NGEx Intersects 1.27% Copper Equivalent Over 182 Metres and Expands New Josemaria High-Grade Zone
Published : July 16, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Argentina | Chile | Copper | Gold | Japan | Market | Oil | Report |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 16, 2012) - NGEx Resources Inc. (News - Market indicators) ("NGEx" or the "Company") is pleased to announce additional assay results from the 2011 / 2012 infill drilling program at the Josemaria copper-gold porphyry project located in San Juan province, Argentina.

To view the maps accompanying this press release, please click on the following link: http://file.marketwire.com/release/ngq716.pdf

Highlights from the latest batch of results include: JMDH50 with 182 metres at 1.27% CuEq* (70 to 252m, 1.06% Cu and 0.31 g/t Au); JMDH45 with 452 metres at 0.82% CuEq* (0 to 452m, 0.51% Cu and 0.46 g/t Au) and JMDH59 with 428 metres at 0.64% CuEq* (154 to 582m, 0.39% Cu and 0.37 g/t Au).

The objective of this season's program was to complete infill drilling on the deposit in order to allow conversion of the currently defined Inferred Resource(i) of 460 million tonnes at 0.39% Cu and 0.30 g/t Au to an Indicated Resource. The drill program, comprising 39 holes totaling 19,220 metres, was completed in the first quarter of 2012. Assay results from the first 10 holes of the program were released on March 28, 2012. Results from an additional 13 holes were released on May 23, 2012. Results from a further 9 holes are disclosed here. Results from the remaining 7 holes are pending and will be released when received.

Wojtek Wodzicki, President and CEO of NGEX, commented on the results, stating, "We are very pleased with the continued positive results from this year's drill program at Josemaria. JMDH50 is an important hole which extends the high-grade, supergene-enriched mineralization first intersected in JMDH49 by 100m to the north, but what is really exciting, is the fact that these results open up a large area of leached cap which was previously interpreted as peripheral to the main deposit. The results from this season's drilling at Josemaria are a good example of the positive surprises that can come from detailed drilling of very large systems and bodes well for future positive surprises as we continue to drill the potentially larger Los Helados and Filo del Sol systems. Together with previously released results from the Company's Los Helados project, located approximately 10 kilometers to the northwest of Josemaria, as well as highly encouraging results from Filo del Sol, the results released today support our view that the Company's land package has the potential to host a very significant new copper-gold district with multiple deposits within a 15 kilometer radius."

The results from hole JMDH50 are of particular interest as they extend the newly discovered high-grade zone first intersected in hole JMDH49 a further 100 metres to the north. This drill hole intersected approximately 70 metres of leached cap before passing into a well-developed supergene enriched zone which contains chalcocite replacing primary pyrite, chalcopyrite, and bornite. The occurrence of bornite is encouraging because this mineral is typical of the central part of porphyry systems rather than the margins. This intersection is on the edge of the current drill pattern and mineralization remains wide open to the north (see attached map and section).

The table below shows details of the drill intersections from the drill holes released today:

HOLE-ID FROM (m) TO (m) LENGTH (m) Cu % Au g/t CuEq*
JMDH41 0.0 451.5 451.5 0.33 0.32 0.55
incl 0.0 142.0 142.0 0.47 0.48 0.79
Infill hole.            
JMDH45 0.0 452.0 452.0 0.51 0.46 0.82
incl 78.0 156.0 78.0 0.89 0.56 1.27
Infill into high-grade core.          
JMDH46 24.0 500.7 476.7 0.35 0.27 0.53
incl 392.0 450.0 58.0 0.53 0.40 0.80
Infill along eastern edge of high-grade core.        
JMDH48 0.0 418.0 418.0 0.31 0.21 0.46
Step-out 80m north of hole JMRC20.          
JMDH50 70.0 252.0 182.0 1.06 0.31 1.27
incl 72.0 92.0 20.0 1.48 0.17 1.60
incl 172.0 182.0 10.0 3.75 0.29 3.95
Step-out 100m north of JMDH49, northernmost hole in new high-grade zone which remains open to north.
JMDH51 248.0 598.0 350.0 0.28 0.20 0.42
Along southeastern margin of deposit, beneath barren volcanic cover rock.    
JMDH52 Stopped above target zone in barren volcanic cover rock - No Significant Values.  
JMDH57 0.0 401.5 401.5 0.39 0.36 0.64
incl 48.0 94.0 46.0 0.88 0.45 1.19
Twin of 2005 RC hole JMRC21, western part of deposit.      
JMDH59 62.0 72.0 10.0 0.01 0.55 0.38
plus 154.0 582.0 428.0 0.39 0.37 0.64
incl 210.0 354.0 144.0 0.50 0.47 0.82
Twin of 2005 RC hole JMRC16, extended mineralization to depth.      

*CuEq - Copper Equivalent calculated using US$3.00/lb copper and US$1,400/oz gold, with no provision for metallurgical recoveries. Drilled lengths are interpreted to be representative of the true width of the mineralized zone.

Holes JMDH41 and JMDH46 were drilled on the same section in the northern part of the deposit. JMDH41 intersected a low-grade intramineral dyke starting at 142 metres which lowers the overall grade in this hole. These dykes are interpreted to be steeply dipping, so the drilled length of lower-grade mineralization is likely to be much longer than the true width of the dyke. JMDH46 was drilled along the eastern margin of the deposit.

Hole JMDH45 intersected the high-grade core of the deposit, extending it 100 metres to the west of previous reverse circulation hole JMRC01.

Hole JMDH48 was a vertical hole which defines the eastern limit of the deposit towards the northern extent of the drill information.

Holes JMDH51 and JMDH59 were drilled on the same section. JMDH51 was drilled to define the eastern limit of the deposit 450 metres to the south of JMDH48. JMDH59 is one of the most southerly holes into the high-grade core of the deposit. This hole also confirms and extends to depth the mineralized intersection in previously drilled RC hole JMRC16.

Hole JMDH52 was abandoned in post-mineral volcanic cover prior to reaching the mineralized porphyry underneath.

Hole 57 was drilled as a confirmation hole in order to evaluate the mineralized intersection in hole JMRC21 which was an earlier reverse circulation hole. The comparison between the two holes was excellent; JMRC21 intersected 400 metres at 0.36 g/t gold and 0.36% copper compared to 401.5 metres of 0.36 g/t gold and 0.39% copper.

Collar coordinates and drill hole orientations for the holes in this news release are shown below:

HOLE-ID East North Elevation Length (m) Azimuth Dip
JMDH41 2446317 6855397 4642 451.5 270 -75
JMDH45 2446310 6855302 4681 452.0 90 -65
JMDH46 2446540 6855398 4610 500.7 270 -70
JMDH48 2446524 6855485 4586 452.2 0 -90
JMDH50 2446356 6855696 4519 452.5 90 -70
JMDH51 2446414 6855004 4778 600.0 90 -70
JMDH52 2446522 6854897 4773 238.6 90 -70
JMDH57 2446195 6855195 4723 401.5 270 -70
JMDH59 2446207 6854998 4795 585.0 90 -70

Josemaria is one of several large copper-gold systems including the Company's Los Helados and Filo del Sol projects, located on a contiguous land package that the Company holds in Chile's Region 3 and adjacent San Juan Province Argentina. Los Helados, Josemaria, and Filo del Sol are all part of a joint venture in which the Company holds 60% and JOGMEC (Japan, Oil, Gas, and Metals National Corporation) holds 40%. Each party funds its pro-rata share of expenditures. This season's drill programs on all three projects are complete. Drilling is expected to resume in the fourth quarter of 2012.

On behalf of the board

Wojtek Wodzicki, President and CEO

Qualified Person and Assay Methods

The drill core was logged, sawed, and half cores were sampled in their entirety in two meter intervals or intervals corresponding to geologic breaks determined by Company personnel. Samples were shipped to Acme Labs in Mendoza, Argentina and pulps were forwarded to the ACME lab in Santiago, Chile. Samples were crushed, split and 500g was pulverized to 85% passing 200 mesh. Gold analyses were by fire assay fusion with AAS finish on a 30g sample. Copper was analyzed by AAS using a 4 acid digestion and samples were also analyzed for a suite of 36 elements with ICP-ES. Copper and gold standards as well as blanks and duplicates (field, preparation and analysis) were randomly inserted into the sampling sequence for Quality Control. On average, 9% of the submitted samples correspond to Quality Control samples.

The Quality Control/Quality Assurance (QA/QC) program on the Josemaria Project is under the management of Diego Charchaflie, M.Sc., P.Geo. (BC), a Qualified Person pursuant to NI 43-101. Mr. Bob Carmichael, B.A.Sc., P.Eng., Vice President, Exploration for the Company, is the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical information contained in this news release.

(i) Technical Report: Preliminary Resource Estimate Update for the Josemaria Project, San Juan Province, Argentina dated November 20, 2007. The report is available on the Company's website or www.sedar.com.

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of NGEx Resources Inc. Forward-looking statements include, but are not limited to, statements with respect to the estimation of commodity prices, mineral reserves and resources, the realization of mineral reserve estimates, capital expenditures, costs and timing of the development of new deposits, the success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining activities, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotations thereof. All such forward-looking statements are based on the opinions and estimates of the relevant management as of the date such statements are made and are subject to important risk factors and uncertainties, many of which are beyond the Company's ability to control or predict.

Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks and uncertainties relating to, among other things, changes in commodity prices, currency fluctuation, financing, unanticipated reserve and resource grades, infrastructure, results of exploration activities, cost overruns, availability of materials and equipment, timeliness of government approvals, taxation, political risk and related economic risk and unanticipated environmental impact on operations as well as other risks and uncertainties described under "Risks Factors" in the Company's Annual Information Form available under the Company's profile at www.sedar.com and the Company's website.

Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All of the forward-looking statements contained in this document are qualified by these cautionary statements. Readers should not place undue reliance on forward-looking statements. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and other to get a better understanding of the Company's operating environment. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, events or otherwise, except in accordance with applicable securities laws.



NGEx Resources Inc.
Sophia Shane
Corporate Development
(604) 689-7842
(604) 689-4250 (FAX)
ngexresources@namdo.com
www.ngexresources.com
Data and Statistics for these countries : Argentina | Chile | Japan | All
Gold and Silver Prices for these countries : Argentina | Chile | Japan | All

Ngex Resources Inc.

EXPLORATION STAGE
CODE : NGQ.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ngex is a zinc and gold exploration company based in Canada.

Ngex holds various exploration projects in Colombia.

Its main exploration properties are CERRO CUADRADO, FILO DEL SOL and JOSEMARÍA in Argentina, MOULE and NYIEME in Burkina Faso, ZYMO and GJ KINASKAN in Canada, LINQUE 1, LINQUE 2, TALADRO 1 and TALADRO 2 in Peru, LOS HELADOS in Chile, HAMBOK in Eritrea and MANDÉ and PIEDRANCHA in Colombia.

Ngex is listed in Canada. Its market capitalisation is CA$ 237.0 millions as of today (US$ 175.9 millions, € 157.2 millions).

Its stock quote reached its lowest recent point on February 06, 2009 at CA$ 0.21, and its highest recent level on September 23, 2011 at CA$ 4.00.

Ngex has 213 470 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Ngex Resources Inc.
1/30/2013New Release - NGEx $34 MILLION PRIVATE PLACEMENT CLOSED
1/16/2013NGEX ANNOUNCES $34 MILLION PRIVATE PLACEMENT
Nominations of Ngex Resources Inc.
6/20/2013Announces Election of Directors
9/2/2011Bob Carmichael Appointed Vice President, Exploration
Financials of Ngex Resources Inc.
5/7/2016Reports First Quarter 2016 Results
8/8/2015Reports Second Quarter 2015 Results
8/6/2013Second Quarter 2013 Financial and Operational Highlights
Project news of Ngex Resources Inc.
11/1/2013(Los Helados)UPDATED METALLURGICAL TEST RESULTS AND FILING OF TECHNICAL R...
8/1/2012(Hambok)NGEx SELLS HAMBOK PROJECT IN ERITREA TO BISHA MINING SHARE C...
7/4/2012AND NAMIBIAN COPPER AGREE TO TERMINATE AGREEMENT ON ERITREAN...
1/18/2012NGEx SIGNS AGREEMENT WITH NAMIBIAN COPPER ON ERITREAN BASE M...
11/28/2011COMMENCES 2011-2012 DRILL PROGRAM ON JOSEMARIA COPPER/GOLD ...
8/15/2011DRILLING COMMENCES AT BADA POTASH PROJECT IN ERITREA
6/16/2011(Los Helados)Final Drill Holes of the Season Confirm Major Copper-Gold Di...
5/5/2011(Los Helados)Reports Further Excellent Drill Results From Los Helados, Ch...
4/1/2011(Los Helados)Drills 701 Metres of 0.67% Copper and 0.30 g/t Gold in Hole ...
Corporate news of Ngex Resources Inc.
12/16/2015NGEx Files Technical Report Updating the Mineral Resource Es...
11/23/2015NGEx Announces Significant Increase in Resource at Filo Del ...
11/4/2015Skeena Acquires GJ Copper-Gold Project
10/6/2015Skeena Acquires GJ Copper-Gold Project
10/5/2015NGEx Announces Sale of Its 49% Interest in the GJ Project
4/16/2015NGEx Drills 42 Metres of 1.13 g/t Gold and 145.6 g/t Silver ...
2/19/2015NGEx Drills 72 Metres of 339 g/t Silver at Filo Del Sol Proj...
2/19/2015NGEx 2014 Financial and Operational Highlights
12/31/2014NGEx Updated Share Capital and Voting Rights
12/19/2014NGEx Files Technical Report on Maiden Resource Estimate for ...
12/2/2014NGEx Reports Initial Filo del Sol Inferred Resource Containi...
11/28/2014Updated Share Capital and Voting Rights for NGEx
11/25/2014NGEx Files Technical Report on Los Helados
11/11/2014NGEx Reports Third Quarter 2014 Results
10/31/2014Updated Share Capital and Voting Rights for NGEx
10/23/2014NGEx Acquires 100% Interest in Filo Del Sol
10/20/2014NGEx Announces Positive Result of Preliminary Economic Asses...
8/7/2014NGEx Reports Second Quarter 2014 Results
6/30/2014NGEx Announces Updated Share Capital and Voting Rights
6/13/2014NGEx to Commence Trading on NASDAQ OMX Stockholm on June 19,...
6/12/2014NGEx Announces Election of Directors
6/4/2014NGEX Intends to Undertake CAD $30 Million Private Placement
5/6/2014NGEx Reports First Quarter 2014 Results
4/30/2014NGEx Drills 7.59% Copper Over 10 Metres and 314.5 g/t Silver...
4/24/2014NGEx Resources Inc.: Final Josemaria Drill Results
11/14/2013NGEX ANNOUNCES FILING OF TEC =?iso-8859-1?Q?HNICAL_REPORT_FO...
10/1/2013Announces Significant Increase in Resource at Josemaria
9/19/2013(Los Helados)Announces Updated Mineral Resource Estimate for Los Helados ...
8/19/2013MANAGEMENT UPDATE - News Release
7/17/2013(Los Helados)Intersects 0.46% Copper Equivalent Over 1,147 Metres at Los ...
7/8/2013Intersects 0.85% Copper Equivalent Over 250 Metres, Continue...
5/23/2013(Filo Del Sol)Intersects 38.1 Metres at 1.23% Copper Expanding High Grade ...
5/9/2013NGEX ANNOUNCES ANNUAL AND SPECIAL
5/9/2013Announces Annual and Special Meeting and Updates By-Laws
4/23/2013(Los Helados)Intersects 1.06% Copper Equivalent Over 304 Metres at Los He...
3/25/2013Intersects 0.78% Copper Equivalent Over 230 Metres and Expan...
11/8/2012(Los Helados)Announces Start of Los Helados Drill Program
10/15/2012(Los Helados)Announces Initial Mineral Resource Estimate and Metallurgica...
10/15/2012(Los Helados)Announces Initial Mineral Resource Estimate and Metallurgica...
10/10/2012(Hambok)Announces Closing of Hambok Sale
9/10/2012(Los Helados)NGEX ANNOUNCES PAN PACIFIC COPPER AS NEW PARTNER AT LOS HELA...
8/23/2012on GJ Copper Gold Project 2012 Exploration Program
8/7/2012(Filo Del Sol)Intersects 385 Metres at 0.68% Copper Equivalent at Filo del...
7/26/2012(Los Helados)Intersects 0.55% Copper Equivalent Over 1,014 Metres at Los ...
7/16/2012Intersects 1.27% Copper Equivalent Over 182 Metres and Expan...
6/19/2012(Filo Del Sol)Intersects 1.45% Copper Over 97.6 Metres and 393.7 g/t Silve...
5/23/2012Announces Josemaria Drill Results Including 172 Metres at 1....
5/2/2012on BNN today at 11:50 Toronto time
4/27/2012(Los Helados)Intersects 1,090 Metres at 0.69% Copper Equivalent at Los He...
4/12/2012NGEX ANNOUNCES DIVESTMENT OF CABALLLO BLANCO ROYALTY TO GOLD...
4/12/2012Announces Divestment of Caballlo Blanco Royalty to Goldgroup...
3/28/2012Announces Initial Drill Results From Josemaria Copper-Gold P...
2/10/2012Corporate Update
1/17/2012Signs Agreement With Namibian Copper on Eritrean Base Metal ...
12/13/2011Announces 141.2 Metres of 0.38% Cu and 0.53 g/t Au From GJ C...
11/28/2011Commences 2011-2012 Drill Program on Josemaria Copper/Gold P...
10/11/2011Announces $27 Million Private Placement
7/20/2011Announces Start of 2011 Exploration Program at GJ Copper Gol...
2/22/2011(Los Helados)Drills 711 Metres 0.54% Copper and 0.26 Grams/Tonnes Gold at...
2/15/2011Announces Major Exploration Programs Underway in South Ameri...
2/16/2010Granted Exploration Licenses in the Republic of Congo
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (NGQ.TO)
1.11+5.71%
TORONTO
CA$ 1.11
07/22 16:55 0.060
5.71%
Prev close Open
1.05 1.04
Low High
1.04 1.11
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.11 -%
Volume 1 month var.
54,700 -%
24hGold TrendPower© : -2
Produces
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/3/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :