Heron Resources Ltd

Published : January 28th, 2016

Heron Resources December 2015 Quarterly Report

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Heron Resources December 2015 Quarterly Report

Microsoft Word - Heron Quarterly Dec15 - final draft


Heron Resources Limited

Quarterly Report

December 2015

Level 1, 37 Ord Street, West Perth WA 6005 [email protected]

+61 8 6500 9200

ABN: 30 068 263 098


27 January 2016

HIGHLIGHTS

Woodlawn Zinc-Copper Project


  • A$11M Feasibility Study (FS) for Woodlawn Zinc-Copper Project progressing to plan, key components include:

    • Feasibility Study drilling programme successfully completed delivering numerous high grade results

    • Mineral Resource estimation is well advanced with preliminary block models provided to SRK engineers for commencement of mine planning

    • Recent metallurgical test work results on underground and tailings samples are encouraging and have confirmed Preliminary Economic Assessment (PEA) concentrate recovery and grade assumptions

    • Project financing discussions continue with prospective senior lenders and other potential funding sources

    • Independent Technical Experts appointed and first pass review completed, recommendations have been incorporated into FS scope

  • Significant intercepts received from Kate Lens drilling:

    22m @ 13.0% ZnEq1 from 378m (3.7% Cu, 0.8g/t Au, 16.8g/t Ag), WNDD0071 (Kate Copper)

    6.5m @ 7.8% ZnEq from 405m (4.5% Zn, 0.6% Cu, 0.9% Pb, 0.5g/t Au, 12.5g/t Ag), WNDD0071

    9.1m @ 31.6% ZnEq from 370m (18.3% Zn, 2.3% Cu, 4.6% Pb, 1.1g/t Au, 53.7g/t Ag), WNDD0073

    14.0m @ 5.1% ZnEq from 294m (1.4% Cu, 0.4g/t Au, 5.1g/t Ag), WNDD0075 (Kate Copper)

    18.9m @ 9.3% ZnEq from 351m (2.6% Cu, 0.7g/t Au, 8.3g/t Ag), WNDD0084 (Kate Copper)

  • Significant intercepts received from shallow E, G and H Lenses drilling:

    2.8m @ 16.8% ZnEq from 79m (9.7% Zn, 0.2% Cu, 4.7% Pb, 1.5g/t Au, 47.2g/t Ag), WNDD0076 (E)

    4.6m @ 47.2% ZnEq from 55m (24.4% Zn,1.1% Cu, 13.6% Pb, 1.4g/t Au, 241g/t Ag), WNDD0078 (E)

    3.0m @ 58.7% ZnEq from 64m (28.5% Zn, 2.1% Cu, 13.1% Pb, 2.2g/t Au, 372g/t Ag), WNDD0078 (E)

    1.3m @ 33% ZnEq from 283m (8.8% Zn, 4.8% Cu, 3.2% Pb, 1.8g/t Au, 168g/t Ag), WNDD0074 (G)

    1.8m @ 25.0% ZnEq from 106m (1.5% Zn, 4.4% Cu, 3.7% Pb, 2.7g/t Au, 145g/t Ag), WNDD0081 (H)

    2.9m @ 35.4% ZnEq from 96m (12.7% Zn, 2.6% Cu, 8.1% Pb, 2.5g/t Au, 202g/t Ag), WNDD0088 (G)

    1.8m @ 32.3% ZnEq from 116m (6.4% Zn, 3.5% Cu, 3.5% Pb, 2.2g/t Au, 341 g/t Ag), WNDD0089 (G)

    1.8m @ 32.0% ZnEq from 80m (13.8% Zn, 1.3% Cu, 8.6% Pb, 0.8g/t Au, 216g/t Ag), WNDD0093 (E)

    2.5m @ 45.3% ZnEq from 93m (7.1% Cu, 4.5g/t Au, 626g/t Ag) WNDD0103 (H)

  • Significant intercepts received from Lisa Lens:

    12.4m @ 20.0% ZnEq from 222m (12% Zn, 1.6% Cu, 2.0% Pb, 0.7g/t Au, 23g/t Ag), WNDD0104

  • Veolia agreements extended with discussions targeting new agreements to incorporate Heron's revised operational plans


    Corporate

  • Cash A$23.8M and listed investments A$3.1M at 31 December 2015

  • Accepting off market bid for Golden Cross Resources, expected to monetise the Company's investment at $0.0825 per share (A$1.6M)

  • Commodity forecasters confirm zinc's strong supply / demand fundamentals for 2016 - 2020


1 Zn equivalents (ZnEq) in this release are based on the formula: Zn (%) + 0.81 x Pb(%) + 3.12 x Cu(%) + 0.86 x Au(g/t) + 0.03 x Ag(g/t). All these metals are expected to be recoverable. Refer to the announcement of 22 April 2015 entitled "Preliminary Economic Assessment Delivers Strong Business Case for the Woodlawn Zinc-Copper Project" for further information.


Heron Resources ("Heron" or the "Company") is pleased to provide its report for the December 2015 quarter. During this reporting period the Company has principally focused on advancing the Woodlawn Project through the progression of the Woodlawn Feasibility Study.


WOODLAWN ZINC-COPPER PROJECT

Heron holds a direct 100% ownership of the mineral rights at the Woodlawn Mine site situated 40km south of Goulburn and 250km south-west of Sydney, in southern NSW, Australia (Figure 1). It is Heron's aim to create a profitable, long life and low cost mineral processing operation at Woodlawn that produces base metal concentrates. Heron also holds a portfolio of advanced stage exploration tenements adjacent to the Woodlawn site covering the prospective felsic volcanic units that host the Woodlawn Volcanogenic Massive Sulphide (VMS) deposit.

Drilling results during the quarter have been very encouraging, with an expansion to the Kate Lens in addition to several high grade intercepts being returned from the shallow positions in the E, G and H Lenses. The Lisa Lens also returned a wide, high grade intercept providing further confidence in this new lens discovery.

Figure 1 Woodlawn Project Location Plan



Feasibility Study Progress


Excellent progress has been made on the Woodlawn Feasibility Study (FS) during the quarter. Work continues within a budget of approximately $11M that is fully funded from the Company's existing cash reserves. The FS remains on schedule for completion within the second quarter of 2016.

Key items of FS progress include:

  • Phase II drilling program was successfully completed - refer to the following section for further details.

  • Mineral Resource estimation is well advanced with preliminary block models provided to SRK engineers for commencement of mine planning.

  • Geotechnical and sterilisation drilling was completed during the quarter. Geotechnical work by Beck Engineering now continues on mine design criteria, deformation modelling, ground support, box-cut and portal access designs. This work will be incorporated into the mine design by SRK as will the outcomes of the structural review of the two portal plugs within the Veolia open cut.

  • An updated JORC 2012 and NI43-101 Resource statement and an associated mine plan for the tailings resource was completed during the quarter to be incorporated into the FS and the estimation of Mineral Reserves.

  • The Water Management Plan was well advanced with plans completed to dewater the existing underground workings. Discussions with Veolia were also advanced regarding details of shared site access to the pit for initial mine dewatering.

  • Metallurgical test work to confirm flowsheet design has continued during the quarter. Testing of tailings, underground and blended (underground and tailings) has progressed. Metallurgical test work results received to date are encouraging and have confirmed PEA assumptions.

  • GR Engineering Services is ready to commence work for the FS process design next quarter with an initial review of the recent metallurgical work.

  • The design of the new tailings storage facility (TSF4) was completed during the quarter by Coffey Mining. A cost estimate will be prepared for inclusion in the FS.

  • A concentrate off-take strategy has been delivered and follow-on work is continuing for the FS. This strategy contemplates off-take contracts for the different concentrates, logistics options, credit and revenue management and potential interaction with project financing options.

  • A quarterly community consultation committee (CCC) meeting was held on the 16 December 2015 with representatives present from the local community, the Goulburn Mulwaree Council and Veolia.

  • Work to finalise statutory requirements has continued with a draft Project Modification Environmental Assessment report being submitted to the Department of Planning & Environment for initial assessment. This report will be finalised and formally submitted in the first quarter. Both the Mine Operations Plan (MOP) and the Annual Environmental Management Report (AEMR) were formally accepted by the Department of Industry, Division of Resources and Energy during the quarter.

  • Behre Dolbear Australia Pty Ltd (BDA) were appointed Independent Technical Experts and completed an initial high level review of the project. Feedback from this review has been incorporated into the work scope for the FS.


Phase II Drilling Program

The Phase II drilling program at Woodlawn commenced in April 2015 was completed on 14 November 2015 with 84 holes having been drilled for a total of 18,653 metres, reflecting on-time and on-budget progress. Advance for the December quarter was 25 Diamond drill holes for 3,994 metres.

The Phase II program was designed to test shallow mineralised positions which have potential to provide readily accessible production in the early part of the future underground operation, as well as to undertake the in-fill drilling required to upgrade parts of the underground Mineral Resource to Indicated status and close off mineralised positions.


The Phase II program has confirmed the up and down plunge extensions to the Kate Lens through several massive sulphide intercepts (refer to Figures 2). Significant intercepts returned include:

Kate Lens significant intercepts:

  • 22m @ 13.0% ZnEq from 378m (3.7% Cu, 0.8g/t Au, 16.8g/t Ag), WNDD0071 (Kate Copper)

    o 6.5m @ 7.8% ZnEq from 405m (4.5% Zn, 0.6% Cu, 0.9% Pb, 0.5g/t Au, 12.5g/t Ag), WNDD0071

    o 9.1m @ 31.6% ZnEq from 370m (18.3% Zn, 2.3% Cu, 4.6% Pb, 1.1g/t Au, 53.7g/t Ag), WNDD0073

  • 14.0m @ 5.1% ZnEq from 294m (1.4% Cu, 0.4g/t Au, 5.1g/t Ag), WNDD0075 (Kate Copper)

  • 18.9m @ 9.3% ZnEq from 351m (2.6% Cu, 0.7g/t Au, 8.3g/t Ag), WNDD0084 (Kate Copper)

E, G and H Lens significant intercepts:

High grade assays albeit over narrow widths were returned through the drill-out of the shallow E, G and H Lens positions (Figure 3):

o 2.8m @ 16.8% ZnEq from 79m (9.7% Zn, 0.2% Cu, 4.7% Pb, 1.5g/t Au, 47.2g/t Ag), WNDD0076 (E) o 8.2m @ 6.6% ZnEq from 127m (3.2% Zn, 0.8% Cu, 0.3% Pb, 0.3g/t Au, 14.5g/t Ag), WNDD0077 (E) o 3.0m @ 19.7% ZnEq from 22m (10.8% Zn, 0.5% Cu, 3.9% Pb, 1.6g/t Au, 96g/t Ag), WNDD0078 (E) o 4.6m @ 47.2% ZnEq from 55m (24.4% Zn,1.1% Cu, 13.6% Pb, 1.4g/t Au, 241g/t Ag), WNDD0078 (E)

o 3.0m @ 58.7% ZnEq from 64m (28.5% Zn, 2.1% Cu, 13.1% Pb, 2.2g/t Au, 372g/t Ag), WNDD0078 (E)

o 1.3m @ 33% ZnEq from 283m (8.8% Zn, 4.8% Cu, 3.2% Pb, 1.8g/t Au, 168g/t Ag), WNDD0074 (G) o 1.8m @ 25.0% ZnEq from 106m (1.5% Zn, 4.4% Cu, 3.7% Pb, 2.7g/t Au, 145g/t Ag), WNDD0081 (H) o 3.8m @ 11.8% ZnEq from 80m (6.4% Zn, 1.0% Cu, 1.7% Pb, 0.3g/t, 17.7g/t Ag), WNDD0084 (E)

o 2.9m @ 35.4% ZnEq from 96m (12.7% Zn, 2.6% Cu, 8.1% Pb, 2.5g/t Au, 202g/t Ag), WNDD0088 (G) o 1.8m @ 32.3% ZnEq from 116m (6.4% Zn, 3.5% Cu, 3.5% Pb, 2.2g/t Au, 341 g/t Ag), WNDD0089 (G) o 6.1m @ 12.2% ZnEq from 50m (6.9% Zn, 0.5% Cu, 2.2% Pb, 1.0g/t Au, 36g/t Ag) , WNDD0093 (E)

o 1.8m @ 32.0% ZnEq from 80m (13.8% Zn, 1.3% Cu, 8.6% Pb, 0.8g/t Au, 216g/t Ag), WNDD0093 (E)

o 9.3m @ 18.7%ZnEq from 41m (8.2% Zn, 0.7% Cu, 3.2% Pb, 1.6g/t Au, 144g/t Ag), WNDD0098 (G)

o 2.5m @ 45.3% ZnEq from 93m (7.1% Cu, 4.5g/t Au, 626g/t Ag) WNDD0103 (H)

These results show the exceptional grades of these shallow lenses and present potential early stage mine production sources.


Lisa Lens significant intercept:


The final hole of the Phase II program targeted the up-dip position of new Lisa Lens and returned a very encouraging result:

o 12.4m @ 20.0% ZnEq from 222m (12% Zn, 1.6% Cu, 2.0% Pb, 0.7g/t Au, 23g/t Ag), WNDD0104

Including 9.5m @ 26.0% ZnEq from 223m (16% Zn, 1.7% Cu, 2.7% Pb, 0.68g/t Au, 28g/t Ag)

This result is illustrated in Figure 3 and provides for a further shallow high grade position that could be mined in the early years of the operation.

Conceptual Targets - DHEM Programs

A review of the downhole electromagnetic (DHEM) models for the Kate Lens extension position revealed the presence of a significant conductor with dimensions in order of 150m long and 200m deep. The conductance of the modelled plate, at 12- 35 siemans (S), is less than that for the Kate Lens (50-80S), and this conductive body is off-set into the stratigraphic footwall by about 60m relative to the Kate Lens. A single drill hole (WNDD0091W1) was drilled into the middle, southern part of this plate and intersected some 16m of disseminated, banded and semi-massive pyrite and minor chalcopyrite (grading 16m @ 0.12% Cu from 684m depth) which was associated with moderate to strong silica, chlorite and sericite alteration, indicating proximity to potentially significant mineralisation.

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | Georgia | All
Gold and Silver Prices for these countries : Australia | Georgia | All

Heron Resources Ltd

EXPLORATION STAGE
CODE : HRR.AX
ISIN : AU000000HRR6
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Heron Res. is a nickel and cobalt development stage company based in Australia.

Heron Res. holds various exploration projects in Australia.

Its main exploration properties are BIG FOUR HERON - GOONGARRIE, BIG FOUR - GOONGARRIE, SIBERIA NORTH, BULONG - MAIN, BULONG - EAST, HAMPTON (KNP PROJECT), BIG FOUR PLACER - GOONGARRIE, GOONGARRIE HILL - GOONGARRIE, GOONGARRIE SOUTH - GOONGARRIE, HIGHWAY - GOONGARRIE, SCOTIA - GOONGARRIE, JUMP-UP DAM, LAVERTON NICKEL and MT ZEPHYR in Australia.

Heron Res. is listed in Australia. Its market capitalisation is AU$ 18.7 millions as of today (US$ 13.5 millions, € 12.6 millions).

Its stock quote reached its highest recent level on April 13, 2007 at AU$ 1.47, and its lowest recent point on April 03, 2020 at AU$ 0.02.

Heron Res. has 415 010 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financials of Heron Resources Ltd
11/1/2016Heron Resources September 2016 Quarterly Report
Project news of Heron Resources Ltd
11/25/2015Woodlawn Phase II drilling program completed – High grade in...
9/5/2007IN-FILL DRILLING RESULTS JUMP-UP DAM PROJECT
Corporate news of Heron Resources Ltd
7/29/201629 Jul 2016: Quarterly Activities Report - June 2016
7/25/2016Heron lodges full Woodlawn Feasibility Study on SEDAR
7/14/2016Lapse and Cancellation of Unlisted Options
7/11/2016Ceasing to be a substantial holder for AYC
7/1/2016Project Update - Clarification
6/30/2016Project Update
6/28/2016ASX/TSX-Heron delivers robust Feasibility Study for Woodlawn...
6/28/2016Media-Heron delivers robust Feasibility Study for Woodlawn P...
6/28/2016TSX-Heron delivers Woodlawn Project Feasibility Study
6/6/2016Herons Woodlawn Zinc-Copper Project Feasibility Study is on ...
6/2/201601 Jun 2016: Cleansing Statement
5/31/201630 May 2016: Alchemy Signs Farm In Agreement over Projects i...
5/31/2016Farm-In Agreement with Alchemy Resources
2/2/2016Heron Resources Announces Quarterly Update on High Grade Woo...
2/1/2016Heron Resources Announces Quarterly Update on High Grade Woo...
1/28/2016Heron Resources December 2015 Quarterly Report
1/20/2016Lapse and Cancellation of Unlisted Options
12/22/2015High Grade Lisa Lens Intercept Completes the Phase II Drilli...
12/22/2015Heron's High Grade Lisa Lens Intercept Completes the Phase I...
12/3/2015Heron Constitution
12/1/2015Release of Woodlawn Retreatment Project Report (NI43-101)
12/1/2015Release of Woodlawn Retreatment Project 2015 Mineral Resourc...
11/25/2015Woodlawn Phase II Drilling Program Completed - High Grade In...
10/29/2015Unaudited Interim Financial Report for 3 months ended 30 Sep...
10/29/2015Management's Discussion and Analysis for 3 Months ended Sep ...
10/20/2015Heron Confirms 10Mt (M+I) of High Grade Tailings at 6.2% ZnE...
10/7/2015Woodlawn Drilling Update - 27.7m @ 23.4% ZnEq from 401m dept...
10/7/2015Heron Resources: Woodlawn Drilling Update: 27.7m at 23.4% Zn...
9/21/2015Kate Lens Definition Drilling continues to impress: 26.6m of...
9/21/2015Heron Resources Limited - Kate Lens Definition Drilling Cont...
9/9/2015Woodlawn Feasibility Study on Track
9/9/2015Heron Resources Announces Woodlawn Feasibility Study on Trac...
9/8/2015Appendix 3Y - Wayne Taylor
9/7/2015Appendix 3Y - Robertson
8/29/2015Annual Financial Report, MD&A and Quarterly Financial
8/29/2015Appendix 4G and Corporate Governance Statement
8/19/2015Heron Resources Appoints Mr. Mark Sawyer as Non-Executive Di...
8/17/2015Appendix 3B New issue announcement
8/17/2015Issue of Placement Shares - Sec 708A Cleansing Notice
8/17/2015Stage 1 Equity Funding Package of $6.8M Completed with Green...
8/17/2015Heron Resources Completes Stage 1 Equity Funding Package of ...
8/12/2015Woodlawn Zinc-Copper Project Fly-through released
8/12/2015Heron's Woodlawn Zinc-Copper Project Fly-Through Released
8/4/2015Wide Kate Lens Up-dip Intercept: 34.0m @ 20.8% ZnEq
7/24/2015Heron Announces Equity Funding Package of up to $20M with Gr...
7/21/2015Excellent Drilling Results Continue at Woodlawn - Kate Lens ...
7/20/2015Excellent Drilling Results Continue at Woodlawn - Kate Lens ...
7/6/2015Woodlawn Phase II Drilling Continues to Deliver: 7.1m @ 40.6...
7/6/2015Woodlawn Phase II Drilling Continues to Deliver: 7.1m at 40....
4/22/2015Preliminary Economic Assessment Delivers Strong Business Cas...
4/18/2015Unaudited Interim Financial Report for 3 and 9 months ended ...
4/18/2015Heron Management's Discussion and Analysis March 2015 Quarte...
4/13/2015Appendix 3X: Initial Director's Interest Notice
4/9/2015Heron appoints Non-Executive Director
4/8/2015Heron Appoints Non-Executive Director
3/13/2015Woodlawn Phase 1 Drilling Program Successfully Completed - O...
2/26/2015Woodlawn Mining Lease Renewed for 15 Years
2/18/2015Woodlawn Drilling Update - High Grade Results from new Lisa ...
2/13/2015Heron Half Year Financial Report
2/13/2015General Meeting Results
2/13/2015Management's Discussion and Analysis for 3 & 6 Months ended ...
2/10/2015Woodlawn Zinc Copper Project Successful Metallurgical Test W...
2/3/2015Woodlawn Drilling Update Further Shallow High-Grade Results
1/27/2015Advancing the Woodlawn Project
1/14/2015Woodlawn Drilling Update - G Lens Delivers Strong Results an...
12/22/2014Woodlawn High Grade Assays and New Massive Sulphide Intercep...
12/16/2014Appendix 3X Initial Director's Interest Notice
12/16/2014Notice of initial substantial holder
12/13/2014Notification of date of General Meeting
12/13/2014Update on Board Spill Meeting
12/8/2014Kate Lens Delivers Highest Grade Intercept 26% Zn+Pb + 2% Cu...
11/26/2014Appendix 3Y Change of Director's Interest Notice
11/24/2014Nominations to Heron Board - Section249N and 249P
11/21/2014Chairman's Response
11/21/2014Results of Meeting
12/1/2009A quarterly communication
6/12/2009Receipt of request to put resolutions at general meeting
11/23/2007And CVRD Inco Approve Program & Budget for KNP Pre Feasibili...
11/20/2007Completes placement
11/16/2007HERON COMPLETES SHARE PLACEMENT
9/17/2007Volume 2, Issue 2, September 2007
8/29/2007RESOURCE ESTIMATE BOYCE CREEK NICKEL LATERITE PROJECT
7/16/2007announces Mining Leases Granted for Jump up Dam Project
5/31/2007An announcement from Heron Resources
4/5/2007Completion of A$27.8 million share placement
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (HRR.AX)
0.045+0.00%
AUSTRALIA
AU$ 0.045
05/27 11:00 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -5
Produces
Develops
Explores for Cobalt - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/1/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20220.00%0.050.05
2021-8.16%0.080.04
2020-48.96%0.110.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :