Bolero Resources Corp.

Published : November 13th, 2007

Intersects 0.054% Mo (0.090% MoS2) Over 710 Feet And Provides Cannivan Gulch Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Diamond | Molybdenum |

BOLERO INTERSECTS 0.054% Mo (0.090% MoS2) OVER 710 FEET AND PROVIDES CANNIVAN GULCH UPDATE

November 13th, 2007, Vancouver, BC, Canada - Bolero Resources Corp. (the "Company" or "Bolero"), (TSX-V: BRU), (FRANKFURT: U7N)  is pleased to report the results for the fifth and sixth Diamond drill holes in its 2007 exploration drilling program for which analytical results have now been received.  Results for the first four holes were reported by Bolero Resources Corp. in a news release dated October 17, 2007 for its Bald Butte molybdenum property, Lewis and Clark County, Montana.

Hole BB07-3, averaged 0.054% Mo (0.090% MoS2) from a depth of 110 feet to a depth of 820 feet for an interval of 710 feet. This average includes all footage within this interval including those intercepts which were below a 0.03% Mo cut-off.  The following table presents the intercepts within this interval that are at least 20 feet in thickness and average 0.03% Mo (0.05% MoS2) or greater.

                    Hole BB07-3  Total Depth- 907 feet   Vertical Hole

FROM(feet)

TO(feet)

INTERVAL(feet)

GRADE-%Mo

GRADE-
%MoS2

110

130

20

0.045

0.075

130

160

30

0.033

0.055

160

180

20

0.082

0.137

180

200

20

0.037

0.062

200

270

70

0.054

0.090

270

330

60

0.081

0.135

330

470

140

0.052

0.087

470

560

90

0.076

0.127

560

580

20

0.034

0.057

650

690

40

0.035

0.058

690

780

90

0.066

0.110

780

820

40

0.039

0.065

Results for Hole BB07-13 have also been received. This hole has a 370 foot intercept from 470 feet to 840 feet averaging 0.056% Mo (0.093% MoS2). In addition, Hole BB07-13 has numerous lower grade intervals both above and below the main mineralized zone. Significant intercepts from this hole are outlined in the following table.

                   Hole BB07-13 Total Depth- 1099.5 feet Vertical Hole

FROM(feet)

TO(feet)

INTERVAL(feet)

GRADE-%Mo

GRADE-
%MoS2

240

260

20

0.020

0.033

340

470

130

0.026

0.043

470

840

370

0.056

0.093

840

900

60

0.021

0.035

1050

1099.5

49.5

0.026

0.043

The interval in Hole BB07-13 from 470 to 840 feet includes three higher grade intercepts.  These are from 470 to 520 for a total of 50 feet at 0.062% Mo (0.103% MoS2), 570 to 630 feet for a total of 60 feet at 0.065 % Mo (0.108% MoS2) and from 670 to 770 feet for a total of 100 feet at 0.074% Mo (0.123% MoS2). Geological logging of Hole BB07-13 is in progress. It is significant that this hole was in mineralization averaging 0.026% Mo (0.043% MoS2) for the final 49.5 feet.
 
"We are delighted with the results of these holes and we are very encouraged that the present drilling program will confirm and expand our previous estimates for the tonnage and grade of the mineralization on the Bald Butte property," states Bolero's President and CEO R. Bruce Duncan.

Strong mineralization in Hole BB07-3 starts in the brecciated and silicified Proterozoic Helena dolomite, carries through a zone of interfingering sheared Helena dolomite and quartz monzonite porphyry which we have interpreted as a dike swarm, and extends an additional 260 feet down into the main mass of the porphyry.  Hole BB07-3 is west of an intense zone of silicification exposed at the surface and is approximately 240 feet north-northwest of Hole BB07-2. This latter hole also had excellent mineralization in brecciated Helena dolomite but circulation was lost in a fault zone before reaching its projected depth.  These holes are situated in the south-central portion of the Bald Butte mineralization and appear to test a strong zone of hydrothermal brecciation within the core of the deposit.  This zone may extend for an additional 150 feet south of Hole BB07-2 to old hole GBB 25, which also had an excellent intercept.

We have now contracted a third core drill owned by Big Snowy Resources (a drilling services company) on the Bald Butte property. As of October 19, 2007 we have drilled 11,250 feet and eleven holes at Bald Butte as part of the 2007 drilling campaign. Weather permitting; we intend to aggressively continue the 2007 drilling program into late Autumn and Winter. We have submitted a supplemental Plan of Operation to the regulatory agencies in which we propose additional drill holes throughout the Bald Butte deposit.

CANNIVAN GULCH

A helicopter-supported core drilling program was initiated at Cannivan Gulch on September 7, 2007 after significant delays caused by a slow permitting process and a lack of helicopters during a very difficult fire season in Montana. Two holes were completed before bad weather and logistical issues forced us off the project on October 4, 2007. Drill Hole CG07-1 was designed to test near-surface mineral ization in the immediate area of old hole CG-1.  A second hole was designed as an in-fill hole between and slightly north of old drill holes CG-22 and CG-23.  Hole 07CG-1 was drilled to a depth of 602 feet and hole 07CG-2 was drilled to 1,475 feet.  Hole CG07-1 has been geologically logged and sawed in half. One half of the core has been sent to ALS Chemex Laboratories in Elko, Nevada for analysis and the remaining half has been archived for future use.  Hole CG07-2 is presently being geologically logged and sawed. 

The Cannivan Gulch project is at a fairly high elevation (8,000 to 9,000 feet), and is on unpatented claims on U.S. Forest Service (USFS) land.  Bolero plans a substantial amount of additional drilling on the project and the planned drill holes have been designed and staked on the ground.  An Environmental Assessment (EA) of the project will be conducted by the USFS.  Bolero's technical team has submitted a Plan of Operations for the planned drilling to the USFS.  A USFS team will examine the proposal on the ground, and a public scoping letter will then be issued.  This will be followed by a draft EA for public comment.  The USFS has stated that this is a priority project.  It is hoped that the permit will be received in time to allow a full drilling program during the 2008 season.

John Childs, Ph.D., Registered Geo (AZ) is the "qualified person" (as such term is defined by NI 43-101) responsible for the preparation o f the technical information in this release.

Bolero Resources Corp. is a well funded exploration and development Company which holds 100% interests in 2 significant molybdenum properties located in Montana, USA. The Company is listed on the TSX-Venture Exchange under the symbol BRU, as well as the Frankfurt Exchange under U7N. For more information, please visit www.unitedbolero.com or call toll-free 888-945-4770.

On behalf of the Board of Directors

"R. Bruce Duncan"
President  & CEO

Renmark Financial Communications Inc.
Henri Perron: hperron@renmarkfinancial.com
Jason Roy: jroy@renmarkfinancial.com
Media - Adam Ross: aross@renmarkfinancial.com
Tel. : (514) 939-3989
Fax : (514) 939-3717
www.renmarkfinancial.com

THE TSX VENTURE EXCHANGE DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Bolero Resources Corp.

EXPLORATION STAGE
CODE : BRU.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Bolero Res. is a gold and copper exploration company based in Canada.

Bolero Res. holds various exploration projects in Canada.

Its main exploration properties are ARCADIA, COPPER STAR, RED CHRIS SOUTH, BALD BUTTE, CANNIVAN GULCH and CARBONATITE SYNDICATE in Canada.

Bolero Res. is listed in Canada and in Germany. Its market capitalisation is CA$ 852 000 as of today (US$ 632 517, € 556 159).

Its stock quote reached its highest recent level on November 20, 2009 at CA$ 0.69, and its lowest recent point on January 01, 2016 at CA$ 0.01.

Bolero Res. has 34 080 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Bolero Resources Corp.
Annual Report 2007
Nominations of Bolero Resources Corp.
9/27/2012Appoints Bruce Coventry to Board of Directors
5/10/2011Welcomes Greg Lipton to Its Board of Directors
3/28/2011Welcomes Alex Knox to Its Advisory Board
3/26/2008 Announces Management Appointments
Project news of Bolero Resources Corp.
7/12/2011(Red Chris South)Drilling Now Underway on Bolero's "Red Chris South" Prospect
7/5/2011(Red Chris South)Work Program Now Underway at "Red Chris South" Prospect
6/4/2008(Bald Butte)Continues to Report Excellent Drill Results for the Bald But...
5/5/2008(Bald Butte)Drills 1,098 Feet @ 0.068% Mo. at Bald Butte ? Drilling Cont...
3/31/2008(Bald Butte)Bald Butte has Indicated Resource Containing 168.5 Million P...
2/27/2008(Bald Butte) Announces Changes to Board of Directors and Corporate Updat...
2/13/2008(Cannivan Gulch)Cannivan Gulch Has Indicated Resource Containing 225 Million...
1/7/2008(Cannivan Gulch)Announces Drilling Results for Cannivan Gulch Project - Hol...
11/13/2007(Cannivan Gulch) Intersects 0.054% Mo (0.090% MoS2) Over 710 Feet And Provid...
11/1/2007 Arranges US$10 Million Term Facility And NI 43-101 For Acqu...
10/17/2007(Bald Butte) Drills 110 Feet of 0.106% Mo (0.177% MoS2) at Bald Butte
9/13/2007(Cannivan Gulch) Begins Drilling at Cannivan Gulch
6/21/2007(Bald Butte)Begins 5,500 Metre Drill Program at Bald Butte
4/10/2007(Bald Butte)A 5,500 Metre Drill Program For Confirmatory Infill And Ste...
Corporate news of Bolero Resources Corp.
10/2/2012Announces Results of Annual and Special Meeting, Effective D...
6/28/2011Aeroquest Commences Multiple Airborne Surveys Over BC "REE" ...
6/23/2011Retains Falcon Drilling for Multiple 2011 Drill Programs
5/5/2011Retains Discovery Consultants for 2011 Work Programs
6/12/2008CEO Interview
5/29/2008Arcadia Drilling Commences
5/9/2008Announces Option Grant
3/7/2008Bolero Resources
10/16/2007Secures Large, Undeveloped Molybdenum Property In Colorado
9/19/2007Announces Name Change And Continuance of its Corporate Chart...
7/16/2007Provides Update on Bald Butte Drill Program and Results of J...
5/30/2007New Drilling to Test Property's Deep Mineral Potential
4/19/2007announces drill program at Cannivan Gulch Moly Project
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BRU.V)
0.025+0.00%
TSX-V
CA$ 0.025
06/28 17:00 -
0%
Prev close Open
0.025 0.030
Low High
0.025 0.030
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.025 -%
Volume 1 month var.
25,000 -%
24hGold TrendPower© : 8
Produces
Develops
Explores for Copper - Gold - Molybdenum - Rare earth - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/16/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !