Taranis Resources Inc.

Published : June 17th, 2010

Intersects 0.43% Nickel, 0.22% Cobalt in New Massive Sulphide Zone at Naakenavaara and Extends Coppe

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Cobalt |
Massive Sulphide (N-5)
Taranis Intersects 0.43% Nickel, 0.22% Cobalt in New Massive Sulphide Zone at Naakenavaara and Extends Copper-Gold Bearing OKI Zone for 2.5 km
 
Lakewood, Colorado, June 17, 2010 -
Taranis Resources Inc. ("Taranis") [TSX.V: TRO] is pleased to announce the results of a four hole drill program (759.2 m) that was completed in April 2010 on the Naakenavaara Project located in Finland. After drilling four holes, spring break-up occurred one month earlier than usual forcing the abandonment of further winter drilling.  Holes N-1, 2, 3 and 5 all encountered mineralization, hole N-4 was not completed since this target occurs on dry land and can be drill tested during the upcoming summer trenching/drilling program.

Taranis is highly encouraged by the apparent extension of the OKI Zone disseminated copper/gold mineralization which with more extensive drilling could delineate a large, low-grade copper-gold deposit. Also, the discovery of new massive cobalt/nickel mineralization on the south limb with supporting coincident electromagnetic and magnetic anomalies over 3 km long is very tantalizing.

 

Many geophysical targets have been identified that indicate a large mineralized system that is essentially unexplored. Mineralization at Naakenavaara consists of two types - a newly discovered Massive Sulphide variety which hosts >50% combined sulphide with associated Nickel-Cobalt-Gold enrichment, and a second Disseminated Sulphide variety (< 25% total disseminated sulphide) that is Copper-Gold bearing.

 

Of particular note is hole N-5 that was directly collared into massive sulphide that contained 0.43% Ni, 0.22% Co and trace Au / 2.55 m. This hole was targeted on a geophysical anomaly that extends over 3 km in length. Greater than expected overburden depths caused the hole to overshoot the target and consequently the full width of the massive sulphide zone is unknown.

 

Results

 

Drill Hole N-1 (-50 degrees drilled due north) was targeted on a coincident magnetic and electromagnetic anomaly, and represents the most easternmost hole drilled on the property to date. This hole intersected the Massive Sulphide Zone ("MSZ") that correlates with MSZ in hole N-2. The two intercepts in this hole are separated by an intrusive ultramafic body from 46.00 to 100.75 m.

 

Hole

N-1

 

 

 

 

 

 

From (m)

To (m)

Thickness (m)

% Cu

% Co

Au (ppb)

% Total Sulphide

Iron Sulphide Phase

 

MSZ

 

 

 

 

 

 

 

35.55

38.78

3.23

0.14

trace

55

16.6

 

Mixed Pyrite and Pyrrhotite

Lower Zone

 

 

 

 

 

 

 

108.00

117.40

9.40

0.03

0.04

41

7.0

Mixed Pyrite and Pyrrhotite

 

* - Total Sulphide equals the total sulphide mineral phases calculated as pentlandite+chalcopyrite+pyrite/pyrrhotite from the analytical data.

 

Drill Hole N-2 (-50 degrees, due north) was targeted on a magnetic anomaly 50 m west of N-1, and terminated in highly-altered and mineralized rocks. This hole encountered three zones of sulphide mineralization. The MSZ consists of massive sulphide that occurs along a sedimentary/sheeted albite sequence with prolific sericite alteration. The Middle Zone is composed of semi-massive sulphide with high copper, cobalt and nickel content and anomalous gold. The Lower Zone is characterized by a wide zone of silicified sediments with sheeted albite veinlets.

 

Hole

N-2

 

 

 

 

 

 

 

From (m)

To (m)

Thickness (m)

% Cu

% Co

% Ni

Au (ppb)

% Total Sulphide

Iron Sulphide Phase

MSZ

 

 

 

 

 

 

 

 

48.43

53.90

5.47

0.19

0.01

 

 

17.0

Pyrrhotite

48.43

49.62

1.19

 

 

0.12

 

56.6

Pyrrhotite

48.43

50.40

1.97

 

 

 

530

35.0

Pyrrhotite

Middle Zone

 

 

 

 

 

 

 

 

69.67

74.50

4.83

 

0.13

 

57

20.8

Pyrrhotite

69.67

85.24

15.57

0.12

 

 

65

8.8

Pyrrhotite

70.44

74.50

4.06

 

 

0.33

64

33.1

Pyrrhotite

Lower Zone

 

 

 

 

 

 

 

 

91.60

99.48

7.88

.04

.03

 

<20

4.7

Pyrrhotite

92.60

103.60

11.00

 

 

0.13

<20

4.21

Pyrrhotite

 

Drill Hole N-3 (-50 degrees, due north) was drilled 750 m east of GTK drill hole R-617 (0.31% Cu / 31.0 m) and intersected the OKI Zone at a depth of 138.85 - 141.57 m. This hole was collared too far north to intersect the MSZ, although a strong geophysical anomaly indicates that it is present south of the drill collar.

 

Hole

N-3

 

 

 

 

 

 

From (m)

To (m)

Thickness (m)

% Cu

% Co

Au (ppb)

% Total Sulphide

Iron Sulphide

Phase

51.70

55.08

3.38

0.06

trace

29

8.5

Pyrrhotite

138.85

141.57

2.72

1.14

0.04

104

4.6

Pyrrhotite

 

 

Drill Hole N-5 (-50 degrees, due north) was drilled in a peat bog on a coincident magnetic-electromagnetic anomaly and intersected a previously unknown zone of massive sulphide mineralization that corresponds to the MSZ found in drill holes N-1 and N-2. This zone appears to thicken to the west where a series of coincident magnetic/electromagnetic anomalies suggest it could extend for over 3,000 m.

 

Hole

N-5

 

 

 

 

 

 

From (m)

To (m)

Thickness (m)

% Ni

% Co

Au (ppb)

% Total Sulphide

Iron Sulphide Phase

24.45

27.00

2.55

0.43

0.22

58

60.4

Pyrite

 

A wide copper-bearing stockwork zone with associated Cu and Co mineralization was found below the upper massive pyrite zone.

 

From (m)

To (m)

Thickness (m)

% Cu

% Co

Au (ppb)

% Total Sulphide

Iron Sulphide Phase

108.20

139.80

31.60

0.12

0.04

52

3.5

Pyrrhotite

213.10

222.10

9.00

0.11

trace

64

3.7

Pyrrhotite

 

Discussion

 

John Gardiner, President and CEO of Taranis states "These four shallow drill holes indicate the presence of a much larger mineralized system at Naakenavaara than previously known. We are particularly interested in the previously unknown high nickel and cobalt content in massive sulphide that now point to an even stronger likelihood of finding an Outokumpu "look-a-like" (see Taranis News Release dated March 4, 2010). The world-class Outokumpu deposit (28.5 Mt @ 3.8% Cu, 0.24% Co, 0.12% Ni, 1.07% Zn, 0.8 ppm Au, 8.9 ppm Ag) had a similar geological setting and metal distribution to what we are seeing at Naakenavaara."

 

A map showing the location of the drill holes can be found on the Taranis Resources Inc. website at www.taranisresources.com, as well as photographs of some of the drill core. All of the drill holes represent the true thickness of the zones with the exception of the nickel-cobalt bearing massive sulphide zone in N-5 (24.45 - 27.00 m) that is likely much wider than the 2.55 m.

 

Quality Control and Analytical Procedures

 

Analytical work for the Naakenavaara Project was completed by Labtium Oy, located in Sodankyla, Finland. Labtium, Oy is accredited to FINAS/IEC 17025 and ISO/IEC 17025 standards that have been renewed in 1998, 2002 and 2006. Drill core is logged in the laboratory and is sawed in half for analysis.  One half of the core is retained for geologic records and further assay verification if required.  Exploration activities at Naakenavaara were overseen by John Gardiner (P. Geol.) and Jim Helgeson (P. Geo.), both Qualified Persons under the meaning of Canadian National Instrument 43-101.

About Taranis Resources Inc.

 

Taranis currently has 26,623,260 shares issued and outstanding (37,591,189 shares on a fully-diluted basis).

Taranis Resources Inc.
John Gardiner (303)-716-5922
George Kent (416)-323-0783
 
.
Taranis Resources Inc. | 14247 West Iliff Avenue | Lakewood | CO | 80228
Data and Statistics for these countries : Finland | All
Gold and Silver Prices for these countries : Finland | All

Taranis Resources Inc.

DEVELOPMENT STAGE
CODE : TRO.V
ISIN : CA87609B1076
CUSIP : 87609B 10 7
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Taranis Res. is a copper exploration company based in United states of america.

Taranis Res. develops copper and gold in Finland, and holds various exploration projects in Finland.

Its main asset in development is NAAKENVAARA in Finland and its main exploration properties are WSM, RIIKONDOSKI, KETTUKUUSIKKO, NÄLKÄJÄRVI-RIIKONKUMPU and MARSINKUUSIKKO in Finland and THOR in Canada.

Taranis Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 12.2 millions as of today (US$ 8.9 millions, € 8.3 millions).

Its stock quote reached its highest recent level on January 23, 2004 at CA$ 0.95, and its lowest recent point on July 24, 2015 at CA$ 0.03.

Taranis Res. has 55 450 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Taranis Resources Inc.
2007 Annual report
Financings of Taranis Resources Inc.
6/27/2016engages FronTier Merchant Capital Group for Investor Relatio...
1/13/2012Announces Financing and Launches New Website
4/16/2010Closing of Private Placement
9/8/2009Announces Private Placement
2/4/2009Announces Private Placement
5/8/2008announces Closing of a Flow-Through Private Placement with t...
4/25/2008Announces Flow-Through Private Placement with the MineralFie...
4/7/2008Engages Kingsdale Capital to Raise $2,000,000 By Way of Priv...
Project news of Taranis Resources Inc.
1/27/2014Acquires Key Claims at Willa Deposit in Slocan Mining Divisi...
10/28/2013(Thor)Five-Year Exploration Permit Approved for Thor
9/19/2013(Thor)Assays 21.25 g/t Au over 11.45 meters at Thor's SIF Prospect...
9/5/2013(Thor)Completes Mapping and Panel Sampling of SIF Zone and Identif...
12/12/2012(Thor)Outlines Two Large Targets in 2012 Exploration Program at Th...
9/11/2012Identifies Second High-Grade Gold Occurrence 750 m Southeast...
7/19/2012(Thor)Finds New Zones of High-Grade Mineralization at Thor, Britis...
5/10/2012Identifies Six Mag-EM Targets Up To 2.5 km from "Bulls-Eye" ...
4/24/2012(Kettukuusikko)Assembles 73 km2 Copper-Gold Project in Finland Linking the ...
3/1/2012Engages Computational Geoscience Inc. to Undertake Evaluatio...
2/22/2012Acquires Mavrik Project between Naakenavaara and Riikonkoski...
11/24/2011Identifies Copper-Nickel-Cobalt Target
10/11/2011Intersects 88 meters Composite Total of Mineralization, and ...
9/12/2011Intersects 133.52 meters Composite Total of Mineralization i...
8/23/2011(Kettukuusikko)Completes Detailed Ground Geophysical Survey over Kettukuusi...
8/2/2011Completes Summer Drilling Program at Naakenavaara and Contin...
7/18/2011(Nälkäjärvi-riikonkumpu)Taranis Explores Nälkäjärvi-Riikonkumpu Block and Locates Nu...
6/2/2011(Naakenvaara)Taranis Commences Drilling at Naakenavaara
5/13/2011Intersects Widespread Zones of Iron Formation at Marskinkuus...
5/12/2011(Naakenvaara)Completes Geophysical Surveys at Naakenavaara, Expands Surve...
4/28/2011(Kettukuusikko)Commences Airborne Surveys in Finland, Prepares Riikonkoski ...
3/18/2011Commences Drilling at Marskinkuusikko and Provides Update of...
2/14/2011Engages Drillcon-Smoy for Drilling at Marskinkuusikko and Na...
8/11/2010(Naakenvaara)Updates Exploration Activities
8/9/2010(Naakenvaara)Reports on Regional Exploration Around Naakenavaara Cu-Au-Co...
6/18/2010(Naakenvaara)Commences Drilling and Files Additional Mining Claim Applica...
6/17/2010(Naakenvaara)Intersects 0.43% Nickel, 0.22% Cobalt in New Massive Sulphid...
6/2/2010(Kettukuusikko)Intersects 4.20 g/t Au over 3.06 m under the Kettukuusikko S...
4/20/2010(Kettukuusikko)Updates Drilling at Naakenavaara and Kettukuusikko Projects,...
3/4/2010(Naakenvaara)Engages SMOY Drilling to Undertake Naakenavaara Exploration
11/18/2009(Thor)Activities at the Thor Property, Southeast British Columbia
10/5/2009(Naakenvaara)s Exploration Activities in Finland
8/26/2009(Naakenvaara)Samples 31 meters of 0.31% Copper, and 0.7 meters of 10.8 g/...
8/18/2009(Marskinkuusikko)Identifies Gold Target at Marskinkuusikko Project, Finland
7/15/2009(Naakenvaara)Identifies Large Copper-Gold Target at Naakenavaara, Finland
5/28/2009(Naakenvaara)Commences Ground Geophysical Surveys at Naakenavaara Gold/Co...
2/24/2009(Marskinkuusikko)Acquires Two New Gold Projects in Finland
2/11/2009(Thor)Drills 3.05 m of 5.70 g/t Au, 190.4 g/t Ag and 9.47% Cu-Pb-Z...
2/9/2009(Thor)Drills 10.51 g/t Au Over 1.53 Meters in the Great Northern Z...
1/21/2009(Thor)Drills 880 g/t Ag, 3.34 g/t Au, 15.36% combined Cu-Pb-Zn in ...
11/19/2008(Kettukuusikko)Gets Approval for Kettukuusikko Mining Claims in Finland and...
11/17/2008(Thor)Intersects 10.86 m of 0.05% Cu, 1.57% Pb, 3.48% Zn, 0.57 g/t...
8/18/2008(Thor)Adds Third Core Drill to Thor Project, British Columbia
8/8/2008(Thor)Intersects 29% Combined Cu-Pb-Zn, 3.51 g/t Au and 697 g/t Ag...
6/20/2008(Thor)Starts Drilling at Thor Project
5/9/2008(Thor)Increases Land Position at Thor 370% and Selects Atlas Drill...
3/25/2008(Thor)Verifies 38.48 grams/tonne Au Over 1.50 m Prospect between B...
3/11/2008(Midway East) Updates Nevada Exploration Activities
3/10/2008(Thor)Acquires Metallurgical Data on Thor Project
1/25/2008(Thor) Intersects 12.07 m of 0.53 g/t Au in Newly Discovered Anker...
1/24/2008(Thor)Intersects 4.54% Zn, 2.83% Pb, 0.21% Cu, 1.31 g/t Au and 176...
1/22/2008(Thor)Intersects 12.32% Zn, 3.57% Pb, 0.17% Cu, 1.09 g/t Au and 28...
1/9/2008(Midway East) Commences Drilling at Midway East Project, Nevada
1/2/2008(Thor) Extends Thor Mineralization 590m North of True Fissure Zone...
12/11/2007(Thor) Intersects 5.07% Zn, 4.07% Pb, 0.26% Cu, 1.59 g/t Au and 29...
11/27/2007(Thor) Channel Sampling Returns 3.75 m of 7.80% Zn, 7.86% Pb, 0.22...
11/5/2007Resources Taranis Intersects 3.29 g/t Au, 305.8 g/t Ag, 0.03...
10/30/2007(Thor)Surface Grab Sampling at Thor Returns 2,281.24 g/t Ag, 10.79...
10/25/2007 Intersects 11.17% Zn & 1.26 g/t Au Over 3.57 m in True Fiss...
Corporate news of Taranis Resources Inc.
9/24/2015Taranis Initiates Environmental Baseline Monitoring Program ...
10/22/2014Taranis Acquires Riikonkoski Copper-Gold Deposit in Finland ...
10/20/2014Taranis Samples 30.59 g/t Au over 17.55 m at SIF in Panel Sa...
10/20/2014Taranis Resources Inc. Completes Delineation Drilling, Sampl...
2/27/2014Board Announces Proposed Change to Share Capital Structure
1/13/2014(Thor)Engages ALS Metallurgy for Thor Project, SE British Columbia
12/11/2013(Thor)Announces Private Placement and Outlines 5 Phases to Permitt...
11/22/2013(Thor)Identifies Two Geochemical Targets Outside of Existing Depos...
10/22/2013announces Closing of $500,000 Private Placement
9/23/2013announces results of Annual General and Special Meeting of S...
9/18/2013Receives Final Approval for Naakenavaara 5-14 Mining Claims ...
8/3/2013(Thor)Files NI 43-101 Resource Estimate for Thor
7/17/2013(Thor)Completes Geochemical Soil and Environmental Baseline Sampli...
6/20/2013(Thor)Completes Initial NI 43-101 Resource Estimate at Thor
4/30/2013(Thor)Outlines Advancement at Thor and Provides Update on NI 43-10...
2/4/2013Completes Hearings on Naakenavaara 5-14 Exploration Claims
10/30/2012(Thor)Engages Roscoe Postle Associates Inc. to Undertake NI 43-101...
10/11/2012(Thor)Finds Another New Zone at Thor Assaying up to 6.6 g/t Au, 2....
9/18/2012Identifies Widespread Gold and Silver Mineralization in the ...
8/31/2012(Thor)Identifies High-Grade SIF Occurrence Assaying up to 90.1 g/t...
5/24/2012(Kettukuusikko)Outlines Five Exploration Targets at Kettukuusikko Gold Prop...
5/4/2012to be featured on CEO Clips on The Documentary Channel
2/27/2012Visit Taranis at the P.D.A.C March 4th - March 7th in Toront...
2/23/2012Acquires N=E4lk=E4j=E4rvi Copper Prospect in Finland
2/22/2012Announces Closing of Private Placement
1/17/2012Visit Taranis at the Cordilleran Roundup January 25-26th in ...
10/12/2011(Kettukuusikko)Outlines 90,000 Ounces of Gold at Kettukuusikko - Targets Ne...
8/5/2011Documents Gold Content Associated with Wide Copper Intercept...
5/18/2011(Kettukuusikko)Identifies Large EM Target Under High-Grade Gold Zone at Ket...
2/24/2011(Kettukuusikko)to Undertake Resource Estimate at the Kettukuusikko Gold Pro...
2/22/2011to Undertake Airborne Geophysical Survey at Naakenavaara, Fi...
3/2/2010Acquires WSM Gold Property in Nevada
2/3/2010Plans Further Work on Three Areas in Nevada Identified From ...
1/12/2010Visit Taranis at the Cordilleran Roundup January 20-21st in ...
12/31/2009Completes Gravity Surveys on Six Target Areas in Nevada
11/30/2009Commences DiRT Exploration in Nevada
11/12/2009Acquires 3 Gold Projects South Of Kimberley and Completes Ge...
1/23/2009Visit Taranis at the Cordilleran Roundup January 28-29th in ...
1/8/2009Drills 1,008 g/t Ag, 1.22 g/t Au, 0.34% Cu, 8.67% Pb and 10....
12/19/2008Exposes 100 m of South end of Great Northern Zone, and Repor...
12/11/2008Cuts 4.33 m of 2.01 g/t Au, 667.35 g/t Ag, 0.19% Cu, 6.37% P...
4/4/2007Identifies New Copper-Gold Zone in Kettukuusikko Center Zone...
3/14/2007Selects Quantec to Undertake Deep Penetration E.M. Surveys a...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (TRO.V)Other OTC (TNREF)
0.220-18.52%0.179-10.50%
TSX-V
CA$ 0.220
04/26 14:57 -0.050
-18.52%
Prev close Open
0.270 0.270
Low High
0.220 0.270
Year l/h YTD var.
0.160 -  0.340 10.00%
52 week l/h 52 week var.
0.110 -  0.340 46.67%
Volume 1 month var.
5,500 15.79%
24hGold TrendPower© : -5
Produces
Develops Copper - Gold
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/3/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202433.33%
2023-2.94%0.250.11
2022112.50%0.240.08
2021-40.74%0.140.08
202092.86%0.160.04
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :