HudBay Minerals Inc.

Published : January 15th, 2016

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Hudbay Announces 2016 Production Guidance and Capital and Exploration Expenditure Forecasts

-- () -- -- Summary (all amounts are in US dollars, unless otherwise noted)

  • 2015 production of all key metals was within guidance ranges in both the and South America Business Units.
  • Copper concentrate inventory levels in were drawn down to normal working levels during the fourth quarter, and all of the excess copper concentrate was sold by year-end.
  • In 2016, assuming the mid-point of the guidance ranges is achieved, total copper, zinc and precious metals production contained in concentrate, is forecast to increase 12%, 9% and 16%, respectively, over 2015 actual levels, reflecting Constancia's first full year at capacity.
  • Capital expenditure guidance is approximately for 2016, a decrease of over 20% compared to 2015 guidance. The spending plans include approximately of sustaining capital expenditures at Hudbay's current operations plus planned expenditures for advancing the project.

('Hudbay' or the 'company') (TSX: HBM)(NYSE: HBM)today released its production guidance along with its capital and exploration expenditure forecasts for 2016.

Contained Metal in Concentrate 2016 Guidance 2015 Production 2015 Guidance
Manitoba
Copper (tonnes) 40,000 - 50,000 41,383 40,000 - 50,000
Zinc (tonnes) 100,000 - 125,000 102,919 95,000 - 120,000
Precious Metals (oz) 95,000 - 115,000 92,793 83,000 - 103,000
Peru
Copper (tonnes) 110,000 - 130,000 105,897 100,000 - 125,000
Precious Metals (oz) 50,000 - 65,000 47,263 46,000 - 59,000
Total
Copper (tonnes) 150,000 - 180,000 147,280 140,000 - 175,000
Zinc (tonnes) 100,000 - 125,000 102,919 95,000 - 120,000
Precious Metals (oz) 145,000 - 180,000 140,056 129,000 - 162,000
Metal reported in concentrate is prior to refining losses or deductions associated with smelter terms. Amounts for 2015 include pre-commercial production volumes for Constancia, where applicable.
2015 guidance for precious metals has been restated -- refer to Footnote 4. 2015 guidance for copper and zinc is unchanged.
Includes 100% of Reed mine production.
Precious metals production includes gold and silver production on a gold-equivalent basis. Silver converted to gold at a ratio of 70:1. 2015 guidance and production has been restated to reflect a 70:1 ratio for consistency; a 60:1 ratio was previously used, with associated precious metals production guidance of 85,000-105,000 ounces for Manitoba, 50,000-65,000 ounces for Peru and 135,000-170,000 ounces total for Hudbay.

Copper, zinc and precious metals production in 2015 was within guidance ranges in both the and South America Business Units, and reflects the successful ramp up of production at the Constancia and Lalor mines. 2015 copper, zinc and precious metals production in increased year-over-year by 10%, 25% and 8%, respectively, due mainly to a full year of commercial production at the Lalor and Reed mines.

In 2016, assuming the mid-point of the guidance ranges is achieved, total copper, zinc and precious metals production contained in concentrate, is forecast to increase 12%, 9% and 16%, respectively, over 2015 actual levels, reflecting Constancia's first full year at capacity. In addition, the 777 mine is expected to benefit from improved equipment reliability resulting from its fleet renewal program. Precious metals production guidance assumes that silver is converted to gold at a ratio of 70:1, an increase from the 60:1 ratio applied previously.

Constancia's production in the first quarter of 2016 is expected to be affected by the planned replacement of the trunnions on both the SAG and ball mills on one of the two grinding circuits. The trunnions were damaged due to a lubrication failure during the commissioning period, and are expected to be replaced over a six to eight-week period in the first quarter of 2016, during which the second grinding circuit should continue to operate normally.

During the fourth quarter of 2015, shipments of copper concentrate from the Constancia mine to the port in Matarani increased with improved trucking capacity, resulting in significant inventory drawdown. The approximate concentrate inventory levels in , including the mine site and port inventories, decreased from 74,000 dry metric tonnes (dmt) at the end of the third quarter, including 65,000 dmt at the mine, to a normal working level of approximately 28,000 dmt at the end of the fourth quarter, including 11,000 dmt at the mine. All of the excess copper concentrate was sold by year-end.

Metal Production and Sales Three months endedDecember 31, 2015 Twelve months endedDecember 31, 2015
Contained Metal Production Payable Metal Sales Contained Metal Production Payable Metal Sales
Manitoba
Metal in concentrate
Copper (tonnes) 10,404 9,816 41,383 39,906
Gold (oz) 20,184 23,996 81,338 77,910
Silver (oz) 229,360 239,967 801,872 713,183
Refined zinc (tonnes) 28,160 27,064 103,252 101,920
Peru
Metal in concentrate
Copper (tonnes) 37,735 48,898 105,897 94,694
Gold (oz) 6,560 7,888 18,839 15,869
Silver (oz) 636,514 511,148 1,989,664 1,159,993

Capital Expenditure Guidance

2016 Capital Expenditure Guidance Millions
Sustaining Capital
Manitoba 90
Peru 180
Total Sustaining Capital 270
Growth Capital
Arizona 30
Total Growth Capital 30
Capitalized Exploration 3
Total Capital Expenditure 303
Excludes capitalized interest. Estimated spending for Rosemont to completion of an updated definitive feasibility study by mid-2016; additional expenditures to be determined.

planned sustaining capital expenditures in 2016 include approximately of deferred stripping costs compared to of deferred stripping costs included in 2015 guidance. These costs will be capitalized rather than recorded in unit operating costs. Prior estimates for sustaining capital and operating costs in the NI 43-101 Technical Report on the , dated , did not reflect potential capitalization of deferred stripping costs. The other major component of sustaining capital expenditures relates to tailings management facility costs, where construction is most intense in 2015 and 2016.

planned sustaining capital expenditures in 2016 have decreased from 2015 due primarily to a change in the Canadian/US dollar exchange rate assumption from /US$ in 2015 to /US$ in 2016, and substantial completion of the fleet renewal program at 777.

spending on the project reflects estimated spending to the completion of an updated definitive feasibility study by mid-2016, at which point additional spending on the project will be evaluated based on the status of permitting, project economics and the metals price environment.

Exploration Guidance

Exploration activities in will focus on targets within the Lalor mine in . This includes continued drilling of the exploration potential of the gold zones from the 865 metre level exploration drift. Pending complete results from the 2015 program, exploration may continue on the down plunge potential of the copper-gold zones from the 955-1025 metre level exploration ramp.

2016 Exploration Guidance Millions
Manitoba 5
Peru 1
Arizona -
Generative and Other 5
Total Exploration Expenditures 11
Capitalized Spending (3)
Total Exploration Expense 8
Assumes $3 million of Manitoba expenditures will be capitalized.

Production and Unit Cost Guidance by Business Unit

2016 Production and Unit Cost Guidance By Business Unit Manitoba Operations 777, Lalor and Reed Peru Operations Constancia Total
Contained Metal in Concentrate Produced
Copper (tonnes) 40,000 - 50,000 110,000 - 130,000 150,000 - 180,000
Zinc (tonnes) 100,000 - 125,000 - 100,000 - 125,000
Precious Metals (oz) 95,000 - 115,000 50,000 - 65,000 145,000 - 180,000
Combined Mine and Mill Unit Operating Costs ($/tonne ore processed) C$85 - 104 US$8.5 - 9.4
Metal reported in concentrate is prior to refining losses or deductions associated with smelter terms. Includes 100% of Reed mine production. Precious metals production includes gold and silver production on a gold-equivalent basis. Silver converted to gold at a ratio of 70:1 for 2016 guidance. Reflects combined mine and mill costs per tonne of milled ore. Peru operations combined mine and mill unit costs are presented in USD, include G&A costs and reflect the deduction of expected deferred stripping costs. Manitoba costs are presented in CAD, and include G&A and cost of ore purchased from joint venture partner at Reed mine.

The combined unit cost methodology for has changed in 2016 to include the cost of ore purchased from the 30% joint venture partner at the Reed mine, and an additional allocation of overhead costs to the mines and mills. The fully-loaded 2016 estimate for combined mine and mill unit operating costs of per tonne of ore processed includes an estimated additional per tonne attributable to the change in methodology. Excluding the impact of the change in unit cost methodology, the guidance range for unit costs is similar in Canadian dollar terms to 2015 guidance.

Metal production in any particular quarter may vary from the annual guidance rate based on variations in grades and recoveries due to the areas mined in that quarter, the timing of planned maintenance, and other factors. Mining and processing costs in any particular quarter can also vary from the annual guidance rate above based on a variety of factors including the scheduling of maintenance events and seasonal heating requirements. As in past years, costs in the first and fourth quarters are expected to be higher at the company's operations due to additional heating and other seasonal costs.

2016 Production and Unit Cost Guidance
Flin Flon Zinc Plant
Zinc Concentrate Treated (tonnes) 195,000 - 240,000
Zinc Metal Produced (tonnes) 100,000 - 120,000
Unit Operating Costs C$0.38 - $0.46/lb
Forecast unit operating costs are calculated on the same basis as reported unit operating costs in Hudbay's quarterly and annual management's discussion and analysis, with the exception of the inclusion of additional allocated overhead cost in the forecast.

Hudbay's planned higher domestic zinc concentrate production in 2016 is expected to result in increased zinc plant production levels compared to 2015, despite a scheduled zinc plant maintenance shutdown that is planned for the second quarter of 2016. The unit cost methodology for the zinc plant has changed in 2016 to include an additional allocation of overhead costs. The fully-loaded estimate for zinc plant unit operating costs includes per pound of zinc metal produced due to this change in unit cost methodology. Excluding the allocation of overhead costs, unit operating costs at the zinc plant in 2016 are expected to increase slightly from 2015 levels.

Forward-Looking Information

This news release contains 'forward-looking statements' and 'forward-looking information' (collectively, 'forward-looking information') within the meaning of applicable Canadian and securities legislation. All information contained in this news release, other than statements of current and historical fact, is forward-looking information. Often, but not always, forward-looking information can be identified by the use of words such as 'plans', 'expects', 'budget', 'guidance', 'scheduled', 'estimates', 'forecasts', 'strategy', 'target', 'intends', 'objective', 'goal', 'understands', 'anticipates' and 'believes' (and variations of these or similar words) and statements that certain actions, events or results 'may', 'could', 'would', 'should', 'might' 'occur' or 'be achieved' or 'will be taken' (and variations of these or similar expressions). All of the forward-looking information in this news release is qualified by this cautionary note.

Forward-looking information includes, but is not limited to, production, cost and capital and exploration expenditure guidance, anticipated production at Hudbay's mines and processing facilities, anticipated production from the company's projects and events that may affect its operations and development projects, planned maintenance shutdowns at the Constancia processing plant and zinc plant and their anticipated impacts on production, the anticipated effect of external factors on revenue, such as commodity prices, estimation of mineral reserves and resources, mine life projections, reclamation costs, economic outlook, government regulation of mining operations, and business and acquisition strategies. Forward-looking information is not, and cannot be, a guarantee of future results or events. Forward-looking information is based on, among other things, opinions, assumptions, estimates and analyses that, while considered reasonable by Hudbay at the date the forward-looking information is provided, inherently are subject to significant risks, uncertainties, contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the forward-looking information.

The material factors or assumptions that Hudbay identified and were applied by the company in drawing conclusions or making forecasts or projections set out in the forward-looking information include, but are not limited to:

  • the success of mining, processing, exploration and development activities;
  • the accuracy of geological, mining and metallurgical estimates;
  • the costs of production;
  • the supply and demand for metals that Hudbay produces;
  • the supply and availability of concentrate for Hudbay's processing facilities;
  • the supply and availability of third party processing facilities for Hudbay's concentrate;
  • the supply and availability of all forms of energy and fuels at reasonable prices;
  • the availability of transportation services at reasonable prices;
  • no significant unanticipated operational or technical difficulties;
  • the execution of Hudbay's business and growth strategies, including the success of its strategic investments and initiatives;
  • the availability of additional financing, if needed;
  • the ability to complete project targets on time and on budget and other events that may affect Hudbay's ability to develop its projects;
  • the timing and receipt of various regulatory and governmental approvals;
  • the availability of personnel for Hudbay's exploration, development and operational projects and ongoing employee relations;
  • maintaining good relations with the communities in which Hudbay operates, including the communities surrounding its Constancia mine and project and First Nations communities surrounding its Lalor and Reed mines;
  • no significant unanticipated challenges with stakeholders at Hudbay's various projects;
  • no significant unanticipated events or changes relating to regulatory, environmental, health and safety matters;
  • no contests over title to Hudbay's properties, including as a result of rights or claimed rights of aboriginal peoples;
  • the timing and possible outcome of pending litigation and no significant unanticipated litigation;
  • certain tax matters, including, but not limited to current tax laws and regulations and the refund of certain value added taxes from the Canadian and Peruvian governments; and
  • no significant and continuing adverse changes in general economic conditions or conditions in the financial markets (including commodity prices and foreign exchange rates).

The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information may include, but are not limited to, risks generally associated with the mining industry, such as economic factors (including future commodity prices, currency fluctuations, energy prices and general cost escalation), uncertainties related to the development and operation of Hudbay's projects (including risks associated with the permitting of the project and related legal challenges), dependence on key personnel and employee and union relations, risks related to political or social unrest or change, risks in respect of aboriginal and community relations, rights and title claims, operational risks and hazards, including unanticipated environmental, industrial and geological events and developments and the inability to insure against all risks, failure of plant, equipment, processes, transportation and other infrastructure to operate as anticipated, planned infrastructure improvements in (including the expansion of the port in Matarani) not being completed on schedule, compliance with government and environmental regulations, including permitting requirements and anti-bribery legislation, depletion of the company's reserves, volatile financial markets that may affect Hudbay's ability to obtain financing on acceptable terms, the failure to obtain required approvals or clearances from government authorities on a timely basis, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources, and the potential for variations in grade and recovery rates, uncertain costs of reclamation activities, the company's ability to comply with its pension and other post-retirement obligations, Hudbay's ability to abide by the covenants in its debt instruments and other material contracts, tax refunds, hedging transactions, as well as the risks discussed under the heading 'Risk Factors' in the company's most recent Annual Information Form.

Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary materially from those expressed or implied in the forward-looking information. Accordingly, you should not place undue reliance on forward-looking information. Hudbay does not assume any obligation to update or revise any forward-looking information after the date of this news release or to explain any material difference between subsequent actual events and any forward-looking information, except as required by applicable law.

Note to

This news release has been prepared in accordance with the requirements of the securities laws in effect in , which may differ materially from the requirements of securities laws applicable to U.S. issuers.

Information concerning Hudbay's mineral properties has been prepared in accordance with the requirements of Canadian securities laws, which differ in material respects from the requirements of the (the 'SEC') set forth in Industry Guide 7. Under the Industry Guide 7, mineralization may not be classified as a 'reserve' unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time of the reserve determination, and the does not recognize the reporting of mineral deposits which do not meet the SEC Industry Guide 7 definition of 'Reserve'. In accordance with National Instrument 43-101 -- Standards of Disclosure for Mineral Projects ('NI 43-101') of the Canadian Securities Administrators, the terms 'mineral reserve', 'proven mineral reserve', 'probable mineral reserve', 'mineral resource', 'measured mineral resource', 'indicated mineral resource' and 'inferred mineral resource' are defined in the , Metallurgy and Petroleum (the 'CIM') Definition Standards for Mineral Resources and Mineral Reserves adopted by the on . While the terms 'mineral resource', 'measured mineral resource', 'indicated mineral resource' and 'inferred mineral resource' are recognized and required by NI 43-101, the does not recognize them. You are cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic value. Inferred mineral resources have a high degree of uncertainty as to their existence and as to whether they can be economically or legally mined. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be economically or legally mined, or that it will ever be upgraded to a higher category. Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded into mineral reserves.

About Hudbay

Hudbay (TSX: HBM)(NYSE: HBM)is an integrated mining company producing copper concentrate (containing copper, gold and silver) and zinc metal. With assets in , the company is focused on the discovery, production and marketing of base and precious metals. Through its subsidiaries, Hudbay owns four polymetallic mines, four ore concentrators and a zinc production facility in northern and ) and Cusco () and a copper project in (). Hudbay also has equity investments in a number of junior exploration companies. The company's growth strategy is focused on the exploration and development of properties it already controls, as well as other mineral assets it may acquire that fit its strategic criteria. Hudbay's vision is to become a top-tier operator of long-life, low cost mines in the . Hudbay's mission is to create sustainable value through increased commodity exposure on a per-share basis, in high-quality and growing long-life deposits in mining-friendly jurisdictions. The company is governed by the Canada Business Corporations Act and its shares are listed under the symbol 'HBM' on the , and . Hudbay also has warrants listed under the symbol 'HBM.WT' on the and 'HBM/WS' on the .

For further information, please contact:

Director, Investor Relations
(416) 814-4387
[email protected]

Source:

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Canada | Georgia | Peru | All
Gold and Silver Prices for these countries : Canada | Georgia | Peru | All

HudBay Minerals Inc.

PRODUCER
CODE : HBM.TO
ISIN : CA4436281022
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

HudBay is a copper and molybdenum producing company based in Canada.

HudBay produces copper, molybdenum, gold, silver and zinc in Canada, and holds various exploration projects in Argentina, in Canada and in Peru.

Its main assets in production are 777 MINE, TROUT LAKE MINE and CHISEL NORTH in Canada and its main exploration properties are FENIX and WHITE PINE in Guatemala, BRAMPTON, REED LAKE, BUR, BALMAT, TOM, JASON, LALOR, WATTS RIVER, BACK FORTY, WINDSOR and NOME CASSIAR in Canada, CONSTANCIA in Peru and CORCOVADO PROPERTY in Argentina.

HudBay is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 2.6 billions as of today (US$ 1.9 billions, € 1.8 billions).

Its stock quote reached its lowest recent point on March 13, 2020 at CA$ 1.66, and its highest recent level on April 25, 2024 at CA$ 11.10.

HudBay has 237 270 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of HudBay Minerals Inc.
5/22/2019Hudbay said to prepare sale of Arizona copper mine stake
3/14/2019Hudbay buys out Rosemont partner for $75m
2/19/2019Waterton steps up efforts to oust Hudbay Minerals' CEO, boar...
1/17/2019Hudbay Minerals investor Waterton seeks to replace CEO, boar...
12/19/2018Hudbay completes acquisition of Mason Resources
10/18/2018Hudbay investor is said to seek changes to miner's board
11/6/2014HudBay's offer for Augusta finally given the nod
Financings of HudBay Minerals Inc.
11/4/2009Exercises Warrants of Polar Star Mining
2/27/2009Lenders Refuse to Renew $80 Million Credit Facility Due to S...
6/27/2008and Skye Announce Closing of $95 Million Private Placement
Option Grants of HudBay Minerals Inc.
8/28/2012Announces Semi-Annual Dividend
Nominations of HudBay Minerals Inc.
5/13/2013Announces Election of Directors
11/12/2009Announces CEO Planned Retirement andAppoints Executive Vice-...
3/10/2009Announces Resignation of CEO and Appointment of Interim CEO
5/1/2008Announces Appointment of H. Maura Lendon as Vice President
4/9/2008 Announces Appointment of Two New Directors
11/22/2007 Appoints Director of Tax
10/26/2007 Appoints Director Corporate Relations
6/8/2007Appointing Vice President, Mining
Financials of HudBay Minerals Inc.
7/31/2013Releases Second Quarter 2013 Results
5/1/2013Releases First Quarter 2013 Results Summary
11/1/2012Releases Third Quarter 2012 Results
8/15/2012Releases Second Quarter 2012 Results
5/10/2012Releases First Quarter 2012 Results
3/8/2012Releases Fourth Quarter 2011 Results
5/17/2011Releases First Quarter 2011 Results
3/14/2011Releases Fourth Quarter and Year-End 2010 Results
8/4/2010Releases Second Quarter 2010 Results; Announces Production D...
5/4/2010Releases First Quarter 2010 Results
3/4/2010Releases Fourth Quarter and Year End 2009 Results
11/3/2009Releases Third Quarter 2009 Results
8/6/2009Releases Second Quarter 2009 Results; Announces Intention to...
3/5/2009Releases Fourth Quarter andYear End 2008 Financial Results
11/4/2008Reports Third Quarter Results
5/7/2008Reports First Quarter 2008 Results
3/18/2008 Reports Fourth Quarter and Annual 2007 Results
5/10/2007Reports Strong First Quarter 2007 Results
Project news of HudBay Minerals Inc.
3/31/2017Hudbay Provides Update on Operations and Growth Projects
11/5/2013(Constancia)Announces Additional US$135 Million Constancia Precious Meta...
3/27/2013Announces Increases in Metals Reserves and Resources and Dec...
8/8/2012(Constancia)Begins Construction of Constancia Copper Mine in Peru and An...
4/2/2012Announces Increases in Metals Reserves and Resources
8/6/2011(Fenix)Announces Sale of Fenix Project
7/6/2011Announces Completion of Compulsory Acquisition of Norsemont ...
6/15/2011(Constancia)Intersects 2=2E4% Copper Equivalent Over 120 Meters at Const...
4/25/2011(Lalor)Announces Funding for Snow Lake Waste Water Treatment Plant
4/3/2011(Constancia)Announces Near Quadrupling of Metals Reserves; US$116 Millio...
6/23/2010(Lalor)Discovers Additional Gold and Copper
2/22/2010(Lalor)Updates Drilling at Lalor Deposit: Copper-Gold Zone Remains ...
12/17/2009(Lalor)Drilling on Copper-Gold Zone at the Lalor Deposit
10/30/2009(Chisel North)Re-Start Chisel North Mine and Snow Lake Concentrator
9/22/2009(Lalor)Major New Copper-Gold Intersections at Lalor
1/9/2009(Chisel North)CORRECTION FROM SOURCE: HudBay to Suspend Operations at Its ...
1/9/2009(Chisel North)to Suspend Operations at Its Chisel North Mine and Snow Lake...
11/20/2008Files Fenix Project Technical Report
3/3/2008(Lalor)Updates Drill Results for Lalor Lake
1/14/2008(Flin-d)43-101 Mineral Resource Estimates for Bur and Watts River De...
8/2/2007 Announces High-Grade Lalor Lake Drill Results
Corporate news of HudBay Minerals Inc.
7/28/2016HudBay Minerals reports 2Q loss
7/26/2016Coverage Initiated on Industrial Metals and Minerals Stocks ...
7/5/2016Hudbay to Host Conference Call for Second Quarter 2016 Resul...
6/9/2016Hudbay to Attend Upcoming June Investor Conferences
5/19/2016Hudbay Announces Election of Directors
5/6/2016HudBay to Attend Bank of America Merrill Lynch 2016 Global M...
4/28/2016Hudbay Announces First Quarter 2016 Results
4/6/2016Hudbay to Host Conference Call for First Quarter 2016 Result...
4/1/2016VMS Reports Update on Reserves and Resources at Reed Mine
2/25/2016HudBay Minerals reports 4Q loss
2/1/2016Hudbay Updates Early Warning Report for VMS Ventures
1/22/2016Hudbay to Attend Upcoming January Investor Conferences
1/15/2016Hudbay to Attend Upcoming January Investor Conferences
1/15/2016Hudbay Announces 2016 Production Guidance and Capital and Ex...
1/14/2016The Zacks Analyst Blog Highlights: Compañia de Minas Buenave...
1/13/2016Hudbay Announces 2016 Production Guidance and Capital and Ex...
12/17/2015HudBay Minerals (HBM) Jumps: Stock Moves 7.6% Higher
11/5/2015HudBay Minerals reports 3Q loss
11/5/2015Hudbay Releases Third Quarter 2015 Results
11/5/2015Star Mountain Resources, Inc. Closes Acquisition of Balmat Z...
11/4/2015VMS Ventures Announces Drill Program Update on Exploration T...
10/9/2015Hudbay to Host Conference Call for Third Quarter 2015 Result...
9/21/2015VMS Ventures Provides Update on Reed Mine
9/3/2015Hudbay to Attend Bank of America Merrill Lynch 21st Annual C...
7/31/2015Edited Transcript of HBM.TO earnings conference call or pres...
7/29/2015HudBay Minerals reports 2Q loss
7/29/2015Hudbay Releases Second Quarter 2015 Results
7/14/2015Hudbay to Host Conference Call for Second Quarter 2015 Resul...
4/15/2015VMS Provides Reed Mine Operations Update
4/7/2015Hudbay to Host Conference Call for First Quarter 2015 Result...
4/7/2015to Host Conference Call for First Quarter 2015 Results
4/1/2015VMS Reports Update on Reserves and Resources at Reed Mine
3/19/2015Hudbay to Attend Barclays Select Series: Metals & Materials ...
3/19/2015to Attend Barclays Select Series: Metals & Materials Cross A...
3/13/2015Hudbay Expands Corporate Revolving Credit Facility to US$300...
3/13/2015Hudbay Expands Corporate Revolving Credit Facility to US$300...
3/13/2015Expands Corporate Revolving Credit Facility to US$300 millio...
2/25/2015VMS Provides Reed Mine Operations Update
2/19/2015Hudbay Releases Fourth Quarter 2014 Results
2/11/2015Hudbay to Attend BMO Capital Markets 24th Global Metals & Mi...
2/11/2015Hudbay to Attend BMO Capital Markets 24th Global Metals & Mi...
2/11/2015to Attend BMO Capital Markets 24th Global Metals & Mining Co...
1/27/2015Hudbay to Attend Upcoming January Investor Conferences
1/27/2015Hudbay to Host Conference Call for Fourth Quarter 2014 Resul...
1/27/2015Hudbay to Host Conference Call for Fourth Quarter 2014 Resul...
1/22/2015Hudbay Announces 2015 Production Guidance and Capital and Ex...
1/21/2015Hudbay to Attend Upcoming January Investor Conferences
1/16/2015Canada Stocks to Watch: Bombardier, Iamgold, HudBay and more
1/15/2015Hudbay Announces 2015 Production Guidance and Capital and Ex...
1/14/2015Canada Stocks to Watch: Suncor, Magna, Shaw, Cogeco and more
12/18/2014VMS Provides Reed Mine Update
12/3/2014VMS Provides Reed Mine Update
11/26/2014Hudbay to Attend Upcoming December Investor Conferences
10/30/2013to Host Conference Call for Third Quarter 2013 Results
10/15/2013to Attend Canaccord Genuity Global Resources Conference
9/12/2013to Attend Upcoming September Investor Conferences
7/2/2013to Host Conference Call for Second Quarter 2013 Results
6/26/2013Receives US$125 Million Deposit Payment from Silver Wheaton
6/10/2013Announces Offering of US$150,000,000 Senior Unsecured Notes
6/10/2013Announces Offering of US$150,000,000 Senior Unsecured Notes
5/28/2013to Attend Upcoming June Investor Conferences
5/14/2013to Attend 2013 Bank of America Merr =?ISO-8859-1?Q?ill=20Lyn...
4/15/2013to Host Conference Call for First Quarter 2013 Results
3/12/2013to Attend Upcoming March Investor Conferences
2/19/2013to Present at the BMO Capital Markets 22nd Global Metals & M...
1/24/2013to Host Conference Call for Fourth Quarter 2012 Results
1/17/2013to Present at Upcoming January Investor Conferences
1/17/2013to Present at Upcoming January Investor Conferences
1/9/2013Announces 2013 Production Guidance and Capital and Explorati...
11/12/2012to Present at GMP Latin American Mining Conference
10/12/2012to Host Conference Call for Third Quarter 2012 Results
9/28/2012Announces Closing of Precious Metals Stream Transaction
9/13/2012Completes Offering for US$500,000,000 Senior Unsecured Notes
9/6/2012Announces Offering of US$400,000,000 Senior Unsecured Notes
7/9/2012to Host Conference Call for Second Quarter 2012 Results
5/19/2012Discontinues Planned Offering of US$4 =?ISO-8859-1?Q?00,000,...
5/14/2012Announces Offering of US$400,000,000 Senior Unsecured Notes
4/17/2012to Host Conference Call for First Quarter 2012 Results
3/8/2012Makes Investment in Panoro Minerals
2/24/2012Aligns All Operations Under Hudbay Brand to Support Growth a...
2/16/2012to Present at the BMO Capital Markets 2012 Global Metals & M...
2/10/2012to Host Conference Call for Fourth Quarter 2011 Results
2/10/2012to Host Conference Call for Fourth Quarter 2011 Results
2/2/2012Makes Investment in Northern Shield
1/12/2012to Present at Upcoming January Investor Conferences
12/19/2011Announces 2012 Production Guidance and Capital and Explorati...
11/28/2011to Present at Upcoming Investor Conferences
10/6/2011to Host Conference Call for Third Quarter 2011 Results
9/16/2011to Present at the Credit Suisse Global Steel and Mining Conf...
9/9/2011(Fenix)Announces Completion of Sale of Fenix Project and Key Manage...
9/1/2011to Present at the Bank of America Merrill Lynch 17th Annual ...
8/4/2011to Present at Jefferies 2011 Global Industrial and A&D Confe...
7/18/2011to Host Conference Call for Second Quarter 2011 Results
7/5/2011(Lalor)Announces Results of Lalor O =?ISO-8859-1?Q?ptimization=20St...
6/30/2011Makes Investment in MacDonald Mines
6/20/2011to Present at RBC Capital Markets' 2011 Global Mining & Mate...
5/4/2011Announces Commencement of Compulsory Acquisition of Remainin...
4/21/2011Makes Investment in CuOro Resources
3/17/2011Announces Expiry of Offer and Additional Take-Up of Norsemon...
3/14/2011to Exercise Compulsory Acquisition Rights After Expiry of Of...
3/2/2011Announces Take-up of Over 90% of Norsemont Mining Inc=2E's S...
2/16/2011Makes Investment in Aquila Resources
2/14/2011Makes Investment in VMS Ventures
1/27/2011Hudbay Minerals Makes Investment in Copper Reef Mining Corpo...
1/25/2011Hudbay and Norsemont Mining Announce Mailing of Offer and Ta...
1/10/2011Announces Agreement to Acquire Norsemont Mining
8/24/2010Makes Investment in Augusta Resource Corporation
7/28/2010to Help Establish Northern Manitoba Mining Academy
7/6/2010Joint Venture With VMS Ventures
4/1/2010New Resource and Significant Increase in Nickel Grade at Fen...
3/4/2010Enters Into Letter of Intent With VMS Ventures
2/3/20102009 Production and 2010 Outlook
1/8/2010Provides Update on Polar Star Holdings
12/22/2009Announces Option Agreement with Halo Resources Ltd.
10/8/2009$85 Million Production Ramp to Lalor Deposit
9/29/2009Files Normal Course Issuer Bid
9/29/2009Provides Update on CGN
8/6/2009Announces Subscription, Option and Joint Venture Agreement w...
6/22/2009CEO Unveils Strategic Plan at AGM
6/19/2009Expects to Close Flin Flon Copper Smelter by July 2010
2/27/2009Urges Shareholders to Vote Against SRM Nominee Slate
2/24/2009 Agree to Terminate Arrangement Agreement
2/16/2009Sets Record Date for March 25, 2009 Shareholders' Meeting
2/4/2009Announces That Unions Ratify Collective Agreements
1/27/2009Reaches Tentative Collective Agreements With Unions
1/26/2009Announces Superior Court Hearing Adjourned
1/23/2009OSC Sets Aside TSX Decision
1/13/2009to Defend Application Vigorously
1/9/2009Discovers New Gold Zone at Lalor
1/8/2009Notified of Request for OSC Hearing and Review
12/30/2008Schedules Meeting of Shareholders for March 31, 2009
12/23/2008Announces Lundin Mining's Receipt of Interim Order
12/19/2008Receives Meeting Requisition From Shareholder
12/11/2008Reports Progress in Lundin Acquisition
12/9/2008Responds to the Concerns of Certain Shareholders
12/2/2008Media Advisory: HudBay Launches Special WebSite Section With...
11/26/2008Recommends Shareholders Take no Action in Response to Jaguar...
11/21/2008and Lundin Announce Friendly Business Combination
8/26/2008Completes Business Combination With Skye Resources; Announce...
8/22/2008Announces Closure of Balmat Zinc Mine
8/21/2008Announces $1 Million 80th Anniversary Fund to Support Commun...
8/19/2008Skye Resources Securityholders Approve Business Combination ...
6/23/2008and Skye Resources AnnounceProposed Business Combination
6/2/2008Reports on U.S. Mine Fatality
2/15/2008 Announces 2007 Production and 2008 Outlook
2/12/2008Announces Updated Mineral Reserves and Resources
1/25/2008Announces Allen J. Palmiere as New President and CEO
1/21/2008 Celebrates 80 Years of Mining Success
12/14/2007 Share Buy Back Program Approved-Normal Course Issuer Bid
12/12/2007Announces Share Buy Back Program-Normal Course Issuer Bid
12/11/2007 Plans $42.8 Million for 2008 Exploration
11/5/2007Announces Exploration Drilling in South West Ontario
10/24/2007Announces Significant New Zinc Discovery at Lalor Lake
10/16/2007First Half 2007 Exploration Update
8/23/2007Confirms No Investments in Asset-Backed Commercial Paper
6/1/2007President & CEO Peter R. Jones to Appear on BNN TV
5/24/2007to Hold Annual & Special Meeting of Shareholders
5/2/2007Renews Shareholder Rights Plan
3/3/2007Second half exploration update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (HBM.TO)NYSE (HBM)
11.10+4.72%8.12+4.91%
TORONTO
CA$ 11.10
04/25 17:00 0.500
4.72%
Prev close Open
10.60 10.69
Low High
10.66 11.20
Year l/h YTD var.
6.89 -  11.10 52.89%
52 week l/h 52 week var.
5.62 -  11.10 66.42%
Volume 1 month var.
2,381,573 20.39%
24hGold TrendPower© : 27
Produces Copper - Gold - Silver - Zinc
Develops
Explores for Copper - Gold - Lead - Molybdenum - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 6/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202463.96%
2023-1.02%8.095.61
2022-24.42%9.9810.00
20211.57%9.9510.05
202065.92%9.541.66
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+11.34%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.62+1.93%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.62+1.00%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :