Osisko Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
Published : September 08, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold | Gold Mine | Gold Production | Lead | Market | Recovery |

MONTREAL, QUEBEC--(Marketwire - Sept. 8, 2011) - Osisko Mining Corporation ("Osisko") (News - Market indicators)(FRANKFURT:EWX) is pleased to announce results from the spring and summer 2011 drill program at the Canadian Malartic and the Malartic CHL properties, located adjacent to Osisko's 100%-owned Canadian Malartic gold mine.

The drill program was focused on the Barnat Extension (Mammoth) area and intersected new mineralization, located either within or immediately outside the currently designed engineered pit over the eastern portion of the Barnat deposit. All of these mineralized intersections were drilled after the publication of the latest resource/reserve estimate (see March 31, 2011 press release) and are therefore not included in the current gold inventory. Highlights include 172.5 metres averaging 1.23 g/t Au, 126.5 metres averaging 1.70 g/t Au and 111.5 metres averaging 1.24 g/t Au, as well as higher grade intersections such as 3.2 metres averaging 42.05 g/t Au (uncut). Assay results for significant intersections are summarized in the table below:

Hole No. Section From (m) To (m) Length (m) Au g/t Au g/t
          (uncut) (cut)
BA11-3999 6150E 103.5 276.0 172.5 1.23  
  including   204.0 204.8 0.8 12.20  
             
BA11-4000 6150E 120.0 246.5 126.5 1.70  
             
BA11-4501 6150E 197.0 293.0 96.0 1.83  
             
BA11-4502 6125E 139.0 235.5 96.5 1.27  
             
BA11-4503 6175E 139.0 264.0 125.0 1.83  
             
BA11-4504 6175E 97.5 152.5 55.0 1.06  
             
BA11-4507 6125E 111.5 150.5 39.0 2.05  
             
BA11-4514 6125E 73.6 105.2 31.6 1.29  
             
BA11-4516 6375E 43.0 154.5 111.5 1.24  
             
BA11-4517 6325E 115.0 151.0 36.0 6.19  
  including   119.3 121.0 1.7 28.50  
             
BA11-4518 6325E 172.4 175.6 3.2 42.05 25.00
  And   243.0 300.0 57.0 1.79  
             
BA11-4521 6325E 78.0 111.0 33.0 1.46  
             
CHL11-2374 6500E 83.6 96.8 13.2 0.78 ---
             
CHL11-2375 6525E 64.7 89.9 25.2 1.67 ---
             
CHL11-2376 6500E 94.5 105.5 11.0 1.39 ---
             
CHL11-2377 6500E 84.0 119.3 35.3 1.11  
             
CHL11-2378 6475E 83.3 116.0 32.7 0.99 ---
             
CHL11-2379 6450E 65.4 82.6 17.2 0.98  
             
CHL11-2380 6450E 88.8 103.3 14.5 1.12 ---
             
CHL11-2381 6425E 65.5 91.0 25.5 1.50 ---
  including   76.5 78.0 1.50 10.50 ---
             

BA-series holes are located on the Canadian Malartic property and CHL-series holes are located on the Malartic CHL property. The drill results indicate mineralization from the Barnat Zone extends further east of the eastern limit of the current pit design, towards the Jeffrey Zone on the Malartic CHL property.

The resource estimate on the Jeffrey Zone, calculated from data of the 2009-2010 definition drill program, is approaching completion and results will be disclosed before the end of the third quarter 2011. Abitibi Royalties Inc. owns a 30% free-carried interest in the Malartic CHL property.

All NQ core assays reported above were obtained by standard 50 g fire assaying-AA finish or gravimetric finish at ALS Chemex laboratories in Val d'Or, Quebec. Reported drill core weighted averages were calculated using a minimum of 0.35 g/t Au over successive intervals of 20 metres. The lengths of mineralized intervals of less than 20 metres were minimized, and an upper cut-off of 30 g/t Au was applied to individual assays where indicated. Intervals containing individual assays that are greater than six times the average of the interval are included separately. Intersected drifts or lost core within mineralized intersections were incorporated as blank intervals.

Osisko follows strict QA-QC protocol measures in keeping with industry standards and regulatory reporting requirements. Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko is the Qualified Persons who has reviewed this news release and is responsible for the technical information reported herein, including verification of the data disclosed.

Cautionary Notes Concerning Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of confidence in the resource estimate. Readers are cautioned that mineral resources are not economic mineral reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. In addition, inferred resources are considered too geologically speculative to have any economic considerations applied to them. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for Preliminary Assessment as defined under NI 43-101. Readers are cautioned not to assume that that further work on the stated resources will lead to mineral reserves that can be mined economically.

Forward-Looking Statements

Certain statements contained in this press release, may be deemed "forward-looking statements". All statements in this release, other than statements of historical fact, that address events or developments that the Corporation expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", «scheduled» and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur, including, without limitation, increasing of throughput at the mill to achieve design capacity, improving mill feed grade, maintaining recovery rates, increasing gold production and developing the Barnat gold deposit. Although the Corporation believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation that the diligent ongoing optimizing of its operations will be achieved and will, accordingly, improve its operating performance, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, the Corporation's limited experience with production and development stage mining operations, uninsured risks, regulatory changes or sanctions, defects in titles, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations costs, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail in the Corporation's most recent Annual Information Form filed on SEDAR, which also provides additional general assumptions in connection with these statements. The Corporation cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on the Corporation's forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. The Corporation believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.



Osisko Mining Corporation
John Burzynski
Vice-President Corporate Development
(416) 363-8653
or
Osisko Mining Corporation
Sylvie Prud'homme
Director of Investor Relations
(514) 735-7131
Toll Free: 1-888-674-7563
www.osisko.com

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold producing company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.04-4.10%2.43-1.62%
TORONTO
CA$ 3.04
04/24 17:00 -0.130
-4.1%
Prev close Open
3.17 3.15
Low High
3.00 3.16
Year l/h YTD var.
2.42 -  3.21 10.14%
52 week l/h 52 week var.
2.36 -  3.87 -21.65%
Volume 1 month var.
885,156 13.86%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202411.36%
2023-22.00%4.532.64
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :