Hana Mining Ltd.

Published : September 13th, 2011

Infill drilling again encounters consistent high-grade copper-silver mineralization along the North

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Botswana | Copper | Diamond | Namibia | Silver | South Africa |
Tuesday, September 13, 2011
NEWS RELEASE
 
Infill drilling again encounters consistent high-grade copper-silver mineralization along the North Limb of the Banana Zone


September 13, 2011 (Vancouver, British Columbia). Hana Mining Ltd. ("Hana" or the "Company") - (TSX-V: HMG) (Frankfurt: 4LH) is pleased to announce its most recent drilling results from the completion of 14 infill Diamond drill holes in the Banana Zone at its Ghanzi sediment hosted Copper-Silver Project in Botswana.

Infill drilling was carried out on the North Limb area (between sections 65835 to 68325 at North Limb North; Figures 1 and 2) to convert a substantial amount of the NI 43-101 compliant resources within this area into the Indicated category from the Inferred category.

These results are from new holes and are in addition to those used in the most recent NI 43-101 compliant Inferred mineral resource calculation (see Table 1 at the end of this press release for the results from all 14 drill holes). The mineralization remains open at depth.

Highlights of recent drilling results:
  • The latest results continue to confirm the continuity of copper-silver mineralization at the North Limb North area of the Banana Zone.
  • Core lengths intercepts of
    • 2.16% Cu and 12.0 g/t Ag over 7.3 metres within a wider mineralized interval of 0.85% Cu and 5.0 g/t Ag over 25.8 metres in hole HA-285-D,
    • 2.25% Cu and 47.0 g/t Ag over 3.8 metres within a wider mineralized interval of 0.72% Cu and 12.0 g/t Ag over 17.0 metres in hole HA-283b-D,
    • 1.60% Cu and 25.0 g/t Ag over 3.6 metres within a wider mineralized interval of 0.41% Cu and 5.0 g/t Ag over 34.8 metres in hole HA-339-D, and
    • 2.13% Cu and 23.0 g/t Ag over 5.0 metres within a wider mineralized interval of 0.61% Cu and 6.0 g/t Ag over 24.0 metres in hole HA-380-D.
Discussion of Results:

The infill drilling program at the North Limb continues to confirm that wide intervals, with multiple zones of high-grade copper-silver mineralization, are continuous along strike along the North Limb (Figure 3). This drilling will allow for the conversion of more mineral resources from the Inferred category into the Indicated category.

Figure 1: Location of Most Recent Drilling Results at the Banana Zone

*Please note all figures are now showing section grid lines that are referenced in the result tables.

Figure 2: Drill Hole Location of North Limb, Sections 65835 to 68325


Figure 3: Cross-section through section 65920 (North Limb North)


Development Update

The following engineering and consultation activities are ongoing:
  • Work on the revised resource estimate for the Banana Zone is continuing as expected and the Company expects to provide a timetable for the completion of the resource estimate within the next few weeks.

  • Work has also re-commenced on the Preliminary Economic Assessment ("PEA"). The company will soon provide guidance on the timing of the completion of the PEA.

  • Metallurgical work has essentially been completed on the oxide material at the Banana Zone. Results from this work are expected to be released shortly.
Hana Mining's CEO and Chairman, Marek Kreczmer, commented as follows:

"So far we have released five batches of drilling results comprising 69 Diamond drill holes from the North Limb North area of the Banana Zone. Nearly all of these drill holes intersected significant widths of copper-silver mineralization over a strike length of just over four kilometers. Therefore, we expect this area is likely to contribute significantly to the next resource estimate."

Qualified Person and Quality Assurance/Quality Control

The drilling program and results are reviewed and approved by Marek Kreczmer, Chief Executive Officer for Hana. He is the qualified person as defined in NI 43-101 and has reviewed the technical information in this press release.

Drill core is logged and photographed. Mineralized intervals are split in half by sawing and sampled at site. The remainder of the core is kept as a permanent record. Samples are placed into labelled bags, closed and packed into sealed bags that are shipped to ALS Chemex Laboratory in Johannesburg, South Africa. Hana has implemented an industry-standard QA/QC program that includes the blind insertion of certified standards, duplicates and blanks into the sample stream.

About Hana Mining's Ghanzi Copper-Silver Project in Botswana:

The Ghanzi Project is located in the center of the Kalahari Copper Belt in northwestern Botswana. The Ghanzi property covers 2,149 square kilometres, and contains sediment-hosted copper-silver deposits with a demonstrated cumulative tested strike length of 70 kilometres. This favorable geology extends over an estimated strike length of 600 kilometres. Hana Mining released results of its most recent NI 43-101 compliant resource estimate for the Ghanzi Project on December 20, 2010, announcing an Indicated mineral resource of 762 million pounds of copper and 16 million ounces of silver from 37.4 million tonnes at a grade of 0.93% copper and 13.4 g/t silver. All of the Indicated resources are from the Banana Zone. There are also Inferred resources of 5.6 billion pounds of copper and 85.4 million ounces of silver from 423.9 million tonnes. This Inferred mineral resource estimate consists of 225.4 million tonnes grading 0.64% Cu and 8.1 g/t Ag in the Banana Zone, 20.7 million tonnes grading 1.23% Cu and 8.7 g/t Ag in Zone 5, 16.7 million tonnes grading 0.86% Cu and 4.0 g/t Ag in Zone 6, and 161.1 million tonnes grading 0.45% Cu and 3.6 g/t Ag in the Chalcocite Zone; all at a cut-off grade of 0.30% Cu.

The Banana Zone exhibits certain areas of higher grade Cu and Ag mineralization, particularly between sections 49700 to 52000 on the North limb and sections 63000 to 71000 on both the North and South limbs, which represent an opportunity to locate starter pits and mine initial tonnages at higher than average grades. These higher grade pockets tend to be well within open pit depth parameters and represent opportunities to improve early cash flow and overall returns in development.

The project will benefit from proposed rail and power infrastructure expansions, along with proximity to local population centers and workforce. A feasibility study is currently underway (funded by the World Bank and the governments of Botswana and Namibia) to support completion of a rail line link that would connect Botswana with the Namibian port of Walvis Bay, on the Atlantic coast. The closest existing railhead to port is at Gobabis, in Namibia, approximately 550 km from our property. Construction has begun on the 600MW expansion of the government-owned Moropule Power Plant, having secured US$825 million project funding in May 2009. The Ghanzi Copper- Silver Project is currently accessed by the paved Trans-Kalahari highway, which passes within 15 km of the property.

The Ghanzi property is one of Africa's premier future copper-silver resources.

For Further Information, contact:
Marek Kreczmer, CEO
Hana Mining Ltd.
Tel: (604) 676-0824
Email: info@hanamining.com
Website: www.hanamining.com

Patrick Donnelly, VP Corporate Development
Hana Mining Ltd.
Tel: (604) 676-0824
Email: patrick@hanamining.com
Website: www.hanamining.com

Table 1: Drill Results from North Limb, Banana Zone, Sections 65835 to 68325 -- Interval indicates down hole interval
Hole # Section Mineralized
Zone
From
(m)
To
(m)
Interval
(m)
Cu
(%)
Ag
(g/t)
North Limb North Diamond Drilling
HA-283b-D NL65835 North Limb North 44.00 61.00 17.00 0.72 12.0
includes     47.00 50.50 3.50 0.62 2.0
includes     55.00 58.75 3.75 2.25 47.0
HA-285-D NL65920 North Limb North 22.00 47.75 25.75 0.85 5.0
includes     34.00 41.28 7.28 2.16 12.0
includes     46.10 47.75 1.65 1.57 16.0
HA-288-D NL66000 North Limb North 57.84 79.53 21.69 0.71 12.0
includes     60.40 63.00 2.60 1.02 1.0
includes     71.97 73.94 1.97 3.23 85.0
includes     76.00 79.53 3.53 0.71 15.0
HA-326-D NL67025 North Limb North 93.50 123.70 30.20 0.26 4.0
includes     94.30 96.00 1.70 0.57 5.0
includes     109.50 111.33 1.83 0.55 11.0
HA-336-D NL67125 North Limb North 77.40 107.87 30.47 0.30 4.0
includes     91.32 94.96 3.64 0.66 12.0
includes     97.85 99.34 1.49 1.26 25.0
HA-339-D NL67125 North Limb North 22.87 57.65 34.78 0.41 5.0
includes     44.24 46.38 2.14 0.62 7.0
includes     46.47 50.11 3.64 1.60 25.0
includes     55.30 57.65 2.35 1.24 6.0
HA-341-D NL67325 North Limb North 93.46 120.33 26.87 0.33 6.0
includes     95.00 97.32 2.32 0.57 5.0
includes     103.21 106.57 3.36 0.89 16.0
HA-350-D NL67525 North Limb North 23.50 41.50 18.00 0.17 1.0
HA-352-D NL67825 North Limb North 67.09 76.00 8.91 0.09 1.0
HA-353-D NL67725 North Limb North 29.70 49.00 19.30 0.36 6.0
includes     38.95 42.50 3.55 1.13 20.0
HA-357-D NL67725 North Limb North 94.47 102.31 7.84 0.70 7.0
includes     95.00 102.31 7.31 0.74 8.0
HA-358-D NL68125 North Limb North 86.80 89.00 2.20 0.14 4.0
HA-364-D NL67925 North Limb North 63.00 86.00 23.00 0.24 6.0
includes     76.67 79.00 2.33 0.74 15.0
HA-380-D NL68325 North Limb North 47.00 71.00 24.00 0.61 6.0
includes     65.10 70.07 4.97 2.13 23.0

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Statements in this press release, other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, may include forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in resource exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.

View News Release in PDF Format:
http://www.hanamining.com/i/pdf/2011-09-13_NR.pdf
837 KB in size, approx. 2 minutes, 37 seconds to download at 56.6Kbps

You can also view this News Release on our website at:
http://www.hanamining.com/s/NewsReleases.asp?ReportID=478821
 

Home    Corporate    Projects    Investors    News    Reports    Contact    Disclaimer    Subscribe    
Data and Statistics for these countries : Botswana | Namibia | South Africa | All
Gold and Silver Prices for these countries : Botswana | Namibia | South Africa | All

Hana Mining Ltd.

EXPLORATION STAGE
CODE : HMG.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Hana Mining is a copper and silver development stage company based in Canada.

Hana Mining holds various exploration projects in Botswana.

Its main exploration property is GHANZI in Botswana.

Hana Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 80.6 millions as of today (US$ 78.4 millions, € 58.5 millions).

Its stock quote reached its lowest recent point on March 27, 2009 at CA$ 0.06, and its highest recent level on December 17, 2010 at CA$ 5.68.

Hana Mining has 99 494 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Hana Mining Ltd.
2/7/2012Announces Completion of Non-Brokered Financing and Investmen...
1/30/2012Announces Final Allocation of Previously Announced Financing
1/27/2012Announces Non-Brokered Financing
5/20/2010Closing of Bought-Deal Private Placement
4/30/2010Arranges $21Million Bought-Deal Private Placement
5/27/2009has closed the first tranche of its brokered private placeme...
Nominations of Hana Mining Ltd.
11/7/2012New Hana Mining Builds the Corporate Structure with Appointm...
5/5/2011Appoints New Chief Financial Officer
4/5/2011shareholders overwhelmingly approve the appointment of three...
3/21/2011Announces the Nomination of Three Highly Experienced Candida...
7/19/2010Appointment of Pat Donnelly, former mining analyst, as VP Co...
Project news of Hana Mining Ltd.
2/8/2013Receives Approval from Botswana Minister of Minerals, Energy...
1/10/2013(Ghanzi)Receives Renewal of Ghanzi Project Prospecting Licenses
10/25/2012Agrees To C$0.82 Per Share All-Cash Acquisition By Cupric Ca...
8/20/2012Expands Zone 5 at Depth with Strong Drill Results
8/13/2012Continues to Hit High-Grade Copper-Silver Mineralization at ...
6/29/2012(Ghanzi)Files Ghanzi Preliminary Economic Assessment Technical Repor...
4/17/2012continues to hit high-grade copper-silver mineralization at ...
2/21/2012(Ghanzi)Infill drilling at the Northeast Fold confirms new geologica...
6/13/2011(Ghanzi)Comments on Share Price - Drilling Continues
5/26/2011(Ghanzi)Provides Update on Banana Zone
3/14/2011(Ghanzi)Provides Update on Banana Zone Preliminary Economic Assessme...
8/5/2010(Ghanzi)RC Drilling in Banana Zone Intersects 3.40% Cu and 48.0 g/t ...
7/14/2010(Ghanzi)Expands Banana Zone at Ghanzi Copper-Silver Project by 4.2 K...
6/18/2010(Ghanzi)Expands Banana Zone by 7 Kilometres
6/3/2010(Ghanzi)Expands Chalcocite Zone - New Drilling Increases Strike Leng
5/19/2010Files NI 43-101
3/30/2010(Ghanzi)RC drilling in Banana Zone intersects 1.63% Cu and 39.5 g/t ...
3/4/2010(Ghanzi)RC drilling in Banana Zone intersects 1.90% Cu and 17.4 g/t ...
1/5/2010(Ghanzi)New VP Engineering to Support Ghanzi Copper-Silver Project P...
12/8/2009drilling intersects 1.84% Cu and 23.6 g/t Ag over 7 metres i...
10/1/2009(Ghanzi)Announces New President and COO to Drive Ghanzi Copper-Silve...
9/28/2009(Ghanzi)RC drilling intersects 2.53% Cu and 32 g/t Ag over 17 metres...
9/15/2009(Ghanzi)Reports Positive Results From a Preliminary Groundwater Inve...
8/26/2009(Ghanzi)Letter from the CEO-Hana Mining Ltd.
7/15/2009(Ghanzi)Agrees to Purchase 100% of Ghanzi Copper-Silver Project in B...
6/25/2009(Ghanzi)43-101 Technical Report for Ghanzi Copper-Silver Deposit, Bo...
5/28/2009(Ghanzi)New results at Ghanzi Copper-Silver Project in Botswana
Corporate news of Hana Mining Ltd.
2/20/2013Completes Arrangement with Cupric Canyon Capital LP
2/14/2013Receives Approval From Botswana Competition Authority
2/5/2013Intersects 4.03% Cu and 50.7g/t Ag over 14 m Further Increas...
2/4/2013Provides Update on Arrangement with Cupric Canyon Capital
1/7/2013Receives Final Court Order for Arrangement with Cupric Canyo...
12/11/2012Advises Regarding Shareholder Meeting
11/1/2012Discovers New Mineralization Further Increasing the Size of ...
10/26/2012from DML's Neighbour, Hana Mining
10/23/2012Reports Consistent High Grades over Thick Intersections at Z...
10/22/2012New Hana Mining Builds Corporate Advisory Team
9/24/2012Finds Strong Copper-Silver Mineralization from New Drill Pro...
9/18/2012Welcomes Two New Board Members
8/27/2012Reports More Strong Results from Zone 5 including 4.54% CuEq...
8/1/2012Drilling continues to encounter down-dip mineralization and ...
7/24/2012Diamond Drilling Extends Down Dip Extension and Confirms Thi...
7/16/2012announces high-grade copper-silver mineralization from Zone ...
5/23/2012Shares Commence Trading on the Botswana Stock Exchange
5/14/2012(Ghanzi)Announces Positive Preliminary Economic Assessment for the G...
3/28/2012Diamond Drilling Extends the Strike and Down Dip Extension o...
3/27/2012to Cancel the Issuance of Stock Options
3/12/2012Diamond drilling encounters consistent high-grade copper-sil...
2/27/2012Infill drilling continues to encounter consistent high-grade...
1/24/2012Infill drilling encounters some of the best intercepts of co...
1/9/2012Infill drilling encounters consistent high-grade copper-silv...
11/28/2011Infill Drilling Again Encounters Consistent High-Grade Coppe...
10/24/2011(Ghanzi)announces the appointment of a highly experienced Technical ...
10/3/2011announces exceptional silver recoveries from oxide-transitio...
9/20/2011(Ghanzi)announces the appointment of highly experienced and successf...
9/13/2011Infill drilling again encounters consistent high-grade coppe...
8/29/2011Infill drilling continues to encounter consistent high-grade...
8/22/2011Infill drilling encounters high-grade copper-silver minerali...
8/15/2011(Ghanzi)announces the appointment of a highly experienced Project Di...
7/26/2011Infill Drilling Again Encounters Thick Intersections of Copp...
7/11/2011Infill drilling still continues to encounter thick intersect...
6/16/2011Infill drilling continues to encounter thick intersections o...
6/13/2011Comments on Share Price-Drilling Continues
4/19/2011Infill Drilling Extends Copper-Silver Mineralization by 300 ...
7/8/2010Comments on Share Price-Drilling Continues
5/25/2010Revisions to Arrangement for Spin-out of New Hana Copper Min...
4/29/2010Letter to Shareholders
3/19/2010New Advisory Board Member
3/5/2010New Chief Financial Officer
1/22/2010Spin-Out of Kuke Property to New Hana Copper Mining Ltd.
7/13/2009Botswana ranked as most favourable mineral investment climat...
6/1/2009completion of inferred resource estimate - Ghanzi Copper-Sil...
5/30/2009Completes $3.2 Million Placement
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (HMG.V)FRANKFURT (4LH.F)
0.810+0.00%0.144+132.26%
TSX-V
CA$ 0.810
02/19 16:59 -
0%
Prev close Open
0.810 0.810
Low High
0.810 0.810
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.810 -%
Volume 1 month var.
61,000 -%
24hGold TrendPower© : 27
Produces
Develops
Explores for Copper - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/6/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.46-2.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.79-1.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.82-4.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.80+0.72%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :