Canadian Gold A...
11/27/2007 Reports Company-Wide Exploration Progress
11/5/2007 Declares Eleventh Monthly Dividend Payment for 2007
9/26/2007Acquires Full Ownership Of Canadian Gold Assets
9/10/2007 Declares Ninth Monthly Dividend Payment for 2007
8/17/2007Reports Minimal Investment in Canadian Asset Backed Securiti...
8/7/2007 Declares Eighth Monthly Dividend Payment For 2007
7/25/2007Announces Completion of Silver Wheaton Transaction
7/9/2007Declares Seventh Monthly Dividend Payment for 2007
6/11/2007Declares Sixth Monthly Dividend Payment for 2007
4/17/2007Signs Agreement with Silver Wheaton for Peñasquito
4/5/2007Sale of Amapari Mine Completed and Construction Resumes at G...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (G.TO)NYSE (GG)
1.12-1.75%11.19+0.00%
TORONTO
CA$ 1.12
04/18 16:59 -0.020
-1.75%
Prev close Open
1.14 1.16
Low High
1.10 1.16
Year l/h YTD var.
0.590 -  1.25 33.33%
52 week l/h 52 week var.
0.570 -  1.35 -17.65%
Volume 1 month var.
53,443 23.08%
24hGold TrendPower© : 21
Produces Copper - Gold - Silver - Zinc
Develops Copper - Gold - Molybdenum - Silver
Explores for Chromium - Copper - Diamonds - Gold - Iron - Lead - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/6/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202451.35%
2023-60.85%2.090.62
202257.50%2.400.89
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.87+2.34%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :