B2Gold Corp.

Published : September 19th, 2011

Gramalote Exploration and Prefeasibility Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Colombia | Peru |

 

News Release
B2Gold Corp. Announces Exploration and Prefeasibility Study Update on the
 Gramalote Gold Property in Colombia

Vancouver, September 19, 2011 - B2Gold Corp. (TSX: BTO, OTCQX: BGLPF) ("B2Gold" or the "Company"), is pleased to announce positive results from the drilling and prefeasibility work underway on the Gramalote Project in Colombia. The Gramalote property is a 51% AngloGold Ashanti Ltd.. ("AngloGold Ashanti") - 49% B2Gold joint venture, with AngloGold Ashanti as the project manager and is located 230 kilometres ("km") northwest of Bogota and 80 km northeast of Medellin in central Colombia.

Prefeasibility and exploration work recommenced at the Gramalote Project in the second half of 2010 with drilling for metallurgical samples, exploration drilling and preliminary engineering investigations with a total of 25,572.85 metres of drilling completed in 72 holes. B2Gold and AngloGold are funding a 2011 prefeasibility and exploration budget of US$37.6 million. This budget includes 29,000 m of diamond drilling to explore additional targets on the property, infill drilling of the Gramalote deposit, drilling for metallurgical test samples and conducting engineering and environmental studies. Each joint venture partner will fund their share of expenditures pro rata. A total of US$17.1 million has been spent since AngloGold became operator in September 2010. The two companies plan to continue exploration and conduct prefeasibility work in 2011 and into 2012, with a goal of completing a prefeasibility study by June 2012 and a final feasibility study by October 2013.

Highlights from the 2011 prefeasibility and exploration work include positive metallurgical test results showing in excess of 90% recovery, encouraging drill results from the outside targets and consistent grade from the infill drilling on the Gramalote Ridge resource.

A total of 8,995 metres in 23 holes have been completed in the infill drill program on Gramalote Ridge resource area since October 2010. Results to date of the infill drilling correlates well with the previous drilling on Gramalote Ridge and include up to 180.0 metres at 1.09 grams per tonne ("g/t") gold in hole GR-121, 142.0 metres at 1.49 g/t gold in hole GR-128 and 88.0 metres at 1.25 g/t gold in hole GR-116.  Infill drilling with two core rigs continues on Gramalote Ridge with the goal of increasing ounces in the resource and converting the resource from inferred into indicated. B2Gold completed and published in 2009 a National Instrument 43-101 compliant inferred mineral resource estimate for the Gramalote Ridge Zone of 74.375 million tonnes grading 1.00 g/t gold for a total of 2.39 million troy ounces of gold at a 0.5 g/t gold cutoff and within a US$1,000 per ounce gold optimised Whittle pit (see press release dated January 12, 2009). The Gramalote Ridge zone is a continuous zone extending 1,200 metres x 275 metres x 500 metres. Exploration drill results indicate the Gramalote Ridge Zone remains open.

Exploration drilling is in progress on five drill targets located within four km of the current Gramalote inferred mineral resource including Monjas West, Trinidad South, Monjas East, Limon and Topacio.. All of these targets have similar geological, alteration and mineralization characteristics to Gramalote Ridge.  Since October 2010 a total of 13,150.44 metres in 37 drill holes have been completed on the satellite targets.  Results to date clearly indicate the upside potential for more gold mineralization on the large Gramalote property.

Positive gold intersections have been returned in Monjas West. Monjas West is located two km west southwest along strike of Gramalote Ridge resource and drilling tested rock channel samples up to 27.0 metres at 2.2 g/t gold, 13.0 metres at 3.3 g/t gold and 12.0 metres at 2..6 g/t gold.  A total of 4,310.88 metres in 11 holes have been drilled at Monjas West with results up to 56.0 metres at 0.94 g/t gold (including 14.0 metres at 1.66 g/t gold and 12.0 metres at 1.45 g/t gold) in hole MW-05, 20.0 metres at 1.88 g/t gold in hole MW-03 and 22.0 metres at 0.93 g/t gold in hole MW-04. Assays are pending for holes 8 to 10. Drilling continues in Monjas West with one drill rig.

Drilling at Trinidad South located four km to the west of Gramalote Ridge is testing the continuity and extension of positive drill results obtained by B2Gold in 2008 at Trinidad that returned up to 223.0 metres at 1..00 g/t gold (TR-6) and 109.0 metres at 1.13 g/t gold (TR-2) as part of the 7,019 metres drill program that outlined similar mineralization to that of Gramalote Ridge over a 1,100 x 500 metres area.  To date 2,284.30 metres in seven holes have been completed with assays up to 12.0 metres at 0.73 g/t gold (TSE-01) and 18.0 metres at 0.80 g/t gold including 10.0 metres at 1.17 g/t gold ( TS-01). Assays are pending on holes TR-22 to TR-25. Drilling with one drill rig continues at Trinidad. Previous results at Trinidad along with the encouraging results from Monjas West demonstrate the good potential for additional gold resources on the Gramalote property.

Monjas East is located immediately west along strike from 2008 Gramalote Ridge drilling results of 34.1 metres at 1.32 g/t gold (GR-95) and 23.8 metres at 1.1 g/t gold (FZ-03).  To date a total of 4,008.42 metres in 14 holes have been drilled at Monjas East with results up to 14.0 metres at 1.14 g/t gold (ME-04), 12.0 metres at 1.01 g/t gold (ME-11) and 12.0 metres at 0.96 g/t gold (ME-03). Assays are pending for hole 13.

The Limon zone, located one km south of Gramalote Ridge, comprises an 850 x 300 metre gold soil geochemical anomaly with rock channel samples up to 6.0 metres at 4.9 g/t gold and 13.0 metres at 1.6 g/t gold. Results from the five holes totaling 1,870.19 metres drilled in Limon include 6.0 metres at 1.65 g/t gold (LM-01). Assays are pending for holes LM-03 to LM-05. Drilling continues at Limon with one drill rig. Two holes totaling 676.65 metres drilled at Topacio located three km west northwest of Gramalote Ridge did not return any significant results.

Selected drill intervals from infill and exploration drilling are tabulated below:

Zone

Hole #

 

From    (metres)

To       (metres)

Interval (metres)

Gold  (g/t)

Gold             (g/t) capped at 17 g/t

Silver (ppm)

Note

Gramalote Ridge

GR-116

 

166.0

254.0

88.0

1.25

1.01

0.94

Gramalote Ridge

GR-116

Including

178.0

184.0

6.0

11.03

7.50

3.49

Gramalote Ridge

GR-117

4.0

108.0

104.0

0.73

0.73

1.68

Gramalote Ridge

GR-117

Including

20.0

60.0

40.0

1.04

1.04

0.99

Gramalote Ridge

GR-117

258.0

282.0

24.0

1.20

1.20

1.21

Gramalote Ridge

GR-118

100.0

214.0

114.0

0.71

0.71

0.93

Gramalote Ridge

GR-119

102.0

148.0

46.0

1.37

1.37

1.28

Gramalote Ridge

GR-119

Including

110.0

128.0

18.0

2.52

2.52

2.11

Gramalote Ridge

GR-120

246.0

268.0

22.0

2.81

2.81

1.46

Gramalote Ridge

GR-121

68.0

248.0

180.0

1.09

1.09

0.94

Gramalote Ridge

GR-122

92.0

130.0

38.0

1.46

1.46

1.81

Gramalote Ridge

GR-123

64.0

116.0

52.0

1.18

1.18

Ag Pending

Gramalote Ridge

GR-123

and

196.0

246.0

50.0

1.41

1.41

Ag Pending

Gramalote Ridge

Gr-125

220.0

250.0

30.0

1.22

1.22

2.48

Gramalote Ridge

GR-125

268.0

296.0

28.0

1.46

1.46

1.39

Gramalote Ridge

GR-125

334.0

388.0

54.0

2.57

2.49

2.18

Gramalote Ridge

GR-126

10.0

120.0

110.0

0.86

0.86

1.47

Gramalote Ridge

GR-127

386.0

416.0

30.0

2.30

2.30

1.44

 Gramalote Ridge

GR-128

200.0

342.0

142.0

1.49

1.49

1.87

Monjas East

ME-03

18.0

30.0

12.0

0.96

0.96

4.46

Monjas East

ME-03

110.0

116.0

6.0

2.87

2.87

4.25

Monjas East

ME-04

148.0

162.0

14.0

1.14

1.14

1.80

Zone

Hole #

 

From    (metres)

To       (metres)

Interval (metres)

Gold  (g/t)

Gold             (g/t) capped at 17 g/t

Silver (ppm)

Note

Monjas East

ME-09

172.0

176.0

4.0

4.33

4.33

0.98

Monjas East

ME-11

230.0

242.0

12.0

1.01

1.01

0.37

Monjas East

ME-12

28.0

40.0

12.0

0.66

0.66

0.55

Monjas West

MW-02

32.0

64.0

32.0

0.88

0.88

0.86

Monjas West

MW-03

70.0

90.0

20.0

1.88

1.88

1.59

Monjas West

MW-04

8.0

14.0

6.0

1.28

1.28

0.40

Monjas West

MW-04

and

58.0

80.0

22.0

0.93

0.93

0.45

Monjas West

MW-05

212.0

268.0

56.0

0.94

0.94

20.57

Monjas West

MW-05

Including

212.0

226.0

14.0

1.66

1.66

81.71

Monjas West

MW-05

and

244.0

256.0

12.0

1.45

1.45

0.25

Limon

LM-02

154.0

156.0

2.0

5.57

5.57

3.67

Trinidad

TSE-01

48.0

60.0

12.0

0.73

0.73

1.40

Trinidad

TS-01

10.0

28.0

18.0

0.80

0.80

0.39

Trinidad

TS-01

Including

10.0

20.0

10.0

1.17

1.17

0.51

Trinidad

TS-01

42.0

68.0

26.0

0.61

0.61

0.90

Trinidad

TS-01

98.0

114.0

16.0

0.67

0.67

0.33

Trinidad

TR-21

12.0

34.0

22.0

0.47

0.47

35.67

Metallurgical testing of 17 tonnes of sample material obtained from new drilling of 2,811 metres (10 holes) as well as core rejects from 2008 Gramalote resource drilling is being conducted by SGS Lakefield Canada. Testing includes gravity, flotation, leaching, comminution and mineralogical evaluation. Initial metallurgical tests are very encouraging with clean ore and low lime and cyanide consumption amenable for leaching and gravity process as well as flotation with recoveries in excess of 90%. Metallurgical studies continue. Environmental base line and TSF/WSF (tailings storage facility / waste storage facility) engineering studies are in progress. In addition two geotechnical and condemnation holes totaling 615.60 metres have been drilled on the property.

The drilling program at the Gramalote property is reviewed and the results approved by Tom Garagan, B2Gold's QP under National Instrument 43-101. The Gramalote drill program utilizes extensive QA/QC (quality assurance and quality control) protocols for assaying and core sample handling that consist of the systematic insertion of blanks, standards and duplicates as well as using a secondary laboratory for regular check assaying.  Core samples are cut with a diamond saw with one-half of the core placed in sealed bags and shipped directly to ALS Chemex Labs in Bogota, Colombia for sample preparation with the pulps subsequently sent to ALS Chemex Labs in Lima, Peru for gold fire assay and ICP analyses.

On Behalf of B2GOLD CORP.

 

"Tom Garagan"
Senior Vice President of Exploration

 

gramalote exploratio

Data and Statistics for these countries : Colombia | Peru | All
Gold and Silver Prices for these countries : Colombia | Peru | All

B2Gold Corp.

PRODUCER
CODE : BTO.TO
ISIN : CA11777Q2099
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

B2Gold is a gold producing company based in Canada.

Its main assets in production are LIMON and LIBERTAD MINE in Nicaragua, its main assets in development are OROSI in Nicaragua and GRAMALOTE in Colombia and its main exploration properties are MOCOA and QUEBRADONA in Colombia, SAN PEDRO, CALIBRE, TREBOL, EL PAVON and MESTIZA-LA INDIA in Nicaragua, BELLAVISTA in Costa Rica and CEBOLLATI in Uruguay.

B2Gold is listed in Canada and in United States of America. Its market capitalisation is CA$ 3.4 billions as of today (US$ 2.5 billions, € 2.3 billions).

Its stock quote reached its lowest recent point on October 24, 2008 at CA$ 0.30, and its highest recent level on August 07, 2020 at CA$ 9.99.

B2Gold has 973 449 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of B2Gold Corp.
5/24/2019B2Gold said to be in talks to buy Zimbabwe gold project
3/27/2019B2Gold goes ahead with $50 million expansion of Fekola mine
12/24/2014One employee shot dead at B2Gold Masbate project in the Phil...
Annual reports of B2Gold Corp.
2008 Annual report
Financials of B2Gold Corp.
4/1/2011Record Fourth Quarter and 2010 Financial Results
1/29/2011Reports on Fourth Quarter 2010 Gold Production ...
1/29/2011Reports on Fourth Quarter 2010 Gold Production ...
1/29/2011Reports on Fourth Quarter 2010 Gold Production ...
Project news of B2Gold Corp.
10/14/2015B2Gold says to restart operations at Nicaragua mine
10/7/2015Policeman dies amid labor dispute at Nicaragua gold mine
2/18/2014(Calibre)Calibre and B2Gold Initiate Trenching Program on the Minneso...
10/7/2013(Calibre)Calibre and B2Gold Sampling Expands Mineralized Zone at the ...
9/10/2013(Calibre)Calibre Mining and B2Gold Sign Definitive Joint Venture Agre...
1/29/2013Completes Earn Into 51% and Approves Initial $2.0 Million Ph...
2/22/2012(Trebol)Radius & B2Gold Provide Trebol Update: Strong Gold-in-Soil A...
9/19/2011(Gramalote)Gramalote Exploration and Prefeasibility Update
9/16/2011(Cebollati)Cebollati Exploration Results
9/15/2011(Libertad Mine)La Libertad Exploration Results
1/22/2010(Orosi)Exploration Results Near the Orosi Mine, Nicaragua
1/19/2010(Kupol)Kupol West Drill Results Confirm the Presence of Multiple Go...
11/16/2009(Limon)The Limon Mine Labour Dispute Has Been Resolved and the Min...
1/26/2009(Gramalote)Announces an Updated Resource Calculation for the Gramalote ...
1/20/2009(Mocoa)Announces Positive Results from the Diamond Drill Program at...
1/12/2009(Gramalote)Announces Continued Positive Exploration Drill Results from ...
12/18/2008(Quebradona)Announces Additional Positive Exploration Drill Results from...
9/4/2008(Gramalote)Announces a New Gold Discovery at the Gramalote Property in ...
8/5/2008(Quebradona)Announces Continued Positive Exploration Drill Results . . .
7/3/2008(Mocoa)Announces Commencement of Diamond Drill Program at the Moco...
5/28/2008(Quebradona)Announces Positive Stage One Exploration Drill Results From ...
Corporate news of B2Gold Corp.
7/29/2016B2Gold Corp.: Second Quarter and First-Half 2016 Results/Con...
7/29/2016ASX Quarterly Report - June 2016
7/13/2016B2Gold Corp. Achieves Record Second Quarter and First-Half 2...
6/29/2016B2Gold 2016 Exploration Update: West Africa
6/15/2016B2Gold Corp. Announces Results of Vote for Election of Board...
6/9/2016B2Gold Corp.: Notice of 2016 Annual General Meeting - Confer...
5/12/2016B2Gold Corp. Reports First Quarter Results 2016
4/28/2016B2Gold Corp. Reports Quarterly Gold Production for First Qua...
1/22/2016B2Gold Corp. Announces Casualty at the Otjikoto Mine
1/20/2016B2Gold 2015 Exploration Update: High Grade Step Out and Infi...
1/19/2016B2Gold Corp. Announces Filing of Final Base Shelf Prospectus
1/19/2016B2Gold Corp. Reports Record Fourth Quarter and Full-Year 201...
1/14/2016B2Gold Corp. Reports Record Fourth Quarter and Full-Year 201...
12/14/2015B2Gold Corp. Announces Filing of Preliminary Base Shelf Pros...
12/14/2015Ground-Breaking of B2Gold Corp.'s Fekola Project, Mali
10/21/2015Wednesday, October 21, 2015B2Gold Corp. Achieves Record Thir...
10/21/2015B2Gold Corp. Achieves Record Third Quarter and Year-to-Date ...
10/19/2015Edited Transcript of BTO.TO earnings conference call or pres...
10/13/2015Nicaraguan government denies permit to B2Gold mining project
10/7/2015Wednesday, October 7, 2015B2Gold Corp.: El Limon Mine Update...
10/5/2015Monday, October 5, 2015B2Gold Corp.: El Limon Mine Update do...
10/5/2015B2Gold Corp.: El Limon Mine Update
9/11/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
8/13/2015B2Gold reports 2Q loss
8/13/2015Thursday, August 13, 2015B2Gold Reports Second Quarter 2015 ...
8/13/2015B2Gold Reports Second Quarter 2015 Results
8/11/2015B2Gold Corp.: Second Quarter Results Conference Call
7/25/2015Saturday, July 25, 2015B2Gold Announces Filing of Technical ...
7/24/2015B2Gold Announces Filing of Technical Report on the Fekola Pr...
7/23/2015Thursday, July 23, 2015B2Gold Corp. Achieves Record Second Q...
7/23/2015B2Gold Corp. Achieves Record Second Quarter and First-Half 2...
7/17/2015Friday, July 17, 2015B2Gold Corp. Announces Results of Vote ...
7/17/2015B2Gold Corp. Announces Results of Vote for Election of Board...
4/15/2015Wednesday, April 15, 2015B2Gold Corp. Reports Record Quarter...
4/15/2015B2Gold Corp. Reports Record Quarterly Gold Production for Fi...
4/15/2015Reports Record Quarterly Gold Production for First Quarter 2...
3/16/2015CANADA STOCKS-TSX set to open higher
3/13/2015Friday, March 13, 2015B2Gold Corp. Achieved Record 2014 Quar...
3/13/2015B2Gold Corp. Achieved Record 2014 Quarterly/Full Year Produc...
3/10/2015Tuesday, March 10, 2015B2Gold Corp. Announces Commercial Gol...
3/10/2015B2Gold Corp. Announces Commercial Gold Production Ahead of S...
2/19/2015B2Gold Corp.: Fourth Quarter and Year End 2014 Results Confe...
1/21/2015B2Gold Corp. Achieves Record 2014 Fourth Quarter and Full-Ye...
1/20/2015B2Gold Announces Updated Higher Grade Gold Resource at Wolfs...
12/23/2014Tuesday, December 23, 2014Fourth Quarter Update at B2Gold Co...
12/23/2014Fourth Quarter Update at B2Gold Corp.'s Masbate Gold Mine
12/11/2014Thursday, December 11, 2014B2Gold Announces First Gold Pour ...
12/11/2014B2Gold Announces First Gold Pour at Otjikoto Ahead of Schedu...
12/9/2014Tuesday, December 9, 2014B2Gold Corp.: Masbate Mine Operatin...
12/9/2014B2Gold Corp.: Masbate Mine Operating Normally Following Typh...
11/14/2014B2Gold Reports 2014 Third Quarter Operational and Financial ...
10/28/2014B2Gold Reports 2014 Third Quarter Gold Production and Revenu...
10/24/2014Friday, October 24, 2014B2Gold Corp.: Third Quarter 2014 Res...
10/24/2014B2Gold Corp.: Third Quarter 2014 Results Conference Call
10/3/2014B2Gold Corp. and Papillon Resources Limited Complete Merger
9/22/2014B2Gold Corp.: Scheme of Arrangement Receives Final Court App...
9/12/2014B2Gold Corp. Shareholders Overwhelmingly Approve the Merger ...
8/15/2012Latest Research - Delivering another solid quarter
4/26/2012(Calibre)Calibre and B2Gold Advance the Minnesota Gold-Copper Project...
4/9/2012(Trebol)Joint News Release B2Gold Corp. Acquires Trebol and Pavon Pr...
5/4/2011Reports First Quarter 2011 Gold Production, Provides Explora...
7/26/2010Sells Interest in Kupol East and West Licenses in Russia to ...
6/21/2010Additional Positive Exploration Results ...
6/15/2010Annual General and Special Meeting Conference Call and Webca...
5/11/2010Corporate Update
8/5/2009Announces Exercise of Over-Allotment Option
7/22/2009Completes $25 Million Common Share Offering
5/20/2009May 19-09
2/9/2009Feb 9
1/27/2009Proposes a Superior Business Combination to Central Sun
7/16/2008Issue of Shares
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (BTO.TO)NYSE (BTG)
3.52+1.44%2.58+1.98%
TORONTO
CA$ 3.52
04/25 17:00 0.050
1.44%
Prev close Open
3.47 3.46
Low High
3.44 3.55
Year l/h YTD var.
3.19 -  4.17 -15.59%
52 week l/h 52 week var.
3.19 -  5.69 -35.06%
Volume 1 month var.
2,754,973 3.23%
24hGold TrendPower© : 40
Produces Gold
Develops Gold
Explores for Copper - Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-18.33%
2023-10.40%5.873.97
2022-2.63%6.393.84
2021-30.72%7.674.21
202040.91%9.993.12
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :