Houston Lake Mining Inc

Published : January 28th, 2015

HLM Announces an Upgraded NI 43-101 Resource Estimate for the PAK Rare Metals Project in Ontario, Canada

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Iron | Lithium | Market | Recovery | Rubidium |

HLM Announces an Upgraded NI 43-101 Resource Estimate for the PAK Rare Metals Project in Ontario, Canada

HLM Announces an Upgraded NI 43-101 Resource Estimate for the PAK Rare Metals Project in Ontario, Canada

Sudbury, Ontario -January 28, 2015 - Houston Lake Mining Inc. (TSX.V: HLM), is pleased to report a Canadian National Instrument (N.I.) 43-101 mineral resource estimate for the PAK Rare Metals Project, located in northwestern, Ontario. The resource estimation has been prepared by WSP Canada Inc. (TSX: WSP), a Montreal-based firm. WSP is one of the largest engineering firms in Canada and has a mining division maintaining independent consulting geologists and engineers.

  • Indicated mineral resource of 2.45 million tonnes grading at 1.81% Li2O equivalent(eq.), including 1.78 million tonnes grading 2.40% Li2O eq. in technical grade lithium zones with a low inherent iron spodumene;

  • Inferred mineral resource of 5.91 million tonnes grading at 2.01% Li2O equivalent(eq.), including 5.57 million tonnes grading 2.11% Li2O eq. in technical grade lithium zones with a low inherent iron spodumene;

  • An increase of 27% in total indicated and inferred Li20 eq. contained tonnes from the 2014 Maiden Inferred Resource Estimate;

  • The Pakeagama Lake pegmatite has a 400m strike length with an estimated true width varying from 10 to 125m with a sub-vertical orientation of the pegmatite, and;

  • Resource remains open to depth and along strike to the northwest and southeast.

"We are extremely pleased with the results of our upgraded resource estimate since there are definitely analogous features to the high grade, multi-element, and large tonnage of the prolific Tanco pegmatite in southeastern Manitoba(1)," commented Trevor R. Walker, President of HLM. "With the deposit exposed at surface, this report also confirms that the Pakeagama Lake pegmatite's lithium mineralization is wide, high grade, continuous and consistent, persisting at depth, and with tantalum and possibly rubidium and cesium byproducts."

Table I: Indicated and Inferred Mineral Resource Estimate - PAK Rare Metals Project (Pakeagama Lake pegmatite deposit)(6)

Cut-off

Resource Category

Commodity

Geologic Zone

Tonnes               (x 1,000)

Li2O        (%)

Ta2O5 (ppm)

Cs2O (%)

Rb2O(5) (%)

Contained Li2O (t)

Contained Ta2O5 (t)

Li2O Eq. (%) (2)

0.4 Li2O Eq.

INDICATED

Lithium

Upper Intermediate Zone (UIZ) (4)

375

3.63

58

0.03

0.14

13,363

22

n/a

Lithium

Lower Intermediate Zone (LIZ)

1,405

1.82

92

0.03

0.31

25,603

129

n/a

Lithium

Total Lithium Zones

1,780.2

2.20

85

0.03

0.27

39,238

151

2.40

Tantalum/ Rubidium

Central Intermediate Zone (CIZ)

668.2

n/a

113

0.08

0.63

n/a (3)

75

n/a

Lithium/Tantalum/Rubidium

Bulk Pegmatite Indicated Resource

2,448.4

1.60

92

0.05

0.37

39,238

226

1.81

0.4 Li2O Eq.

INFERRED

Lithium

Upper Intermediate Zone (UIZ) (4)

426

3.23

66

0.04

0.17

13,767

26

n/a

Lithium

Lower Intermediate Zone (LIZ)

5,145

1.75

111

0.03

0.30

90,220

573

n/a

Lithium

Total Lithium Zones

5,571

1.87

108

0.03

0.29

103,987

601

2.11

Tantalum/ Rubidium

Central Intermediate Zone (CIZ)

338

n/a

117

0.08

0.60

n/a (3)

40

n/a

Lithium/Tantalum/Rubidium

Bulk Pegmatite Inferred Resource

5,909

1.76

108

0.04

0.31

103,987

640

2.01

(1)           The original size of the Tanco pegmatite was 57,427,342 tonnes with a maximum thickness of 100m (Stilling, A., Cerney., P., and Vanstone, P.; 2006, The Tanco Pegmatite at Bernic Lake, Manitoba, The Canadian Mineralogist; Vol. 44 pp. 599-623). The UIZ, CIZ and LIZ units at the Pakeagama Lake Pegmatite have striking similarities in mineralogy and chemical composition to those at the Tanco deposit. The bulk chemical composition for Li2O and Ta2O5 was 0.74% and 366ppm, respectively at Tanco. The Tanco Mine is located in southeastern Manitoba and was a lithium mineral concentrate producer from 1986 until operations were suspended in 2009. Tanco was also a tantalum mineral concentrate producer until March 2013 when operation of this circuit ceased.

 (2)          Li2O equivalent was determined based on lithium and tantalum grades, prices ($330.56 per tonne of 6% spodumene concentrate and $198.51 per kg of 30% tantalite concentrate) and their respective recovery ratio (50% recovery for tantalum and at 78.5% recovery for lithium from bulk pegmatite). No credit was included for rubidium, cesium or any of the other elements contained for the purpose of this report.

(3)         Li2O content in the CIZ is predominantly associated with lithian micas and without metallurgical testing not deemed recoverable, therefore, not included in the Li2O contained and subsequently the Li2O equivalent calculation for the purpose of this report.

(4)           The UIZ and LIZ are technical/ceramic-grade lithium zones (high-grade lithium with low inherent iron (2O3 from whole rock analysis). The iron content of spodumene contained within the LIZ increases as the contact with iron-rich metasedimentary country rocks are approached, but it has been noted that a concentration below 0.1% wt.% Fe2O3 is maintained to within about 10 meters of the pegmatite-metasediment contact.

 (5)          Without further metallurgical testing it is unknown if the Rb2O is recoverable from the Lithium zones (UIZ, LIZ). For the purpose of this report, Rb2O credit has not been considered in any of the zones.

(6A)        Calculation is based on 2,444m of drilling in 14 holes to an average depth of 190m in the deposit, and 21 channels covering 149m at surface.

(6B)        Mineral Resources are not Mineral Reserves having no demonstrated economic viability. Results are presented undiluted and in situ.

(6C)       Indicated and Inferred Resources were evaluated from drill hole and channel sample results using a block model approach (inverse distance squared interpolation) with 5 blocks withinGeovia/Surpac software.

(6D)       Calculations used metric units (meters, tonnes and ppm). Results were rounded to reflect their estimated nature. Tonnes are rounded to 100,000 except Ta2O5 contained that are rounded to the nearest tonne. Grades reported in percent were rounded to two decimals while grades reported in part per million (ppm) were rounded to the closest integer.

Due Diligence

The Mineral Resources for PAK Rare Metals Project disclosed in this news release have been estimated by Mr. Todd McCracken, P.Geo., an employee of WSP and independent of HLM. By virtue of his education and relevant experience, Mr. McCracken is "Qualified Person" for the purpose of National Instrument 43-101. The Mineral Resource has been classified in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves, (November 2010). Mr. McCracken, P.Geo., has read and approved the contents of this press release as it pertains to the disclosed Mineral Resource estimate.

Mr. Peter J. Vanstone, P.Geo., is an independent "Qualified Person" to HLM defined under NI 43-101 and has reviewed and approved the technical information contained in this news release.

About the PAK Rare Metals Project

The PAK Rare Metals Project lies close to the boundary between two geological sub-provinces of the western Superior geologic province in northwestern Ontario and hosts a rare metals pegmatite deposit. The deposit is an LCT (lithium- cesium- tantalum) classified pegmatite. These rare types of deposits have been the principal source of hard rock lithium, tantalum, rubidium and cesium ores mined in the world.

HLM is actively exploring its 100% owned and optioned project which contains the Pakeagama Lake pegmatite. The deposit is one of the highest grade deposits in North America which has a current Indicated Resource of 2.45 million tonnes of 1.81% Li2O Eq. and Inferred Resource of 5.91 million tonnes of 2.01% Li2O Eq. which has a technical/ceramic grade spodumene with low inherent iron (below 0.1% Fe2O3). The deposit has a 400m strike length with an estimated true width varying from 10m to 125m with a sub-vertical orientation. The resource remains open to depth and along strike to the northwest and southeast.

About Houston Lake Mining Inc.
HLM's goal is to become a fully integrated lithium and tantalum producer  through the development of the PAK Rare Metals Project in Ontario, Canada .  The Company's strategy is to take advantage of the global shift towards electric/hybrid vehicles and high quality consumer electronics by becoming a raw material supplier of the elements required for the pursuit of sustainable energy and other applications in high-tech electronics and metal alloys. Combined, HLM's Board of Directors and Management have over 300 years of finance, exploration and mining experience to help to facilitate the Company's goal.

HLM has a total of 93,788,003 common shares issued and outstanding, excluding the proposed shares to be issued as a result of this press release. For additional information on HLM, please visit www.houstonlakemining.com.

Company Contact Information

Trevor R. Walker, President
2736 Belisle Drive
Val Caron, ON.
P3N 1B3 CANADA


Henry Kloepper, CEO 
T. +001 416.520.0187

T. +001 705.897.7622
F. +001 705.897.7618

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and those actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, Investors should review the Company's registered filings what are available at http://www.sedar.com

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Houston Lake Mining Inc

EXPLORATION STAGE
CODE : HLM.V
ISIN : CA4419241076
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Houston Lake Mining is a gold and palladium exploration company based in Canada.

Houston Lake Mining holds various exploration projects in Canada.

Its main exploration properties are PAKEAGAMA LAKE, TIB LAKE, WEST CEDARTREE and DUBENSKI (WEST CEDARTREE) in Canada.

Houston Lake Mining is listed in Canada. Its market capitalisation is CA$ 31.1 millions as of today (US$ 23.8 millions, € 21.6 millions).

Its stock quote reached its highest recent level on March 14, 1997 at CA$ 3.50, and its lowest recent point on December 31, 2012 at CA$ 0.03.

Houston Lake Mining has 124 410 644 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Houston Lake Mining Inc
2007 Annual Report
Financings of Houston Lake Mining Inc
8/17/2010Announces Closing of $250,000 Flow-Through Financing
7/6/2010$250,000 Flow-Through Financing
1/13/2010Closing of Additional $135,000 Flow-Through Financing
12/23/2009Closing of $500,000 Flow-Through Financing
9/30/2009Raises $325 000 in a Fistr Closing of a $500 000 Private Pla...
6/17/2009Raises $100,000 In A Private Placement Financing
1/8/2009Closes a $755,200 Private Placement
12/29/2008Announces $755,200 in a Flow-Through Financing
9/4/2008Raises $200,000 In A Private Placement Financing
8/25/2008Raises $800,000 In A Flow-Through Private Placement
5/20/2008Raises $168,600 in First Tranche of $1.25 Million Flow-Throu...
4/18/2008Raise $1.0 Million in a Non-Brokered Flow-Through Private Pl...
11/22/2007COMPLETES $255,010 EQUITY OFFERING
Nominations of Houston Lake Mining Inc
1/6/2010Appoints Interim President
7/20/2009Appoints Robert Callander As New Board Member
2/13/2008 Appoints Corporate Advisory Firm for Proactive Investor Rel...
Project news of Houston Lake Mining Inc
8/23/2010(West Cedartree)Announces Potential New Gold Zone is Confirmed by Channel Sa...
7/22/2010(West Cedartree)Drilling Crews Mobilized
7/20/2010(West Cedartree)Discovers Potential New Gold Zone
6/25/2010(Dubenski (west Cedartree))Intersects 4.58 g/t Gold Over 1.7 Metres
5/19/2010Intersects 32.82 g/ over 0.95 metres of New Horizon at Duben...
4/20/2010Intersects 5.70 g/t Gold Over 3.0 Metres on Dubenski Gold Pr...
1/22/2010(West Cedartree)High Grade Channel Samples Returned
12/2/2009(West Cedartree)Technical & Drilling Crews Mobilized to Houston Lake Mining'...
11/18/2009(West Cedartree)High Grade Channel Samples Returned Lake Mining’s West Ceda...
11/5/2009(Dubenski (west Cedartree))Update on Dubenski Gold Property
9/15/2009(Pakeagama Lake)Plans Fall Exploration Program
8/18/2009(Dogpaw Lake)Expands Width of Gold Mineralizat on in Channel Sampling at ...
6/26/2009(West Cedartree)IP Survey Extends Angel Hill Gold Trend To Over 3.3 Km
6/5/2009(West Cedartree)Discovering Gold In Ontario
5/20/2009(Dubenski (west Cedartree))Continues To Encounter High Grade Gold In Drilling Along The...
3/10/2009(Dubenski (west Cedartree))Drilling Continues to Expand Gold Mineralization at Houston ...
2/17/2009(Dubenski (west Cedartree))Intersects More Gold at Dubenski
2/2/2009(West Cedartree)Updates Exploration on the West Cedartree Gold Project
1/16/2009Dubenski Gold Property NI 43-101
12/9/2008(Dogpaw Lake)Intersects 1.5 Metres Grading 15.98 G/mt Gold At Dogpaw
11/12/2008(West Cedartree)Begins Phase 2 Drilling
4/23/2008(West Cedartree)Intersects 256.94 g/mt Gold Over A Core Length Of 3.0 Metres...
3/26/2008Intersects More High Grade Gold Mineralization at Dubenski S...
3/19/2008Intersects High Grade Gold in First Four Drill Holes at Dube...
3/11/2008(West Cedartree)IP Survey On West Cedartree Gold Project Extends
2/20/2008(West Cedartree)intersects 23m grading 4.66 g/mt Au
1/10/2008(West Cedartree)Winter Exploration Begins on Houston Lake Mining’s West Ceda...
12/6/2007(West Cedartree)SIGNS 5,000METRE DRILL CONTRACT TO INITIATE EXPLORATION PROG...
6/26/2007(Tib Lake)Drilling Starts on Houston Lake Mining's PGM Project
Corporate news of Houston Lake Mining Inc
6/9/2016HLM Issues Common Shares on Exercise of Stock Options for Pr...
4/5/2016HLM Raises $811,635 in Non Flow-Through Financing
1/21/2016HLM Raises $823,720 in Flow-Through Financing
1/20/2016HLM Raises $823,720 in Flow-Through Financing
1/12/2016Hlm Identifies 28 Metres Of 4.41% Li2o At Surface Across Its...
1/7/2016HLM Appoints Mike Tamlin as New Director
12/22/2015HLM Announces $750,000 Flow-Through Financing
12/18/2015HLM Commences Resource Estimate update for the PAK Lithium P...
12/18/2015Hlm Extends Eastern Extension On The Pak Lithium Project Int...
12/17/2015HLM Commences Resource Estimate Update for the PAK Lithium P...
12/15/2015HLM Extends Eastern Extension on the Pak Lithium Project Int...
9/15/2015PHASE IV DIAMOND DRILL PROGRAM COMMENCES ON THE PAK LITHIUM ...
9/8/2015HLM Drills Eastern Extension On The Pak Lithium Project Inte...
7/30/2015HLM Raises $566,000 in Financing Oversubscribed by 26%
7/14/2015HLM Announces $450,000 Financing
4/7/2015HLM Announces Exercise of Warrants for Proceeds of $641,763
3/23/2015HLM Advances Toward Proof of Concept with Bulk Sampling Prog...
3/6/2015Phase III Diamond Drill Program Commences On The Pak Rare Me...
1/28/2015HLM Announces an Upgraded NI 43-101 Resource Estimate for th...
1/28/2015HLM Announces an Upgraded NI 43-101 Resource Estimate for th...
1/12/2015HLM Raises $359,155 in Flow-Through Financing Oversubscribed...
12/19/2014HLM Announces $200,000 Flow-Through Financing
12/16/2014HLM Identifies Further High Grade Lithium At Surface Through...
12/16/2014HLM Identifies Further High Grade Lithium at Surface Through...
12/8/2014HLM Commences Resource Estimate update for the PAK Rare Meta...
12/8/2014HLM Commences Resource Estimate update for the PAK Rare Meta...
11/11/2014Hlm Drills The Pak Inferred Resource Intersecting 2.01% Lith...
11/11/2014HLM Drills the Pak Inferred Resource Intersecting 2.01% Lith...
9/24/2014HLM Drills beneath the PAK Inferred Resource Intersecting 1....
9/2/2014HLM’s Phase II Drilling Confirms and Extends High-Grade Lith...
7/24/2014HLM Increases Land Position by 43% to 4,032 Hectares Through...
6/11/2014HLM Electron Microprobe Study Indicates Low Inherent Iron Sp...
4/15/2014HLM Appoints Metallurgist Ernie J. Marcotte (P.Eng, FCIM) as...
3/26/2014HLM Completes 7-Hole, 1,500 Metre Phase II Diamond Drill Pro...
3/26/2014Hlm Completes 7-Hole, 1,500 Metre Phase II Diamond Drill Pro...
3/18/2014Diamond Drill Program Commences on the PAK Rare Metals Proje...
1/17/2012- 2011 President's Address
9/19/2011announces assay results on its Dogpaw Lake Property
9/19/2011Assay Results on Dogpaw Lake Property
7/20/2011Press Release, July 20, 2011
7/20/2011July 20, 2011
6/1/2011Minng Press Release, June 1, 2011
6/1/2011June 1, 2011
4/13/2011Press Release April 13, 2011
3/23/2011March 23, 2011
2/28/2011Reports 3rd Quarter Financials
2/25/2011Interview with Trevor Walker
11/27/2009Raises $1.000.000 in a Flow-Trough Financing
10/15/2009Update on The West Cedartree Gold Project
7/9/2009Kenora exploration activity at historic highs
6/11/2009Featured Gold Company for 2009
2/19/2009Discloses AGM Results
12/18/2008Completes Phase II Drilling On The Dubenski Gold Property
11/10/2008Participates in Chicago Resource Expo
9/19/2008Continues To Define More Gold Mineralization At West Cedartr...
9/11/2008Completes Drilling at Dogpaw Lake
8/7/2008Updates Exploration on West Cedartree
7/22/2008Steady Drill Results Continue to Add Value to West Cedartree...
5/27/2008Completes Drill Program On West Cedartree Gold Project
5/1/2008Provides An Update On Exploration At West Cedartree Gold Pro...
4/15/2008Continues To Intersect Significant Widths Of Gold Mineraliza...
2/1/2008 Exploration Update on Houston Lake Mining’s West Cedartree ...
12/18/2007Continues to Intersect Significant Gold Values in Channel Sa...
6/27/2007Extends Gold Zone and Completes Drill Program
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (HLM.V)
0.250-7.41%
TSX-V
CA$ 0.250
07/08 15:54 -0.020
-7.41%
Prev close Open
0.270 0.270
Low High
0.240 0.280
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.250 -%
Volume 1 month var.
293,850 -%
24hGold TrendPower© : -27
Produces
Develops
Explores for Beryllium - Cesium - Copper - Gallium - Germanium - Gold - Lithium - Nickel - Rubidium - Tantalum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/29/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :