China Gold International Announces Pre-Feasibility Study for Expansion of the Jiama Project with IRR of 53.7% and Project Update

VANCOUVER, Oct. 25, 2012 /CNW/ - China Gold International Resources Co. Ltd. (TSX: CGG, HK: 2099) (the "Company") is pleased to announce the results of an updated NI 43-101 compliant, Independent Pre-Feasibility Study for the Phase II Expansion of its Jiama Copper-Polymetallic Mine, (the "Project") in Tibet Autonomous Region, China. The Pre-Feasibility Study was completed by Minarco-MineConsult (MMC), part of the Runge Limited Group of Companies, in conjunction with independent consulting engineers and management.

(All amounts in US dollars unless otherwise stated)

Highlights

  • Copper (Cu) Measured and Indicated Mineral Resources increased to 10.2 billion pounds of metal at 0.44% Cu;
  • Copper Proved and Probable Mineral Reserves Increased to 6.2 billion pounds of metal at 0.77% Cu;
  • Production from open-pit and underground operations is expected to produce 6.3 million tonnes and 6 million tonnes (Mt) of run-of-mine ("ROM") ore per annum respectively;
  • Ramp up to an annual processing capacity of 12.3 Mt of ROM ore, over a 31 year period, producing approximately:
    • 176 million pounds of copper per annum
    • 35 thousand ounces of gold (Au) per annum
    • 2.7 million ounces of silver (Ag) per annum
    • 2.3 thousand tonnes of molybdenum (Mo) per annum
  • Estimated capital expenditures of $705 million;
  • After-tax Net Present Value (NPV) of $1.2 billion with a discount rate of 9% at metal price assumptions of: $2.90/lb Cu, $18/lb Mo, $1,380/oz Au, $16.5/oz Ag
  • After-tax Internal Rate of Return (IRR) of 53.7% and payback period of 4.5 years
  • Pre-tax NPV of $1.5 billion with IRR of 60.4%;
  • Life of Mine (LOM) projected average cash cost $1.76/lb Cu equivalent, or $1.52/lb Cu with other metals credited;
  • Average annual net cash flow of $120 million for 31 year LOM;
  • Contribution of Cu, Mo, Au and Ag to gross revenues are 75%, 11%, 7% and 6% respectively.  Lead (Pb) and Zinc (Zn) contributes less than 1% of overall revenue; and
  • Undiscounted, cumulative net cash flow, is approximately $3.8 billion

Dr. Xin Song, CEO of the Company, commented, "With a potential increase in the processing capacity from 6,000 to 40,000 tonnes per day (tpd), along with a longer mine life of close to 31 years, we are very pleased with the future outlook of the operation. Highlights of the study show a payback period of less than 5 years, an internal rate of return of 53.7% and an after-tax NPV of approximately $1.2 billion, indicating solid economics and strong annual net cash flow of $120 million over the mine life.  During 2012, we continued to increase our reserve and resource base, and we work to achieve the expansion of this strategic asset."

Overview

The Jiama Project is a large scale polymetallic (Cu, Mo, Au, Ag, Pb, Zn) deposit located about 60 kilometers east of Lhasa City along the Sichuan-Tibet Highway within the Gangdise Copper Metallogeny Belt in Central Tibet, China.

The Company plans to expand the Project from its current processing capacity of 6,000 to 40,000 tpd of ore through the expansion of current open-pit operations and the development of new open-pit and underground mining operations. The Phase II Expansion will include four open pits, one underground, and a new floatation plant with a processing capacity of 34,000 tpd of ore.  The total Project processing capacity will be increased from its current production rate of 1.8 Mt of ore per year to 12.3 Mt of ore per year, producing approximately 176 Mlb of Cu, 2.3 Kt of Mo, 35 Koz of Au, 2.7 Moz of Ag, per annum over a period of 31 years. LOM average head grade will be 0.77%, 0.03%, 0.22 g/t and 12 g/t for Cu, Mo, Au and Ag respectively.

Geology

The Project is located in the central-south portion of the Gangdise-Nianqing Tanggula Terrane. Stratigraphy outcropping in the Project area is dominated by passive epicontinental clastic-carbonate rocks. Three types of copper-polymetallic mineralization are observed within the Project. These include Skarn, Hornfels and porphyry hosted mineralization. All three styles of mineralization are structurally controlled with concentrations occurring along shear/structure zones and mineralization offset by thrust and detachment faults as well as associated with anticlines and synclines.

Mining

The Phase II Expansion Project will include the addition of four open pits and one underground mine.

The four open pits are designed to mine all three types of mineralization, producing approximately 6.3 Mt of ROM ore and removing about 19 Mt of waste rock per annum with a LOM stripping ratio of 3.01.  The underground mine is designed to mine the high grade portion of the skarn type mineralization and will produce approximately 6 Mt of ROM ore per annum.

Processing and Products

The Company plans to expand the Project's processing capacity from its current 1.8 Mt of ore per year to 12 Mt of ore per year, producing approximately 176 Mlb of Cu, 2.3 Kt of Mo, 35 Koz of Au, 2.7 Moz of Ag, per annum over a period of 31 years. The end products include copper, moly, lead, and zinc concentrates, with other metals as by-products, which will be sold to smelters within China.

The processing recovery estimates are based on the current processing test work completed by a number of leading Chinese research institutes and two years of actual production data. The processing recoveries estimated for the different rock types are shown in Table 1.

Table 1: Jiama Copper-Polymetallic Project -Recovery Factors
                   
Ore (Rock) Type     Product     Element     Recovery (%)
Cu-Mo Ore
(Skarn)
    Cu Concentrate     Cu     88
    Au     45
    Ag     65
    Mo Concentrate     Mo     70
Cu-Mo Ore
(Hornfels & Porphyry)
    Cu Concentrate     Cu     84
    Mo Concentrate     Mo     48
Cu-Pb-Zn Ore
(Skarn)
    Cu Concentrate     Cu     88
    Au     45
    Ag     60
    Pb Concentrate     Pb     88
    Zn Concentrate     Zn     75

Source: MMC Derived based on Testwork Reports

Life of Mine Operating Costs

The LOM average operating costs are listed in Table 2.

Table 2: Jiama Copper-Polymetallic Project - Life of Mine Operating Costs (USD/ t processed)
                 
Cost Centre       USD/t waste       USD/t processed
Overburden Removal       2.60       7.36
Open Cut Mining               2.81
Underground Mining               18.08
Support               1.45
Processing               11.43(Cu/Mo)/13.33(Cu/Pb/Zn)
Admin & Other Overheads               4.37
Total Mine Operating Costs/t processed               45.5/47.43
Metal Selling and Transport               2.22
Average royalty per ROM tonne               4.10
Total Project Operating Costs/t processed               51.82/53.75

Capex and Cash Flow Analysis

Estimated capital expenditures for the Phase II Expansion of the Project will be approximately $705 million, including, $221 million for new floatation plant, $355 million for mining, $76 million for engineering, $28 million for loan interest and $24 million mining camp.

The long term metal prices used for the  Pre-Feasibility Study are $2.90/lb, $1,380/oz, $16.5/oz and $18/lb for Cu, Au, Ag and Mo respectively, the long term price for both zinc (Zn) and lead (Pb) is at $2,000/tonne.

The after-tax net present value ("NPV") is $1.2 billion with a discount rate of 9%, giving the capital expenditure payback period of 4.5 years, LOM average cash cost of Cu equivalent of $1.76/lb, or $1.52/lb Cu with other metals credited, and the after-tax IRR of 53.7%.  The undiscounted, cumulative net cash flow is approximately $3.8 billion. The indicated contribution of Cu, Mo, Au and Ag to gross revenues are 75%, 11%, 7% and 6% respectively.  Zn and Pb account for less than 1% of overall revenue.

Table 3: Jiama Copper-Polymetallic Project - NPV and IRR Summary

Long Term Metal Price   NPV ($ Million) IRR
Cu
($/lb)
Mo
($/lb)
Au
($/oz)
Ag
($/oz)
@0% @7% @9%
Base Case
@11%
$2.90 $18 $1,380 $16.50 Pre-Tax $4,480 $1,820 $1,470 $1,204 60.4%
After-Tax $3,841 $1,542 $1,239 $1,010 53.7%

Mineral Resources Estimate

A Mineral Resource estimate, dated April 28, 2012, has been independently completed by MMC in accordance with the CIM Definitions Standards under NI 43-101. The updated Mineral Resource is based on 22 infill drill holes totaling 10,720m completed in late 2011. These holes were drilled within the proposed pit locations which enabled detailed mine planning to be undertaken.  Further drilling has recently been completed over the South Pit area to upgrade the classification of the existing Inferred Mineral Resources within the pit areas with sampling and assaying ongoing.

During the review of the data MMC noted that whilst the mineralisation occurs all within a single mineralised body, Au and Ag mineralisation within the orebody had a significantly higher spatial variability than the other elements. As a result MMC has classified the Au and Ag resource presented in Table 5 separately; this classification takes into account the proposed large scale mining techniques where Au and Ag will only be credits to the overall products from the operations. MMC has assumed that Au and Ag will not be used as a single cut-off grade for a selected mining block and will be mined in conjunction with the other elements.

The Mineral Resources are summarized in Tables 4 and 5. The Mineral Resources presented in Table 5 for Au and Ag are inclusive and not in addition to the Mineral Resources in Table 4 and occur within the same mineralised body.

Table 4: Jiama Project - Cu, Mo, Pb and Zn Mineral Resources
Reported at a 0.3 % Cu Equivalent Cut Off Grade*, as of April 28, 2012
                                         
Rock
Type
  Class   Quantity
Mt
  Cu %   Mo %   Pb %   Zn %   Cu Metal
(kt)
  Mo Metal
(kt)
  Pb Metal
(kt)
  Zn Metal
(kt)
Skarn   Measured   35.6   0.71   0.048   0.11   0.07   252   17   38   25
    Indicated   293.2   0.73   0.043   0.07   0.06   2,135   127   201   163
    M+I   328.8   0.73   0.044   0.07   0.06   2,388   144   239   187
    Inferred   174   0.6   0.045   0.16   0.08   1,036   79   286   146
Hornfels   Measured   38.4   0.28   0.035   0.04   0.01   107   14   14   5
    Indicated   626.1   0.31   0.031   0.01   0.01   1,952   196   66   64
    M+I   664.5   0.31   0.032   0.01   0.01   2,059   210   80   69
    Inferred   219   0.29   0.034   0.03   0.01   633   74   72   32
Porphyry   Measured   2.1   0.22   0.056   0.01   0.01   5   1   0   0
    Indicated   57.7   0.33   0.043   0.01   0.01   188   25   4   6
    M+I   59.8   0.32   0.043   0.01   0.01   193   26   4   6
    Inferred   2.9   0.23   0.099   0.02   0.04   7   3   0   1
Total   Measured   76   0.48   0.042   0.07   0.04   364   32   52   30
    Indicated   977.1   0.44   0.036   0.03   0.02   4,275   348   271   232
    M+I   1,053.1   0.44   0.036   0.03   0.02   4,640   380   323   262
    Inferred   395.9   0.42   0.039   0.09   0.05   1,676   156   359   179

Table 5: Jiama Project - Au and Ag Mineral Resources
Reported at a 0.3% Cu Equivalent Cut Off Grade* (>0.02 Au g/t), as of April 28, 2012
                                     
Rock Type     Class     Quantity (Mt)     Au g/t     Ag g/t     Au Moz     Ag Moz
Skarn     Indicated     256.5     0.31     17.01     2.537     140.290
      Inferred     117.0     0.39     16.50     1.472     62.077
Hornfels     Indicated     178.6     0.06     2.52     0.337     14.486
      Inferred     68.9     0.08     5.06     0.186     11.195
Porphyry     Indicated     15.7     0.24     8.22     0.121     4.145
      Inferred     0.4     0.11     10.79     0.001     0.128
Total     Indicated     450.8     0.21     10.97     2.995     158.921
      Inferred     186.2     0.28     12.26     1.659     73.400

Note:  Figures reported are rounded which may result in small tabulation errors.

Cu Equivalent is based on associated component grades, process recoveries and bank consensus forecast metal pricing as at May 2012 (before tax). The key inputs are outlined in Table 6 below:

Table 6: Jiama Copper-Polymetallic Project - Copper Equivalence Parameters Mineral Reserves
                   
Process Recoveries     Skarn     Skarn (Cu/Pb/Zn Ore)     Hornfels/Porphyry
Copper     88.00%     88.00%     84.00%
Molybdenum     70.00%     -     48.00%
Gold     45.00%     45.00%      
Silver     65.00%     60.00%      
Lead           75.00%      
Zinc           88.00%      
Product Prices                  
Copper USD per lb     2.90     2.90     2.90
Molybdenum USD per lb     15.50     -     15.50
Gold USD per Troy ounce     1,300     1,300      
Silver USD per Troy ounce     20.00     20.00      
Lead USD per tonne           2,150      
Zinc USD per tonne           2,100      
Copper Equivalence Ratio                   
Copper     1     1     1
Molybdenum     2.5540     -     1.7513
Gold     0.2478     0.2478      
Silver     0.0051     0.0051      
Zinc           0.2023      
Lead           0.1884      

Mineral Reserves Estimate

A Mineral Reserve estimate, dated April 28, 2012, has been independently completed by MMC in accordance with the CIM Definitions Standards under NI 43-101.

Table 7 presents the Mineral Reserves estimate for the Project reported at a 0.35% Cu-equivalent cut-off grade for the ore extracted via open cut methods and 0.5% to 0.65% Cu-equivalent cut-off grade for the ore extracted via underground methods. The Mineral Reserves is inclusive of, and not additional to the Mineral Resources in Tables 4 and 5.

Table 7: Jiama Project Statement of NI 43-101 Mineral Reserve Estimate as of April 28, 2012
                                                     
        Grade           Metals
Type   Ore   Cu   Mo   Au   Ag   Pb   Zn   Cu   Mo   Au   Ag   Pb   Zn
    kt   %   %   g/t   g/t   %   %   kt   kt   t   t   kt   kt
Tongqianshan                                        
Proved   -   -   -   -   -   -   -   -   -   -   -   -   -
Probable   2,632   0.57   0.014   0.15   8.05   -   -   15.0   0.37   0.39   21.2   -   -
Subtotal   2,632   0.57   0.014   0.15   8.05   -   -   15.0   0.37   0.39   21.2   -   -
Waste   7,770   -   -   -   -   -   -   -   -   -   -   -   -
Strip Ratio*   2.95   -   -   -   -   -   -   -   -   -   -   -   -
Niumatang                                            
Proved   -   -   -   -   -   -   -   -   -   -   -   -   -
Probable   15,328   1.24   0.044   0.57   25.77   -   -   189.5   6.74   8.78   394.9   -   -
Subtotal   15,328   1.24   0.044   0.57   25.77   -   -   189.5   6.74   8.78   394.9   -   -
Waste   141,919   -   -   -   -   -   -   -   -   -   -   -   -
Strip Ratio*   9.26   -   -   -   -   -   -   -   -   -   -   -   -
South Pit                                                    
Proved   -   -   -   -   -   -   -   -   -   -   -   -   -
Probable   38,231   0.93   0.021   0.22   20.90   -   -   354.0   8.03   8.53   799.0   -   -
Subtotal   38,231   0.93   0.021   0.22   20.90   -   -   354.0   8.03   8.53   799.0   -   -
Waste   233,346   -   -   -   -   -   -   -   -   -   -   -   -
Strip Ratio*   6.10   -   -   -   -   -   -   -   -   -   -   -   -
Jiaoyan                                                    
Proved   -   -   -   -   -   -   -   -   -   -   -   -   -
Probable   146,017   0.42   0.016   0.03   1.11   -   -   611.8   23.36   4.53   161.6   -   -
Subtotal   146,017   0.42   0.016   0.03   1.11   -   -   611.8   23.36   4.53   161.6   -   -
Waste   224,620   -   -   -   -   -   -   -   -   -   -   -   -
Strip Ratio*   1.54   -   -   -   -   -   -   -   -   -   -   -   -
Underground (north)                                          
Proved   16,241   1.14   0.073   0.38   21.69   0.108   0.058   185.6   11.90   6.15   352.3   17.5   9.5
Probable   113,158   1.10   0.049   0.42   20.61   0.039   0.033   1,241.9   55.30   47.60   2,332.1   44.5   37.0
Subtotal   129,399   1.10   0.052   0.42   20.74   0.048   0.036   1,427.5   67.20   53.75   2,684.4   62.0   46.5
Underground (south)                                    
Proved   8,673   0.63   0.014   0.29   0.38   0.116   10.855   54.8   1.26   2.48   3.3   10.1   941.5
Probable   23,190   0.67   0.016   0.09   10.82   0.094   0.125   155.1   3.76   2.05   251.0   21.8   28.9
Subtotal   31,864   0.66   0.016   0.14   7.98   0.100   3.046   209.9   5.02   4.53   254.3   31.9   970.4
Total Reserves Open Cut + Underground                
Proved   24,914   0.96   0.053   0.35   14.27   0.111   3.817   240.4   13.15   8.63   355.6   27.6   950.9
Probable   338,556   0.76   0.029   0.21   11.70   0.020   0.019   2,567.3   97.57   71.88   3,959.8   66.4   65.9
Total   363,470   0.77   0.030   0.22   11.87   0.026   0.280   2,807.7   110.72   80.50   4,315.4   94.0   1,016.9

-Note: Figures reported are rounded which may result in small tabulation errors
-Information on the Cu Equivalent Cut-off grade calculation are outlined in the Mineral Resource section of this release.
*Strip ratio units are waste tonne: ore tonne

An NI 43-101 Pre-Feasibility Study Technical Report is being prepared by MMC to support the Statement of Mineral Resources and Mineral Reserves and this will be available on SEDAR and on the Company's website within the next forty-five days.

Project Update

As of October 7, 2012, the Company has completed a further infill drilling program to upgrade the resource confidence and help further optimize the mine design and reserves of the Jiama deposit. The program consisted of 90 drill holes for a total of 40,496 meters, including: 71 regular in-fill resource drill holes (31,489 m), 13 geo-technical drill holes (4,835 m), and 6 geo-hydrological holes (4,172 m). Assaying and geological logging and testing of the core from this program is ongoing and this information will be included in future updates of the Mineral Resources and Mineral Reserves.

The Company is currently completing further metallurgical testing of both skarn and hornfels ores to further optimize the molybdenum and precious metal recoveries especially in lower grade ores. Further testing underway in the hornfels mostly located in the Jiaoyan pit area, will be focused on further refining the Cu-Mo separation.

Based on the above infill drilling and metallurgical program the Company aims to release an update of the Mineral Resources and Mineral Reserves in the first half of 2013.

About China Gold International Resources

China Gold International Resources Corp Ltd is based in Vancouver, BC, Canada and operates both the CSH Gold Mine in Inner Mongolia, and the Jiama Copper-Polymetallic Mine in Tibet Autonomous Region of China. CGG's objective is to continue to build shareholder value by growing production at its current mining operations, expanding its resource base, and aggressively acquiring and developing new projects internationally. The Company is listed on the Toronto Stock Exchange (TSX: CGG) and the Main Board of the Stock Exchange of Hong Kong Limited (HKEx: 2099).

QUALIFIED PERSON

An Independent Pre-Feasibility Study Technical Report titled "Jiama Copper-Polymetallic Project, Metrorkongka County, Tibet Autonomous Region People's Republic of China" with an effective date of October 25, 2012 has been prepared by MMC. The report will be available on SEDAR (www.sedar.com) within 45 days of this release.

Mr. Jeremy Lee Clark, a full time Principal Geologist for MMC, and a Qualified Person as defined by NI-43-101, has reviewed the data underlying the Mineral Resource and supervised the estimation of the Mineral Resource as well as reviewed the entire Pre-Feasibility Technical Report. Jeremy has approved the technical and scientific information pertaining to the Jiama Project's Mineral Resources and Geology contained in this release.

Mr. Anthony Robert Cameron, a part time Associate Mining Engineer engaged by MMC, and a Qualified Person as defined by NI-43-101, has reviewed the data underlying the Mineral Reserve and supervised the estimation of the Mineral Reserve as well as reviewed the reserve sections of the Pre-Feasibility Technical Report. Anthony has approved the technical and scientific information pertaining to the Jiama Project's Mineral Reserves, Life of Mine Operating Costs and Capex and Cashflow Analysis contained in this release.

Mr. Andrew James Haigh Newell, a full time Executive Processing Consultant Engineer for MMC, and a Qualified Person as defined by NI-43-101, has reviewed the data underlying the Processing aspects of the project and sections of the Pre-Feasibility Technical Report. Andrew has approved the technical and scientific information pertaining to the Jiama Project's Processing and Products contained in this release.

Forward-Looking Statements

Certain information regarding China Gold International Resources contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although China Gold International Resources believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. China Gold International Resources cautions that actual performance will be affected by a number of factors, most of which are beyond its control, and that future events and results may vary substantially from what China Gold International Resources currently foresees. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration results, continued availability of capital and financing and general economic, market or business conditions. The forward-looking statements are expressly qualified in their entirety by this cautionary statement. The information contained herein is stated as of the current date and subject to change after that date.  

 

 

 

SOURCE: China Gold International Resources Corp. Ltd.

For further information:

Stefanie Makagon: Investor Relations Manager
Tel:  +1.604.695 5032
+86.10.5635.3938
Email: stefaniem@chinagoldintl.com
Website:  www.chinagoldintl.com

Data and Statistics for these countries : Canada | China | Hong Kong | Mongolia | All
Gold and Silver Prices for these countries : Canada | China | Hong Kong | Mongolia | All

China Gold Int. Res

PRODUCER
CODE : CGG.TO
CUSIP : 47758X 102
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

China Gold is a gold producing company based in Canada.

China Gold holds various exploration projects in China, in Kazakhstan and in Tanzania.

Its main asset in production is CHANG SHAN HAO (217) GOLD MINE in China, its main asset in development is TWANGIZA in Congo Dem. Rep. of and its main exploration properties are XINJIANG, DADIANGOU, JIAMA MINE and CSH 217 in China and KABANGA JV in Tanzania.

China Gold is listed in Canada and in United States of America. Its market capitalisation is CA$ 3.3 billions as of today (US$ 2.7 billions, € 2.3 billions).

Its stock quote reached its lowest recent point on October 10, 2008 at CA$ 0.39, and its highest recent level on April 17, 2024 at CA$ 8.40.

China Gold has 396 413 753 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of China Gold Int. Res
4/6/2019China gold demand firms, price dip adds to festive sparkle i...
7/25/2012China Gold and Silver Strategy
1/12/2012China Gold Panic 2012
Annual reports of China Gold Int. Res
2007 Annual Report
Nominations of China Gold Int. Res
2/24/2014International Appoints New Chairman, CEO and Director.
2/28/2011Resources Announces Management Changes
Financials of China Gold Int. Res
6/24/2016International Reports Results of its Annual General and Spec...
3/31/2016International Reports Year-End 2015 Results and Provides 201...
11/13/2015International Reports 2015 Third Quarter Results.
8/14/2015International Reports 2015 Second Quarter and First Half Res...
11/14/2013International Reports 2013 Third Quarter and Nine Months Res...
8/15/2013International Reports Strong 2013 Second Quarter and First H...
5/16/2013International Reports Strong 2013 First Quarter Results and ...
8/16/2011International Reports 2011 First Half Financial Results
Project news of China Gold Int. Res
4/15/2013International Resources is Assisting with Comfort and Relief...
3/31/2013(Jiama Mine)International Reports on Landslide at Jiama Mine's Explorati...
10/25/2012International Announces Pre-Feasibility Study for Expansion ...
1/5/2012(Jiama Mine)Secures Sufficient Permanent Power Supply for the Jiama Mine
6/14/2011(Chang Shan Hao (217) Gold Mine)Announces April and May Gold Production
5/30/2011(Csh 217)Resources Commences Drilling at CSH Gold Mine
4/21/2011(Twangiza) Enters Into Memorandum of Understanding With Banro Corporat...
4/5/2011(Jiama Mine)Announces 2011 Aggressive Exploration Plan for its Jiama Pro...
8/1/2007(Dadiangou)Phase II Drilling Underway at Jinshan's Dadiangou Gold Prope...
4/14/2005(Jbs)Jinshan and Ivanhoe sell their interest in the JBS project
Corporate news of China Gold Int. Res
6/23/2016China Gold International Reports Results of its Annual Gener...
5/13/2016China Gold International Reports 2016 First Quarter Results
3/30/2016China Gold International Reports Year-End 2015 Results and P...
12/21/2015China Gold International Announces Jiama Mine Expansion Upda...
11/3/2015China Gold International Announces Loan Facility Agreement.
11/3/2015China Gold International Announces Loan Facility Agreement
8/14/2015China Gold International Reports 2015 Second Quarter and Fir...
8/14/2015China Gold International Reports 2015 Second Quarter and Fir...
7/27/2015China Gold International Reports Results of Voting at the An...
3/25/2015China Gold International Reports Year-End 2014 Results and P...
11/14/2014China Gold International Reports 2014 Third Quarter Results.
11/14/2014China Gold International Reports 2014 Third Quarter Results
11/5/2014CSH Mine successfully completes test production on its new a...
11/5/2014CSH Mine successfully completes test production on its new a...
11/5/2014CSH Mine successfully completes test production on its new a...
10/23/2014China Gold International Resources Announces New Director Ap...
10/23/2014China Gold International Resources Announces New Director Ap...
8/18/2014China Gold International Resources Appoints Senior Executive...
8/14/2014China Gold International Reports 2014 Second Quarter and Fir...
7/24/2014China gold demand slumps 19.4 pct on yr, but output rises
7/17/2014China Gold International Resources Successfully Completed th...
7/10/2014China Gold International Resources Announces the Issuance of...
4/30/2014International Resources Provides an Update on First Quarter ...
2/28/2014International Resources Provides Preliminary 2013 Operating,...
1/16/2014International Announces Completion and Positive Results of J...
8/1/2013CSH Mine completes its new additional 30,000 tpd crushing sy...
4/4/2013International Launches Risk Emergency Plan, Enhances Monitor...
4/3/2013International Provides Full Support to The Government in Tib...
3/25/2013International Announces Year-End 2012 Results and 2013 Outlo...
3/21/2013International Resources Appoints New Senior Executive Vice P...
3/18/2013International to Release Year-End 2012 results on March 25th...
1/29/2013International Resources Provides Preliminary 2012 Operating,...
8/29/2012in talks to purchase African Barrick
8/16/2012International Reports 2012 First Half Financial and Operatio...
6/28/2012International Acquires Shares in China Nonferrous Mining Cor...
3/29/2012International Provides 2011 Year-End Results and 2012 Outlo...
12/19/2011International Resources Corp. Ltd. Intercepts 248.09 Meters ...
12/7/2011International Significantly Increases Water Supply for its C...
10/3/2011National Gold Group Announces Purchase of CGG Stock
9/16/2011International Resources "CGG" Graduates From the S&P Small C...
8/25/2011International Announces a 443% Increase in the Measured and ...
7/19/2011International Update Regarding Release of Jiama Resource Est...
7/13/2011International Resources Announces Production Results at Jiam...
7/5/2011National Gold Group Buys CGG Stock
6/9/2011 Receives Top Honor
5/11/2011to Hold Investor Update Presentation
3/17/2011 Deputy Minister of Ministry of Land and Resources of China ...
3/7/2011Joins Hang Seng Composite Index
6/18/2008presenting at the Asia Pacific Gold Forum
3/10/2008Jinshan Gold Mines opens Toronto Stock Exchange
9/27/2007presents at the Denver Gold Forum
6/5/2007Announces Note Offering of up to C$20 Million to Replace Uni...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CGG.TO)
8.40-1.18%
TORONTO
CA$ 8.40
04/17 16:36 -0.100
-1.18%
Prev close Open
8.50 8.46
Low High
8.40 8.46
Year l/h YTD var.
5.33 -  9.06 44.58%
52 week l/h 52 week var.
4.70 -  9.06 13.67%
Volume 1 month var.
2,501 3.83%
24hGold TrendPower© : -2
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/14/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202433.55%
202360.87%7.653.95
202218.84%5.453.03
202180.77%4.471.75
202065.45%2.000.45
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.06%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-2.56%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :