Hemisphere Energy Corp

Published : November 03rd, 2015

Hemisphere Energy Provides Operational and Corporate Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Growth | Market | Oil | Recovery | Water |

Hemisphere Energy Provides Operational and Corporate Update

Vancouver, British Columbia, November 3, 2015 - Hemisphere Energy Corporation ('Hemisphere' or the 'Company') (TSX-V: HME) is pleased to provide an update on its recent field operations and corporate activities.

Atlee Buffalo, Alberta

Hemisphere has received the necessary approvals and commenced injection in all three of its planned waterflood pilots in Atlee Buffalo. The Company expects to see significant production and reserve additions over the next number of years through enhanced recovery from its Atlee Buffalo assets while spending minimal capital over the next year as pressure maintenance is achieved. Secondary recovery by waterflood is commonly used in oil pools, and several analogue pools under waterflood in the area have seen recoveries of 12-35% to-date, with all pools still producing.

Two of Hemisphere's waterflood pilots are within the Atlee Buffalo Upper Mannville F pool, which has a current recovery factor of only 5% of its estimated 23 MMbbl of original oil in place. Initial pool development in the 1970s and 1980s focused on vertical wells and primary recovery methods. Pressure drawdown at the vertical wellbores led to severe sand production and most vertical wells were shut-in prematurely due to expensive operating costs. Prior to the Company acquiring this pool in late 2013, it was producing only 40 boe/d. Applying a different development approach in 2014, Hemisphere drilled, tied-in, and placed on production 10 horizontal wells to test pool pressure, deliverability, and completion techniques. Production from the pool in 2015 peaked at over 650 boe/d with operating costs of less than $10.00/boe, proving excellent reservoir deliverability and giving estimates of potential waterflood rates. New wells have been oriented to maximize enhanced oil recovery using horizontal water injectors in an alternating pattern with horizontal producers. Hemisphere plans to convert up to two additional wells to injectors in this pool by mid-2016, and geological modelling suggests an overall pool recovery factor of 11% for the current wells. Hemisphere estimates recovery factors of up to 20-25% with subsequent development drilling.

The Company's third waterflood pilot commenced in late October in the Upper Mannville G pool, which has a current recovery factor of only 4% of its estimated 35 MMbbl of original oil in place. This pool was developed much like the Upper Mannville F pool in the 1980s, with vertical wells mostly shut-in by the early 2000s. Only one horizontal well has been drilled into this pool thus far, which Hemisphere purchased in mid-2014 when it consolidated its land position in the pool from the adjacent operator. This well is now being used as an injector in order to re-energize the reservoir prior to further development. This pool currently has no production and less than 20,000 bbl of proved non-producing reserves booked. Substantial upside exists for both Proved and Probable bookings as the field is developed in a comparable pattern to the F pool.

Additionally, the Company recently purchased 2.5 sections of key land in Atlee Buffalo at a Crown land sale for a total cost of approximately $60,000, bringing its land ownership to 100% over both pools. Hemisphere now controls 11 sections of land in the area and can shift its focus at the Upper Mannville G pool from land consolidation to active development drilling, as it has already done in the Upper Mannville F pool.

Jenner, Alberta

In the Jenner area, Hemisphere continues to invest in low cost projects to increase production, reserves, and overall value with focus on optimizing existing infrastructure and wells. In late August, the Company optimized an injection pump to increase its capacity by 30%. In September, Hemisphere took advantage of the lower oil prices and higher differential to do a turnaround and internally coat one of its vessels to extend its life. In late October, the Company began construction of a new pipeline to increase water disposal capacity within an existing disposal well.

Corporate

During 2015, the Company has successfully reduced year-over-year costs and is forecasting reductions in operating costs per boe of 27%, and general and administrative expenses per boe of 33%. Hemisphere is committed to bringing long-term value to its shareholders during the current market environment by spending minimal capital on strategic projects and continuing to reduce all other costs where possible. The Company expects the majority of its reserve additions and growth over the next year to come from existing wells under waterflood performance, as well as upward technical revisions from better than booked performance in Jenner.

Hemisphere will carefully evaluate all future capital investments based on payouts, rates of return, and capital efficiency metrics. The Company has a large inventory of undrilled development locations in both Jenner and Atlee Buffalo, making it ready for accelerated and substantial organic growth once the oil market turns.

About Hemisphere Energy Corporation

Hemisphere Energy Corporation is a producing oil and gas company focused on developing conventional oil assets with low risk drilling opportunities. Hemisphere plans continual growth in production, reserves and cash flow by drilling existing projects and executing strategic acquisitions. Hemisphere trades on the TSX Venture Exchange as a Tier 1 issuer under the symbol 'HME'.

For further information, please contact:

Don Simmons, President & Chief Executive Officer
Telephone: (604) 685-9255
Email: [email protected]

Scott Koyich, Investor Relations
Telephone: (403) 619-2200
Email: [email protected]

Website: www.hemisphereenergy.ca

Forward-looking Statements

This news release contains 'forward-looking statements' that are based on Hemisphere's current expectations, estimates, forecasts and projections. These forward-looking statements include statements regarding Hemisphere's outlook for our future operations, plans and timing for the commencement or advancement of exploration and development activities on our properties, and other expectations, intention and plans that are not historical fact. The words 'estimates', 'projects', 'expects', 'intends', 'believes', 'plans', or their negatives or other comparable words and phrases are intended to identify forward-looking statements. Such forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking statements. Many of these factors are beyond the control of Hemisphere. Consequently, all forward-looking statements made in this news release are qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by Hemisphere will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking statements. Hemisphere disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

A barrel of oil equivalent ('boe') may be misleading, particularly if used in isolation. A boe conversion ratio of 6 Mcf:1 Bbl is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

Original Oil In Place

Original Oil In Place ('OOIP') is equivalent to Discovered Petroleum Initially-In-Place (DPIIP). DPIIP, as defined in the Canadian Oil and Gas Evaluations Handbook (COGEH), is that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations prior to production. The recoverable portion of DPIIP includes production, reserves and contingent resources; the remainder is unrecoverable. OOIP/DPIIP estimates are based on current accepted technology and prepared by Hemisphere's qualified reservoir engineers and geologists.

Definitions and abbreviations

bbl

barrel

boe

barrel of oil equivalent

boe/d

barrel of oil equivalent per day

MMbbl

millions of barrels

Mbbl

thousands of barrels

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Read the rest of the article at www.noodls.com

Hemisphere Energy Corp

CODE : HME.V
ISIN : CA4236301020
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Hemisphere Energy is a silver and gold exploration company based in Canada.

Hemisphere Energy produces silver, gold, in Canada, and holds various exploration projects in Canada.

Its main asset in production is JENNER in Canada and its main exploration properties are ELK 1 (DESTAFFANY MINE), FALCON LAKE TANTALUM and NORTHSTAR-KAZA in Canada.

Hemisphere Energy is listed in Canada and in United States of America. Its market capitalisation is CA$ 149.2 millions as of today (US$ 108.9 millions, € 101.7 millions).

Its stock quote reached its highest recent level on March 25, 2005 at CA$ 9.30, and its lowest recent point on December 24, 2008 at CA$ 0.04.

Hemisphere Energy has 85 750 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Hemisphere Energy Corp
1/26/2013Closes Final Tranche of Private Placement
10/27/2011Announces Flow-Through Private Placement
8/30/2011Receives Proceeds from Warrant Exercise
5/4/2011Closes Private Placements
12/1/2010Announces Flow-Through Private Placement
12/23/2009Closes Private Placement and Provides Sylvan Lake Operationa...
12/14/2009Announces Private Placement and Provides Operational Update
12/2/2009Closes First Tranche of Private Placement and Attains Albert...
11/4/2009Announces Private Placement
9/28/2009Announces Intention to Amend Terms of Share Purchase Warrant...
12/15/2008Closes First Tranche of Private Placement
Nominations of Hemisphere Energy Corp
5/27/2011Announces Appointment of Vice-President of Engineering and G...
10/11/2007 Appoints Vice President Exploration
Financials of Hemisphere Energy Corp
11/19/2013Announces Third Quarter 2013 Results
8/27/2013Announces Second Quarter 2013 Results
5/28/2013Announces First Quarter 2013 Results
1/17/2013Announces Positive Third Quarter Results and Operations Upda...
10/30/2012Announces Second Quarter Financial and Operating Results
1/31/2012Reports Third Quarter 2011 Results
Project news of Hemisphere Energy Corp
1/28/2014Completes Initial 2014 Drilling Program
1/6/2014Commences Winter Drilling Program
4/25/2013Files Amended and Restated Business Acquisition Report
7/10/2012(Jenner)Commences Summer Drilling Program in Jenner
4/18/2012(Jenner)Announces 206 BOPD Production Rate from Horizontal Well on J...
3/13/2012Completes Drilling and Commences Completion and Tie-in of We...
1/25/2012(Jenner)Announces New Farm-in on Jenner Property
1/10/2012Announces 207 BOPD Production Rate From Third Horizontal Wel...
10/24/2011(Jenner)Commences Drilling Program in Jenner
7/21/2011(Jenner)Announces Initial Production Rate From First Horizontal Well...
7/5/2011(Jenner)Proceeds With Tie-in of First Horizontal Well in Jenner Prop...
6/29/2011(Jenner)Completes Drilling and Commences Completion of First Horizon...
6/28/2011Releases Reserve Reports
6/14/2011(Jenner)Commences Drilling on Jenner Property in Southeast Alberta
6/8/2011Announces Trutch Property Acquisition
4/1/2011(Jenner)Closes Jenner Oil Property Acquisition
3/16/2011(Jenner)Acquires Jenner Oil Property
2/28/2011(Wainwright)Announces Closing of Wainwright Property Acquisition
7/27/2010Closes Acquisition of Natura
Corporate news of Hemisphere Energy Corp
7/12/2016Hemisphere Energy Announces Closing of its Private Placement...
6/29/2016Hemisphere Energy Announces Closing of the First Tranche of ...
6/13/2016Hemisphere Energy Announces Results of Annual General and Sp...
6/8/2016Hemisphere Energy Announces Non-Brokered Private Placement o...
5/30/2016Hemisphere Energy Announces Q1 2016 Financial & Operating Re...
4/28/2016Hemisphere Energy Announces Year-End 2015 Financial and Oper...
11/3/2015Hemisphere Energy Provides Operational and Corporate Update
9/18/2015Hemisphere Energy Announces Change in Auditor
9/17/2015Hemisphere Energy Announces Change in Auditor
7/28/2015Hemisphere Energy Renews $15.0 million Credit Facility
4/22/2015Hemisphere Energy Announces Year-End 2014 Financial and Oper...
4/21/2015Hemisphere Energy Announces Plan to Restate Audited Financia...
3/11/2015Hemisphere Energy Announces a 61% Increase in 2014 Reserves
3/11/2015Hemisphere Energy Announces a 61% Increase in 2014 Reserves
1/29/2015Hemisphere Energy Grants Incentive Stock Options
1/29/2015Hemisphere Energy Grants Incentive Stock Options
1/28/2015Hemisphere Energy Exceeds 1,000 boe/d and Provides Operation...
12/9/2014Hemisphere Energy Receives 40% Increase to Credit Facility
11/18/2014Hemisphere Energy Announces Q3 2014 Financial and Operating ...
10/28/2014Hemisphere Energy Provides Operations and Production Update
10/8/2014Hemisphere Energy Appoints New Director
9/29/2014Hemisphere Energy Grants Incentive Stock Options
9/22/2014Hemisphere Energy Achieves Record Production and Commences F...
9/9/2014Hemisphere Energy Appoints Chief Operating Officer and Vice ...
8/27/2014Hemisphere Energy Announces Q2 2014 Financial and Operating ...
8/26/2014Hemisphere Energy Announces Results of First Two Wells From ...
7/23/2014Hemisphere Energy Closes Atlee Buffalo Acquisition and Compl...
6/27/2014Hemisphere Energy Acquires Additional Land in Atlee Buffalo
6/27/2014Hemisphere Energy Acquires Additional Land in Atlee Buffalo
6/13/2014Hemisphere Energy Corporation - Archive Webcast of June 11, ...
6/9/2014Hemisphere Energy Announces Results of Annual General and Sp...
6/5/2014Hemisphere Energy Kicks Off 5 Well Summer Drill Program
5/28/2014Hemisphere Energy Announces Increased 2014 Drilling Plans
4/1/2014Hemisphere Energy Announces 64% Increase in Proved Plus Prob...
2/20/2014Announces 80 BOPD From First Atlee Buffalo Well
11/18/2013Closes Atlee Buffalo Acquisition and Reports Record Producti...
10/16/2013to Acquire Oil Assets in Southeast Alberta
10/15/2013Provides Operational Update
9/9/2013(Jenner)Tests 357 Boe/d Well in Jenner
6/11/2013Announces Results of Annual General Meeting
6/5/2013to Present at EPAC Oil & Gas Investor Showcase
5/14/2013Graduates to Tier 1 of the TSX Venture Exchange
4/24/2013Announces Increased Credit Facility
4/11/2013Announces Substantial Growth in 2012
4/9/2013(Jenner)Tests 400 boe/d Well in Jenner
3/21/2013Announces 90% Increase to Proved Reserves in 2012
11/14/2012Drills Two Successful Oil Wells
9/5/2012Drills Two Successful Oil Wells Adding 197 bopd
8/20/2012Announces Results of Annual General and Special Meeting of
7/25/2012Announces FirstQuarter Financial and Operating Results
6/26/2012Announces Year-End Financial and Reserves Results
6/19/2012Enters Into Seismic Option Agreement and Provides Operationa...
3/5/2012(Jenner)Spuds Farm-in Commitment Well at Jenner
1/30/2012(Jenner)Closes Brokered Private Placement and Strategic Jenner Oil P...
12/8/2011(Jenner)Announces Jenner Oil Property Acquisition and Brokered Priva...
12/6/2011(Jenner)Spuds Horizontal Oil Well at Jenner
9/7/2011Announces Results of Annual General Meeting
3/31/2011Announces $1,540,000 in Private Placements
11/4/2008Announces Trutch Winter Drilling Program
7/7/2008Annual Financial & Reserve Results on SEDAR
12/11/2007FIRST GAS WELL OF THE SEASON
11/15/2007FIRST GAS WELL OF THE SEASON LICENSED
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (HME.V)Other OTC (HMENF)
1.74+0.00%1.27+0.79%
TSX-V
CA$ 1.74
04/24 16:59 -
0%
Prev close Open
1.74 1.74
Low High
1.71 1.75
Year l/h YTD var.
1.25 -  1.74 38.10%
52 week l/h 52 week var.
1.19 -  1.74 31.82%
Volume 1 month var.
55,485 3.57%
24hGold TrendPower© : 34
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202431.82%
20230.76%1.471.20
202233.67%1.980.94
2021390.00%1.030.20
2020-4.76%0.240.06
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :