Metallurg, Inc.

Published : May 01st, 2013

Goldrock News Release =2D Arizaro Metallurgical Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Is this email not displaying correctly?
View it in your browser.
Maiden Metallurgical Results for the Arizaro Project Indicate
Mineralization is Potentially Amendable to Heap Leach Processing
 
 
Vancouver, British Columbia � Goldrock Mines Corp. (TSX.V � GRM)
May 1, 2013
NR 13-06

Goldrock Mines Corp. (�Goldrock� or the "Company") is pleased to announce that it has received initial metallurgical test work results for the Arizaro project. Arizaro is a gold-copper porphyry discovery located 3 km southeast of Goldrock�s 100% owned and fully permitted developmental stage Lindero gold deposit.

With the view to potentially utilizing the Lindero heap leach processing facility, preliminary metallurgical testing was conducted to start profiling leaching behavior of the typical Arizaro medium to high grade mineralization. This metallurgical test work was undertaken by Kappes, Cassiday and Associates in Reno, Nevada.

Four cyanide bottle roll test results were conducted on both fresh and oxide mineralization and show very favorable coarse fraction gold recoveries of between 64% and 73%.  These recoveries are in a range typical of the early bottle roll test work for the Lindero deposit, and provide a preliminary indication that the Arizaro mineralization is amenable to heap leach gold extraction.

Diamond drill core samples were crushed to 80% passing 9.5 mm mesh, which is the nominal ore crush size for the designed crushing circuit at Lindero.  The composites were prepared to produce representative samples of medium and high gold grades for oxide (weathered) and fresh (non-weathered material) portions of the Arizaro mineralization. Cyanide bottle roll metallurgical tests were then run on the sample composites at 1000 ppm cyanide concentrations for more than 50 days at a pH of 10.5.

The following table shows the results from the Cyanide bottle roll metallurgical test work:

Gold Grade Ore Type Calculated Head
(g Au/T)
Calculated Head
(g Cu/T)
Gold Recovery Copper Recovery Leach Time
(days)
 
Final pH
% Oxide % Fresh
Medium Grade 52 48 0.42 1,974 73% 17% 53 10.5
Medium Grade 52 48 0.62 2,230 64% 26% 53 10.4
High Grade 0 100 1.04 3,326 72% 33% 53 10.7
High Grade 60 40 1.86 3,367 67% 22% 53 10.5

Gold analyses of each particle size fraction from the bottle roll tails indicates that there is good leaching in the coarser fractions.  The relationship between crush size and recovery will be tested in further more detailed test work programs.   Cyanide and lime consumptions for the bottle rolls were comparable to those from Lindero, which are well within the average range of reagent consumptions for a heap leaching project.
 
Paul Matysek, President and CEO, commented �This maiden metallurgical test work certainly increases our confidence that Arizaro has the potential to add to the Lindero project reserve base.  The recently released Lindero feasibility study projects average gold production of 128,000 oz/year over the first three years of operation, and 109,000 oz/year over the initial nine years of operation.  Adding Arizaro material to this production schedule could potentially add to mine life and gold production, enhancing an already robust project.�

The Company is now working towards the release of a maiden NI 43-101 technical report for the Arizaro project in the second quarter of 2013, as well as a commencing detailed metallurgical test work, including heap leach column test work and detailed mineralogical analyses of the Arizaro mineralization.

Arizaro Background

The Arizaro porphyry body was identified prior to the discovery of the Lindero gold deposit in 1999. The Arizaro porphyry system, as defined by drilling, surface sampling and mapped alteration covers a 600 metre by 500 metre surface area. Gold-copper mineralization occurs from surface to a true vertical depth of 300 metres and remains open for expansion in all directions. The Company initially tested the discovery with 16 Diamond drill holes, all of which had significant mineralized intercepts with numerous thick sections greater than 100 meters with grades greater than 0.30 g/t gold and 0.15% copper, and with one hole returning 48 meters of 1.38 g/t gold and 0.36% copper.

Qualified Person

David Keough FAusIMM(CP) of Goldrock Mines Corp is a "qualified person" as such term is defined in National Instrument 43-101 (Standards of Disclosure for Mineral Projects) and has reviewed and approved the technical information and data included in this press release.

ON BEHALF OF THE BOARD OF DIRECTORS,
 
Paul Matysek
 
Paul Matysek, M.Sc., P.Geo
President and CEO
 
For additional information
(604) 681-4462   www.goldrockmines.com

 
About Goldrock Mines Corp. 
 
Goldrock Mines Corp. is an emerging gold producer focused on the development of its 100% owned Lindero gold deposit located in Salta province, northwestern Argentina. The Company has been granted the primary mining permit by the Salta provincial government allowing the Company to develop the Lindero open pit, heap leach gold mine. Results of the Lindero Feasibility Study have recently been announced.  Production will be at an initial throughput rate of 15,000 TPD, increasing to 18,750 TPD during the first year of operation.  Average annual production will be 109,000 ounces during the first nine years. The Company has assembled an experienced operating team and is now arranging project financing with commercial production anticipated in 2015.  Goldrock�s objective is to become a mid-tier gold producer with annual gold production of 250,000 ounces per year through organic growth and accretive acquisitions of near-term producing assets. 

 
Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.
 
Caution Regarding Forward-Looking Statements
 
This press release includes certain statements that may be deemed �forward-looking statements�.  All statements in this discussion, other than statements of historical facts, that address future exploration drilling, exploration activities, anticipated metal production, internal rate of return, estimated ore grades, commencement of production estimates and projected exploration and capital expenditures (including costs and other estimates upon which such projections are based) and events or developments that the Company expects, are forward looking statements.  Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements.  Factors that could cause actual results to differ materially from those in forward-looking statements include metal prices, exploration success, continued availability of capital and financing, and general economic, market or business conditions.  Accordingly, readers should not place undue reliance on forward-looking statements.
 
GOLDROCKMINES.COM
Goldrock Mines Corp., Suite 922, 510 West Hastings Street Vancouver, BC Canada V6B 1L8
T: 604.681.4462 / info@goldrockmines.com
Copyright � 2013 GOLDROCK MINES CORP., All rights reserved.

Our mailing address is:
Goldrock Mines Corp.
Suite 922, 510 West Hastings Street
Vancouver, BC V6B 1L8
Canada

Add us to your address book
Email Marketing Powered by MailChimp
  |  

Data and Statistics for these countries : Argentina | Canada | All
Gold and Silver Prices for these countries : Argentina | Canada | All

Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Metallurg is a producing company based in United states of america.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of
9/5/2013Radcliff Metallurgical Study Results / 15,000,000 Unit Priva...
Project news of
6/1/2017Plymouth Minerals' Metallurgical Testwork confirms developme...
4/20/2017Trilogy Metals Announces Metallurgical, Geotechnical and Hyd...
4/6/2017Plymouth Minerals Reports Exceptional Metallurgical Results ...
3/15/2017KTN.v Reports Follow Up Metallurgical Leach Testing Underway
3/15/2017KOOTENAY REPORTS FOLLOW UP METALLURGICAL LEACH TESTING UNDER...
3/7/2017Corazon Mining Reports 7.38% Cobalt Concentrate at Mt Gilmor...
2/7/2017Metallurgical Testing and Drill Data at Bullfrog Golds Nevad...
1/22/2017KOOTENAY REPORTS METALLURGICAL TESTING ON LA CIGARRA DEPOSIT...
8/22/2016Metals of Africa reports further High Grade Metallurgical Re...
6/8/2016Metals of Africa reports exceptional Metallurgical Results a...
4/21/2016Pilot Gold Commences Core Drilling and Metallurgical Program...
9/30/2015Balmoral Reports Positive Metallurgical Results From Initial...
11/24/2014WPG completes metallurgical sampling program at Tarcoola gol...
10/28/2014Global Recoveries of 94.6% Gold and 97.8% Copper Realized in...
8/20/2014Borborema Gold Project - Drilling, Metallurgy and Optimisati...
6/27/2014Freegold Announces Positive Metallurgical Test Results Golde...
5/5/2014Gruyere Metallurgical Testing Delivers High Recoveries
10/11/2013Released ASX Announcement: Positive Metallurgy Results - Pil...
9/4/2013New Talisman Stock Exchange Release today - Maiden Ore Reser...
8/1/2013Natougou Gold Deposit - Positive Metallurgical Test Results
7/18/2013Melkior Reports 95% Gold Recovery from Preliminary Metallurg...
4/24/2013Melkior Reports 87% Gold Recoveries from Preliminary Metallu...
1/28/2013FURTHER METALLURGICAL TESTING ON NEW LIBERTY ORE
12/11/2012International Tower Hill Announces Positive Metallurgical T...
8/16/2012Advanced Explorations Inc. Metallurgical Pilot Plant Test Re...
7/24/2012European Uranium Completes Metallurgical Drilling Program at...
5/15/2012Excellent metallurgical gold recoveries confirmed & final pl...
4/12/2012Focus Metals Releases Update on Lac Knife Metallurgical Test...
2/29/2012Rogue Iron Ore Commences Metallurgical Testing On Radio Hil...
Corporate news of
3/6/2017Vendetta's Metallurgical Test Work Yields Excellent Recoveri...
3/1/2017Wellgreen Platinum Ltd. - Wellgreen Platinum Announces Resul...
2/10/2017Wellgreen Platinum Ltd. - Wellgreen Platinum Announces Compl...
8/4/2016Pilot Gold =E2?? RC=2FCore Drill Results & Metallurgical Upd...
1/25/2016Lundin Gold Announces Positive Metallurgical Results at Frut...
10/22/2015KOOTENAY REPORTS POSITIVE RESULTS AND HIGH RECOVERY RATES FR...
9/17/2015Pilot Gold reports metallurgical results from Valley Porphy...
7/13/2015Pilot Gold reports metallurgical results from upper gold hos...
7/29/2014Asanko Gold Announces Positive Metallurgical Results from Dy...
3/6/2014Lexam Preliminary Metallurgical Work Yields Ex =?ISO-8859-1?...
2/3/2014Exceptional Metallurgical Test Results from Gruyere Prospect
1/29/2014Northern Vertex Provides Metallurgical Update for Phase I - ...
7/18/2013Melkior Resources reports 95% gold recovery from preliminary...
7/12/2013Positive 7B Metallurgical Tests
7/5/2013Northern Vertex Advises Metallurgical Results on Low Grade M...
7/2/2013Metallurgical Results For Crucero Gold Project's A-1 Zone
7/2/2013Silver Bull Announces Updated Metallurgical Test Results On ...
5/30/2013Brewery Creek\222s Metallurgical...
5/1/2013Goldrock News Release =2D Arizaro Metallurgical Results
3/13/2013McEwen Mining Los Azules Metallurgical Update
2/14/2013Metallurgy Tests Return Favourable Results for In=2DSitu Rec...
12/11/2012Preliminary Metallurgical Recoveries Exceed 95%
10/26/2012Quest Engages Hatch to Undertake Advanced Metallurgical and
10/16/2012Aldridge - Aldridge Confirms Metallurgical Performance
10/4/2012Metallurgy Results Indicate Uranium Recoveries Of Up To 94% ...
9/27/2012Moneta Announces Positive Metallurgical Results on Golden Hi...
9/20/2012Metallurgical Developments Continue to Advance and De-Risk P...
7/30/2012Positive Metallurgical Results for Crater Mountain, PNG
5/15/2012Quest Completes Bulk of Phase II Metallurgical Testwork: Pro
5/10/2012SGS Mineral Services Metallurgical Test Results
12/1/2011Aldridge - Aldridge Minerals Announces Results of Yenipazar ...
10/11/2011Encouraging Metallurgical Testwork at Fekola [Papillon Reso...
8/16/2011METALLURGY OF THE ROSE DEPOSIT LITHIUM RECOVERY OF 90.7% AT ...
5/25/2011Quest Reviews Rare Earth Element Mineralogy and Metallurgy o
5/18/2011METALLURGICAL TESTWORK INDICATES POTENTIAL FOR SINTER FINES ...
2/15/2011Preliminary Metallurgical Testwork Yields Excellent Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
Prev close Open
Low High
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  - -
Volume 1 month var.
-
Produces
Develops
Explores for
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.16+1.09%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.49-1.19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.81-1.50%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.91+0.93%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :