Golden Predator.

Published : September 14th, 2015

Golden Predator Confirms Continuity of High Grade Gold from Surface at 3 Aces’ Bulk Sample Target, Intersects 4.64 oz/t (158.97 g/t) Gold over 7.5 Feet

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold | Gold Mine | Recovery |

Golden Predator Confirms Continuity of High Grade Gold from Surface at 3 Aces’ Bulk Sample Target, Intersects 4.64 oz/t (158.97 g/t) Gold over 7.5 Feet

News Release re: Castle Peak Leas Draft 1 (01078103).DOCX



NEWS RELEASE TSX.V: GPY

September 14th, 2015

NR 15-11

www.goldenpredator.com


Golden Predator Confirms Continuity of High Grade Gold from Surface at 3 Aces' Bulk Sample Target, Intersects 4.64 oz/t (158.97 g/t) Gold over 7.5 Feet


Vancouver, BC, September 14th, 2015: Golden Predator Mining Corp. (TSX.V:

GPY) (the 'Company' or 'Golden Predator') is pleased to announce the Company has

completed a tightly spaced Rotary Air Blast (RAB) drill program confirming gold mineralization in advance of bulk sampling from the Sleeping Giant vein at the 3 Aces project. Gold mineralization was intersected in all holes sampled at or near the surface, including:

  • Hole 3ARAB15-11 with 2.5 ft from surface of 9.73 oz/t (333.50 g/t) gold;

  • Hole 3ARAB15-05 with 2.5ft from surface of 6.84 oz/t (234.50 g/t) gold;

  • Hole 3ARAB15-12 with 7.5ft from surface of 3.04 oz/t (104.39 g/t) gold; and

  • Hole 3ARAB15-13 with 7.5 ft from surface of 4.64 oz/t (158.97 g/t) gold

RAB Drill Program

A total of 13 shallow holes totaling 150 ft (45.73m) were drilled in preparation for bulk sampling from the Sleeping Giant vein. Drill samples were collected downhole at 2.5 ft (0.76m) intervals on an irregular grid (see map) covering an area of approximately 50 ft by 20 ft (15.24m by 6.10m) with hole depths ranging from 6.5 ft (1.98m) to 13.5 ft (4.12m). Drill holes were collared in the outcropping vein (hanging wall) where exposed from earlier trench and road work, and oriented for true-width intersection.

Drill holes were designed to collect a large volume sample, varying from 17.6 pound to 63.8 pounds (8 to 29 Kg), and were capped for use in blasting of the planned bulk sample. Drill holes 3ARAB15-01 and 10, located at the eastern end of the drilled section of the vein intersected a moderately dipping fault which cuts off the vein. All other drill holes were terminated in the quartz vein at the planned depth for blasting of the initial bulk sample. Holes 09 and 10 were collared in argillite and were not sampled until the vein was intercepted substantiating the continuation of the vein beneath the argillite. The western portion of the vein was not able to be drilled due to topographic constraints and remains open.


The drilling program was designed to test a portion of the Sleeping Giant vein where previous channel sampling by Golden Predator (formerly Northern Tiger Resources Ltd.) returned grades up to 3.88 oz/t (132.91 g/t) gold over 22.63 feet (6.9 m)(1), and metallurgical testwork from a 1,366 pound (620kg) sample (sample BS-3A13-03) that returned a metallic screen gold assay of

  1. oz/t (215.5 g/t) gold and reported gravity recoverable gold of 78.9% and overall gold recovery of 97.9%(2).


    Sleeping Giant Zone - RAB Significant Results Table

    Hole

    From

    (ft) To (ft)

    Thickness

    (ft)1

    Au oz/t2

    Au g/t3

    3ARAB15-

    01

    0.00

    2.50

    2.50

    1.39

    47.60

    3ARAB15-

    02

    0.00

    5.00

    5.00

    1.51

    51.91

    3ARAB15-

    03

    0.00

    2.50

    2.50

    1.92

    65.75

    3ARAB15-

    04

    0.00

    2.50

    5.00

    0.75

    25.75

    3ARAB15-

    05

    0.00

    2.50

    2.50

    6.84

    234.50

    3ARAB15-

    06

    0.00

    5.00

    5.00

    2.74

    93.98

    3ARAB15-

    07

    0.00

    5.00

    5.00

    1.54

    52.70

    3ARAB15-

    08

    0.00

    7.50

    7.50

    1.93

    66.02

    3ARAB15-

    09

    2.30

    5.00

    2.70

    1.47

    50.55

    3ARAB15-

    10

    2.00

    5.00

    3.00

    1.00

    34.45

    3ARAB15-

    11

    0.00

    10.50

    10.50

    3.17

    108.54

    including

    0.00

    2.50

    2.50

    9.73

    333.50

    3ARAB15-

    12

    0.00

    7.50

    7.50

    3.04

    104.39

    including

    0.00

    2.50

    2.50

    3.31

    113.65

    including

    5.00

    7.50

    2.50

    5.37

    184.25

    3ARAB15-

    13

    0.00

    7.50

    7.50

    4.64

    158.97

    including

    0.00

    2.50

    2.50

    8.08

    277.00

    including

    5.00

    7.50

    2.50

    5.32

    182.25

  2. Drill intercepts are reported as true thickness intervals.

  3. Au grades are reported in troy ounces per short ton

  4. Au grades are reported in grams per metric tonne





Sleeping Giant Zone

The Sleeping Giant Zone, accessible via an exploration dirt road, encompasses an area approximately 33,000 m2 defined by float and outcrops of quartz veins. To date, it contains one of the 3 Aces property's two preferred continuous quartz veins offering potential for bulk sampling. The Zone consists of a number of outcropping targets consisting of gently to moderately dipping gold-bearing quartz veins. Located along the road cut on the southern part of the Sleeping Giant Zone, the veins' apparent dip slope is exposed for about 25m along strike on the north side of the road.


2015 Bulk Sample Program

After evaluation of the current drilling results, the Company has refined its plan for the bulk sample at the Sleeping Giant Zone where it now expects to initially extract and ship approximately 550 short tons (500 tonnes) of high grade vein material. The program is anticipated to target the top 2.5 feet (0.76m) to 7.5 feet (2.29m) of the vein as dictated by 3-D analysis of the RAB drill results. The Company may continue to extract additional tonnage within the confines of our permit at the Sleeping Giant vein based on conditions and grade encountered following the initial blast and extraction. The bulk sample will be conducted in a manner attempting to preserve any possible occurrences of specimen value rock prior to bagging the broken sample into super sacks designed for shipping the ore to a processing facility. The material will be transported off site and is planned to be processed in its entirety to not only recover gold but to further advance the Company's understanding of the distribution of the coarse gold particles and provide additional baseline data that can be used in designing a process flow sheet for this type of material.


The Company is engaged in logistical planning and negotiating potential processing options. The Company has a Class 3 exploration permit allowing up to 2,000 cubic meters (approx. 5,000 tonnes) of bulk sampling.

3 Aces Project, Yukon

The 3 Aces property consists of 1,118 contiguous quartz claims (23,000 hectares) located in southeast Yukon. The property is located along the all-season Nahanni Range Road which accesses the Cantung Mine located 40 kilometres to the north.


The 3 Aces property contains a number of quartz veins and vein zones that cut Cambrian aged limestone, shale, quartz grits and pebble chert conglomerates of the Hyland Group. Previous sampling and exploration by Golden Predator (formerly Northern Tiger) has outlined extensive gold-in-soil anomalies over nine square kilometres, including numerous high grade gold showings.


The 3 Aces property is located in the traditional territory of the Kaska Nation. In January 2013, Golden Predator signed an Exploration Agreement with the Kaska Nation, as represented by the Ross River Dena Council and the Liard First Nation, with respect to activities within their traditional territories.

Sampling Methodology, Quality Control and Assurance

The RAB sampling was conducted under the direct supervision of Mike Burke, Chief Geologist for Golden Predator. Fifty individual samples were collected, bagged, security-tagged and maintained in Company custody until delivery to ALS' Whitehorse sample preparation facility.


Previous metallurgical work(2) established that a 2,000 gram pulp and screen metallic assaying is an appropriate method to obtain reliable gold grades from the high grade gold veins. All analyses for the drill samples from the 2015 program were performed by ALS with sample preparation in Whitehorse, YT and assaying in North Vancouver, BC. Two one kilogram splits were collected from each drill sample and were analyzed for gold using Screen Metallics Gold (Au-SCR21) procedure. Reported grades are the average of the two splits.


No field-split samples were submitted and samples consisted entirely of whole interval cuttings. Quality control and assurance consisted of 7% laboratory duplicates. No standard reference materials were analyzed in conjunction with the drill samples. The RAB sampling results are consistent with previous results (1)(2) and considered of sufficient quality for internal bulk sampling feasibility and planning purposes.

The technical content of this news release has been reviewed and approved by Mark C. Shutty, CPG, a Qualified Person as defined by National Instrument 43-101 and a consultant for the Company.


Golden Predator Mining Corp.

Golden Predator Mining Corp. holds the Brewery Creek Project, a past producing heap leach gold mine with a preliminary economic assessment delivered in Q4 2014. The Company also holds the 3 Aces Gold Project in the Yukon, which it continues to delineate and test, and the Castle West Project in Nevada.


For additional information: Janet Lee-Sheriff

Chief Executive Officer

(208) 446-6451

[email protected] www.goldenpredator.com

  1. Northern Tiger Resources Inc., News Release dated August 8, 2012

  2. Golden Predator Mining Corp., News Release dated December 2, 2014


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.


This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward- looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change.

Read the rest of the article at www.noodls.com

Golden Predator.

PRODUCER
CODE : GPY.V
ISIN : CA38116P1053
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Golden Predator. is a gold development stage company based in Canada.

Golden Predator. develops gold and silver in USA, and holds various exploration projects in Canada.

Its main asset in production is BALD MOUNTAIN in USA, its main asset in development is TAYLOR MINE in USA and its main exploration properties are BREWERY CREEK, CLEAR CREEK, LANTERN DEPOSIT, ST. ELMO, BUENA VISTA/FRENCH BOY, CEDAR (NEVADA), BOND, OGOPOGO, DEL, AGATE, MEL, DAD, LED, CHOPIN, MCCONNEL, DOME HILL, GOLD (SCHEELITE) DOME, HARLAN, PHOENIX JV, ANTIMONY MOUNTAIN, WINDFALL LAKE, ALBERTA SUN, TUSCARORA, AFGAN, GREW CREEK, ADELAIDE, WILLOUGHBY, ALKALIC, ANGEL'S CAMP, GOLDEN RIDGE ( NEVADA), PAN, TONKIN PROJECT, SONORA GULCH, MARG, BRUIN CREEK and BROWNS CREEK in Canada and GUIJOSO and MAGISTRAL I in Mexico.

Golden Predator. is listed in Canada. Its market capitalisation is CA$ 14.7 millions as of today (US$ 11.6 millions, € 9.8 millions).

Its stock quote reached its highest recent level on November 19, 2010 at CA$ 9.80, and its lowest recent point on April 25, 2014 at CA$ 0.03.

Golden Predator. has 91 570 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Golden Predator.
9/16/2011Corporate Presentation - Precious Metal Summit (September 15...
8/20/2009Corporate presentation August 2009
In the News and Medias of Golden Predator.
1/22/2019Golden Predator extends 3 Aces mineralization
Annual reports of Golden Predator.
receives 2,533,333 Shares of Silver Predator Corp.; Provides...
2008 Annual Report
Financings of Golden Predator.
9/23/2011Extends 950,000 Warrants
6/22/2011Golden Predator and Seabridge Gold Agree to Contribute Selec...
Nominations of Golden Predator.
2/13/2013Appoints Financial Advisor
Project news of Golden Predator.
8/18/2016(3ace Property)Predator Pours First Gold from Bulk Sample
8/15/2016(3ace Property)Predator Discovers Coarse Visible Gold in New Vein at 3 Aces...
9/27/2012(Brewery Creek)arranges USD $35,000,000 Loan Facility with RK Mine Finance;...
7/16/2012(Brewery Creek)and Tr'ondek Hwech'in First Nation Update Brewery Creek Proj...
7/10/2012(Brewery Creek)Drilling extends Brewery Creek\222s Bohemian Zone...
3/5/2012(Brewery Creek)Drills Third Major Brewery Creek Discovery; Classic Zone Hos...
1/5/2012(Pan)continues to expand North Slope Zone at its Brewery Creek Pr...
12/5/2011(Pan)Calculates NPV of Royalty Interest in Pan Project at USD $32...
9/1/2011Acquires Livingstone District; Now Controls Largest Land Pos...
8/11/2011(Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at Br...
8/11/2011(Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at ...
7/26/2011(Harlan)Commences Drill Program on its Enticing Harlan Project in ...
7/18/2011(Brewery Creek)Investigates Gold Recovery from Existing Heap Leach Pad at ...
7/5/2011(Grew Creek)drills 92.0 m of 2.02 g/t Gold; Commences Resource Calcu...
6/1/2011(Brewery Creek)Triples 2011 Budget, Adds Second Drill, and Plans for Third ...
5/26/2011(Grew Creek)Intersects 98.3 m of 1.83 g/t Gold at Carlos Zone, Grew Cree...
4/26/2011(Brewery Creek)Intersects 74 m of 7.08 g/t Gold 250m East of Bohemian Zone,...
4/21/2011(Harlan)Increases Land Position in the Yukon's Selwyn Basin to 7,800...
4/14/2011(Swede Dome)Stakes 4 Project Areas in Historic Yukon Placer Headwaters
4/8/2011(Brewery Creek)Intercepts 28 m of 5.06 g/t Gold at Brewery Creek's Bohemian...
3/24/2011(Brewery Creek)expands Bohemian Discovery with 32.9 m of 3.01 g/t Gold at ...
2/22/2011(Brewery Creek)COMMENCES 2011 YUKON DRILL PROGRAM
1/24/2011(Harlan)Acquires Harlan Property, Yukon
1/6/2011(Mcconnel)Acquires McConnell Property, Yukon
11/30/2010(Gold (scheelite) Dome)Intercepts 21.95 m of 1.00 g/t Gold from Hawthorne Ridge Zon...
12/10/2009(Brewery Creek)Intersects 20.17 gpt Gold over 1.90 m and 4.72 gpt Gold over...
11/16/2009(Gold (scheelite) Dome)Intersects 11.12 gpt Gold over 25.40 m including 52.35 gpt G...
11/5/2009(Antimony Mountain)Intersects 12.45 gpt Gold over 4.88 m including 28.81 gpt Go...
8/10/2009(Adelaide)completes Technical Report on the Adelaide Project, Nevada
6/8/2009(Brewery Creek)GOLDEN PREDATOR ACQUIRES BREWERY CREEK PROJECT, YT
2/11/2009(High Grade Gp) Reports on Initial Exploration at High Grade Project
Corporate news of Golden Predator.
8/2/2016Golden Predator Increases Previously Announced Offering to C...
7/26/2016Golden Predator Closes C$16.36 Million Financing; Includes C...
7/13/2016Golden Predator Commences Geotechnical and Metallurgical Dri...
7/6/2016Golden Predator Increases Previously Announced Offering to C...
6/27/2016Golden Predator and Tr’ondëk Hwëch’in Amend Brewery Creek Pr...
6/27/2016Golden Predator Announces $7,300,000 Investment By Eric Spro...
6/20/2016Golden Predator Intersects 11.43m of 31.82 g/t Gold at 3 Ace...
6/16/2016Golden Predator Retires 10,312,154 Common Shares
6/13/2016Tony Lesiak Appointed to Golden Predator’s Board of Director...
6/10/2016Golden Predator Exercises Option to Acquire Shares
6/8/2016Till Capital Receives $1,546,823 CDN From Sale of Golden Pre...
6/7/2016McEwen Mining’s Stefan Spears Appointed to Golden Predator’s...
6/6/2016Golden Predator Reports Initial Gold Gravity Recoveries of 8...
1/25/2016Golden Predator Recovers 79.9 to 90.8% Gold from 3 Aces Prel...
1/4/2016Golden Predator Announces TSXV Approval of Castle West Prope...
10/6/2015Golden Predator Chairman Increases Holdings
10/2/2015Golden Predator Announces Stock Option Grant
9/30/2015Golden Predator Arranges CDN $300,000 Line of Credit
9/30/2015Golden Predator Arranges CDN$300,000 Line of Credit
9/14/2015Golden Predator Confirms Continuity of High Grade Gold from ...
9/14/2015IIROC Trading Resumption - GPY
9/14/2015IIROC Trading Halt - GPY
9/11/2015Golden Predator announces re-election of board at Annual Gen...
9/3/2015Golden Predator Announces Board and Management Appointments;...
9/3/2015IIROC Trading Resumption - GPY
9/2/2015Golden Predator Announces Board and Management Appointments;...
9/2/2015Till Capital Announces Board and Executive Changes
8/24/2015Till Capital Reports on Golden Predator Annual General Meeti...
8/21/2015IIROC Trading Halt - GPY
7/30/2015Golden Predator Adopts Advance Notice Policy
7/16/2015Golden Predator Announces Convertible Debenture Financing
6/22/2015Golden Predator Receives 3 Aces Permit
4/21/2015Golden Predator Completes First Note Payable Payment
3/30/2015Golden Predator Announces Joint Venture and Option Agreement...
3/16/2015Golden Predator Announces Joint Venture and Option Agreement...
12/2/2014Metallurgical Tests Indicate 93.5% to 98.3% Overall Gold Rec...
11/20/2014Golden Predator Files Preliminary Economic Assessment Result...
11/12/2014Golden Predator Announces Positive Preliminary Economic Asse...
10/22/2014Golden Predator Appoints Janet Lee-Sheriff as Chief Executiv...
9/4/2014Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Pr...
8/25/2014Golden Predator Leases the Castle West Property, Nevada
8/5/2014Preliminary Economic Assessment on Brewery Creek Project, Yu...
7/15/2014Golden Predator Commences Preliminary Metallurgical Characte...
7/10/2014Golden Predator Announces Former Yukon Premier Dennis Fentie...
2/21/2013to start trading as Americas Bullion Royalty Corp. (TSX:AMB)...
2/19/2013and Tr\222ondek Hwech\222in ...
2/19/2013and Tr'ondek Hwech'in Disagree with YESAB
2/7/2013Approves Creation of Shareholder Rights Plan, Finalizes Name...
1/30/2013Silver Predator and Redtail Metals Sign Exploration Agreemen...
1/24/2013(Rogue)Discovers High-grade Gold Mineralization on Rogue B Property...
1/18/2013Announces Name Change to Gold Bullion Royalty Corp.
1/8/2013Tr'ondek Hwech'in and Golden Predator Continue to Work Toget...
1/8/2013Tr'ondëk Hwëch'in and Golden Predator Continue to Work Toget...
11/5/2012(Brewery Creek)- Classic Zone Drilling Intersects 41.2 m of 1.04 g/t Go...
10/12/2012William Sheriff, Chairman & CEO, Interviewed on BNN's Commod...
10/11/2012(Alkalic)Announces New Brewery Creek Discovery; Open-Ended Lone Star ...
10/11/2012(Alkalic)Announces New Brewery Creek Discovery: Open-Ended Lone Star ...
10/4/2012(Brewery Creek)Lower Fosters Zone Drilling Intersects 29.0 m of 1.86 g/t Go...
7/19/2012New Mineralization Encountered at Moosehead Pit, Brewery Cre...
7/16/2012and Tr\222ond\353k Hw\353ch\222in ...
6/28/2012JOINT NEWS RELEASE: Golden Predator Corp. and Seabridge Gold...
6/7/2012Joint News Release: Golden Predator Corp. and Seabridge Gold...
5/1/2012Announces Resource Estimate at Brewery Creek Project of 580,...
3/22/2012(Brewery Creek)Sleeman Zone Drilling Intersects 40.9 m of 1.81 g/t Gold and...
3/15/2012(Brewery Creek)Bohemian-Schooner Zone Drilling Intersects 24.0 m of 1.47 g/...
2/23/2012(Grew Creek)Intersects 68 m of 5.96 g/t Gold at Carlos Zone, Grew Creek ...
2/22/2012(Brewery Creek)East Big Rock Zone Drilling Intersects 15.2 m of 1.93 g/t Go...
1/20/2012Upcoming Events
1/12/2012(Brewery Creek)intersects 30.5 m of 1.97 g/t Gold at its Brewery Creek Proj...
1/10/2012(Harlan)announces New Gold Discovery at Cache Creek (Harlan) Project...
1/9/2012(Brewery Creek)Encounters 35.1 m of 1.63 g/t Gold and 136.72 g/t Silver at ...
9/12/2011100%\240OF\240EXPIRING\240WAR...
8/29/2011(Pan)Brewery Creek\222s Expanding Sle...
8/5/2011and Ross River Dena Council Sign Traditional Knowledge P...
6/30/2011(Pan)Continues to Expand Brewery Creek's Bohemian-Schooner Zone
6/21/2011(Grew Creek)Intersects 46.7m of 3.78 g/t Gold at Carlos Zone, Grew Creek...
3/17/2011RECEIVES 5,000,000 SHARES OF SILVER PREDATOR CORP.
9/29/2009Provides Update on Yukon Projects
7/28/2009Drilling Commences at Gold Dome Project, Yukon Territory
3/7/2009Completes Spin-Out
3/5/2009Announces Voting Results of Special Meeting
3/3/2009Timing of Shareholders Meeting To be Held On March 4, 2009
2/26/2009to Retire Convertible Debentures of Subsidiary
2/13/2009Confirms Date of Shareholder Meeting
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GPY.V)
0.160+0.00%
TSX-V
CA$ 0.160
09/01 16:52 -
0%
Prev close Open
0.160 0.160
Low High
0.155 0.160
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.160 -%
Volume 1 month var.
201,699 -%
24hGold TrendPower© : 50
Produces Gold
Develops Silver
Explores for Antimony - Copper - Gold - Silver - Tungsten - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2021-33.33%0.300.12
2020-31.43%0.480.15
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.57+3.64%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :