UEX Corp

Published : December 14th, 2007

Interim Resource Estimate for the West Bear Deposit Adds 223,000 Pounds of U(3)O(8) Outlining an

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Japan | K Street | Uranium | Water |

Attention Business Editors:

UEX Interim Resource Estimate for the West Bear Deposit Adds 223,000 Pounds of U(3)O(8) Outlining an Indicated Resource of 73,800 Tonnes, Grading 1.004% U(3)O(8) and Totaling 1.614 Million Pounds of U(3)O(8) - Final Resource Estimate to be Completed in 2008

     Trading Symbol: UEX-TSX
     VANCOUVER, Dec. 13 /CNW/ - UEX Corporation ("UEX") is pleased to announce
that it has received an interim resource estimate report from Golder
Associates Ltd. ("Golder") of Saskatoon, SK, for UEX's West Bear Uranium
Deposit ("West Bear"). West Bear is located within the southern block of UEX's
100%-owned Hidden Bay Project in the eastern Athabasca Basin area of northern
Saskatchewan, Canada. The new resource estimate is 73,800 tonnes grading
1.004% U(3)O(8) containing 1.614 million pounds of U(3)O(8) using a cut-off
grade of 0.15% U(3)O(8) and is based on both UEX's 2005 and 2007 sonic
drilling programs and incorporates only the high-grade main deposit area,
where mineralization occurs at a vertical depth of between 10 and 31 metres
from surface. This new estimate shows an increase of 223,000 pounds of
U(3)O(8) representing a 16.0% increase in total pounds of U(3)O(8) from the
2005 Cameco Corporation ("Cameco") National Instrument 43-101 ("N.I. 43-101")
compliant indicated resource estimate.
     Due to incomplete geochemical data from the eastern area of West Bear,
this resource estimate does not utilize data from the eastern deposit area
where sonic drilling in 2007 extended uranium mineralization 150 metres beyond
the current boundaries of the deposit, as well as a secondary lens of
mineralization discovered in the southern section of the eastern deposit area
over a strike length of 75 metres.
     "The increase of 223,000 pounds of U(3)O(8) at West Bear is very
significant given the shallow nature of the deposit, and we expect to add more
pounds once we receive the full uranium assay results for this resource, which
we expect in 2008," said Stephen Sorensen President and CEO of UEX.
     "Turn around times for geochemical assay results are taking three to four
months where previously four to six weeks was the norm. As a result, UEX
decided that Horseshoe and Raven samples should take priority over West Bear
samples due to the significantly larger size of these deposits compared to
West Bear. We are doing the best we can to accelerate N.I. 43-101 compliant
resource estimates on Raven and Horseshoe as well as West Bear."
     Sorensen went on to say that "discussions regarding the West Bear Deposit
are ongoing with AREVA and Cameco. UEX is considering a few options which
include a toll milling arrangement with one of the operators or an out right
sale of the deposit. Either way, West Bear represents a potentially
significant source of future cash flow for UEX that could be used to finance
the development of its major deposits at Shea Creek and Raven-Horseshoe."
     2007 West Bear Interim Resource Estimate Report
     A 2005 N.I. 43-101 compliant indicated resource estimate prepared by
Roger Lemaitre, P.Eng., P.Geo. of Cameco, which was based only on UEX's 2005
sonic drilling program, outlined an indicated resource of 45,600 tonnes,
grading 1.385% U(3)O(8) and totaling 1.391 million pounds U(3)O(8) at West
Bear using a cut off grade of 0.15% U(3)O(8). The West Bear resource estimate
technical report dated March 2, 2006 is available for review at www.sedar.com
     UEX's 2007 winter sonic drilling program (see UEX News Release, July 23,
2007) included additional infill holes spaced at 5 metre intervals on two
sections (1762.5E and 1787.5E) in the high-grade core of the main deposit area
between sections 1750E, 1775E and 1800E drilled by Cameco in 2005. These holes
were designed to better define the deposit geometry and uranium grades in this
main deposit area. Uranium grades in this high-grade core area were increased,
and include intercepts of 6.032% U(3)O(8) over 10.67 metres in hole UEX-206
(see Section 1762.5E on UEX's website under West Bear) and 2.341% U(3)O(8)
over 7.08 metres in hole UEX-197 (see Section 1787.5E on UEX's website under
West Bear).
     The new interim resource estimate calculated by Kevin Palmer, P.Geo. of
Golder of Burnaby, BC dated December 11, 2007 incorporating the results from
both the 2005 and 2007 winter sonic drilling programs, outlined an indicated
resource of 73,800 tonnes, grading 1.004% U(3)O(8) and totaling 1.614 million
pounds of U(3)O(8) at West Bear in the high-grade main deposit area. The
resource estimate was calculated using a cut-off grade of 0.15% U(3)O(8)
utilizing a geostatistical-block model technique with ordinary kriging methods
and the DATAMINE Studio 3 software package.
     2007 Summer Sampling Program
     The 2005 West Bear resource estimate report by Cameco notes that only
two-thirds of the strike length of the mineralized area included as part of an
historical resource outlined by Gulf Minerals ("Gulf") was tested during the
2005 sonic drilling program. A number of historical Gulf holes indicated that
uranium mineralization likely extends to the east up to 150 metres beyond the
current boundaries of the deposit.
     One of the goals of the 2007 winter sonic drilling program was to test
the eastern deposit area for uranium mineralization not previously drilled.
The 2007 program extended the uranium mineralization 150 metres east of the
boundary outlined during the 2005 sonic drilling program on drill fences
spaced 25 metres apart with holes spaced at 5 metre intervals. This new
uranium mineralization forms a narrow continuous lens straddling the
unconformity in the northern section of the eastern deposit area. This
mineralization includes intercepts of 0.360% U(3)O(8) over 2.0 metres in hole
UEX-116 (see Section 2075E on UEX's website under West Bear) and 0.670%
U(3)O(8) over 3.05 metres in hole UEX-120 (see Section 2025E on UEX's website
under West Bear).
     A small secondary lens of uranium mineralization not previously
identified by Gulf Minerals was also discovered in the southern section of the
eastern deposit area. This southern lens of mineralization extends over a
strike length of over 75 metres and includes an intercept of 0.421% U(3)O(8)
over 2.55 metres in hole UEX-172 (see Section 2025E on UEX's website under
West Bear).
     In order to create a final resource calculation for the full 500 metre
strike length of the deposit based on a lower cut-off, additional sampling was
required to sample material not previously sampled during the 2005 and 2007
winter sonic programs. This additional sampling was carried out in the summer
of 2007. Sample analyses from these samples are currently pending. Once all
assays are received and fully interpreted, a final resource estimate will be
carried out by Golder which will incorporate the entire deposit, including the
eastern deposit area and the high-grade main deposit area reported here.
Golder's final resource estimate is expected to be delivered to UEX during
2008.
     Metallurgical Testing
     Melis Engineering Ltd. of Saskatoon, SK is currently overseeing a
confirmation metallurgical testing program using representative composites
derived from fresh drill core samples collected from the 2007 sonic drilling
program. The composites are currently being processed at SGS Lakefield
Research Ltd. of Lakefield, ON to confirm leach and effluent treatment
conditions on fresh samples of core.
     West Bear Environmental Baseline and Feasibility Studies
     Golder is carrying out an environmental baseline study ("EBS") and a
feasibility study for West Bear. The EBS has been underway at West Bear since
August 2005 and Golder continues to collect biological, hydrogeological and
other environmental data. Further baseline studies are scheduled for 2008
following the input of more detailed information on the project design
generated from the West Bear feasibility study.
     UEX looks forward to the completion of the feasibility study, which is
expected to be delivered in 2008, following Golder's integration of the
results from UEX's 2007 sonic drilling program. The feasibility study will
examine the most efficient methods and procedures for extracting the defined
uranium resource, including the most appropriate road access and support
infrastructure, mining methods and operating plans. Golder is currently
carrying out mine, open pit slope, and waste dump design work. As the
feasibility study progresses, Golder will supervise the tendering of contracts
for all aspects of a potential mining operation, and will perform cash flow
analyses and projections in order to determine net present values and internal
rates of return for West Bear at various uranium price levels.
     Golder and UEX have created a Strategic Planning Group, consisting of key
representatives from both companies, in order to commence the permitting
process for West Bear in 2008. Following receipt of the final EBS report from
Golder, UEX plans to initiate the environmental assessment ("EA") process with
the appropriate government agencies on both provincial and federal levels. The
first step in the provincial EA process is to provide a Project Proposal to
the Saskatchewan EA Branch that details the project description (e.g., mine
plan, mining method, water and waste management), current environmental
conditions, proposed measures to mitigate environmental issues, and residual
effects from the project. After review of this document, the EA Branch will
decide if the project meets the definition of a "development", in which case,
an Environmental Impact Statement ("EIS") will be required and various
provincial and federal responsible authorities will be identified to take part
in the review of the EIS. The Strategic Planning Group will also initiate the
community and public consultation process in 2008.
     The information in this document has been compiled and reviewed by Sierd
Eriks, P. Geo., a qualified person as defined by National Instrument 43-101.
     About West Bear
     West Bear uranium mineralization occurs at a vertical depth of between 10
and 31 metres (or approximately 33 to 100 feet) from surface and is one of the
shallowest, undeveloped uranium deposits in the prolific Athabasca Basin.
Combined with the relatively soft nature of the host rocks and overburden, UEX
believes that the deposit could be mined using low cost, open pit techniques
within a very short timeframe. The deposit is located close to two existing
uranium mills, Cameco Corporation's Rabbit Lake Mill and the McClean Lake
Mill, operated by AREVA Resources Canada Inc. ("AREVA"). UEX believes that at
current uranium prices, the West Bear Deposit could become a viable source of
future cash flow.
     About UEX
     UEX is a Canadian uranium exploration and development company actively
involved in 19 uranium projects, including seven that are 100% owned and
operated by UEX, one joint venture with AREVA Resources Canada Inc. ("AREVA")
that is operated by UEX, ten under option from AREVA and one under option from
Japan-Canada Uranium Company, Limited, which are operated by AREVA. The 19
projects, totaling 386,650 hectares (955,400 acres), are located in the
eastern, western and northern perimeters of the Athabasca Basin, the world's
richest uranium belt, which accounts for approximately 25% of the global
primary uranium production. UEX is currently developing several uranium
deposits in the Athabasca Basin which include the Anne, Kianna and Colette
Deposits at its Shea Creek Uranium Project, a joint venture with AREVA in the
western Athabasca Basin, and the West Bear, Raven and Horseshoe Deposits
located at its 100% owned Hidden Bay Project in the eastern Athabasca Basin.
UEX's exploration and development budgets for 2007 total $30.0 million, and
the Company has a cash position of approximately $52.5 million.
            ON BEHALF OF THE BOARD OF DIRECTORS OF UEX CORPORATION
                              Stephen H. Sorensen,
                              President & C.E.O.
     Forward-Looking Statements
     This news release contains "forward-looking statements" that are based on
UEX's current expectations, estimates, forecasts and projections. These
forward-looking statements include statements regarding UEX's outlook for our
future operations, plans and timing for the commencement or advancement of
exploration activities on our properties, and other expectations, intention
and plans that are not historical fact. The words "estimates", "projects",
"expects", "intends", "believes", "plans", or their negatives or other
comparable words and phrases are intended to identify forward-looking
statements. Such forward-looking statements are subject to risks,
uncertainties and other factors that could cause actual results to differ
materially from future results expressed or implied by such forward-looking
statements. Many of these factors are beyond the control of UEX. Consequently,
all forward-looking statements made in this news release are qualified by this
cautionary statement and there can be no assurance that actual results or
developments anticipated by UEX will be realized. For the reasons set forth
above, investors should not place undue reliance on such forward-looking
statements. UEX disclaims any intention or obligation to update or revise
forward-looking information, whether as a result of new information, future
events or otherwise.
     %SEDAR: 00017609E
For further information: UEX CORPORATION, SUITE 1007 - 808 NELSON STREET,
VANCOUVER, B.C., CANADA, V6Z 2H2, PH: (604) 669-2349, FAX (604) 669-1240,
Website: www.uex-corporation.com, email: uex@intergate.ca

Data and Statistics for these countries : Canada | Japan | All
Gold and Silver Prices for these countries : Canada | Japan | All

UEX Corp

EXPLORATION STAGE
CODE : UEX.TO
ISIN : CA9026661061
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

UEX is a gold and copper exploration company based in Canada.

UEX holds various exploration projects in Canada.

Its main exploration properties are BLACK LAKE, RIOU LAKE, BEATTY RIVER, DOUGLAS, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, FOND DU LAC, SHEA CREEK, HIDDEN BAY, ALEXANDRA, BRANDER LAKE PROJECTS and JAMES CREEK PROJECTS in Canada.

UEX is listed in Canada and in Germany. Its market capitalisation is CA$ 158.0 millions as of today (US$ 126.3 millions, € 110.7 millions).

Its stock quote reached its lowest recent point on August 15, 2003 at CA$ 0.05, and its highest recent level on November 09, 2007 at CA$ 9.30.

UEX has 319 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of UEX Corp
5/18/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
6/5/2013Announces Closing of Private Placement
5/25/2013Announces $3.175 Million Private Placement
2/23/2012Announces $3 Million Private Placement
Nominations of UEX Corp
12/19/2013Announces the Appointment of Roger Lemaitre as President and...
4/29/2011appoints Ed Boney as Chief Financial Officer
5/27/2010Appoints Walter Segsworth and David Rhys to its Management A...
Financials of UEX Corp
11/6/2013Third Quarter 2013 Financial Results and MD&A
Project news of UEX Corp
1/7/20142014 Joint Venture Exploration Programs Commence
6/4/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
4/10/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
3/20/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
2/13/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
4/26/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
2/16/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
11/30/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
8/9/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
2/24/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
2/18/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
1/27/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
1/6/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
7/23/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
2/25/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
1/12/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
1/5/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
9/29/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
6/18/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
1/17/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
1/15/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
12/5/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
12/4/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
11/14/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
10/18/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
9/4/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
8/21/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
7/23/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
7/12/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
6/14/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
2/8/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Corporate news of UEX Corp
8/18/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
7/11/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
6/24/2016High Grade Zone Extended at Christie Lake
6/13/2016Drill Turning at Christie Lake
6/8/2016UEX Corporation Reports Results of Annual General Shareholde...
5/25/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
5/17/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
5/2/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
4/28/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
4/13/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
1/22/2016UEX Closes $2.0 Million Private Placement
1/19/2016Final Option Agreement Signed - Drill Program to Commence Im...
1/19/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
12/22/2015UEX Announces $2.0 Million Private Placement
10/26/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
9/21/2015Uranium companies could take the cake
4/21/2015UEX Announces $2.5 Million Private Placement
4/10/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
2/27/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
6/5/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
4/2/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
11/28/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
8/6/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
6/4/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
3/21/2013(Beatty River)Announces Completion of Beatty River Earn-in
8/8/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
6/8/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
5/31/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
5/7/2012Terminates Shareholder Rights Plan
5/1/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
2/17/2012Announces $8 Million Bought Deal
12/16/2011Comments by David Talbot on UEX Corporation in the Energy Re...
12/7/2011Adopts Shareholder Rights Plan
12/6/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
6/24/2011Board Re-elected
4/28/2011appoints Nan Lee as Vice-President of Project Development
3/17/2010Significant Unconformity Intersections at Shea Creek's 58B A...
9/23/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
6/10/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
11/26/2008Announces Minimum $16.5 Million Budget for 2009
4/9/2008 reports final results of 2007 Horseshoe and Raven drilling,...
3/26/2008Eaton Joins UEX Board
1/22/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
1/14/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
12/14/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
7/11/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
4/23/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
2/28/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0.495+16.47%0.385+2.67%
TORONTO
CA$ 0.495
08/24 16:59 0.070
16.47%
Prev close Open
0.425 0.400
Low High
0.440 0.500
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.495 -%
Volume 1 month var.
9,418,620 -%
24hGold TrendPower© : 44
Produces
Develops
Explores for Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202230.26%0.510.24
202146.15%0.600.25
2020108.00%0.280.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :