Aurizon Mines Ltd

Published : March 11th, 2009

Infill Drilling Increases Mineral Resources at Joanna

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Infill Drilling Increases Mineral Resources at Joanna

Vancouver, BC - March 11, 2009 - Aurizon Mines Ltd. (TSX: ARZ; NYSE Alternext: AZK) reports that an updated mineral resource estimate has been completed for the Joanna Property, located in north western Quebec, Canada.  The new updated mineral resource estimate has been prepared by SGS Geostat Ltd. (�Geostat�).

The updated measured and indicated mineral resource estimate integrates results of the 2008 infill drilling program completed within the limit of the proposed pit outline of the Hosco Block and the results of all exploration drilling performed outside of that pit contour above 300 metres.  The inferred mineral resources are estimated down to 600 metres.

  • Measured and Indicated mineral resources have increased by 900,000 ounces in comparison with the previous estimate of September, 2007.  The increase is mainly within the pit outline as proposed in the BBA preliminary assessment report of May, 2008
  • Inferred mineral resources estimates decreased by 151,000 ounces in comparison with the previous estimate of September, 2007.  The decrease is mainly due to the upgrade of resources to the measured and indicated category.

In addition to the upgrading of previously reported mineral resources, total resources have increased within and along the extension of the previous mineral resources outline.

JOANNA MINERAL RESOURCES ESTIMATE (1,2,3,)

 

December, 2008

September 2007

 

Mineral Resources

 


Tonnes

Grade
Grams/tonne

Gold
Ounces


Tonnes

Grade
Grams/tonne

Gold
Ounces

Gain (loss)
Ounces

Measured

Hosco

18,500,000

1.4

827,000

-

-

-

827,000   

Indicated

Hosco

Heva

11,100,000

4,200,000

1.3

1.9

446,000

257,000

  8,200,000

  3,100,000

1.6

2.1

420,000

210,000

26,000   

47,000   

Total Measured and Indicated

 


33,800,000


1.4


1,530,000


11, 300,000


1.7


630,000


900,000   

Inferred

Hosco

Heva

19,800,000

8,600,000

1.2

1.8

774,000

488,000

24,300,000

4,300,000

1.5

1.9

1,150,000

263,000

(376,000)  

225,000   

 

 

28,400,000

1.4

1,262,000

28,600,000

1.5

1,413,000

(151,000)  

(1) Mineral Resources which are not mineral reserves do not have demonstrated economic viability
 
(2) Measured and indicated mineral resources for 2008 are reported to a depth of 300 metres at a cut off grade of 0.5 grams of gold per tonne.  Inferred mineral resources for 2008 are related to a depth of 600 metres at a cut off grade of 0.5 grams of gold per tonne.  Mineral resources for 2007 are reported to a depth of 600 metres at cut-offs from 0.5 to 1.5 grams of gold per tonne, depending of depth.

(3) Historical production of 9,700 oz (Hosco) and 10,700 oz (Heva), has not been subtracted from indicated and measured resources.

The mineral resource estimate is in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (�CIM�) Definitions Standards for mineral resources and reserves and has been completed in accordance with the National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

�As the updated mineral resource estimate has confirmed the quality of the existing mineral resources, Aurizon is proceeding with the pre-feasibility study which will include all necessary technical and economic aspects for the project and address environmental and social issues, including the results of future discussions with local and municipal organizations.� said Michel Gilbert, ing. Vice President.

MINERAL RESOURCES � VARIABLE CUT-OFF GRADES

Cut-off
(g/t)

Property

Measured

Indicated

Total Measured & Indicated

Tonnes
(M)

Grade
(g/t)

Ozs
(000)

Tonnes
(M)

Grade
(g/t)

Ozs
(000)

Tonnes
(M)

Grade
(g/t)

Ozs
(000)

0.5

Hosco

18,524

1.4

827

11,072

1.3

446

29,596

1.3

1,273

 

Heva

-

-

-

4,203

1.9

257

4,203

1.9

257

 

Total

18,524

1.4

827

15,275

1.4

703

33,799

1.4

1,530

1.0

Hosco

13,476

1.6

691

6,899

1.5

337

20,375

1.6

1,028

 

Heva

-

-

-

3,670

2.1

244

3,670

2.1

244

 

Total

13,476

1.6

691

10,569

1.6

581

24,045

1.6

1,272

1.5

Hosco

5,762

2.1

385

2,431

2.1

162

8,193

2.1

547

 

Heva

-

-

-

2,467

2.5

195

2,467

2.5

195

 

Total

5,762

2.1

385

4,898

2.2

357

10,660

2.2

742

 

 

 

 

 

 

 

Inferred

Cut-off
(g/t)

Property

Tonnes
(M)

Grade
(g/t)

Ozs
(000)

0.5

Hosco

19,767

1.2

774

 

Heva

8,586

1.8

488

 

Total

28,353

1.4

1,262

1.0

Hosco

12,618

1.4

586

 

Heva

7,775

1.9

466

 

Total

20,393

1.6

1052

1.5

Hosco

3,953

2.0

249

 

Heva

5,403

2.1

368

 

Total

9,356

2.0

617

Geology
Mineralization at Joanna is closely related to the east-west Cadillac Fault and forms a 200 metre wide corridor composed of different mineralized lenses parallel to the fault, dipping 55 degrees to the north.  Mineralization takes the form of a few millimetres to 15 centimetres wide quartz veins networks inside finely disseminated sulphides.  Mineralization has been defined and correlated based on altered mineral assemblages (biotite, tremolite, carbonates, muscovite, tourmaline, chlorite), quartz textures, deformation features and sulphides types (pyrrhotite and arsenopyrite). Mineralization is concentrated within two main sectors, respectively, Hosco on the eastern side and Heva on the western side.

At Hosco, mineralization is located within three lenses, one located north of the fault and two others at the southern side.  Each lens shows a thickness between 15 and 60 metres and a variable lateral extension between 300 and 700 metres. At Heva, lenses are always located south of the fault and rarely exceed 10 metres.

Data
Data from drilling and underground channel sampling have been used for the mineral resource estimate, including holes completed by previous owners and four hundred and seventy (470) holes, totaling 134,489 metres, completed by Aurizon.  All holes were drilled between Sections 4,200m East and 9,700m East.  At Hosco, infill drilling at an average spacing of 25 metres was completed between section 8,200m East and 9,300m East from surface to a depth of 200 metres.

Preliminary assessment
BBA Inc. completed a Preliminary Assessment Report based on the mineral resources contai ned in the Hosco block, as calculated in September, 2007. See news release dated May 12, 2008, and the Preliminary Assessment Report filed under the Company�s profile at www.sedar.com �BBA Preliminary Assessment� dated May 22, 2008.  The preliminary assessment has not been revised to incorporate the updated resource estimate prepared by Geostat.

Hosco mineral reserves
Aurizon holds an option to earn a 100% interest in the mineral claims containing the Hosco mineral reserves.

Heva mineral resources
The Heva block covers mineral claims under two different option agreements, namely the Vantex agreement and Feifer option. Aurizon holds a 75% interest in the claims held under the Vantex agreement, with the residual 25% interest held by Stellar Pacific Ventures Inc, subject to dilution, and a 100% interest in the claims held under the Feifer option. Mineral resources contained in the Vantex claim blocks comprise indicated mineral resources of 2,012,000 tonnes at an average grade of 2.4 grams of gold per tonne, and inferred mineral resources of 1,386,000 tonnes at an average grade of 2.0 grams per tonne (at a variable cut-off with depth). No work has been performed on the Vantex claims since the previous mineral resource estimate of September, 2007.
 
Outlook
Two (2) drill rigs are currently active on the Joanna property, one to test a deep exploration target 400 to 700 metres down-pl unge from the existing mineral resource contour, and a second drill rig is testing geophysics targets in the northern part of the property and will explore the main horizon along the recently optioned Alexandria property, to the east of the Hosco Block.

The pre-feasibility study will incorporate the new resource estimate on the Hosco block of the Joanna property as well as the results from the metallurgical and geo-mechanical tests and studies currently in progress.  In addition, a preliminary economic assessment study will be initiated on the Heva (West) block.  The studies are expected to be completed during the third quarter, 2009.

Qualified Person and Quality Control
Information of a scientific or technical nature in this news release has been prepared by or under the supervision of Ghislain Fournier ing., Corporate Development Manager and Martin Demers, P.Geo, Exploration Manager of the Company.  Mineral resource estimat es were prepared by Michel Dagbert of Geostat, a �qualified person� as defined by National Instrument 43-101.

Additional Information
Additional information required by Part 3 of NI 43-101 and not otherwise contained in this news release can be found in the �Technical Report Resource modeling & estimation update Joanna Gold deposit�, dated October 26, 2007 and the �Technical Report NI 43-101 Preliminary Assessment for the Joanna Gold Project�, dated May 22, 2008, which can be found under Aurizon�s profile on www.sedar.com.

Two sketches are attached showing the updated resource outline at the Joanna Gold Project.  An appendix is also attached detailing the technical parameters used for the mineral resource estimate.  All other information previously released on Joanna is also available on Aurizon�s website at www.aurizon.com.

About Aurizon
Aurizo n is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions.  Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE Alternext (formerly the American Stock Exchange) under the symbol "AZK".  Additional information on Aurizon and its properties is available on Aurizon's website at http://www.aurizon.com.

For further information, contact

AURIZON MINES LTD.
David Hall, President and C.E.O.
Telephone: 604-687-6600
Toll Free: 1-888-411-GOLD
Fax: 604-687-3932 

Michel Gilbert, Vice President
Telephone: 819-874-4511
 Fax: 819-874-3391
Web Site: www.a urizon.com; Email: info@aurizon.com

Or

Renmark Financial Communications Inc.
Barry Mire: bmire@renmarkfinancial.com
Henri Perron: hperron@renmarkfinancial.com
Media: Vanessa Napoli: vnapoli@renmarkfinancial.com
Montreal - Tel: 514 939-3989 / Fax: 514 939-3717
Toronto - Tel.: 416 644-2020 / Fax: 416 644-2021
www.renmarkfinancial.com

FORWARD-LOOKING STATEMENTS
This News Release contains "forward-looking statements" and �forward-looking information� within the meaning of applicable securities legislation. These forward-looking statements include, but are not limited to, statements and information regarding estimated mineral resources, anticipated effect of the completed drill resul ts on the Joanna project, a preliminary assessment, timing of a pre-feasibility study, and timing and expectations for future work programs.  Forward-looking statements express, as at the date of this News Release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and the Company does not intend, and does not assume any obligation to update these forward-looking statements. Forward-looking statements are based on certain assumptions, including, those referred to in this news release and, with respect to mineral resource estimates, the key assumptions and parameters on which such estimates are based, as set out in the technical report for the property, and involve risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold; possible variations in ore resources, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, delays in work programs due to shortage of labour, equipment or financial resources, environmental risks and hazards and other risks of the mining industry; and other risks more fully described in Aurizon's Annual Information Form filed with the Securities Commissions of the provinces of British Columbia, Alberta, Manitoba, Ontario and Quebec, and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission. These documents are available on Sedar at
www.sedar.com and on Edgar at www.sec.gov.

CAUTIONARY NOTE TO US READERS
As a British Columbia corporation, the Company is subject to certain rules and regulations issued by the British Columbia Securities Commission (�BC Securities Commission�).  The Company is required to provide detailed information regarding its properties including mineralization, drilling, sampling and analysis, security of samples and mineral resource and mineral reserve estimates.  Further, the Company describes mineral resources associated with its properties utilizing terminology such as �indicated� or �inferred� which terms are recognized by Canadian regulations but are not recognized by the United States Securities and Exchange Commission (�SEC�).

Cautionary Note to U.S. Investors Regarding Mineral Resources
The SEC allows mining companies, in the ir filings with the SEC, to disclose only those mineral deposits they can economically and legally extract or produce.  The Company may use certain terms in this document, such as �mineral resources�, �indicated mineral resources� and �inferred resources� that are recognized and mandated by Canadian securities regulators but are not recognized by the SEC.

This News Release may use the term �indicated� resources.  U.S. readers are cautioned that while that term is recognized and required by Canadian regulations, the SEC does not recognize it.   U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into mineral reserves.

This News Release may also use the term "inferred� resources.  U.S. readers are cautioned that while this term is recognized and required by Canadian regulations, the SEC does not recognize it.  "Inferred resources" have a great amount of uncertai nty as to their existence, and great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category.  Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases.  U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

Appendix

Technical Parameters � Mineral Resource Estimate

Technical parameters used for the updated mineral resource estimate are as follows:

  • For the block model calculation, the block size is 5m (EW) x 2m (NS) x 5m (Z)
  • The average gold grade of each block is interpolated by ordinary kriging from the grades of nearby 2 metre composites.
  • Higher grade intercepts have been revised and capped at 15 grams of gold per tonne on the 2 metre composite, in comparison with 25 grams of gold per tonne on 1metre composite at Heva and 15 grams of gold per tonne at Hosco as previously used.
  • The specific gravity used in the tonnage calculation is 2.66 tonnes per cubic metre.
  • The minimum cut off grade of 0.5 grams of gold per tonne, which is in line with the BBA preliminary assessment completed in 2008, was based on a gold price of US$650 per ounce, a Canadian dollar exchange rate of 1.17, and milling recovery of 77%.
<
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Aurizon Mines Ltd

PRODUCER
CODE : ARZ.TO
ISIN : CA05155P1062
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Aurizon Mines is a gold producing company based in Canada.

Aurizon Mines holds various exploration projects in Canada.

Its main asset in production is CASA BERARDI in Canada, its main asset in development is JOANNA in Canada and its main exploration properties are DUVERNY, PATRIS, OPINACA, REX SOUTH, MARBAN MINE, KIPAWA, FAYOLLE and JOANNES in Canada.

Aurizon Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 27.5 millions as of today (US$ 21.1 millions, € 18.3 millions).

Its stock quote reached its lowest recent point on December 31, 2001 at CA$ 0.21, and its highest recent level on September 16, 2016 at CA$ 8.75.

Aurizon Mines has 63 960 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Aurizon Mines Ltd
2008 Annual Report
2007 Annual Report
2005 Annual report
Financings of Aurizon Mines Ltd
2/2/2011AURIZON ANNOUNCES US$50 MILLION REVOLVING CREDIT FACILITY
Option Grants of Aurizon Mines Ltd
8/15/2011Grant of 600,000 options at 6,38
Nominations of Aurizon Mines Ltd
1/18/2013Aurizon Appoints a Special Committee to Evaluate Offer
8/26/2011Announces Vice President, Corporate Development Resignation
8/15/2011George Paspalas Joins Aurizon as Chief Executive Officer; Da...
6/27/2011Aurizon Announces Appointment of George Paspalas as Chief Ex...
Financials of Aurizon Mines Ltd
5/15/2013Aurizon Reports First Quarter 2013 Financial Results
3/14/2013Aurizon Reports 2012 Financial Results
11/8/2012Aurizon Reports Third Quarter 2012 Financial Results
8/9/2012Aurizon Reports Second Quarter 2012 Financial Results
5/10/2012Aurizon Reports First Quarter 2012 Financial Results
3/15/2012Aurizon Reports 2011 Financial Results
8/11/2011Aurizon Reports Second Quarter 2011 Results
5/16/2011AURIZON REPORTS FIRST QUARTER 2011 RESULTS
8/14/2009reports record revenues and cash flow in second quarter 2009
5/13/2009Reports Highlights Of First Quarter 2009 Results
3/11/2009Reports 2008 Financial Results
11/6/2008Third Quarter 2008 Results
11/6/2008Reports Highlights Of Third Quarter 2008 Results
8/8/2008Reports Highlights Of Second Quarter 2008 Results
5/7/2008Reports Highlights Of First Quarter 2008 Results
3/19/2008 Reports 2007 Financial Results
Project news of Aurizon Mines Ltd
5/3/2013(Casa Berardi)Aurizon Reports Status Update on Minor Discharge at Tailings...
5/2/2013(Casa Berardi)Aurizon Reports Minor Discharge at Tailings Facility at Casa...
3/25/2013(Casa Berardi)Aurizon Reports Accident at Casa Berardi Mine
2/15/2013(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
12/12/2012New Discovery at Aurizon's Heva West Area Returns 1.7 Grams ...
9/6/2012Aurizon Mines Ltd.: New Drill Results Confirm High Grade Pot...
9/6/2012(Fayolle)Aurizon Announces an Updated Mineral Resource Estimate for F...
8/16/2012(Marban Mine)Aurizon Announces the Completion of the Marban Block Phase T...
7/30/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Confirm Continuity and...
7/20/2012(Joanna)Aurizon Files Feasibility Study of the Hosco Deposit
7/9/2012(Joanna)Aurizon Mines Ltd.: New Drill Results Expand the Heva Area a...
6/12/2012Aurizon Mines Ltd.: Marban's Phase Two Drill Program Results...
6/11/2012Aurizon Acquires Common Shares of Typhoon Exploration Inc.
6/6/2012(Joanna)Aurizon Receives Results of Feasibility Study for Joanna's H...
5/15/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
4/26/2012(Marban Mine)Aurizon Mines Ltd.: New Results at Marban Highlight Potentia...
4/20/2012(Joanna).: Higher Grade Mineralization Discovered on the Heva and Ho...
4/4/2012(Rex South)Aurizon Announces Results from the 2011 Exploration Program ...
3/1/2012(Marban Mine)Aurizon Mines Ltd.: Marban Eastern Down Dip Zone Returns 6.4...
3/1/2012(Casa Berardi)Reports Mineral Reserve Replenishment and Mineral Resource U...
9/22/2011(Marban Mine) Two New High Grade Gold Zones Discovered at Marban
9/9/2011(Casa Berardi)Aurizon Mines Ltd.: Drilling Confirms the Continuity and the...
8/31/2011(Fayolle)Aurizon Reports New High Grade Values at Fayolle
8/11/2011(Joanna)Aurizon Reports Joanna Feasibility Study Delayed, However Dr...
8/9/2011(Fayolle)Aurizon Reports Discovery of New Gold Bearing Trends Outside...
6/22/2011(Marban Mine) Deeper Drilling at Marban Reveals Added Upside With 5
6/13/2011(Joanna)Aurizon Increases the Hosco In-Pit Measured and Indicated Mi...
5/25/2011(Marban Mine)AURIZON REPORTS FURTHER RESULTS FROM MARBAN BLOCK
4/14/2011(Marban Mine)AURIZON REPORTS FURTHER DRILL RESULTS FROM MARBAN
3/13/2011(Casa Berardi)AURIZON REPORTS A 44% INCREASE IN MINERAL RESERVES FOR THE C...
2/15/2011(Rex South)AURIZON AND AZIMUT RE-EVALUATE TUNGSTEN VALUES ON THE COPPER...
1/21/2011(Marban Mine)AURIZON ANNOUNCES 9=2E06 GRAMS OF GOLD PER TONNE OVER 7=2E3 ...
1/11/2011AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
9/1/2009Aurizon Intersects 18.9 Grams of Gold per Tonne Over 4.0 Met...
3/11/2009(Joanna) Infill Drilling Increases Mineral Resources at Joanna
2/20/2009(Casa Berardi)Reports Mineral Reserve Renewal And Mineral Resource Update ...
1/26/2009(Joanna): Grade and Thickness Confirmed Along the North Zone at Joan...
12/11/2008(Joanna)Infill Drilling Program Completed At Joanna 116 Grams Of Gol...
6/13/2008(Kipawa)Reports Additional Rare Earth And Uranium Results At Kipawa ...
5/12/2008(Joanna) Commissions Pre-Feasibility Study At Joanna
4/23/2008(Joanna) Reports Further Results From Its Joanna Property Including ...
4/2/2008(Casa Berardi)Provides Mineral Reserves And Resources Update
Corporate news of Aurizon Mines Ltd
5/30/2013Aurizon Announces Results of Hecla Arrangement Consideration...
5/28/2013Aurizon Announces Receipt of Investment Canada Act Approval
5/22/2013Aurizon Announces Change to Election Deadline to May 29, 201...
5/21/2013Aurizon Announces Extension of Election Deadline
5/10/2013Aurizon Receives Final Court Approval of Plan of Arrangement
5/9/2013Aurizon Securityholders Approve Plan of Arrangement
5/8/2013Aurizon Announces Preliminary Results of Hecla Arrangement C...
5/6/2013Aurizon Reminds Shareholders of Election Deadline
5/1/2013Aurizon Reminds Shareholders of Important Vote Deadline of M...
5/1/2013Reminds Shareholders of Important Vote Deadline of May 7, 20...
4/24/2013Announces That Leading Independent Proxy Advisory Firm Insti...
4/12/2013Aurizon Announces Special Meeting of Securityholders and Mai...
3/26/2013(Casa Berardi)Aurizon Mines Ltd.: Regular Operations Resume at Casa Berard...
3/20/2013Aurizon Comments on Expiry of Alamos Offer
3/19/2013Aurizon Responds to BCSC Decision to Cease Trade New Shareho...
3/18/2013Aurizon Reiterates Rejection of the Financially Inadequate A...
3/12/2013Aurizon Announces Hearing on New Shareholder Rights Plan
3/11/2013Aurizon Takes Steps to Ensure Equal Treatment of All Shareho...
2/15/2013(Casa Berardi)Aurizon Reports Mineral Reserve Replenishment and an Increas...
2/12/2013Aurizon Announces Hearing on Shareholder Rights Plan
2/8/2013Aurizon Mails Shareholder Rights Plan Materials
1/30/2013Aurizon Provides Update on Shareholder Rights Plan
1/15/2013Aurizon Responds to Unsolicited Offer
1/14/2013Alamos Gold Acquires Common Shares of Aurizon Mines
10/30/2012. Announces Third Quarter 2012 Conference Call & Webcast
9/7/2012Aurizon Announces an Updated Mineral Resource Estimate for t...
5/1/2012. Announces First Quarter 2012 Conference Call & Webcast
4/24/2012Aurizon Mines Ltd.: Preliminary Metallurgical Testwork at Ma...
3/31/2012Aurizon Releases Annual Disclosure Documents
3/9/2012. Announces 2011 Financial Results Conference Call & Webcast
1/11/2012Aurizon Announces Record 2011 Gold Production and 2012 Plans
12/8/2011Aurizon Grants Stock Options
12/8/2011Grants Stock Options
8/2/2011. Announces Second Quarter 2011 Conference Call & Webcast
11/30/2010Receives Award From Aemq
5/26/2010Options Azimut's Rex South Property
6/13/2008defines Gold Targets and Commences Exploration Program at Ki...
5/15/2008Andre Falzon Joins Aurizon's Board
3/15/2008deeply regrets
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ARZ.TO)FRANKFURT (AUE.F)
0.430+10.26%2.95+5.85%
TORONTO
CA$ 0.430
08/09 16:50 0.040
10.26%
Prev close Open
0.390 0.395
Low High
0.395 0.510
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.430 -%
Volume 1 month var.
274,400 -%
24hGold TrendPower© : -44
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/11/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.83+1.69%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.32-15.27%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.68+9.32%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.94+0.57%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+7.50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.99+8.15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.85+0.57%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04-5.26%Trend Power :