PMI Gold Corporation

Published : July 19th, 2013

Implements Multi-Pronged Strategy for Advancing the Obotan Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
News Releases
July 19, 2013

PMI Implements Multi-Pronged Strategy for Advancing the Obotan Project

Measures include maximising margins by reducing capital and operating costs as well as plans to accelerate early project cash flow

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA AND AUSTRALIA ONLY AND IS NOT AUTHORIZED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Key Points
  • Studies underway to reduce capital costs, strengthen margins and optimize returns from the Obotan Gold Project, with key initiatives including:
    • a review of all major contracts and re-tendering process to take advantage of falling costs industry-wide;
    • opportunities to accelerate development of satellite oxide prospects, such as the recently discovered Dynamite Hill prospect, which could potentially defer some or all of the capitalized pre-stripping at Obotan; and
    • a review of mining strategies and cut-off grades.

  • PMI continuing to progress a range of financing options for Obotan while the final EIS approval is awaited.

  • Until a suitable financing package is secured, the Company has taken a number of decisive steps to cut costs across the organization to preserve its strong cash reserves of US$102M for project development and refocus exploration. These initiatives include:
    • a material reduction in Directors' fees and salaries for all executives and senior staff;
    • a reduction in exploration staff in Ghana;
    • a reduction in corporate and administrative overheads across the Company, including revised arrangements with all contractors; and
    • a significant reduction in exploration expenditure, with the exception of advanced prospects such as Dynamite Hill.

    PMI Gold Corporation (TSX:PMV)(FRANKFURT:PN3N)(ASX:PVM) ("PMI" or the "Company") today announced that it is pursuing initiatives to optimize and enhance its flagship Obotan Gold Project in Ghana, including strategies to reduce forecast capital and operating costs while it progresses project finance and final environmental approvals.

    PMI completed a Feasibility Study in 2012 which confirmed that Obotan is an extremely robust project with attractive economic parameters including forecast production of over 220,000oz a year at a highly competitive C1 cash operating cost of US$626/oz. This Study was based on a gold price of US$1,300 per ounce.

    The Company has recently identified a number of areas where significant improvements and enhancements can be made to the August 2012 Feasibility Study in order to reduce pre-production capital requirements and strengthen forecast operating margins.

    Some of the changes have emerged as a result of changed market conditions over the past six months which have seen a significant slow-down across the global mining and contracting industries.

    Another key factor has been the recent discovery of the Dynamite Hill oxide gold prospect, located 7km north-east of the proposed processing plant. This has highlighted the potential to delineate additional sources of high-grade oxide ore feed in close proximity to the plant which could have a significant impact on the overall development configuration and economics of the Obotan Project.

    Some of the initiatives currently underway include:

    • a review of the pricing of all major contracts incorporated in the Feasibility Study, with a process of re-tendering currently underway to take advantage of rapidly changing cost structures across the mining and contracting industry;

    • the potential to defer some or all of the capitalized pre-stripping required in the early stage of the Project's development by defining alternative sources of oxide ore feed within a 5-10km radius of the mill. This opportunity has recently been significantly progressed as a result of the discovery of the Dynamite Hill prospect, where a new zone of gold mineralization has been defined and a maiden JORC Mineral Resource could be targeted towards the end of this year; and

    • a review of mining strategies and cut-off grades at the key deposits with a view to maximising cash flows during the early years of the project.

    PMI is continuing to review a wide range of project financing alternatives for the Obotan Project while it awaits the final approval for the Environmental Impact Study (EIS) from the Environmental Protection Authority (EPA) in Ghana.

    The delay in achieving EIS approval has been due to ongoing discussions regarding recently introduced changes over and above the EPA guidelines concerning the tails storage facilities, waste dumps and mine closure requirements. These changes have all been addressed and EIS approval is expected during the second half of 2013.

    This is the final remaining outstanding regulatory approval required.

    Until project finance is secured and a Final Investment Decision has been made, the Board of PMI has moved decisively to reduce costs across the Company in order to protect its strong cash position (circa US$102 million at the end of the June Quarter). This will ensure that it is in the best possible position to proceed with development once it secures project finance.

    Importantly, none of these changes will impact on the Company's ability to move ahead rapidly with the development of Obotan at the appropriate time.

    Key initiatives include:

    1. All PMI Directors have agreed to an immediate material reduction in their fees.

    2. The base salary for the CEO, all executives and senior management will also be significantly reduced. In accordance with ASX Listing Rule 3.16.4, Mr Collin Ellison, CEO & Managing Director, has varied his existing Executive Services Agreement with a 20% reduction from his previous pay level of C$525k pa inclusive of all entitlements to C$420k pa inclusive of all entitlements.

    3. Limited "Early Works" will be completed at Obotan including completion of approximately one-third of the camp upgrade and the Process plant detailed design work will be progressed to approximately 70 per cent completion. Both of these elements will enable PMI to move rapidly to commence construction and development of the project once project finance is secured. No major additional contracts will be let until project finance is in place.

    4. There will be a significantly reduced regional exploration commitment for FY2014. The Company will focus on those advanced exploration opportunities which offer the best chance for defining JORC Mineral Resources and Ore Reserves in the near-term, such as the recent Dynamite Hill discovery.

    5. Staff salaries in the corporate offices will be reduced or some staff will move to a reduced-hours basis. In addition, the planned recruitment of two senior corporate executives will be deferred until a decision on project commencement has occurred.

    6. Corporate and administrative overheads have been reduced across the organization, with all key contractors being asked for, and agreeing to, reductions in their remuneration structures.

    PMI Gold's CEO, Collin Ellison, said the studies on the Obotan Project had always shown that the project would enjoy strong margins and robust rates of return, with the new initiatives designed to strengthen its position in a lower gold price environment.
    "We have identified several key opportunities to reduce capital and operating expenses at Obotan which we believe will go a long way to offsetting the impacts of the lower gold price. It is now well known that construction costs and other contracting expenses have fallen since commodity prices came off. This is particularly the case in West Africa, where project developments have slowed dramatically.

    "Obotan already had the significant advantage of being a low-cost, high-margin producer, as shown by the 2012 Feasibility Study, and we are confident that this multi-pronged strategy will protect our margins and ensure that we are able to secure finance on attractive terms."

    For further information please contact:

    Investor Relations Canada:
    Rebecca Greco
    Fig House Communications
    +1 (416) 822-6483
    fighouse@yahoo.com

    Investor Relations Australia:
    Nicholas Read/Paul Armstrong
    Read Corporate
    +61 8 9388 1474
    M. +61 419 929 046

    PMI Contact Canada:
    Marion McGrath
    Corporate Secretary
    +1 (604) 684-6264
    Toll-Free: 1 (888) 682-8089

    PMI Contact Australia:
    Collin Ellison
    Managing Director & CEO
    +61 8 6188 7900

    or visit the PMI Gold Corporation website at www.pmigoldcorp.com

    Cautionary Statement Regarding Forward-Looking Statements

    This Announcement contains forward-looking statements or forward-looking information under applicable Canadian securities laws (hereinafter collectively referred to as "forward-looking statements") which concern the Company's Obotan Gold Project and other matters. These statements relate to analyses and other information that are based on forecasts or projections of future results, estimates of amounts not yet determinable and assumptions of management. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, strategies, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements.

    Forward-looking statements included in this Announcement include statements with respect to the reduction of capital and operating costs at the Obotan Gold Project; early year cash flow maximization; receipt of EIS approval in the second half of 2013; the delineation of additional high-grade oxide ore feed at the Dynamite Hill gold prospect; and development of the Obotan Gold Project.

    Forward-looking statements are subject to a variety of risks and uncertainties, which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including without limitation: the actual results of exploration activities; changes in gold prices; the actual results of studies; changes in exchange rates; possibility of equipment breakdowns, delays and availability; changes in mine development plans; the unknown impact of the 10% windfall profit tax announced by the Government of Ghana; title defects; the failure of contract parties to perform their obligations; the unavailability of capital and financing; adverse general economic, market or business conditions; regulatory changes; failure to receive necessary government or regulatory approvals; the loss of key personnel; interference with and potential delays to the Company's exploration and development activities as a result of the artisanal mining sector in Ghana; and other risks and factors detailed from time to time in the filings made by the Company with securities regulators and stock exchanges. These forward-looking statements are based on certain assumptions which the Company believes are reasonable at the date they are made.

    Any forward-looking statement or information only speaks as of the date on which it was made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or otherwise. Although the Company believes that the assumptions inherent in the forward looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such.

View News Release in PDF Format:
http://www.pmigoldcorp.com/i/pdf/2013-07-19_NR.pdf
213 KB in size, approx. 41 seconds to download at 56.6Kbps

You can also view this News Release on our website at:
http://www.pmigoldcorp.com/s/News.asp?ReportID=593910

Home | Corporate | Projects | Investors | News | Contact Us | � 2013 PMI Gold Corporation (PMV) All rights reserved.
Data and Statistics for these countries : Australia | Canada | Ghana | All
Gold and Silver Prices for these countries : Australia | Canada | Ghana | All

PMI Gold Corporation

EXPLORATION STAGE
CODE : PMV.V
ISIN : CA7301531033
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

PMI Gold is a gold exploration company based in Canada.

PMI Gold holds various exploration projects in Ghana.

Its main exploration properties are GYIMIGYA & DUNKWA, KANIAGO, OBOTAN, OFOASE, BANKAME, EDUBIA and KUBI in Ghana.

PMI Gold is listed in Australia, in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 339.6 millions as of today (US$ 321.0 millions, € 236.3 millions).

Its stock quote reached its lowest recent point on November 28, 2008 at CA$ 0.01, and its highest recent level on February 24, 2012 at CA$ 1.46.

PMI Gold has 409 193 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of PMI Gold Corporation
10/4/2007Larry Myles Reports: Another Look at PMI Gold Corporation.
Annual reports of PMI Gold Corporation
2008 Annual report
Annual Report 2007
Financings of PMI Gold Corporation
11/13/2012Completes Equity Financing; Overallotment Option Exercised i...
10/10/2012Announces C$100 Million Equity Financing
3/15/2011Completes Short-Form Prospectus And Qualifies Exercise of Sp...
10/20/2009Private Placement for $3,645,500 Closes
9/30/2009$2.75 Million Private Placement Increased to $3.20 Million
8/25/2009$2.75 Million Private Placement, Drilling Program Expanded
6/16/2009Repricing of warrants
5/26/2009Private Placement, Drilling Program Expanded
3/3/2009announces two private placements
3/3/2009Private Placements Announced
2/19/2009US$20 Million Private Placement Announcement
2/19/2009Announces US$20 million private placement
8/11/2008Private Placement $1.0 Million/5 Million Units Announced
4/15/2008Reprices Brokered Private Placement
3/12/2008Non-Brokered Private Placement Closed Fiscal Advisory Agreem...
1/14/2008Private Placement Increased
11/27/2007Private Placement 10 Million Units - $2,800,000 Announced
Nominations of PMI Gold Corporation
9/9/2013Advises Appointment Of General Manager Corporate Developmen...
4/4/2013appoints Jim Askew as Chairman and Non-Executive Director
4/12/2011PMI Gold Corporation - Resignation of Director
9/15/2008New Board Appointments; Stock Option Announced
Project news of PMI Gold Corporation
2/6/2014Asanko Gold Inc. Completes Acquisition Of PMI Gold Corporati...
7/26/2013Targets Maiden Gold Resource for Dynamite Hill After Further...
7/19/2013(Obotan)Implements Multi-Pronged Strategy for Advancing the Obotan P...
6/6/2013Intersects High Grade Gold at Newly Discovered Dynamite Hill...
3/11/2013(Kubi)Regional Air Core Drilling Continues to Identify Anomalous G...
2/18/2013(Obotan)Obotan Project Update
9/26/2012(Obotan)to receive Mining Leases for Obotan Gold Project Another Imp...
9/26/2012(Obotan)to Receive Mining Leases for Obotan Gold Project
8/28/2012(Obotan)Obotan Gold Project Feasibility Study Demonstrates a Robust...
5/25/2011(Obotan)- Positive drilling results pave way for resource upgrade at...
5/4/2011PMI Gold Corporation - Extensive gold zones intersected in l...
3/2/2011(Obotan)DRILLING FLEET EXPANDED FOR AGGRESSIVE EXPLORATION PROGRAM -...
10/22/2009(Obotan)Retires Debt - Next Phase Kubi Drilling Commences - Obotan O...
9/9/2009(Kubi)New gold zone discovered at Kubi, Ghana
7/15/2009(Kubi)Change Of Control Approved By Shareholders Additional Drilli...
7/1/2009(Obotan)Updates Obotan Project, Ghana
9/23/2008(Kubi)Kubi License Area Increased In Ghana
6/3/2008(Kubi)Fiscal Agent Appointed for Kubi Gold Project Financing
4/10/2008Announces Positive Preliminary Assessment Scoping Study Resu...
8/29/2007Drills 44.5 Metres @ 2.61 G/T Au at Nkran, Ghana
Corporate news of PMI Gold Corporation
1/21/2014ISS and Glass Lewis Recommend Asanko and PMI Shareholders Vo...
1/7/2014Asanko and PMI Mail Joint Information Circular in Connection...
12/17/2013Asanko Gold To Acquire PMI To Create An Emerging Mid-Tier Go...
11/28/2013Announces Results of Annual and Special Meeting
10/24/2013Disclosure of CEO Remuneration
9/17/2013Announces Change of CEO
7/30/2013Quarter Activity Update for the period ended 30 June 2013
2/18/2013and Keegan Agree to Terminate Merger Plans
2/1/2013Quarter Activity Update - For the period ended 31 December 2...
1/24/2013And Keegan Mail Joint Information Circular In Connection Wit...
1/10/2013Anomalous Gold Intersected at PMI Gold's Diaso Prospect, Gh...
10/26/2012Quarter Activity Update for the Period Ended 30 September 20...
10/9/2012Announces "Overnight Marketed" Offering
9/26/2012Secures US$30m Standby Funding Facility Decision to Apply f...
9/19/2012(Obotan)Files National Instrument 43-101 Compliant Technical Report ...
4/30/2012(Obotan)Positive Drilling Results Show Potential for Fromenda Prospe...
4/19/2012(Obotan)New Discovery at Kaniago Strengthens Satellite Oxide Gold Po...
2/22/2012(Obotan)Announces Further Positive Resources Drill Results from its ...
10/14/2011(Obotan)- 270% Increase in Obotan Project Gold Resources, Ghana
5/10/2011PMI Gold appoints highly experienced geologist to lead aggre...
3/16/2010raises $7.5 m for Ghana gold work
12/11/2009 Warrant exercised / shares for debt issued
1/30/2009on Trafalgar capital Bridge Loan Facility
1/30/2009- updates Trafalgar bridge loan
1/5/2009- New Director Appointed/Debenture Shares Issued
11/20/2008- bridge loan extension-MacQuarrie returns as President
9/26/2008Kubi Mining Leases Extended For 20 Years
9/23/2008acquires two more concessions, Ghana
9/3/2008Private Placment Can$1,000,000 Closed; Private Investor Inc...
8/21/2008New Concession Acquired in Ghana
8/11/2008to raise $1 million privately
7/9/2008$3.5 Million Secured Loan Arranged Kubi Gold Project Purchas...
5/29/2008VTEM Survey Confirms New Drill Targets At Obotan
2/11/2008(audio) Korelin Daily Radio Inverview with Doug MacQuarrie
1/30/2008Option Of Bankame And Ofoase Concessions To Golden Lion Reso...
12/3/2007Golder Associates to Commence Kubi Gold Project Review
10/15/2007Acquires Nevsun's Kubi Gold Project, Ghana
9/17/2007to purchase Nevsun's Kubi Gold Project, Ghana
8/16/2007Acquires Rights to Purchase Edubia Lease, Ghana
1/13/2006(Obotan)ANALYSIS : Follow up N° 7
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (PMV.V)AUSTRALIA (PVM.AX)
0.830+0.00%0.3650
TSX-V
CA$ 0.830
11/29 10:25 -
0%
Prev close Open
0.830 -
Low High
0.830 0.830
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.830 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -27
Produces
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 5/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :