Golden Queen Mining

Published : November 09th, 2015

Golden Queen Announces Financial Results for the Third Quarter of 2015 and Provides a Construction Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Derivative | Gold | Market | Merrill | Silver | Water |

Golden Queen Announces Financial Results for the Third Quarter of 2015 and Provides a Construction Update

Golden Queen Announces Financial Results for the Third Quarter of 2015 and Provides a Construction Update

November 9, 2015 - Golden Queen Mining Co. Ltd. (TSX:GQM; OTCQX:GQMNF)

(the 'Company' or 'Golden Queen') is pleased to announce its financial results for the third quarter ended September 30, 2015 for its 50%-owned Soledad Mountain gold-silver project (the 'Project') located just south of the town of Mojave, California. The financial results are filed on Form 10-Q with the SEC, which will be available on the Company's website at

www.goldenqueen.com

, on SEDAR at

www.sedar.com

, and on EDGAR at

www.sec.gov

. All amounts are in U.S. dollars and reflect 100% of the financial results of Golden Queen Mining Company, LLC ('GQM LLC'), the Company's 50%-owned subsidiary that holds the Project, unless otherwise stated.

Third Quarter Highlights

  • The assay laboratory was commissioned in late July and is now fully operational;
  • GQM LLC received four 100-ton trucks, two wheel loaders and one medium dozer during the third quarter;
  • Stockpiling of unprocessed ore started in late August;
  • Construction of the Phase 1, Stage 1 heap leach pad was completed in late September;
  • Structural steel and equipment for the crushing-screening plant and Merrill-Crowe plant was delivered during the third quarter and the assembly continued;
  • Construction of the basic water supply infrastructure is completed and the backup production water well is currently being connected to the mine water supply infrastructure;
  • Construction of the site-wide power distribution system has essentially been completed; and
  • The Company repaid its C$10 million convertible debentures on July 24, 2015.
Financial Highlights

During the third quarter ended September 30, 2015, the net loss attributable to the Company was $1.9 million (or $0.02 basic per share), compared to a net loss of $1.8 million (or $0.02 basic per share), for the corresponding period in 2014. The net loss in the third quarter of 2015 is mainly due to an increase of interest expenses and a loss resulting from the change in fair value of the derivative liability, which is a non-cash item.

The Company had, on a consolidated basis, $166.4 million in assets, including $52.0 million in cash, and a working capital balance of $43.3 million as at September 30, 2015, compared with $129.5 million in assets, including $91.4 million in cash, and a working capital balance of $65.1 million as at December 31, 2014.

The Company incurred capitalized development costs of $59.8 million during the nine month period ended on September 30, 2015, compared to $13.2 million during the same period in 2014. Construction costs included $17.1 million in costs related to the crushing-screening plant, $7.8 million in costs related to the Merrill-Crowe plant and solution management, $7.6 million in costs related to the construction of the Phase 1, Stage 1 heap leach pad and $3.6 million in costs related to the construction of the conveying and stacking system. The Company also capitalized $4.9 million in interest cost.

The results for the quarter ended on September 30, 2015 are summarized in the table below:

Financial position as at: September 30, 2015 December 31, 2014
Select Items - On a consolidated basis * $ $
Cash 52,005,369 91,407,644
Mineral property interests 112,848,211 37,138,134
Total assets 166,419,133 129,517,335
Working capital 43,333,362 65,110,327
Current liabilities 9,105,708 26,464,078
Long term liabilities 48,785,591 1,314,435
Redeemable portion of non-controlling interest - Temporary equity 27,322,445 22,833,645
Non-controlling interest - Shareholders' equity 40,983,667 34,250,468
Shareholders' equity attributable to Golden Queen 40,221,722 44,654,709
Shareholders' equity 81,205,389 78,905,177
Results for the quarter ended on: September 30, 2015 September 30, 2014
Item $ $
Net income (loss) and comprehensive income (loss) attributable to the Company (1,924,167) (1,811,843)
Basic income (loss) per share attributable to the Company (0.02) (0.02)
Diluted income (loss) per share attributable to the Company (0.02) (0.02)
*These consolidated results include the accounts of Golden Queen, Golden Queen Mining Holdings Inc. and GQM LLC. GQM LLC meets the definition of a Variable Interest Entity. Golden Queen has determined that it is the member of the related party group that is most closely associated with GQM LLC and, as a result, is the primary beneficiary who consolidates GQM LLC. Golden Queen's economic interest in GQM LLC is 50%.

Shareholders are reminded that the Company does not currently have any revenue as its Project is not yet in production.

Construction Update

Construction has continued to progress on site during the third quarter of 2015 and is approximately 90% complete. Recent developments include:

  • Construction is proceeding within budget and commissioning of the processing facilities is anticipated to be completed in the final quarter of 2015;
  • The primary section of the crushing-screening plant was commissioned in late October. The secondary and tertiary sections are expected to be commissioned in November;
  • The installation of the Merrill-Crowe plant is well advanced. This turn-key project is expected to be completed in late November;
  • The assembly of the conveying and stacking system is nearing completion;
  • The primary power sub-station was completed in November and we anticipate the connection to the Southern California Edison grid to be completed in two phases in November 2015; and
  • There are now 60 full-time employees in Mojave with an expected increase to over 100 full-time employees in the near term.
About Golden Queen Mining Co. Ltd.:

The Company is developing a gold-silver, open pit, heap leach operation on its fully-permitted 50%-owned Soledad Mountain property, located just outside the town of Mojave in Kern County in southern California.

For further information regarding this news release please contact:

Brenda Dayton
Telephone: 778.373.1557
Email: [email protected]

Caution With Respect To Forward-looking Statements: The information in this news release includes certain 'forward-looking statements'. All statements in this news release, other than statements of historical fact, including, without limitation, plans for and intentions with respect to budgets, capital requirements, construction, hiring, infrastructure development, and other development activities on the Project; expectations related to management and operation of GQM LLC and future mining operations on the Project, are forward-looking statements. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from statements in this news release regarding our intentions include, without limitation, risks and uncertainties regarding: the ability of the Company to maintain its current interest in the Project by funding additional capital requirements; potential change in accounting policy; and the development and operation of the Project, including additional capital requirements for the Project, accidents, equipment breakdowns and non-compliance with environmental and permit requirements. Other risks and uncertainties include risks related to fluctuations in gold and silver prices; changes in planned work resulting from logistical, technical or other factors; that results of operations on the Project will not meet projected expectations due to any combination of technical, operational or market factors; uncertainties involved in the interpretation of technical data and the estimation of gold and silver resources and reserves; and other risks and uncertainties disclosed in the section entitled 'Risk Factors' contained in our Annual Report on Form 10-K for the year ended December 31, 2014 and filed on March 16, 2015.

Investors are cautioned that forward-looking statements are not guarantees of future performance and, accordingly, investors should not put undue reliance on forward-looking statements. Any forward-looking statement made by us in this news release is based only on information currently available to us and speaks only as of the date on which it is made.

Read the rest of the article at www.noodls.com

Golden Queen Mining

DEVELOPMENT STAGE
CODE : GQM.TO
ISIN : CA38115J1003
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Golden Queen is a gold development stage company based in Canada.

Golden Queen develops gold and silver in USA.

Its main asset in development is SOLEDAD in USA.

Golden Queen is listed in Canada and in United States of America. Its market capitalisation is CA$ 2.8 millions as of today (US$ 2.1 millions, € 1.8 millions).

Its stock quote reached its highest recent level on September 23, 2011 at CA$ 3.95, and its lowest recent point on July 25, 2019 at CA$ 0.02.

Golden Queen has 111 050 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Golden Queen Mining
12/31/2014secures loan financing
Nominations of Golden Queen Mining
5/31/2013Appoints New Board Members
Financials of Golden Queen Mining
8/10/2016Golden Queen Announces Financial Results for the Second Quar...
11/10/2014reports financial results for the third quarter of 2014
8/11/2014Announces Financial Results and Review of Operations for the...
3/17/2014reports year end results and provides a construction update
11/13/2013Files Financial Statements
2/18/2011 Quarterly Report
Project news of Golden Queen Mining
4/13/2015Golden Queen comments on a US Fish and Wildlife Service noti...
11/25/2014(Soledad)Company Ltd. provides update on the Soledad Mountain Project
9/15/2014(Soledad)announces closing of joint venture to develop and operate th...
6/9/2014(Soledad)announces joint venture to develop and operate the Soledad M...
10/25/2012(Soledad)Files Updated Feasibility Study Report for Soledad Mountain ...
4/8/2011(Soledad)ANNOUNCES UPDATED FEASIBILITY STUDY FOR SOLEDAD MOUNTAIN PRO...
Corporate news of Golden Queen Mining
7/25/2016Golden Queen Completes C$16.1 Million Bought Deal Financing
7/14/2016Golden Queen Announces C$13 Million Bought Deal Financing
7/13/2016Golden Queen Annouces Proposed C$13 Million Unit Financing
6/9/2016Golden Queen Provides A Project Update
6/6/2016Golden Queen Provides A Project Update
6/3/2016Golden Queen Announces Voting Results of Annual General Meet...
5/10/2016Golden Queen Announces Financial Results for the First Quart...
2/1/2016A Look Inside the Chart, Technical Insights - Analyst Notes ...
1/21/2016Direction of Market Influences -- Featured Research on Salee...
1/14/2016Today's Market Driven by Key Factors - New Research on Trans...
1/5/2016Golden Queen Begins Commissioning of Processing Facility and...
1/4/2016Golden Queen Begins Commissioning of Processing Facility and...
1/4/2016Golden Queen Begins Commissioning of Processing Facility and...
8/13/201510-Q for Golden Queen Mining Co. Ltd.
8/13/201510-Q for Golden Queen Mining Co. Ltd.
8/10/2015Golden Queen Announces Senior Management Changes And Reports...
8/10/2015Golden Queen Announces Senior Management Changes and Reports...
5/14/201510-Q for Golden Queen Mining Co. Ltd.
5/14/201510-Q for Golden Queen Mining Co. Ltd.
5/5/201510-K for Golden Queen Mining Co. Ltd.
5/5/201510-K for Golden Queen Mining Co. Ltd.
4/13/2015Golden Queen Comments on a US Fish and Wildlife Service Noti...
3/16/2015Golden Queen Reports Financial Results for the Year Ending D...
3/16/2015Golden Queen reports financial results for the year ending D...
2/27/2015Golden Queen Mining Company Ltd. Announces Filing of NI 43-1...
2/27/2015Golden Queen Mining Company Ltd. Announces Filing of NI 43-1...
2/10/2015Company Ltd. provides update on resource estimates, reserve ...
1/1/2015Golden Queen Secures Loan Financing
12/3/2014CANADA STOCKS-TSX set to open lower ahead of Bank of Canada ...
11/26/2014Golden Queen Mining Company Ltd. Provides Update on The Sole...
11/11/2014Golden Queen Reports Financial Results for the Third Quarter...
9/9/2014Company Ltd. shareholders approve the joint venture with Gau...
7/31/2014announces date for Extraordinary Shareholder Meeting to appr...
7/31/2014announces date for Extraordinary Shareholder Meeting to appr...
7/2/2014(Soledad)secures an advance with Leucadia and Auvergne for the ongoin...
4/22/2014on the Center for Biological Diversity Emergency Petition
3/27/2014provides a construction update and updates its capital cost ...
2/3/2014Petition Filed with the United States Fish and Wildlife Serv...
1/6/2014(Soledad)secures interim financing for the ongoing development of its...
12/9/2013provides a construction update
10/8/2013Proposed Extraordinary General Meeting to Increase Authorize...
7/25/2013Announces $10 Million Private Placement
4/30/2013Appointment of Project and Construction Manager
9/11/2012Begins Trading on OTCQX International
5/17/2011(Soledad)ANNOUNCES FILING OF FEASIBILITY STUDY FOR SOLEDAD MOUNTAIN ...
1/21/2011 Financials
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (GQM.TO)Other OTC (GQMNF)
0.025+0.00%0.163-9.44%
TORONTO
CA$ 0.025
07/25 16:45 -
0%
Prev close Open
0.025 0.025
Low High
0.025 0.030
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.025 -%
Volume 1 month var.
557,744 -%
24hGold TrendPower© : -24
Produces
Develops Gold - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.02+1.33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.41+1.26%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.18-3.86%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84-1.08%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.60+0.91%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :