Monument Mining Limited

Published : November 21st, 2012

Intercepts 3.84 g=2Ft Gold over 51 metres in Selinsing Drilling

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
You are receiving this email because you opted in at our website
Email not displaying correctly? View it in your browser.
Dear 24H,

November 21 2012

Monument Intercepts 3.84 g/t Gold over 51 metres in Selinsing Drilling


Release #27 - 2012


Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) �Monument� or the �Company� is pleased to report additional drill assay results from its ongoing drilling program at the producing Selinsing open pit gold mine in Pahang, Malaysia. 
 
ASSAY HIGHLIGHTS
 
  • MSMDD035 intersected 51.0m at 3.84 g/t gold;
  • MSMDD025 intersected  65.0m at 3.09 g/t gold; and
  • MSMCD017 intersected 64.58m at 2.91 g/t gold (uncut) and 2.22 g/t gold (cut to 34.286 g/t gold).
 
Background
 
The Selinsing property exploration program announced on September 22, 2010 was aimed to increase the reserves by converting the inferred resources below the present Selinsing open pit outline. The program planned 22 drill holes comprising 1,000m of RC drilling and 3,000m of Diamond drilling with a budget of US$0.6 million.
 
The drill program since has been expanded to focus on finding additional oxide and sulfide ores adjacent to the existing pit development areas, extending known mineralization north and south of the Selinsing open pit along strike, and converting Inferred gold resources to Indicated as follows:  
 
-          Fourteen (14) drill holes (MSMDD001 to MSMDD014) totaling 3,013m were completed in fiscal 2011 costing $US1.1 million. Of which drill results for MSMDD 001-006 were reported in the Company�s press release on July 26, 2011.
 
-          Forty seven (47) drill holes (MSMDD015 to MSMDD061) totaling 10,554m of drilling were completed in fiscal 2012 costing $US2.2 million.
 
A full list of assay results from the above drill programs received as of November 1, 2012, including MSMDD 001-006 which were disclosed on July 26, 2011, and two plan maps showing the Selinsing RC and Diamond drill hole locations are presented on the Company�s website at www.MonumentMining.com. MSMDD 051-061 and others as listed in the below table are still pending for assay.
 
Drill results
 
As presented in the table 1 in this news release, MSMDD35 (51m at 3.84 g/t gold from 159.5 to 210.5m), MSMDD025 (65m at 3.09 g/t gold from 157.10m to 222.1m) and MSMCD017 (64.58m at 2.91 g/t gold  from 188.65m to 253.23m) partially define a new high grade ore pod located approximately 85-103m below the current pit bottom. This ore pod needs additional drill tests to determine its full extent. These drill results demonstrate that gold mineralization at the Selinsing Deposit continues at depth along an east-dipping structural zone.  It is hosted in cataclasite and mylonite rocks with weak to moderate gold-bearing quartz veins and quartz stockwork veinlets.  Ores exposed in the current Pit 4 bottom are mostly �fresh� or sulfide-bearing rock and are currently being processed through the plant.
 
Encouraged with the outcome of the deeper drilling below the existing pit, more drill holes are planned to define the vertical and lateral extension of the orebody at depth with the objective to expand the pit below the target depth of RL 400.
 
The information in this press release has been reviewed and approved by Todd Johnson (MS, P.E.), Vice President of Exploration for Monument Mining Limited, who is also the Qualified Person as required by National Instrument 43-101 guidelines.  Todd Johnson has visited the Selinsing site several times since October 2011 to the present (last trip was in November 2012) to observe the drilling, sampling, and geological activities.
 
Drill holes at Selinsing are being sampled and logged at the mine site in a highly secured area. The drill samples are shipped to SGS Malaysia at Port Klang, a certified lab under ISO 17025, for sample preparation and analysis.   The samples are dried, crushed to 90% passing 4.0mm and pulverized to 90% passing -75 microns and analyzed for: Au fire assay (2 assay ton) using the FAA505 analysis method; and ICP Ag, ICP As, and ICP Sb. As part of the Quality Control and Quality Assurance program, certified Au standards and non-certified blank materials are inserted approximately every 20 samples into the sample sequence.  Assay results reported in this press release are drill thicknesses but approximate true thickness as most drill holes are oriented at an azimuth of 270 degrees with an inclination of 50 to 70 degrees (near perpendicular to the strike and dip of the ore body).
 
There are currently three exploration drills operating at Selinsing and Buffalo Reef.  The fiscal 2013 exploration drilling plan includes shallow RC drilling targeting additional areas for potential oxide resources and Diamond drilling targeting the well-defined structural zone along strike throughout the district to consolidate the Selinsing and Buffalo Reef resources. As of November 1, 1555 RC meters in 24 drill holes and 3992m of Diamond drilling in 23 holes has been completed at Selinsing and assays are pending.
 
 
Table 1.  Summary of previously unreported Selinsing drill hole intercepts received as of November 1, 2012.
 
DHID Azimuth Dip Hole Depth Depth From (m) Depth To (m) Thickness (m) Au (g/t)
MSMCD007 270 -70 302.5 186.66 203.94 17.28 1.74
MSMDD010 270 -70 300 40.4 43 2.6 2.89
        164 194 30 1.06
        213.5 226 12.5 0.92
        236.5 237.35 0.85 0.92
        264.9 265.7 0.8 2.27
        296 296.25 0.25 1.71
MSMDD011 270 -70 152.43 115.23 116.43 1.2 3.63
MSMDD012 270 -60 30.7 12 14.4 2.4 4.48
        22.6 24.1 1.5 3.33
MSMDD013 270 -60 201.85 33.75 38.42 4.67 0.86
        60.25 61.36 1.11 1.4
MSMDD014 270 -60 100.7 57.7 58.1 0.4 1.76
        72.9 74.4 1.5 1.22
MSMDD015 270 -60 170.8 89.38 90.88 1.5 2.97
MSMCD017 270 -70 300.6 44.35 45.1 0.75 1.88
        120.5 122.44 1.94 1.07
        188.65 253.23 64.58 2.91 uncut  (2.22 cut to 34.286 g/t)
        264.63 265.23 0.6 3.87
        268.44 269.41 0.97 1.56
        275.42 276.6 1.18 0.83
        292.45 293.45 1 1.53
MSMDD019 270 -70 318.4 100 101.2 1.2 1.25
        117.7 119 1.3 0.88
        154.4 201.4 47 1.02
DHID Azimuth Dip Hole Depth Depth From (m) Depth To (m) Thickness (m) Au (g/t)
        280.7 283.5 2.8 1.5
MSMDD020 270 -50 308.7 165.4 166.5 1.1 1.04
MSMDD021 270 -50 296.9 120.3 126.4 6.1 1.14
        168.4 175.2 6.8 1.13
        184.3 198.9 14.6 1.46
        204.9 208 3.1 3.75
MSMDD022 270 -60 261.5 163.5 165.5 2 1.23
        165.5 166.5 1 2.06
        173.4 175.5 2.1 1.67
        180.8 181.9 1.1 3.48
        188.5 190.1 1.6 3.22
        195.9 196.9 1 0.76
MSMDD023 270 -52 309 133.6 134.5 0.9 1.29
        151.5 152.5 1 1.51
        159 162 3 0.98
        163.55 165 1.45 0.92
        225 226.4 1.4 1.43
MSMDD025 270 -60 308.5 157.1 222.1 65 3.09
MSMDD027 270 -70 306.3 184.5 195.3 10.8 1.07
        199.6 201.3 1.7 1.47
        216.3 219.3 3 0.93
        219.3 222.3 3 1.39
        228.3 231.3 3 1
MSMDD028 270 -65 309.4 203.9 207 3.1 1.06
        208.5 213.4 4.9 1.45
        227.3 233.05 5.75 0.92
        237.2 240.4 3.2 0.93
        241.85 243.8 1.95 2.21
MSMDD029 270 -50 300.5 142.2 144.2 2 1.48
        147 148.3 1.3 12.7
        155 156.5 1.5 1.48
        171.5 177.5 6 3.97
MSMDD031 270 -53 189.4 159.4 160.8 1.4 1.95
        174.4 187.8 13.4 3.4
MSMDD033 270 -75 324.5 195.5 198.5 6 1.76
        204.5 216.5 12 1.85
        224.9 225.5 0.6 1.94
        230 234.5 4.5 2.59
        248 249.5 1.5 1.58
MSMDD034 270 -85 309.5 194.9 195.5 0.6 7.87
        258.5 270.5 12 2.76
        286.6 290.3 3.7 0.99
        293.1 295.7 2.6 1.3
        308.1 309.5 1.4 1.21
MSMDD035 270 -60 303.5 95.5 97 1.5 3
        159.5 210.5 51 3.84
MSMDD044 270 -70 155 22.4 23.9 1.5 0.72
        26.9 28.4 1.5 0.73
        39.5 40.7 1.2 1.16
        45.5 47.2 1.7 1.33
        95 96.5 1.5 1.43
        131 132.1 1.1 0.87
MSMDD047 0 90 101 26 33 7 1.05
        59 63.5 4.5 1.25
        72.3 76.9 4.6 1.07
MSMDD050 270 -60 122 0 3.5 3.5 2.34
        6.5 12.5 6 2.32
        17 18.5 1.5 1.11
DHID Azimuth Dip Hole Depth Depth From (m) Depth To (m) Thickness (m) Au (g/t)
        41 45.5 4.5 0.69
        50 54.5 4.5 0.87
        60.5 62 1.5 1.75
Notes:  (1) Assays for drill holes MSMCD002 to MSMCD006 were previously published in a Monument press release dated July 26, 2011;                                                (2) Assays in progress for drill hole numbers:  MSMDD008, MSMDD018, MSMDD024, MSMDD026, MSMDD030, MSMDD032, MSMDD036 to MSMDD043, MSMDD045, MSMDD046, MSMDD048, and MSMDD049, and others greater than MSMDD050.
 
About Monument
Monument Mining Limited (TSX-V:MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia, with production cash costs among the lowest in the world.  Its experienced management team is committed to growth and is advancing several exploration and development projects in Malaysia, including the Mengapur project. The Company employs 260 people in Malaysia and is committed to the highest standards of environmental management, social responsibility, and health and safety for its employees and neighboring communities.
 
Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 910- 688 West Hastings Street
Vancouver B.C. Canada V6B 1P1
 
FOR FURTHER INFORMATION visit the company web site at www.monumentmining.com or contact:

Nick Kohlmann, MMY Toronto               T: +1-647-478-3594                   nkohlmann@monumentmining.com

Richard Cushing, MMY Vancouver          T: +1-604-638-1661 x102        rcushing@monumentmining.com

Wolfgang Seybold, Axino AG-Europe     T: +49 711-2535-92 40             wolfgang.seybold@axino.de


"Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release."
 
Forward-Looking Statement
This news release contains forward-looking statements about Monument Mining Limited (�Monument�), its business and future plans. Forward-looking statements are statements that are not historical facts and include the timing of the proposed programs and events.  The forward-looking statements in this news release are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements.  These risks and certain other factors include, without limitation, the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; statements regarding the future price of gold; the estimation of mineral resources; conclusions of economic evaluation (including scoping studies); the realization of mineral resource estimates; the timing and amount of estimated future production, development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking information can be identified by the use of forward- looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general business, economic, competitive, geopolitical and social uncertainties; the actual results of current exploration activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the annual information form of the Company, which is available under the profile of the Company on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward- looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

| Send to a Friend | Update Profile
Data and Statistics for these countries : Canada | Malaysia | All
Gold and Silver Prices for these countries : Canada | Malaysia | All

Monument Mining Limited

PRODUCER
CODE : MMY.V
ISIN : CA61531Y1051
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Monument Mining is a gold producing company based in Canada.

Its main asset in production is SELINSING in Malaysia and its main exploration properties are MENGAPUR and BUFFALO REEF in Malaysia.

Monument Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 51.6 millions as of today (US$ 37.5 millions, € 35.2 millions).

Its stock quote reached its highest recent level on January 21, 2011 at CA$ 0.74, and its lowest recent point on April 09, 2020 at CA$ 0.04.

Monument Mining has 322 720 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Monument Mining Limited
2/13/2013Announces Closing of First Tranche of Brokered Private Place...
10/17/2012Announces Private Placement
10/12/2011Announces Private Placement of up to $70=2C000=2C000
8/12/2010Closes $13.0 Million Financing
7/22/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Nominations of Monument Mining Limited
1/8/2014Receives Notice of Nominations for Election of Directors
1/8/2014Receives Notice of Nominations for Election of Directors
10/28/2013Appoints Executive General Manager, Monument Malaysia Group
9/20/2012Appoints Chief Operating Officer
6/29/2012Appoints Gerald Ruth to Board
1/25/2012Grants Share Purchase Options to its Directors
12/21/2011Appoints Graham Dickson as Chairman of the Board
6/9/2010Grants 1,600,000 options to CHF investor relation firm
6/9/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
6/30/2009Appoints New Director
12/17/2008Appoints New Directors and Names George Brazier Chairman of ...
8/25/2008Appoints General Manager and Mine Manager
6/20/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Financials of Monument Mining Limited
11/29/2013Reports First Quarter Fiscal 2014 Results
5/30/2013Reports Third Quarter Fiscal 2013 Results
6/1/2012=E2??s 2012 Third Quarter Results
3/1/20122012 Second Quarter Results
1/5/2012=E2??s 2012 First Quarter Results
5/30/2011 2011 Third Quarter Results
5/9/2011 Third Quarter Production and Sales Results
3/1/2011 2011 Second Quarter Results
Project news of Monument Mining Limited
5/15/2013Central Australian Phosphate and Monument Mining to Establi...
5/1/2013s Its Interest In Central Australian Phosphate Limited
4/30/2013(Selinsing)s Selinsing and Buffalo Reef Resources
3/19/2013Abandons Earn=2DIn on Mersing Project
10/26/2012Attending Singapore and German Resource Conferences
10/25/2012(Selinsing)to Vigorously Defend Opportunistic Claim Filed Against Seli...
10/9/2012(Mengapur)Signs Harmonization Agreement on Mengapur Project
3/26/2012(Selinsing)Exposes Gold Thieves at Selinsing Gold Mine
2/21/2012(Mengapur)Closes Acquisition of 70% of the Mengapur Polymetalic Projec...
2/2/2012(Mengapur)Receives Final Acceptance from the TSX=2DV to Close the Meng...
12/3/2011(Mengapur)Enters into Definitive Agreement for Acquisition of 70% of ...
9/15/2011Grows Gold Project Pipeline
7/26/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
7/22/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
6/1/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
5/29/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
3/3/2011(Selinsing)to Increase Gold Production
2/21/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
11/4/2009(Selinsing)Pours First Gold From Gravity Circuit
9/1/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
7/20/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
2/11/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
2/2/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
3/7/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
3/4/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
2/7/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Corporate news of Monument Mining Limited
7/11/2016Monument Announces Significant Intercepts Assay Results at N...
6/13/2016Monument Collects Judgment and Adds Peter Kestel Personally ...
5/31/2016Monument Reports Third Quarter Fiscal 2016 Results
5/9/2016Monument Announces Not to Proceed with Matala
5/2/2016Monument Withdraws Technical Disclosure regarding Matala Pro...
4/11/2016Monument Announces Significant Intercepts Assay Results at B...
3/24/2016Monument Comments on Unusual Trading Activity
3/23/2016Monument files NI43-101Technical Report for Resource Estimat...
11/30/2015Monument Reports First Quarter Fiscal 2016 Results
11/21/2015Monument Mining Announces Results of Annual General Meeting ...
9/30/2015Monument Commissions Intec Pilot Plant at Selinsing
9/30/2015Monument's Fiscal 2015 Results
9/28/2015Monument Progresses Mine Development at Burnakura Site
8/17/2015Monument Murchison Gold Project Update
8/12/2015Monument Files Amended Technical Report for Murchison Gold P...
7/31/2015Monument Litigation Update
4/2/2015Monument files NI43-101Technical Report for Resource Estimat...
4/2/2015Monument files NI43-101 Technical Report for Resource Estima...
3/23/2015Monument Mining Announces Results of Annual General Meeting ...
3/8/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Reports Second Quarter Fiscal 2015 Results
2/27/2015Monument Delays Start-up of Iron and Copper Project at Menga...
2/18/2015Monument Announces Mineral Resource on Alliance/New Alliance...
2/16/2015Monument Files Claim Against Summer Empire Sdn. Bhd. and Kes...
2/13/2015Monument Announces Adjournment of Shah Alam High Court Trial...
2/7/2015Monument Issues Shares for Intec Transaction
2/6/2015Monument Issues Shares for Intec Transaction
2/2/2015Monument Secures Intec License to Exploit Sulphide Gold and ...
1/21/2015Monument Update Selinsing Litigation
1/20/2015Monument Update Selinsing Litigation
1/19/2015Monument Announce RC Assay Results from Federal City Drillin...
12/23/2014Monument Announces Termination of Proposed Transaction with ...
12/1/2014Monument Reports First Quarter Fiscal 2015 Results - Gold Pr...
11/30/2014Monument Reports First Quarter Fiscal 2015 Results
11/18/2014Monument Receives Order to Extend Time for Holding Annual Ge...
11/18/2014Monument Announces Second Round of RC Assay Results at Murch...
11/18/2014Extension of Closing Date for Proposed Transaction, 189 KB
11/17/2014Monument Extends Closing Date of Proposed Transaction with G...
11/12/2014Monument Completes Tuckanarra Gold Project Acquisition in We...
11/8/2014Monument to Extend Time for Holding Annual General Meeting
10/27/2014Monument Extends Close Date of Tuckanurra Acquisition
10/20/2014Monument Updates Selinsing Litigation
10/6/2014Monument Updates Selinsing Litigation
9/30/2014Monument's Fiscal 2014 Results
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/28/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
1/20/2014Warns Shareholders to Be Wary of the Dissident Group Attempt...
5/23/2013(Selinsing)Files Technical Report for Selinsing and Buffalo Reef
5/1/2013Reports Third Quarter Gold Production of 13=2C255 Ounces
4/24/2013Confirms Indicative Non=2DBinding Conditional Proposal to ac...
4/15/2013(Buffalo Reef)Starts Mining and Processing Oxide Materials at Buffalo Reef
4/2/2013Announces Results of Annual General Meeting of Shareholders
3/13/2013President and CEO to Speak at Hong Kong Conference
2/22/2013Settles Legal Disagreement
2/21/2013Welcomes Support from Major Shareholder
2/8/2013Further Comments on GoldMet Disclosure
2/8/2013Comments on GoldMet Disclosure=3A No Agreement Reached
1/17/2013Provides Update to Shareholders
1/11/2013Reports Record Second Quarter Gold Production of 15=2C902 Ou...
11/14/2012Has Engaged Mackie Research Capital Corporation as Financial...
11/10/2012to Extend Time for Holding Annual General Meeting
10/2/2012=E2??s 2012 Annual Results=3A Gross Revenue of $61.7 M with ...
8/24/2012(Mengapur)Confirms Historic Drilling Results at Mengapur Polymetalic P...
8/16/2012(Selinsing)Completed Selinsing Gold Plant Expansion
8/7/2012(Mengapur)Provides Updates on Mengapur Project and Private Placement
7/30/2012=E2??s 2012 Fourth Quarter Production Result
7/24/2012Received $12 Million through Exercise of Stock Purchase Warr...
6/19/2012and PLSB Working Together Harmonizing Oxide Magnetite Iron O...
5/14/2012=E2??s 2012 Third Quarter Production
5/9/2012Announces Senior Management Appointments
4/25/2012to Attend The INVEST 2012 Conference in Stuttgart
1/25/2012=E2??s 2012 Second Quarter Production
1/4/2012Announces Results of Annual and Special General Meeting of S...
12/20/2011Reminds Shareholders to Vote
12/16/2011(Mengapur)Discusses Mengapur Property Iron Ore Production Information
12/15/2011Provides Details of Annual General and Special Meeting
12/13/2011Annual General and Special Meeting Important Reminder
10/26/2011=E2??s 2012 First Quarter Production
9/29/2011=E2??s 2011 Annual Results
8/8/2011=E2??s 2011 Fourth Quarter Production and Sales Results
1/15/2010Fundamental Research Report Update #2
12/21/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
9/18/2009to Issue Shares for Debt to Avocet Mining PLC
7/8/2009Moves to New Office
5/13/2009Releases Selinsing Gold Project Update
2/13/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
12/24/2008Amends Selinsing Gold Project Construction Plan
9/24/2008Fundametal Initial Research Report
8/20/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
8/15/2008Grants Stock Purchase Options to its Directors Officers unde...
8/8/2008Commences Action for Injunction and Damages
7/28/2008Closes Avocet Mill Transaction For Future Plant Upgrade
7/8/2008Acquires Package of Additional Adjacent Land - Update
6/20/2008Notice of Change of Business Address
5/26/2008Acquires Second Mill for Future Production Plant Upgrade
5/13/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
1/21/2008Acquires Package of Additional Adjacent Land
10/25/2007 Q1 Project Development Update
9/13/2007Commences Exploration Program
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0.160+6.67%0.100-6.54%
TSX-V
CA$ 0.160
04/18 16:59 0.010
6.67%
Prev close Open
0.150 0.150
Low High
0.150 0.160
Year l/h YTD var.
0.130 -  0.195 -5.88%
52 week l/h 52 week var.
0.080 -  0.195 52.38%
Volume 1 month var.
166,704 14.29%
24hGold TrendPower© : -40
Produces Gold
Develops
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/19/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202418.52%
202392.86%0.150.07
2022-41.67%0.130.06
202133.33%0.210.09
2020125.00%0.120.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.84+2.02%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.21+2.44%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :