China Gold International Resources Corp. Ltd. Intercepts 248.09 Meters of 0.78 Grams/Tonne Gold at Its CSH Gold Mine
Published : December 19, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Dec. 19, 2011) - China Gold International Resources Corp. Ltd. (News - Market indicators) (HKSE:2099) (the "Company") is pleased to announce an update on its exploration progress for 2011 at its CSH gold mine in Inner Mongolia, China. The planned 108 hole - 59,135.40 meter drill campaign was completed in early November 2011 on schedule, which is aimed to define more resource down depth below the current open pit. All of the assay results were received in late November 2011.

Highlights of the 2011 drill program from the recently received assay results include intercepts of 340.36 meters (true width 248.09 meters) grading 0.78 grams per tonne (g/t) gold in hole DDH9900-2 and 221.88 meters (true width 190.99 meters) grading 0.92 grams per tonne (g/t) gold in hole DDH9800-3.

"We are pleased with the results from the drill campaign. The results indicate that the gold mineralization is continuous and the gold grade has improved to depth beneath the current open pit operation and provides confidence that the resource at CSH will have a significant increase. With the growing gold resource, and the recent increases in mine water supply, we look forward to potentially further expanding the mine production capacity from its current 30,000 tpd," commented Dr. Xin Song, the Company's CEO.

The following is a brief summary on the 2011 drilling results:

Table 1: Gold intercepts from 108 Diamond drill holes in the mining permit area:
China Gold Int'l
CSH 2011 Drilling
DDH ID
  Mineral-
ization
Zones
  Mineralization   Downhole
Length
(m)
  True
Thickness
(m)
  Average Grade
Au gram/tonne
(ppm)
        From (m) To (m)            
DDH6900-1   ( 1 )   240.90 243.60   2.70   2.30   0.57
    ( 2 )   259.55 264.05   4.50   3.84   0.61
              7.20   6.14   0.59
DDH6900-2   No Significant Mineralization            
DDH7000-1   ( 1 )   192.90 210.60   17.70   14.41   0.64
    ( 2 )   253.85 258.35   4.50   3.77   1.74
              22.20   18.18   0.87
DDH7000-2   ( 1 )   263.26 270.29   7.03   5.50   0.58
    ( 2 )   306.29 314.29   8.00   6.38   0.72
    ( 3 )   321.49 325.49   4.00   3.19   0.53
              19.03   15.07   0.63
DDH7000-3   No Significant Mineralization            
DDH7100-1   ( 1 )   141.85 151.85   10.00   7.97   0.51
    ( 2 )   177.25 212.57   35.32   28.87   0.61
    ( 3 )   226.20 240.20   14.00   11.59   1.29
              59.32   48.44   0.76
DDH7100-2   ( 1 )   221.83 248.30   26.47   20.93   0.60
    ( 2 )   271.55 303.55   32.00   25.66   0.72
    ( 3 )   315.00 331.00   16.00   12.92   1.07
              74.47   59.51   0.75
DDH7100-3   ( 1 )   401.55 430.10   28.55   21.43   0.53
     ( 2 )   459.65 479.65   20.00   15.23   0.52
    ( 3 )   500.84 508.64   7.80   5.97   0.60
    ( 4 )   514.65 518.65   4.00   3.05   1.11
              48.55   45.68   0.57
DDH7200-1   ( 1 )   185.35 200.75   15.40   11.16   0.51
    ( 2 )   210.75 216.75   6.00   4.35   1.37
    ( 3 )   224.75 256.00   31.25   23.21   0.82
    ( 4 )   262.80 282.20   19.40   14.59   1.24
              72.05   53.31   0.91
DDH7200-2   ( 1 )   239.07 251.07   12.00   8.03   0.52
    ( 2 )   262.10 364.50   102.40   69.87   0.57
              114.40   77.89   0.57
DDH7200-3   ( 1 )   469.37 523.82   54.45   41.00   0.71
    ( 2 )   531.82 535.87   4.05   3.10   2.74
              58.50   44.10   0.85
DDH7300-1   ( 1 )   220.70 227.00   6.30   4.59   0.53
    ( 2 )   257.50 316.40   58.90   44.80   0.57
              65.20   49.39   0.57
DDH7300-2   ( 1 )   368.05 396.87   28.82   19.72   0.77
    ( 2 )   406.83 435.75   28.92   19.81   0.76
              57.74   39.54   0.77
DDH7300-3   ( 1 )   448.22 511.23   63.01   49.78   0.63
DDH7400-1   ( 1 )   373.65 407.40   33.75   27.27   0.52
DDH7400-2   ( 1 )   444.95 452.35   7.40   6.13   0.50
    ( 2 )   463.20 506.20   43.00   36.10   0.52
              50.40   42.23   0.51
DDH7400-3   No Significant Mineralization            
DDH7500-1   ( 1 )   169.90 208.60   38.70   29.99   0.76
    ( 2 )   239.65 258.45   18.80   14.81   0.55
              57.50   44.79   0.69
DDH7500-2   ( 1 )   346.95 367.45   20.50   16.15   0.90
DDH7500-3   ( 1 )   456.90 468.90   12.00   9.19   0.51
    ( 2 )   482.49 540.65   58.16   45.75   0.71
              70.16   54.94   0.67
DDH7600-1   ( 1 )   272.51 314.49   41.98   34.55   0.87
    ( 2 )   322.67 330.05   7.38   6.15   0.59
              49.36   40.70   0.82
DDH7600-2   ( 1 )   476.90 482.34   5.44   4.48   0.55
    ( 2 )   488.64 504.64   16.00   13.18   0.52
              21.44   17.66   0.53
DDH7700-1   ( 1 )   203.60 250.45   46.85   36.80   0.53
    ( 2 )   258.55 315.07   56.52   45.24   0.79
    ( 3 )   327.10 330.95   3.85   3.12   1.49
              107.22   85.16   0.71
DDH7700-2   ( 1 )   374.20 388.18   13.98   11.36   0.62
DDH7700-3   ( 1 )   438.80 446.36   7.56   5.87   0.59
DDH7800-1   ( 1 )   187.52 211.13   23.61   18.30   0.66
    ( 2 )   230.83 309.43   78.60   63.04   0.55
              102.21   81.34   0.58
DDH7800-2   ( 1 )   288.76 307.01   18.25   11.44   0.50
    ( 2 )   334.87 379.96   45.09   37.81   0.65
    ( 3 )   391.81 403.36   11.55   9.93   0.73
              74.89   59.18   0.64
DDH7900-1   ( 1 )   226.44 238.18   11.74   9.43   1.01
    ( 2 )   280.04 295.28   15.24   11.88   0.65
    ( 3 )   301.77 340.41   38.64   30.27   0.97
              65.62   51.57   0.90
DDH7900-2   ( 1 )   341.41 352.41   11.00   8.75   0.52
    ( 2 )   362.91 368.41   5.50   4.38   0.52
    ( 3 )   378.03 384.41   6.38   5.22   0.77
    ( 4 )   391.35 408.61   17.26   14.34   0.97
    ( 5 )   423.21 465.87   42.66   36.26   0.52
              82.80   68.95   0.63
DDH8000-1   ( 1 )   199.83 203.75   3.92   3.00   0.60
    ( 2 )   270.52 274.60   4.08   3.07   0.70
    ( 3 )   299.13 303.13   4.00   3.10   0.59
    ( 4 )   335.45 360.70   25.25   19.70   0.53
              37.25   28.88   0.56
DDH8000-2   ( 1 )   377.55 383.55   6.00   4.81   0.69
    ( 2 )   398.75 404.75   6.00   4.84   0.53
    ( 3 )   423.20 444.52   21.32   17.32   0.51
              33.32   26.98   0.55
DDH8100-1   ( 1 )   254.00 261.38   7.38   5.80   0.53
    ( 2 )   272.87 295.26   22.39   18.37   0.63
              29.77   24.17   0.61
DDH8100-2   ( 1 )   366.20 390.85   24.65   19.65   0.54
    ( 2 )   398.85 457.10   58.25   46.34   0.77
              82.90   65.98   0.70
DDH8200-1   ( 1 )   212.94 310.27   97.33   77.05   0.82
DDH8200-2   ( 1 )   374.38 384.39   10.01   8.52   0.51
    ( 2 )   394.39 425.60   31.21   26.70   0.62
              41.22   35.21   0.59
DDH8300-1   ( 1 )   275.96 287.02   11.06   8.84   0.55
    ( 2 )   295.58 324.46   28.88   23.10   2.19
    ( 3 )   331.96 353.33   21.37   17.48   0.76
    ( 4 )   372.17 376.16   3.99   3.26   0.73
              65.30   52.67   1.35
DDH8300-2   ( 1 )   513.97 526.99   13.02   11.33   0.57
    ( 2 )   534.82 555.35   20.53   18.23   0.57
              33.55   29.56   0.57
DDH8400-1   ( 1 )   251.35 317.72   66.37   50.26   0.70
DDH8400-2   ( 1 )   32.10 35.10   3.00   2.16   0.57
    ( 2 )   346.90 377.50   30.60   24.24   0.99
              33.60   26.40   0.96
DDH8500-1   ( 1 )   208.14 215.72   7.58   6.16   0.57
    ( 2 )   221.45 233.10   11.65   9.69   0.56
              19.23   15.85   0.56
DDH8500-2   ( 1 )   325.75 380.45   54.70   45.11   0.60
DDH8600-1   ( 1 )   217.50 225.50   8.00   6.19   1.32
    ( 2 )   244.10 283.60   39.50   32.45   0.69
              47.50   38.64   0.79
DDH8600-2   ( 1 )   316.00 328.00   12.00   9.47   0.56
    ( 2 )   340.40 357.51   17.11   13.74   0.50
    ( 3 )   363.50 376.85   13.35   10.75   0.50
              42.46   33.95   0.52
DDH8700-1   ( 1 )   35.49 39.29   3.80   2.70   0.63
    ( 2 )   143.44 160.69   17.25   12.80   0.67
    ( 3 )   170.20 184.40   14.20   10.88   0.53
              35.25   26.37   0.61
DDH8700-2   ( 1 )   119.40 123.20   3.80   2.80   0.56
    ( 2 )   353.90 359.90   6.00   5.00   0.52
              9.80   7.79   0.54
DDH8800-1   ( 1 )   200.60 217.10   16.50   13.26   0.53
DDH8800-2   ( 1 )   321.50 329.50   8.00   6.66   0.59
DDH8900-1   ( 1 )   92.44 102.00   9.56   5.57   0.64
DDH9300-1   ( 1 )   173.72 185.05   11.33   8.93   0.62
    ( 2 )   213.15 221.15   8.00   6.34   0.57
              19.33   15.28   0.60
DDH9300-2   ( 1 )   238.49 246.99   8.50   6.79   0.81
    ( 2 )   331.54 339.54   8.00   7.00   0.60
    ( 3 )   380.09 390.79   10.70   9.41   0.54
              27.20   23.19   0.63
DDH9400-1   ( 1 )   197.15 237.75   40.60   31.49   0.56
DDH9400-2   ( 1 )   357.20 361.00   3.80   3.07   0.67
    ( 2 )   382.50 435.43   52.93   43.46   0.56
              56.73   46.54   0.57
DDH9500-1   ( 1 )   62.43 184.28   121.85   75.05   0.55
DDH9500-2   ( 1 )   40.30 45.45   5.15   3.44   0.62
    ( 2 )   174.80 178.80   4.00   2.87   0.77
    ( 3 )   314.00 376.26   62.26   48.96   1.12
              71.41   55.27   1.07
DDH9600-1   ( 1 )   184.23 197.25   13.02   9.03   0.73
    ( 2 )   285.67 342.93   57.26   42.53   0.54
    ( 3 )   395.29 419.29   24.00   18.25   1.06
              94.28   69.81   0.70
DDH9600-2   ( 1 )   235.26 242.77   7.51   5.22   0.73
    ( 2 )   265.26 270.26   5.00   2.44   0.65
    ( 3 )   404.76 417.84   13.08   10.14   0.58
    ( 4 )   442.97 454.42   11.45   9.00   0.67
    ( 5 )   462.26 528.86   66.60   51.87   0.51
              103.64   78.68   0.55
DDH9600-3   ( 1 )   44.70 62.20   17.50   11.30   0.51
    ( 2 )   354.50 368.50   14.00   10.53   0.52
    ( 3 )   415.35 419.35   4.00   3.10   0.60
    ( 4 )   458.15 507.60   49.45   38.96   0.55
    ( 5 )   514.04 613.22   99.18   80.52   0.90
              184.13   144.41   0.74
DDH9700-1   ( 1 )   36.88 74.20   37.32   25.45   0.56
    ( 2 )   206.64 222.20   15.56   11.56   0.59
    ( 3 )   252.20 255.81   3.61   2.76   0.73
    ( 4 )   267.85 359.16   91.31   71.03   0.59
              147.80   110.80   0.58
DDH9700-2   ( 1 )   184.07 190.00   5.93   4.08   0.55
    ( 2 )   338.75 346.77   8.02   6.27   0.72
    ( 3 )   354.77 469.17   114.40   92.77   0.61
    ( 4 )   509.57 522.33   12.76   11.05   0.52
              141.11   114.17   0.60
DDH9700-3   ( 1 )   26.35 35.56   9.21   5.64   0.52
    ( 2 )   376.36 384.15   7.79   5.82   0.65
    ( 3 )   463.01 512.26   49.25   39.08   0.90
    ( 4 )   518.26 537.46   19.20   15.42   0.72
    ( 5 )   543.86 591.16   47.30   38.27   0.78
    ( 6 )   670.66 674.36   3.70   3.08   0.52
              136.45   107.30   0.79
DDH9700-4   ( 1 )   582.41 606.57   24.16   16.73   0.52
    ( 2 )   617.21 680.60   63.39   46.22   1.05
    ( 3 )   688.74 700.55   11.81   9.04   1.20
    ( 4 )   745.40 749.40   4.00   3.06   0.57
    ( 5 )   757.50 782.95   25.45   19.71   0.50
              128.81   94.76   0.84
DDH9800-1   ( 1 )   192.20 196.79   4.59   3.07   0.51
    ( 2 )   209.75 301.20   91.45   62.10   0.80
    ( 3 )   308.30 358.80   50.50   34.40   1.18
    ( 4 )   426.97 512.28   85.31   63.70   0.67
              231.85   163.27   0.82
DDH9800-2   ( 1 )   375.15 379.15   4.00   2.68   0.52
    ( 2 )   501.75 612.76   111.01   80.47   0.91
    ( 3 )   621.80 628.41   6.61   4.86   0.74
    ( 4 )   636.55 714.29   77.74   57.95   0.99
              199.36   145.95   0.93
DDH9800-3   ( 1 )   66.46 70.46   4.00   2.35   0.52
    ( 2 )   398.06 402.06   4.00   3.06   0.57
    ( 3 )   472.20 686.08   213.88   185.58   0.93
              221.88   190.99   0.92
DDH9900-1   ( 1 )   223.10 229.00   5.90   3.68   0.72
    ( 2 )   267.74 517.70   249.96   177.32   0.77
              255.86   181.00   0.77
DDH9900-2   ( 1 )   283.22 307.50   24.28   15.60   0.58
    ( 2 )   314.38 319.25   4.87   3.13   1.63
    ( 3 )   335.30 356.30   21.00   13.77   0.57
    ( 4 )   376.40 381.70   5.30   3.61   0.99
    ( 5 )   387.70 421.70   34.00   23.18   0.53
    ( 6 )   440.20 484.00   43.80   30.65   0.77
    ( 7 )   490.00 505.65   15.65   11.25   0.77
    ( 8 )   519.68 588.70   69.02   50.67   1.10
    ( 9 )   596.70 600.70   4.00   3.01   0.59
    ( 10 )   614.20 732.64   118.44   93.23   0.70
              340.36   248.09   0.78
DDH9900-3   ( 1 )   538.95 552.95   14.00   9.00   0.69
    ( 2 )   560.92 571.18   10.26   6.59   1.02
    ( 3 )   661.33 678.23   16.90   12.18   0.52
    ( 4 )   704.28 750.61   46.33   34.47   0.56
    ( 5 )   760.61 834.65   74.04   57.24   0.50
              161.54   119.47   0.56
DDH10000-1   ( 1 )   700.36 723.80   23.44   18.70   1.21
    ( 2 )   729.80 756.40   26.60   21.50   0.54
    ( 3 )   765.60 768.53   2.93   2.37   0.51
    ( 4 )   801.24 902.40   101.16   82.29   0.50
              154.13   124.86   0.62
DDH10100-1   ( 1 )   143.86 149.86   6.00   3.93   0.55
    ( 2 )   184.11 253.83   69.72   47.61   0.70
    ( 3 )   272.11 394.12   122.01   89.85   0.80
    ( 4 )   409.56 437.87   28.31   21.57   0.57
              226.04   162.96   0.73
DDH10100-2   ( 1 )   222.71 226.71   4.00   2.52   0.59
    ( 2 )   314.66 318.66   4.00   2.62   0.70
    ( 3 )   326.66 337.54   10.88   7.28   0.52
    ( 4 )   345.12 450.70   105.58   72.59   0.63
    ( 5 )   497.50 511.72   14.22   10.38   0.64
    ( 6 )   529.15 535.61   6.46   4.80   0.56
    ( 7 )   543.72 555.72   12.00   8.91   0.67
    ( 8 )   562.08 568.08   6.00   4.46   0.52
    ( 9 )   575.76 579.76   4.00   3.02   0.71
    ( 10 )   587.82 619.65   31.83   24.02   0.56
    ( 11 )   637.61 671.18   33.57   25.64   0.51
    ( 12 )   683.18 701.94   18.76   14.34   0.52
              251.30   180.57   0.59
DDH10100-3   ( 1 )   464.52 477.07   12.55   8.71   0.50
    ( 2 )   510.65 527.03   16.38   11.40   0.50
    ( 3 )   541.03 571.75   30.72   21.70   0.93
    ( 4 )   587.75 599.75   12.00   0.59   8.63
    ( 5 )   614.09 617.54   3.45   2.48   1.62
    ( 6 )   623.54 654.51   30.97   22.61   0.55
    ( 7 )   679.86 745.03   65.17   48.67   0.98
    ( 8 )   762.95 770.69   7.74   5.90   0.52
              178.98   122.06   0.84
DDH10100-4   ( 1 )   781.00 785.00   4.00   3.19   0.55
    ( 2 )   920.63 924.52   3.89   3.15   0.71
    ( 3 )   942.52 956.04   13.52   10.93   0.55
              21.41   17.27   0.58
DDH10200-1   ( 1 )   140.17 161.87   21.70   12.87   0.79
    ( 2 )   228.18 232.18   4.00   2.55   1.22
    ( 3 )   268.40 347.64   79.24   56.01   0.84
    ( 4 )   371.52 445.86   74.34   61.88   0.63
    ( 5 )   454.66 486.80   32.14   27.56   0.50
    ( 6 )   492.56 511.06   18.50   15.99   0.79
    ( 7 )   517.06 545.44   28.38   24.63   0.52
              258.30   201.49   0.69
DDH10200-2   ( 1 )   420.77 440.77   20.00   15.17   0.54
    ( 2 )   466.31 602.84   136.53   106.72   0.57
    ( 3 )   696.28 701.20   4.92   3.88   0.55
              161.45   125.77   0.56
DDH10200-3   No Significant Mineralization            
DDH10300-1   ( 1 )   107.84 125.52   17.68   11.05   0.59
    ( 2 )   171.48 355.27   183.79   122.61   0.66
    ( 3 )   366.62 389.28   22.66   14.92   1.01
              224.13   148.58   0.69
DDH10300-2   ( 1 )   257.91 265.91   8.00   5.43   0.52
    ( 2 )   274.21 294.00   19.79   14.69   0.51
    ( 3 )   308.00 325.74   17.74   13.17   0.57
    ( 4 )   335.63 459.92   124.29   91.16   0.76
              169.82   124.44   0.70
DDH10300-3   ( 1 )   423.64 426.93   3.29   2.25   0.66
    ( 2 )   508.06 535.15   27.09   19.79   0.50
    ( 3 )   580.07 616.46   36.39   28.01   0.50
    ( 4 )   638.47 644.68   6.21   4.82   0.54
              72.98   54.86   0.51
DDH10300-4   ( 1 )   734.47 740.47   6.00   4.16   0.57
    ( 2 )   760.88 782.12   21.24   14.80   0.51
              27.24   18.96   0.52
DDH10300-5   ( 1 )   766.76 815.44   48.68   36.44   0.73
DDH10400-1   ( 1 )   372.90 486.35   113.45   91.76   0.63
DDH10400-2   No Significant Mineralization            
DDH10400-3   ( 1 )   549.29 557.29   8.00   6.61   0.52
    ( 2 )   591.43 640.16   48.73   38.33   0.51
              56.73   44.94   0.51
DDH10400-4   ( 1 )   785.89 789.89   4.00   3.19   0.57
DDH10500-1   ( 1 )   188.68 257.51   68.83   44.35   0.63
    ( 2 )   271.04 340.95   69.91   48.20   0.59
              138.74   92.55   0.61
DDH10500-2   ( 1 )   565.07 575.07   10.00   7.24   0.57
    ( 2 )   585.03 588.34   3.31   2.41   0.77
              13.31   9.65   0.62
DDH10500-3   ( 1 )   564.12 568.12   4.00   2.95   0.62
    ( 2 )   621.47 626.28   4.81   3.62   0.53
    ( 3 )   642.34 648.34   6.00   4.54   0.68
              14.81   11.11   0.61
DDH10500-4   No Significant Mineralization            
DDH10600-1   ( 1 )   280.25 353.77   73.52   59.16   0.55
DDH10600-2   ( 1 )   359.91 443.94   84.03   69.86   0.60
DDH10600-3   ( 1 )   615.30 621.32   6.02   5.14   0.51
DDH10600-4   ( 1 )   798.31 802.32   4.01   3.34   0.68
DDH10700-1   ( 1 )   139.84 157.42   17.58   11.90   0.71
    ( 2 )   170.46 173.96   3.50   2.37   0.55
    ( 3 )   199.96 226.46   26.50   18.11   0.51
              47.58   32.38   0.59
DDH10700-2   ( 1 )   369.15 382.00   12.85   11.13   0.72
DDH10700-3   No Significant Mineralization            
DDH10800-1   ( 1 )   241.88 259.61   17.73   11.41   0.56
DDH10800-2   ( 1 )   213.67 217.70   4.03   3.14   0.59
DDH11000-1   ( 1 )   147.80 159.62   11.82   7.24   0.66
DDH9600-4   ( 1 )   306.21 314.70   8.49   4.14   1.38
    ( 2 )   323.40 331.40   8.00   4.09   0.75
    ( 3 )   339.40 389.50   50.10   26.57   0.73
              66.59   34.81   0.81
DDH9800-4   No Significant Mineralization            
DDH10000-2   No Significant Mineralization            
DDH10000-3   No Significant Mineralization            
DDH10200-4   ( 1 )   461.66 468.33   6.67   2.71   0.51
    ( 2 )   590.91 632.91   42.00   22.33   0.87
              48.67   25.04   0.83
DDH10200-5   No Significant Mineralization            
DDH10400-5   ( 1 )   402.65 412.65   10.00   4.97   0.51
DDH10400-6   No Significant Mineralization            
DDH10600-5   ( 1 )   322.20 343.63   21.43   9.96   0.53
DDH10600-6   No Significant Mineralization            
 
Notes:
  1. All grades reported are sample length weighted averages (LWA), where the individual samples range from 0.5 to 2 meters lengths with most in 2 meter lengths.
  2. The intervals listed above include both drill intercept widths and calculated true widths based on actual down hole surveys.

Please refer to the attachment to the press release on the Company's website (www.chinagoldintl.com) for additional information on the drill program including drill collar locations.

Quality Control and Quality Assurance:

Due to the large amount of samples to be assayed, two internationally recognized well known labs were chosen to perform the assays. One is the SGS Tianjin Lab and the other ALS Chemex Guangzhou lab, both in China. At the SGS Tianjin Lab China and ALS Chemex Guangzhou Lab, the samples were dried, pulverized to approximately 95%-pass 200 mesh (75um). The gold content was determined using the standard 30-gram fire assay followed by Atomic Absorption techniques. About 10% of the samples that were assayed above 0.2 ppm Au were checked by a third lab, the ITS Shanghai Lab, which is also an internationally well recognized lab. China Gold, SGS and ALS all maintain comprehensive and independent Quality Control/Quality Assurance programs.

Please refer to the attachment to the press release on the Company's website (www.chinagoldintl.com) for additional information on the Company's quality control and quality assurance measures.

Qualified Persons

Mario Rossi, M.Sc., Min. Eng., of GeoSystems International Inc., an Independent Qualified Person as defined by National Instrument 43-101 has reviewed the drill program, supervised the preparation of the scientific and technical information and verified the data supporting such scientific and technical information contained in this news release.

About CSH Mine

The CSH gold mine is an open pit, heap leach gold mine located in Inner Mongolia, China, approximately 210 kilometers northwest of the city of Baotou. Production has increased each year since commercial production was reached in 2008. The annual commercial gold production was 33,671 ounces in 2008, 83,570 ounces in 2009 and 111,000 ounces in 2010. Production for 2011 is estimated to reach 120,000 to 125,000 ounces. The Company has recently completed its 2011 drilling program at the mine site, and a full evaluation on the mine's new resources is in progress.

Forward-looking statements

Certain statements made herein, and other statements relating to matters that are not historical facts and statements of our beliefs, intentions and expectations about developments, results and events which will or may occur in the future, constitute "forward-looking information" within the meaning of applicable securities legislation. Forward-looking information and statements are typically identified by words such as "anticipate", "could", "should", "expect", "seek", "may", "intend", "likely", "plan", "estimate", "will", "believe" and similar expressions suggesting future outcomes or statements regarding an outlook. All such forward-looking information and statements are based on certain assumptions and analysis made by China Gold International Resources Corp. Ltd.'s management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information or statements. Important factors that could cause actual results to differ from these forward-looking statements include those described under the heading "Risks and Uncertainties" elsewhere in the Company's MD&A filed at www.SEDAR.com. The reader is cautioned not to place undue reliance on forward-looking information or statements. Except as required by law the Company does not assume the obligation to revise or update these forward looking statements after the date of this document or to revise them to reflect the occurrence of future, unanticipated events.

Hong Kong Exchanges and Clearing Limited, The Stock Exchange of Hong Kong Limited and Hong Kong Securities Clearing Company Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

China Gold International Resources Corp. Ltd.
Investor Relations
+1.604.609.0598 or +86.10.8413.5708
+1.604.688.0598 (FAX)
info-chinagoldintl@chinagoldintl.com
www.chinagoldintl.com
Data and Statistics for these countries : China | Hong Kong | Mongolia | All
Gold and Silver Prices for these countries : China | Hong Kong | Mongolia | All

China Gold Int. Res

PRODUCER
CODE : CGG.TO
CUSIP : 47758X 102
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

China Gold is a gold producing company based in Canada.

China Gold holds various exploration projects in China, in Kazakhstan and in Tanzania.

Its main asset in production is CHANG SHAN HAO (217) GOLD MINE in China, its main asset in development is TWANGIZA in Congo Dem. Rep. of and its main exploration properties are XINJIANG, DADIANGOU, JIAMA MINE and CSH 217 in China and KABANGA JV in Tanzania.

China Gold is listed in Canada and in United States of America. Its market capitalisation is CA$ 3.3 billions as of today (US$ 2.4 billions, € 2.3 billions).

Its stock quote reached its lowest recent point on October 10, 2008 at CA$ 0.39, and its highest recent level on April 26, 2024 at CA$ 8.41.

China Gold has 396 413 753 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of China Gold Int. Res
4/6/2019China gold demand firms, price dip adds to festive sparkle i...
7/25/2012China Gold and Silver Strategy
1/12/2012China Gold Panic 2012
Annual reports of China Gold Int. Res
2007 Annual Report
Nominations of China Gold Int. Res
2/24/2014International Appoints New Chairman, CEO and Director.
2/28/2011Resources Announces Management Changes
Financials of China Gold Int. Res
6/24/2016International Reports Results of its Annual General and Spec...
3/31/2016International Reports Year-End 2015 Results and Provides 201...
11/13/2015International Reports 2015 Third Quarter Results.
8/14/2015International Reports 2015 Second Quarter and First Half Res...
11/14/2013International Reports 2013 Third Quarter and Nine Months Res...
8/15/2013International Reports Strong 2013 Second Quarter and First H...
5/16/2013International Reports Strong 2013 First Quarter Results and ...
8/16/2011International Reports 2011 First Half Financial Results
Project news of China Gold Int. Res
4/15/2013International Resources is Assisting with Comfort and Relief...
3/31/2013(Jiama Mine)International Reports on Landslide at Jiama Mine's Explorati...
10/25/2012International Announces Pre-Feasibility Study for Expansion ...
1/5/2012(Jiama Mine)Secures Sufficient Permanent Power Supply for the Jiama Mine
6/14/2011(Chang Shan Hao (217) Gold Mine)Announces April and May Gold Production
5/30/2011(Csh 217)Resources Commences Drilling at CSH Gold Mine
4/21/2011(Twangiza) Enters Into Memorandum of Understanding With Banro Corporat...
4/5/2011(Jiama Mine)Announces 2011 Aggressive Exploration Plan for its Jiama Pro...
8/1/2007(Dadiangou)Phase II Drilling Underway at Jinshan's Dadiangou Gold Prope...
4/14/2005(Jbs)Jinshan and Ivanhoe sell their interest in the JBS project
Corporate news of China Gold Int. Res
6/23/2016China Gold International Reports Results of its Annual Gener...
5/13/2016China Gold International Reports 2016 First Quarter Results
3/30/2016China Gold International Reports Year-End 2015 Results and P...
12/21/2015China Gold International Announces Jiama Mine Expansion Upda...
11/3/2015China Gold International Announces Loan Facility Agreement.
11/3/2015China Gold International Announces Loan Facility Agreement
8/14/2015China Gold International Reports 2015 Second Quarter and Fir...
8/14/2015China Gold International Reports 2015 Second Quarter and Fir...
7/27/2015China Gold International Reports Results of Voting at the An...
3/25/2015China Gold International Reports Year-End 2014 Results and P...
11/14/2014China Gold International Reports 2014 Third Quarter Results.
11/14/2014China Gold International Reports 2014 Third Quarter Results
11/5/2014CSH Mine successfully completes test production on its new a...
11/5/2014CSH Mine successfully completes test production on its new a...
11/5/2014CSH Mine successfully completes test production on its new a...
10/23/2014China Gold International Resources Announces New Director Ap...
10/23/2014China Gold International Resources Announces New Director Ap...
8/18/2014China Gold International Resources Appoints Senior Executive...
8/14/2014China Gold International Reports 2014 Second Quarter and Fir...
7/24/2014China gold demand slumps 19.4 pct on yr, but output rises
7/17/2014China Gold International Resources Successfully Completed th...
7/10/2014China Gold International Resources Announces the Issuance of...
4/30/2014International Resources Provides an Update on First Quarter ...
2/28/2014International Resources Provides Preliminary 2013 Operating,...
1/16/2014International Announces Completion and Positive Results of J...
8/1/2013CSH Mine completes its new additional 30,000 tpd crushing sy...
4/4/2013International Launches Risk Emergency Plan, Enhances Monitor...
4/3/2013International Provides Full Support to The Government in Tib...
3/25/2013International Announces Year-End 2012 Results and 2013 Outlo...
3/21/2013International Resources Appoints New Senior Executive Vice P...
3/18/2013International to Release Year-End 2012 results on March 25th...
1/29/2013International Resources Provides Preliminary 2012 Operating,...
8/29/2012in talks to purchase African Barrick
8/16/2012International Reports 2012 First Half Financial and Operatio...
6/28/2012International Acquires Shares in China Nonferrous Mining Cor...
3/29/2012International Provides 2011 Year-End Results and 2012 Outlo...
12/19/2011International Resources Corp. Ltd. Intercepts 248.09 Meters ...
12/7/2011International Significantly Increases Water Supply for its C...
10/3/2011National Gold Group Announces Purchase of CGG Stock
9/16/2011International Resources "CGG" Graduates From the S&P Small C...
8/25/2011International Announces a 443% Increase in the Measured and ...
7/19/2011International Update Regarding Release of Jiama Resource Est...
7/13/2011International Resources Announces Production Results at Jiam...
7/5/2011National Gold Group Buys CGG Stock
6/9/2011 Receives Top Honor
5/11/2011to Hold Investor Update Presentation
3/17/2011 Deputy Minister of Ministry of Land and Resources of China ...
3/7/2011Joins Hang Seng Composite Index
6/18/2008presenting at the Asia Pacific Gold Forum
3/10/2008Jinshan Gold Mines opens Toronto Stock Exchange
9/27/2007presents at the Denver Gold Forum
6/5/2007Announces Note Offering of up to C$20 Million to Replace Uni...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CGG.TO)
8.41+4.34%
TORONTO
CA$ 8.41
04/26 17:00 0.350
4.34%
Prev close Open
8.06 8.13
Low High
8.13 8.46
Year l/h YTD var.
5.33 -  9.06 44.75%
52 week l/h 52 week var.
4.70 -  9.06 22.77%
Volume 1 month var.
12,258 -1.29%
24hGold TrendPower© : -2
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/14/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202433.70%
202360.87%7.653.95
202218.84%5.453.03
202180.77%4.471.75
202065.45%2.000.45
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :