International Tower Hill Mines Intersects 33.5 Metres of 8.07 g/t Gold in Shallow Drilling at the Livengood Project, Alaska
Published : May 03, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 3, 2011) - International Tower Hill Mines Ltd. ("ITH" or the "Company") (News - Market indicators)(NYSE Amex:THM)(FRANKFURT:IW9) is pleased to announce the results from a further 29 holes drilled during the Company's 2011 Winter Drill Program at the Livengood Gold Project near Fairbanks, Alaska. The winter drill program, which began in February, is focused on confirming the continuity and grade of the mineralization in the Southwest (SW), South Core and Sunshine zones of the Money Knob deposit, as well as follow-up exploration of a new, deeper, higher grade zone with a series of 500-metre core holes.

Highlights from Drilling:

  • Hole MK-RC-0504: 33.5 m @ 8.07 g/t gold from 80.8-114.3 m depth (infill, Core Zone)
  • Hole MK-RC-0485: 93.0 m @ 1.24 g/t gold from 178.3-271.3 m depth (infill, Core Zone)
  • Hole MK-RC-0488: 88.4 m @ 0.94 g/t gold from 185.9-274.3 m depth (infill, Core Zone)
  • Hole MK-11-103: 28.6 m @ 1.83 g/t gold from 156.4-185.0 m depth (infill, Core Zone)

As a continuation of the program's initial results announced in news on March 29, 2011, these intersections are part a series of shallow infill and step out holes completed prior to deeper core drilling designed to test the deposit's new high-grade zone at depth. Results from this series of deeper core holes are expected by the end of May.

Southern Core Zone

Eleven of the 29 holes were drilled as infill holes in the southern Core zone. Two holes (holes MK-RC-0504 and MK-RC-0485) intersected higher grade mineralization related to quartz veining, extending a zone of high-grade mineralization further to the west (see Figure 1 below). The remaining holes are similar in grade and thickness to the surrounding holes and continue to add continuity to the deposit. Assay data for four core holes testing the deep mineralization in the southern Core Zone are pending and expected to become available by the end of May.

Southwest Zone

Current drill results on the western edge of the SW zone appear to be defining a limit to the shallow oxide zone in the area; however, strong near-surface gold-in-soil anomalies located 300 to 500 metres to the west have yet to be tested. The SW zone also remains open at depth with six holes mineralized to the lower limit of drilling, potentially part of the same deep high-grade mineralized zone being explored in the south Core zone. This deeper mineralization will be targeted in follow-up drilling programs.

Jeff Pontius, Chief Executive Officer of ITH, states: "These results continue to confirm and expand our understanding of the higher grade areas of the Money Knob deposit which could form the 'starter pit' phase of our mining plan. We look forward to bringing more exciting drill results over the next few weeks and months, particularly from our deeper core drilling."

To view Figure 1, please click on the following link: http://media3.marketwire.com/docs/ith52.pdf

Table 1: Significant new intercepts*
*Intercepts are calculated using a 0.25g/t gold cutoff and a maximum of 3 metres of internal waste.

Drill Hole From (metres) To (metres) Length (metres) Gold (g/t)   Area and Comments
             
MK-RC-0485 178.3 271.3 93.0 1.24   Core Zone infill
includes 179.8 195.1 15.2 3.00    
includes 201.2 211.8 10.7 2.05    
  272.8 283.5 10.7 0.47    
  347.5 394.7 47.3 0.87    
includes 361.2 368.8 7.6 2.72    
             
MK-RC-0487 237.7 245.4 7.6 0.33   SW Zone
             
MK-RC-0488 51.8 57.9 6.1 0.82   Core Zone infill
  153.9 181.4 27.4 0.56    
  185.9 274.3 88.4 0.94    
includes 239.3 256.0 16.8 1.75    
  278.9 320.0 41.2 0.72    
includes 278.9 283.5 4.6 3.02    
  324.6 349.0 24.4 1.80    
  353.6 362.7 9.1 0.71    
  365.8 413.0 47.2 0.65    
includes 391.7 402.3 10.7 1.09    
             
MK-RC-0491 152.4 161.5 9.1 0.44   SW Zone
             
MK-RC-0492 117.4 126.5 9.1 1.01   Sunshine infill
  134.1 147.8 13.7 1.51    
includes 134.1 138.7 4.6 2.92    
  153.9 166.1 12.2 0.70    
  195.1 225.6 30.5 0.71    
             
MK-RC-0493 70.1 79.3 9.2 0.50   Core Zone infill
  105.2 109.7 4.6 0.58   lost, redrilled as 498
  112.8 120.4 7.6 0.51    
  125.0 134.1 9.1 0.61    
             
MK-RC-0494 94.5 99.1 4.6 4.03   SW Zone
  189.0 214.9 25.9 0.46    
             
MK-RC-0495 30.5 71.6 41.2 0.64   Sunshine infill
  76.2 86.9 10.7 0.56    
  93.0 150.9 57.9 0.76    
  155.5 166.1 10.7 0.71    
  201.2 257.6 56.4 0.41    
             
MK-RC-0496 108.2 125.0 16.8 1.61   Sunshine infill
includes 108.2 111.3 3.1 6.79    
  138.7 157.0 18.3 0.59    
  164.6 199.6 35.1 0.53    
  205.7 263.7 57.9 0.59    
             
MK-RC-0497 179.8 195.1 15.2 0.68   SW Zone
  278.9 291.1 12.2 0.49    
  300.2 318.5 18.3 0.34    
  332.2 341.4 9.2 0.84    
MK-RC-0497 342.9 352.0 9.1 0.74    
(cont) 356.6 381.0 24.4 0.85    
  385.6 419.1 33.5 0.98    
             
MK-RC-0498 97.5 105.2 7.6 1.12   Core Zone infill
  140.2 150.9 10.7 0.45   lost hole
             
MK-RC-499 112.8 131.1 18.3 0.87   SW Zone
  172.2 184.4 12.2 0.80    
  195.1 213.4 18.3 0.67    
  243.8 285.0 41.2 0.51    
  307.9 327.7 19.8 0.66    
             
MK-RC-500 143.3 150.9 7.6 1.33   Core Zone pre-collar,
            core tail pending
             
MK-RC-501 109.7 114.3 4.6 3.06   SW Zone
  234.7 275.8 41.1 0.69    
includes 249.9 254.5 4.6 2.35    
  312.4 326.1 13.7 0.61    
             
MK-RC-502 213.4 224.0 10.7 0.55   SW Zone
  225.6 239.3 13.7 0.62    
  246.9 260.6 13.7 0.42    
             
MK-RC-503 27.4 38.1 10.7 0.68   Sunshine infill
  56.4 70.1 13.7 1.36    
  77.7 85.3 7.6 1.23    
  96.0 102.1 6.1 0.99    
  121.9 144.8 22.9 0.71    
  146.3 198.1 51.8 0.82    
  236.2 243.8 7.6 0.76    
includes 161.5 167.6 6.1 1.82    
             
MK-RC-504 80.8 114.3 33.5 8.07   Core Zone infill
includes 80.8 96.0 15.2 14.59    
includes 99.1 111.3 12.2 3.73    
  155.5 164.6 9.1 0.50    
  169.2 178.3 9.2 0.55    
  189.0 211.8 22.9 0.47    
  277.4 315.5 38.1 0.56    
  339.9 356.6 16.8 0.86    
             
MK-RC-505 45.7 76.2 30.5 0.74   Sunshine infill
  93.0 135.6 42.7 0.94    
includes 96.0 99.1 3.1 6.47    
             
MK-RC-506 291.1 300.2 9.2 1.18   SW Zone
  303.3 324.6 21.3 1.25    
includes 318.5 324.6 6.1 1.88    
             
MK-RC-507 30.5 33.5 3.1 2.13   Core Zone infill, lost hole
  121.9 150.9 29.0 0.65   re-drilled as 512
  175.3 192.0 16.8 0.44    
  196.6 234.7 38.1 1.14    
includes 205.7 211.8 6.1 3.91    
             
MK-RC-508 86.9 93.0 6.1 0.95   SW Zone
  292.6 312.4 19.8 0.52    
  326.1 342.9 16.8 0.43    
             
MK-RC-509 111.3 121.9 10.7 0.78   Sunshine infill
  167.6 251.5 83.8 0.84    
includes 219.5 233.2 13.7 1.07    
  265.2 285.0 19.8 0.65    
             
MK-RC-510 41.2 45.7 4.6 0.91   SW Zone
  53.3 57.9 4.6 1.41    
             
MK-RC-511 7.6 13.7 6.1 1.55   Sunshine infill
  51.8 64.0 12.2 0.49    
  192.0 236.2 44.2 0.80    
includes 205.7 214.9 9.1 1.37    
  245.4 256.0 10.7 0.51    
  260.6 272.8 12.2 1.46    
includes 262.1 269.8 7.6 1.91    
             
MK-RC-512 29.0 33.5 4.6 1.06   Core Zone infill
  146.3 182.9 36.6 0.44    
  184.4 201.2 16.8 0.50    
  204.2 242.3 38.1 0.43    
  265.2 286.5 21.3 1.14    
includes 278.9 281.9 3.1 3.35    
  289.6 315.5 25.9 0.55    
             
             
MK-RC-513 97.5 108.2 10.7 1.45   SW Zone
  208.8 231.7 22.9 0.86    
  240.8 243.8 3.1 3.54    
  260.6 291.1 30.5 0.46    
  298.7 320.0 21.3 0.49    
  350.5 378.0 27.4 0.48    
             
MK-11-103 156.4 185.0 28.6 1.83   Core Zone infill, lost hole
  187.2 194.6 7.4 0.63    
             
MK-11-104 no significant intercepts     Core Zone, lost, re-drill
            as 11-108 (assays pending)
MK-11-105 94.3 102.6 8.3 0.74   Core Zone infill, lost hole
  107.9 117.6 9.7 0.89    

Livengood Project Highlights

  • ITH controls 100% of its approximately 145 square kilometre Livengood land package, which is made up of fee land leased from the Alaska Mental Health Trust, a number of smaller private mineral leases and 115 Alaska state mining claims. 
  • The Livengood project has a very favourable logistical location, being situated 110 road kilometres north of Fairbanks, Alaska, along the paved, all-weather Elliott Highway, the Trans-Alaska Pipeline Corridor, and the proposed Alaska natural gas pipeline route. The terminus of the Alaska State power grid lies approximately 80 kilometres to the south.
  • Drilling at the project continues to expand the deposit, with the current estimated resource only representing a snapshot in time. The latest resource estimate (as at April 12, 2011) of 397 Mt at an average grade of 0.83 g/t gold (10.6MozMeasured and Indicated) and 104 Mt at an average grade of 0.79 g/t gold (2.7Moz Inferred), both at a 0.5 g/t gold cut-off grade, makes it one of the largest new gold discoveries in North America.
  • The Core and Sunshine zones together account for most of the higher grade mineralization (Measured and Indicated Resources of 193 Mt at an average grade of 1.08 g/t gold and Inferred Resources of 41 Mt at an average grade of 1.11g/t gold, based on a cut-off grade of 0.70 g/t gold) and will form the basis for starter pit design work.
  • Ongoing metallurgical studies are focused on the potential use of milling with a flotation-gravity circuit, which has returned initial recoveries to a concentrate of 89%, offering significant potential for operational and capital cost savings. Test data for conventional whole ore milling with a gravity-CIL system produced initial recoveries of 76% (See NR10-19). Optimization work is ongoing for these processing alternatives, as they have the potential to make significant positive impacts on project economics.
  • The geometry of the currently defined shallowly dipping, outcropping deposit has a low strip ratio amenable to low cost open pit mining which could support a high production rate and economies of scale.
  • No major permitting hurdles have been identified to date.

Geological Overview

The Livengood Deposit is hosted in a thrust-interleaved sequence of Proterozoic to Palaeozoic sedimentary and volcanic rocks. Mineralization is related to a 90 million year old (Fort Knox age) dike swarm that cuts through the thrust stack. Primary ore controls are a combination of favourable lithologies and crosscutting structural zones. In areas distal to the main structural zones, the selective development of disseminated mineralization in favourable host rocks is the main ore control. Within the primary structural corridors, all lithologies can be pervasively altered and mineralized. Devonian volcanic rocks and Cretaceous dikes represent the most favourable host lithologies and are pervasively altered and mineralized throughout the deposit. Two dominant structural controls are present: 1) the major shallow south-dipping faults which host dikes and mineralization which are related to dilatant movement on structures of the original fold-thrust architecture during post-thrusting relaxation, and 2) steep NW trending linear zones which focus the higher-grade mineralization which cuts across all lithologic boundaries. The net result is broad flat-lying zones of stratabound mineralization around more vertically continuous, higher grade core zones with a resulting lower strip ratio for the overall deposit and higher grade areas that could be amenable for starter pit production.

The surface gold geochemical anomaly at Livengood covers an area 6 kilometres long by 2 kilometres wide, of which approximately half has been explored by drilling to date. Surface exploration is ongoing as new targets are being developed to the northeast and west of the known deposit.

Qualified Person and Quality Control/Quality Assurance

Jeffrey A. Pontius (CPG 11044), a qualified person as defined by National Instrument 43-101, has supervised the preparation of the scientific and technical information that forms the basis for this news release and has approved the disclosure herein. Mr. Pontius is not independent of ITH, as he is the CEO and holds common shares and incentive stock options.

Development work at the Livengood Project is directed by Carl E. Brechtel (Colorado PE 23212, Nevada PE 8744), who is a qualified person as defined by National Instrument 43-101. He is a member of AusIMM and SAIMM. Mr. Brechtel is not independent of ITH, as he is the President and COO and holds incentive stock options.

The work program at Livengood was designed and is supervised by Chris Puchner, Chief Geologist (CPG 07048) of the Company, who is responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project photograph the core from each individual borehole prior to preparing the split core. Duplicate reverse circulation drill samples are collected with one split sent for analysis. Representative chips are retained for geological logging. On-site personnel at the project log and track all samples prior to sealing and shipping. All sample shipments are sealed and shipped to ALS Chemex in Fairbanks, Alaska for preparation and then on to ALS Chemex in Reno, Nevada or Vancouver, B.C. for assay. ALS Chemex's quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Finally, representative blind duplicate samples are forwarded to ALS Chemex and an ISO compliant third party laboratory for additional quality control.

About International Tower Hill Mines Ltd.

International Tower Hill Mines controls a 100% interest in the world-class Livengood Gold Project accessible by paved highway 70 miles north of Fairbanks, Alaska. ITH is focused on the rapid advancement of the project into a compelling potential development project in 2011 while it continues to expand its current resource and explore its 145 km2 district for new deposits.

On behalf of International Tower Hill Mines Ltd.

Jeffrey A. Pontius, Chief Executive Officer

Cautionary Note Regarding Forward-Looking Statements

This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and US securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the anticipated content, commencement and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, the potential for the expansion of the estimated resources at Livengood, the potential for any production at the Livengood project, the completion of a preliminary economic analysis of the Livengood project incorporating a milling scenario, the potential for higher grade mineralization to form the basis for a starter pit component in any production scenario, the potential low strip ratio of the Livengood deposit being amenable for low cost open pit mining that could support a high production rate and economies of scale, the potential for cost savings due to the high gravity concentration component of some of the Livengood mineralization, the completion of a pre-feasibility study at Livengood, the potential for a production decision to be made, the potential commencement of any development of a mine at Livengood following a production decision, business and financing plans and business trends, are forward-looking statements. Information concerning mineral resource estimates and the preliminary economic analysis thereof also may be deemed to be forward-looking statements in that it reflects a prediction of the mineralization that would be encountered, and the results of mining it, if a mineral deposit were developed and mined. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in the nature, quality and quantity of any mineral deposits that may be located, variations in the market price of any mineral products the Company may produce or plan to produce, the inability of the Company to obtain any necessary permits, consents or authorizations required for its activities, the inability of the Company to produce minerals from its properties successfully or profitably, to continue its projected growth, to raise the necessary capital or to be fully able to implement its business strategies, and other risks and uncertainties disclosed in the Company's Annual Information Form filed with certain securities commissions in Canada and the Company's annual report on Form 40-F filed with the United States Securities and Exchange Commission (the "SEC"), and other information released by the Company and filed with the appropriate regulatory agencies. All of the Company's Canadian public disclosure filings may be accessed via www.sedar.comand its United States public disclosure filings may be accessed via www.sec.gov, and readers are urged to review these materials, including the technical reports filed with respect to the Company's mineral properties.

Cautionary Note Regarding References to Resources and Reserves

National Instrument 43 101 - Standards of Disclosure for Mineral Projects ("NI 43-101") is a rule developed by the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all resource estimates contained in or incorporated by reference in this press release have been prepared in accordance with NI 43-101 and the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resource and Mineral Reserves, adopted by the CIM Council on November 14, 2004 (the "CIM Standards") as they may be amended from time to time by the CIM.

United States shareholders are cautioned that the requirements and terminology of NI 43-101 and the CIM Standards differ significantly from the requirements and terminology of the SEC set forth in the SEC's Industry Guide 7 ("SEC Industry Guide 7"). Accordingly, the Company's disclosures regarding mineralization may not be comparable to similar information disclosed by companies subject to SEC Industry Guide 7. Without limiting the foregoing, while the terms "mineral resources", "inferred mineral resources", "indicated mineral resources" and "measured mineral resources" are recognized and required by NI 43-101 and the CIM Standards, they are not recognized by the SEC and are not permitted to be used in documents filed with the SEC by companies subject to SEC Industry Guide 7. Mineral resources which are not mineral reserves do not have demonstrated economic viability, and US investors are cautioned not to assume that all or any part of a mineral resource will ever be converted into reserves. Further, inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher resource category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of a feasibility study or prefeasibility study, except in rare cases. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit amounts. The term "contained ounces" is not permitted under the rules of SEC Industry Guide 7. In addition, the NI 43-101 and CIM Standards definition of a "reserve" differs from the definition in SEC Industry Guide 7. In SEC Industry Guide 7, a mineral reserve is defined as a part of a mineral deposit which could be economically and legally extracted or produced at the time the mineral reserve determination is made, and a "final" or "bankable" feasibility study is required to report reserves, the three-year historical price is used in any reserve or cash flow analysis of designated reserves and the primary environmental analysis or report must be filed with the appropriate governmental authority.

This press release is not, and is not to be construed in any way as, an offer to buy or sell securities in the United States.

NR11-07



International Tower Hill Mines Ltd.
Shirley Zhou
Vice President - Corporate Communications
1-888-770-7488 (toll free) (604) 638-3247
(604) 408-7499 (FAX)
szhou@ithmines.com
www.ithmines.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Intl. Tower Hill Mines

DEVELOPMENT STAGE
CODE : ITH.TO
ISIN : CA46051L1040
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Intl. Tower Hill is a gold development stage company based in Canada.

Intl. Tower Hill develops gold and silver in USA, and holds various exploration projects in USA.

Its main asset in development is LIVENGOOD in USA and its main exploration properties are BMP, PAINTED HILLS and COFFE DOME in USA.

Intl. Tower Hill is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 120.0 millions as of today (US$ 88.2 millions, € 79.3 millions).

Its stock quote reached its lowest recent point on April 29, 2005 at CA$ 0.25, and its highest recent level on February 25, 2011 at CA$ 9.99.

Intl. Tower Hill has 162 190 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Intl. Tower Hill Mines
9/18/2012International Tower Hill Closes Second Tranche of Non-Broker...
7/19/2012International Tower Hill Increases Non-Brokered Private Plac...
7/12/2012International Tower Hill Announces Up To $25,000,000 Non-Bro...
2/17/2011International Tower Hill Receives Share Ownership Top-Up Not...
4/7/2010 Closes Final Tranche of CAD 30,000,000 Non-Brokered Equity ...
3/16/2010CAD 30,000,000 Non-Brokered Equity Financing
8/26/2009Closes AngloGold Ashanti Top Up Private Placement
3/5/2009Closes $10,500,000 Bought Deal Equity Financing
2/17/2009Increase in Bought Deal Equity Financing
2/12/2009 Announces Bought Deal Equity Financing
Option Grants of Intl. Tower Hill Mines
8/24/2012International Tower Hill Grants Incentive Options
Nominations of Intl. Tower Hill Mines
1/30/2013International Tower Hill Announces Resignation of a Director
1/9/2012International Tower Hill Mines Names Thomas E. Irwin as New ...
4/14/2010Appointment of Timothy Haddon and Daniel Carriere as new Dir...
Financials of Intl. Tower Hill Mines
8/15/2012International Tower Hill Files 2012 Second Quarter Financial...
5/11/2012International Tower Hill Files 2012 First Quarter Financial ...
Project news of Intl. Tower Hill Mines
7/23/2013(Livengood)International Tower Hill Mines Announces Livengood Gold Proj...
11/7/2012(Livengood)International Tower Hill Provides an Update on the Livengood...
6/19/2012(Livengood)International Tower Hill Mines Announces Update on the Liven...
1/26/2012(Livengood)International Tower Hill Mines Selects Engineering Firms for...
12/14/2011(Livengood)International Tower Hill Mines Acquires Mining Claims Near L...
6/9/2011(Livengood)International Tower Hill Mines Intersects 92.9 Metres of 1.6...
5/3/2011(Livengood)International Tower Hill Mines Intersects 33.5 Metres of 8.0...
3/30/2011(Livengood)International Tower Hill Mines Intersects Additional Zones o...
3/15/2011(Livengood)International Tower Hill Mines Hires Construction Manager fo...
2/5/2011(Livengood)International Tower Hill Intersects 13.7 metres of 5.45 g/t ...
6/16/2010(Livengood)Announces Resource Update, Livengood Gold Project, Alaska
5/11/2010(Livengood)Continues to Grow New High-Grade SW Zone, Livengood Project
4/26/2010(Livengood)Expands Higher Grade SW and Sunshine Zones at Livengood Proj...
3/22/2010(Livengood)Expands Livengood Deposit with First Results of Winter Drill...
3/10/2010(Livengood)Increases Indicated Resources at Livengood Gold Project
3/8/2010(Livengood)Announces Key Positive Metallurgical Test Results for Liveng...
3/4/2010(Terra) Signs LOI to Form Production Joint Venture on Terra Project
2/4/2010(Livengood)Begins 50,000 Metre 2010 Exploration Drill Program at Liveng...
12/4/2009Coffee Dome Drilling Intersects Gold System 17Km East of For...
11/30/2009(Livengood)Positive Preliminary Economic Assessment Results
11/12/2009(Livengood) Continues to Expand Livengood Gold Project, Alaska
11/5/2009(Chisna)Reaches JV Agreement on Chisna Copper
11/2/2009(Livengood)Continues to Expand the Livengood Gold Project
9/30/2009(Livengood)Expands the Sunshine Zone at Livengood
9/9/2009(Livengood)Latest Drill Results From Livengood Gold Project, Alaska
9/2/2009(Coffe Dome)Begins Drilling at Coffee Dome Project, Alaska
8/4/2009(North Bullfrog)Signs Agreement to Acquire 100% Interest in North Bullfrog
8/5/2009(Livengood)Delineates Major New Zone of Gold Mineralization at Livengoo...
6/26/2009(Livengood)Resource Update at Livengood, Alaska
6/10/2009(Livengood)Livengood Gold Project, Alaska Summer Drilling Program Comme...
3/10/2009(Livengood)Doubles Planned 2009 Drill Program for Livengood Gold Projec...
3/2/2009(Livengood)First Two Holes of 2009 Winter Drill Program
2/9/2009(Livengood)Livengood Gold Project, Alaska Winter Drilling Program Comme...
Corporate news of Intl. Tower Hill Mines
5/6/2016International Tower reports 1Q loss
3/16/2016International Tower reports 4Q loss
10/30/2015International Tower Hill Mines Files 2015 Third Quarter Fina...
8/6/2015International Tower reports 2Q loss
8/6/2015International Tower Hill Mines Files 2015 Second Quarter Fin...
3/26/2015International Tower Hill Mines Appoints Karl Hanneman as Chi...
3/11/2015International Tower Hill Mines Files 2014 Year End Financial...
1/6/2015International Tower Hill Mines Announces Progress on Livengo...
12/18/2014International Tower Hill Mines Announces Management Change
11/24/2014International Tower Hill Mines Announces CAD 8.4 Million Non...
11/5/2014International Tower Hill Mines Files 2014 Third Quarter Fina...
8/7/2014International Tower Hill Mines Files 2014 Second Quarter Fin...
8/7/2014International Tower Hill Mines Files 2014 Second Quarter Fin...
5/7/2014International Tower Hill Mines Files First Quarter 2014 Fina...
9/9/2013(Livengood)International Tower Hill Mines Files NI 43-101 Technical Rep...
8/8/2013International Tower Hill Mines Announces Addition to the Boa...
7/31/2013International Tower Hill Mines Files 2013 Second Quarter Fin...
6/7/2013International Tower Hill Mines Announces Results from Annual...
5/9/2013International Tower Hill Mines Files 2013 First Quarter Fina...
4/24/2013International Tower Hill Mines Comments on Recent Gold Marke...
3/13/2013International Tower Hill Mines Announces Corporate Update an...
12/11/2012(Livengood)International Tower Hill Announces Positive Metallurgical Te...
8/21/2012International Tower Hill Reports New High-Grade Gold Interce...
8/2/2012International Tower Hill Mines Announces New Manager of Inve...
6/29/2012International Tower Hill Mines Announces Interim Chief Execu...
4/4/2012International Tower Hill Recognizes Alaska Progress Made Tow...
3/21/2012International Tower Hill Mines Files Audited Annual Financia...
3/6/2012(Livengood)International Tower Hill Mines Validates Resource Estimate a...
2/27/2012International Tower Hill Mines Reports Historical Resource o...
1/16/2012International Tower Hill Mines Changes Fiscal Year End
1/4/2012International Tower Hill Mines Grants Options
12/20/2011International Tower Hill Mines Appoints Robert D. Comer as I...
8/29/2011International Tower Hill Mines Files 2011 Audited Annual Fin...
8/23/2011International Tower Hill Announces Surface Mine Measured & I...
8/16/2011International Tower Hill Mines Appoints Harold Galbriath as ...
7/28/2011International Tower Hill Mines Grants Stock Options
5/10/2011International Tower Hill Mines Appoints James Komadina as Ne...
5/6/2010 Signs Key Exploration Agreement with Ahtna
2/11/2010Receives Share Ownership Top-up Notice from AngloGold Ashant...
1/12/2010Hires Chief Operating Officer
11/26/2009to Begin Trading on Toronto Stock Exchange
11/18/2009Receives Conditional Toronto Stock Exchange Listing Approval
10/13/2009Expands Livengood Gold Resource by 64%
7/10/2009Receives Share Ownership Top-up Notice from AngloGold Ashant...
7/3/2009Retains Renmark Financial Communications Inc.
5/20/2009Receives Proceeds of $23,114,288 from Warrant/Broker Option ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ITH.TO)AMEX (THM)
0.740+5.71%0.543+5.03%
TORONTO
CA$ 0.740
09/18 13:05 0.040
5.71%
Prev close Open
0.700 0.740
Low High
0.740 0.740
Year l/h YTD var.
0.570 -  1.08 -11.90%
52 week l/h 52 week var.
0.450 -  1.08 39.62%
Volume 1 month var.
505 21.31%
24hGold TrendPower© : 4
Produces
Develops Gold
Explores for Bismuth - Copper - Gold - Nickel - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-3.90%1.120.57
202332.76%0.910.43
2022-40.21%1.560.51
2021-45.51%1.960.79
2020161.76%3.070.43
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.06+0.57%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 9.28+1.31%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59-3.26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.08+0.97%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 12.91+2.79%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 1.83+1.10%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.80+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.