| | Published : April 09th, 2008 | Intercepts 9 Meters Of 25.8 G Au/T Mineralization Identified Over 5.5 K |
|
Article
|
Comments
|
Comment this article
|
Rating
|
♥
Follow Company
|
|
| |
|
Wednesday, April 09, 2008
African Gold Group, Inc. Intercepts 9 Meters Of 25.8 G Au/T
Mineralization Identified Over 5.5 Km Of Strike At Kobada, Mali
|
|
TORONTO, CANADA, APRIL 09, 2008 -- African Gold Group, Inc., ("AGG" or the "Company") is pleased to report the assay results for 71 reverse circulation ("RC") step-out drill holes, drilled on 9 lines covering a total of 5.5 kilometers of strike length at Kobada, Mali. These holes were drilled on a N30ºE orientation and are hypothesized to represent the potential strike extension, to the north and south of "Zone 1".
STEP-OUT RC DRILL HIGHLIGHTS
- KBRC7-5: 9 meters grading 25.8 g Au/t, including 1 meter of 228 g Au/t
- KBRC7-6: 14 meters grading 3.66 g Au/t, including 9 meters of 4.61 g Au/t
- KBRC7-8: 18 meters grading 1.78 g Au/t, including 7 meters of 3.59 g Au/t (ended in mineralization).
- KBRC7-15: 22 meters grading 1.48 g Au/t, including 10 meters of 1.98 g Au/t
RESULTS AND ANALYSIS
For coherence, the results from the 71 RC drill holes have been organized according to the section the hole was drilled on as opposed to numerical order and are depicted in Table 1 below. All of the RC holes were drilled to a depth of approximately 90 meters (down the hole) at an angle of -55º and an azimuth of 290º. Please see the attached map for the collar locations and the respective section the holes were drilled on.
Please click to see the map
The ALS Chemex Laboratory in Bamako is used as the analytical facility for the Kobada Project. Reverse circulation (RC) samples were dried and crushed in their totality. A 500 gram split of the crushed sample, nominally at 3 mm was then pulverized to approximately 90% passing 75 µm (200 mesh). The coarse material was retained as crusher reject and stored in its original numbered sample bag. Approximately 200 grams of the pulp was retained in a sample packet. A 50 gram sample from the packet was analysed for gold by conventional fire assay with an instrumental AAS finish.
TABLE 1: ASSAY RESULTS FOR RC STEP-OUT HOLES -- KOBADA, MALI
Significant Intersections On Sections Drilled
SECTION |
HOLE |
INTERVAL |
Length |
Au (g/t) |
From |
To |
L 3400 S |
KBRC07-108 |
85 |
88 |
3m |
9.17 |
L 3400 S |
KBRC07-109 |
0 |
4 |
4m |
1.88 |
L 3400 S |
KBRC07-110 |
24 |
25 |
1m |
2.47 |
L 3400 S |
KBRC07-107 |
|
|
|
No significant intercept |
L 1200 S |
KBRC07-1 |
15 |
18 |
3m |
1.01 |
L 1200 S |
KBRC07-2 |
6 |
7 |
1m |
1.15 |
L 1200 S |
KBRC07-3 |
17 |
25 |
8m |
1.30 |
|
incl. |
|
|
1m |
4.70 |
L 1200 S |
KBRC07-3 |
37 |
41 |
4m |
1.07 |
L 1200 S |
KBRC07-3 |
59 |
60 |
1m |
1.29 |
L 1200 S |
KBRC07-4 |
42 |
48 |
6m |
1.97 |
|
incl. |
42 |
43 |
1m |
7.66 |
|
and |
46 |
48 |
2m |
1.82 |
L 1200 S |
KBRC07-4 |
62 |
63 |
1m |
1.30 |
L 1200 S |
KBRC07-5 |
2 |
3 |
1m |
4.93 |
L 1200 S |
KBRC07-5 |
16 |
24 |
9m |
25.8 |
|
incl. |
16 |
17 |
1m |
228.00 |
|
and |
20 |
24 |
4m |
0.82 |
L 1200 S |
KBRC07-6 |
14 |
28 |
14m |
3.66 |
|
incl. |
19 |
28 |
9m |
4.61 |
L 1200 S |
KBRC07-6 |
50 |
62 |
12m |
0.71 |
|
incl. |
50 |
54 |
4m |
1.07 |
|
and |
60 |
62 |
2m |
1.80 |
L 1200 S |
KBRC07-7 |
9 |
36 |
27m |
1.05 |
|
incl. |
12 |
15 |
3m |
2.78 |
|
and |
27 |
35 |
8m |
1.76 |
L 1200 S |
KBRC07-7 |
64 |
66 |
2m |
7.76 |
L 1200 S |
KBRC07-7 |
80 |
81 |
1m |
13.85 |
L 1200 S |
KBRC07-8 |
7 |
12 |
5m |
2.61 |
|
incl. |
|
|
1m |
10.15 |
L 1200 S |
KBRC07-8 |
19 |
20 |
1m |
1.69 |
L 1200 S |
KBRC07-8 |
27 |
36 |
9m |
0.96 |
|
incl. |
27 |
30 |
3m |
1.75 |
|
and |
24 |
36 |
2m |
1.47 |
L 1200 S |
KBRC07-8 |
42 |
52 |
10m |
1.09 |
|
incl. |
42 |
44 |
2m |
3.25 |
|
and |
51 |
52 |
1m |
1.69 |
L 1200 S |
KBRC07-8 |
61 |
63 |
2m |
1.14 |
L 1200 S |
KBRC07-8 |
72 |
90 |
18m |
1.78 |
|
incl. |
77 |
78 |
1m |
3.59 |
|
and |
80 |
87 |
7m |
3.59 |
L 1200 S |
KBRC07-9 |
12 |
13 |
1m |
5.31 |
L 1200 S |
KBRC07-10 |
4 |
9 |
5m |
0.76 |
|
incl. |
4 |
5 |
1m |
1.06 |
|
and |
8 |
9 |
1m |
2.27 |
L 400 S |
KBRC07-11 |
11 |
12 |
1m |
7.41 |
|
KBRC07-12-13 |
|
|
|
No significant intercept |
L 400 S |
KBRC07-14 |
41 |
42 |
1m |
1.33 |
L 400 S |
KBRC07-15 |
5 |
13 |
8m |
5.08 |
|
incl. |
5 |
11 |
6m |
6.65 |
L 400 S |
KBRC07-15 |
23 |
45 |
22m |
1.48 |
|
incl. |
23 |
30 |
7m |
2.10 |
|
and |
35 |
45 |
10m |
1.98 |
L 400 S |
KBRC07-15 |
57 |
60 |
3m |
1.24 |
L 400 S |
KBRC07-16 |
|
|
|
No significant intercept |
L 400 S |
KBRC07-17 |
10 |
11 |
1m |
2.01 |
L 400 S |
KBRC07-17 |
59 |
60 |
1m |
1.27 |
L 400 S |
KBRC07-17 |
76 |
77 |
1m |
1.58 |
|
KBRC07-18 |
|
|
|
No significant intercept |
L 400 S |
KBRC07-19 |
54 |
55 |
1m |
2.38 |
|
KBRC07-20-23 |
|
|
|
No significant intercept |
L 00 |
KBRC07-24 |
6 |
8 |
1m |
1.30 |
L 00 |
KBRC07-25-26 |
|
|
|
No significant intercept |
L 400 N |
KBRC07-27-28 |
|
|
|
No significant intercept |
L 400 N |
KBRC07-29 |
11 |
12 |
1m |
1.44 |
|
KBRC07-29 |
23 |
25 |
2m |
0.48 |
|
KBRC07-29 |
48 |
50 |
2m |
0.98 |
L 400 N |
KBRC07-30 |
37 |
38 |
1m |
1.77 |
|
KBRC07-30 |
55 |
57 |
2m |
6.86 |
|
KBRC07-30 |
64 |
68 |
4m |
1.11 |
L 400 N |
KBRC07-31 |
|
|
|
No significant intercept |
L 400 N |
KBRC07-32 |
7 |
8 |
1m |
1.58 |
L 400 N |
KBRC07-33-36 |
|
|
|
No significant intercept |
L 400 N |
KBRC07-37 |
5 |
6 |
1m |
1.36 |
L 400 N |
KBRC07-38 |
55 |
59 |
4m |
5.00 |
|
incl. |
56 |
59 |
3m |
6.47 |
L 400 N |
KBRC07-38 |
27 |
28 |
1m |
0.56 |
L 400 N |
KBRC07-38 |
55 |
60 |
5m |
4.04 |
L 400 N |
KBRC07-39-40 |
|
|
|
No significant intercept |
L 400 N |
KBRC07-41 |
3 |
4 |
1m |
1.6 |
L 400 N |
KBRC07-41 |
69 |
71 |
2m |
1.34 |
L 400 N |
KBRC07-42-43 |
|
|
|
No significant intercept |
L 1000 N |
KBRC07-44-47 |
|
|
|
No significant intercept |
L 1000 N |
KBRC07-48 |
55 |
57 |
2m |
2.96 |
L 1400 N |
KBRC07-49-53 |
|
|
|
No significant intercept |
L 1400 N |
KBRC07-54 |
62 |
63 |
1m |
|
L 1400 N |
KBRC07-54 |
85 |
86 |
1m |
8.99 |
L 1400 N |
KBRC07-55 |
|
|
|
No significant intercept |
L 2000 N |
KBRC07-56 |
68 |
71 |
3m |
0.56 |
L 2000 N |
KBRC07-57-60 |
|
|
|
No significant intercept |
L 2000 N |
KBRC07-61 |
17 |
23 |
6m |
1.52 |
L 2000 N |
KBRC07-61 |
30 |
33 |
3m |
0.61 |
L 2000 N |
KBRC07-61 |
39 |
48 |
9m |
0.28 |
L 2000 N |
KBRC07-61 |
51 |
53 |
2m |
0.35 |
L 2000 N |
KBRC07-62-63 |
|
|
|
No significant intercept |
L 2150 N |
KBRC07-102 |
|
|
|
No significant intercept |
L 2150 N |
KBRC07-103 |
21 |
22 |
1m |
0.58 |
L 2150 N |
KBRC07-104 |
8 |
14 |
6m |
0.46 |
L 2150 N |
KBRC07-104 |
25 |
45 |
20m |
1.62 |
L 2150 N |
KBRC07-105 |
78 |
83 |
5m |
0.53 |
L 2150 N |
KBRC07-106 |
85 |
86 |
1m |
1.37 |
"We are most encouraged that this program of reconnaissance reverse circulation drilling, on a 400 meter to 800 meter sectional spacing, has identified gold mineralization over 5.5 km of strike length at Kobada, Mali. In particular, we note the very strong degree of gold mineralization intercepted on section L 1200 S. It is reasonable, at this point in time, to perceive this zone of mineralization as the potential extension of "Zone 1". Furthermore, we note the presence of strong mineralization 800 meters to the north of L 1200 S on section L 400 S but will refrain from any conjecture regarding the spatial relationship of this mineralization, at this point in time. The purpose of this program was to intercept extensions or repetitions of Kobada's productive structure to the north and south of "Zone 1" in as cost-effective a manner as possible. We are of the opinion that we have succeeded in demonstrating the pervasive and extensive nature of gold mineralization at Kobada and remain confident that we will build significantly on the recently announced Mineral Resources Estimate for "Zone 1", which represents approximately 10% of the 12 km anomalous Kobada Trend, states AGG Chairman, Ben Adoo, C. Eng.
In a press release dated April 02, 2008, the Company released the initial 43-101 Mineral Resources estimate for Kobada, Mali, which was completed by Watts, Griffis and McOuat Limited of Toronto ("WGM"), a well respected international consulting firm which has filled the role of AGG's independent consultant since December, 2007. WGM estimates that "Zone 1" of the Kobada deposit, representing approximately 10% of the overall Kobada geochemical trend contains an Inferred Mineral Resource, as presently outlined, of between 450,000 ounces of gold and 740,000 ounces of gold as follows:
Inferred Mineral Resources -- "Zone 1" -- Kobada Project, Mali |
Cut-off Grade
( g Au/t ) |
Tonnage
( x 1,000 ) |
No Assay Cutting |
Assays Cut to 10 g Au/t |
Avg. Grade
(g Au/t ) |
Contained Ounces |
Avg. Grade
(g Au/t ) |
Contained Ounces |
0.3 |
18,381 |
1.25 |
738,080 |
1.11 |
657,386 |
0.5 |
8,482 |
1.99 |
542,804 |
1.72 |
470,461 |
1.0 |
5,569 |
3.02 |
540,933 |
2.53 |
452,320 |
This news release has been reviewed and approved by Al Workman, P.Geo. (Ontario), Vice-President of Watts, Griffis and McOuat Limited. The geotechnical portion of this press release has been reviewed and approved by AGG Chairman, Ben Adoo, C. Eng., a Qualified Person.
CORPORATE UPDATE
African Gold Group, Inc. is pleased to announce that Mr. Jaimie MacPherson has been appointed Chief Financial Officer of the Company, subject to regulatory approval. Mr. MacPherson is a Chartered Accountant and is the former Chief Financial Officer of a private equity group located in Hamilton, Bermuda. Upon his return to Canada, he was an audit manager at Moore Stephens Cooper Molyneux, where he specialized in audits of Canadian junior public mining companies. Mr. MacPherson will be responsible for the accounting, financial management and corporate compliance of the Company.
African Gold Group, Inc., based in Toronto, Canada, is engaged in the identification, acquisition and exploration of prospective gold projects that are situated along significant gold trends within West Africa. To date, the Company controls a total of twelve gold concessions that are consolidated in five distinct standalone exploration projects, of which three projects are located in Ghana and the remaining two are located in Mali, West Africa.
Additional Information is available on the Company's website at www.africangoldgroup.com and on www.sedar.com and through the Company's offices at: BCE Place, Canada Trust Tower, 27th Floor, 161 Bay Street, Toronto, Canada M5J 2S1
On Behalf of the Board:
Michael A. J. Nikiforuk
President, Director
FOR FURTHER INFORMATION PLEASE CONTACT:
African Gold Group, Inc.
Michael A. J. Nikiforuk
(416) 572-2225
info@africangoldgroup.com
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
|
|
|
| |
| |
|
VanEck Vectors Global Alternative Energy ETF
|
|
EXPLORATION STAGE |
CODE : AGG.V |
ISIN : CA00829A1066 |
|
| |
ProfileMarket IndicatorsVALUE : Projects & res.Press releasesAnnual reportRISK : Asset profileContact Cpy |
African Gold Group is a gold exploration company based in Canada. African Gold Group holds various exploration projects in Ghana. Its main exploration properties are BAGOE - EAST, BAGOE - WEST and KOBADA in Mali and NYANKUMASI, MANKRANHO and ASANKRANGWA in Ghana. African Gold Group is listed in Canada and in United States of America. Its market capitalisation is 7.1 millions as of today (US$ 5.7 millions, € 5.6 millions). Its stock quote reached its highest recent level on April 02, 2004 at 3.40, and its lowest recent point on April 12, 2019 at 0.01. African Gold Group has 47 442 200 shares outstanding. |
Financings of VanEck Vectors Global Alternative Energy ETF |
Option Grants of VanEck Vectors Global Alternative Energy ETF |
Project news of VanEck Vectors Global Alternative Energy ETF |
|
Corporate news of VanEck Vectors Global Alternative Energy ETF |
1/6/2016 | African Gold Group, Inc. Announces Sale of Ghanian Assets fo... |
10/28/2015 | African Gold Group, Inc. Announces Metalurgical Test Work Co... |
9/3/2015 | African Gold Group Announces Closing of Private Placement |
8/5/2015 | African Gold Group, Inc. Announces Grant of Kobada Mining Li... |
7/8/2015 | African Gold Group, Inc. Announces Election of Mr. Georges C... |
2/6/2015 | African Gold Group to Participate in "Doing Business in Mali... |
1/22/2015 | African Gold Group Closes Second Non-Brokered Private Placem... |
1/14/2015 | African Gold Group Closes Non-Brokered Private Placement for... |
12/23/2014 | African Gold Group, Inc. Announces Filing of Preliminary Eco... |
11/25/2014 | African Gold Group, Inc.: Updated Preliminary Economic Asses... |
10/29/2014 | Kobada Metallurgy Test Work Confirms 85.2% Gold Recovery for... |
10/28/2014 | African Gold Group Unaware of Any Material Change |
9/4/2014 | AGG Appoints David Brown as Company Chairman |
7/29/2014 | African Gold Group Updates on Kobada Feasibility Study |
7/23/2014 | African Gold Group Inc. Completes 2014 Kobada Field Season-B... |
7/17/2014 | African Gold Group, Inc., Appoints Misha Collins Feasibility... |
7/9/2014 | African Gold Group, Inc., Kobada Feasibility Study Work to M... |
6/19/2014 | African Gold Group, Inc.: Bulk Sampling Results Identifies S... |
5/22/2014 | African Gold Group Closes Over-Subscribed Non-Brokered Priva... |
4/29/2014 | African Gold Group Strengthens Mine Development Team With th... |
3/25/2014 | African Gold Group, Inc. Announces Early Warrant Exercise In... |
10/22/2013 | (Kobada), Engineering Team Mobilizes to Commence Metallurgical Test ... |
7/8/2013 | Annual and Special Shareholder Meeting |
6/20/2013 | letter Press Release June 18 2013 |
6/18/2013 | (Kobada)Updated Resources Estimate for Kobada Gold Project Surges to... |
5/29/2013 | KBRC12-160 Intercepts 75 Meters of 3.06 g/t Au; KBRC12-201 I... |
5/29/2013 | KBRC12-160 Intercepts 75 Meters of 3.06 g/t Au; KBRC12-201 I... |
5/15/2013 | KBRC12-084 Intercepts 69 Meters of 2.37 g/t Au; KBRC12-066 I... |
5/8/2013 | Feasibility Study Drilling on 25 Meter Centers Pushes Au Min... |
3/25/2013 | IGE Resources calls for Extra General Meeting, related to th... |
2/5/2013 | (Mankranho)Completes Sale of Mankranho, Ghana Concession for US$4,000,0... |
11/5/2012 | Pope & Company Initiates Equity Research Coverage on African... |
10/10/2012 | (Mankranho)Announces Sale of Mankranho, Ghana Concession for US$4,000,0... |
5/1/2012 | May 01/2012 |
3/29/2012 | March 29/2012 |
3/20/2012 | March 20/2012 |
11/29/2011 | Nov 30/11 |
10/26/2011 | Featured In The Financial Post, |
10/25/2011 | Oct 25/11 |
9/14/2011 | Sept 14/11 |
8/25/2011 | Featured In The Financial Post, Mining News |
7/13/2011 | July 13/11 |
7/13/2011 | Positive Preliminary Economic Assessment Generates $216.9 Mi... |
6/1/2011 | June 01/11 |
6/1/2011 | Southern Step Out Hole Intercepts 96 Meters of 1.35 g/t Au f... |
4/5/2011 | April 05/11 |
3/29/2011 | March 29/11 |
3/22/2011 | March 22/ 11 |
3/22/2011 | 67 RC Drill Holes Shipped to Lab; 3,980 m of Trench Results ... |
3/16/2011 | Re-Adopts Shareholder Rights Plan |
4/29/2008 | included in The Gold Newsletter, April 2008 Edition |
4/16/2008 | Trenching Returns 84 Meters Of 3.0 G Au/T, Including 36 Mete... |
2/25/2008 | Retains AGORACOM To Provide Google Search Engine IR Program... |
|
|