Osisko Mining Corp.

Published : December 03rd, 2008

Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold | Market |

OSISKO INTERSECTS 102 METRES AVERAGING 3.21 G/T Au AT SOUTH BARNAT


Montreal, December 3, 2008 - Osisko Mining Corporation (�Osisko�, OSK - TSX, EWX - Deutsche Boerse) is pleased to announce new results from the definition drill program currently under way at South Barnat, a separate gold mineralized zone located northeast of the Canadian Malartic deposit.  Significant results include 3.21 g/t Au over 102.0 metres (BA08-3154), 3.16 g/t Au over 54.0 metres (BA08-3149) and 1.78 g/t Au over 106.0 metres (BA08-3152).  Narrow zones of higher grade gold values were also encountered, including 51.0 g/t Au over 1.5 m (BA08-3149) and 17.4 g/t Au over 6.0 m (BA08-3154). Results from eighteen new holes are tabled below:

Hole No.

Section

From (m)

To (m)

Length (m)

Au g/t

 

BA08-3146

450E

14.0

30.0

16.0

2.70

BA08-3147

200E

31.5

89.0

57.5

2.00

including

 

67.0

68.2

1.2

24.20

BA08-3148B

175E

33.5

54.3

20.8

2.68

BA08-3149

150E

17.5

71.5

54.0

3.16

including

 

43.0

44.5

1.5

51.00

And

 

171.5

183.7

12.2

5.29

BA08-3150

000E

24.4

57.5

33.1

1.11

And

 

209.0

210.5

1.5

15.20

BA08-3151

575E

63.0

82.5

19.5

3.19

And

 

175.0

197.5

22.5

3.21

BA08-3152

650E

143.0

249.0

106.0

1.78

BA08-3153

650E

121.0

210.0

89.0

2.35

including

 

138.0

141.0

3.0

16.60

BA08-3154

650E

135.5

237.5

102.0

3.21

including

 

167.5

173.5

6.0

17.41

BA08-3156

025E

55.5

79.5

24.0

1.15

And

 

127.0

151.7

24.7

1.89

BA08-3157

025E

68.5

92.0

23.5

1.08

BA08-3158

025E

85.0

127.0

42.0

1.02

And

 

284.0

408.0

124.0

0.62

BA08-3160

450E

35.5

102.0

66.5

1.57

And

 

147.0

167.5

20.5

1.40

BA08-3161

450E

46.0

51.5

5.5

9.70

And

 

81.5

150.9

69.4

1.51

And

 

200.1

265.3

65.2

2.93

BA08-3162B

450E

83.0

163.0

80.0

2.32

BA08-3163

125E

17.0

77.3

60.3

1.39

And

 

202.0

203.0

1.0

13.10

BA08-3164

175E

66.0

80.3

14.3

6.87

BA08-3165

175E

274.5

286.0

11.5

1.36

Drill holes BA08-3155 and BA08-3159 did not reach the intended target depths and did not intersect significant mineralization. Drill holes BA08-3146, BA08-3148, BA08-3152, BA08-3162 and BA08-3164 were lost in fault zones or intercepted historic mine workings and did not reach the intended target depths. Assay results for further holes at South Barnat are pending.  

The definition drill program is focused on an 850 metre-long grid oriented northwest-southeast with drill sections spaced 25 metres apart. All holes on this grid are inclined 45 to 75 degrees to the northeast or southwest. True widths of the mineralized intersections reported above are 40 to 70 percent of the drilled intersections.

Drilling to date suggests that the minimum strike length of the South Barnat Zone is 850 metres with a true width between 30 and 160 metres. The mineralized zone is open along strike to the southeast, where it merges with the old East Malartic M ine. It extends to depths of 250 to 400 metres in the southeastern portion, where the system is still open at depth. Estimated depth in the northwestern third of the deposit is 130 to 200 metres.

Mineralization in the South Barnat Zone is located to the north and south of the old Barnat and East Malartic mine workings, largely along the southern edge of the Cadillac fault. The gold mineralization comprises multiple subvertical, tabular subzones hosted both in silicified greywackes of the Pontiac Group south of the fault contact and in schistose, carbonated and biotitic ultramafic rocks north of the fault contact. Porphyry dykes on both sides of the fault contain disseminated mineralization as well as late quartz veins containing visible gold. Gold mineralization in the South Barnat Zone likely extends to the east along the north and south walls of the past-producing East Malartic mine.

All NQ or HQ core assays reported above were obtained by standard 50 g fire assaying-AA finish or gravimetric finish at ALS Chemex laboratories in Val d'Or, Quebec. Reported weighted averages were calculated using a minimum of 0.50 g/t Au over successive maximum intervals of 20 metres with no upper cut-off of individual assays.  Intersected drifts or lost core within mineralized intersections were incorporated as blank intervals.

Osisko Mining Corp. is currently evaluating the Canadian Malartic gold deposit and adjacent areas for a large-scale open pit, bulk-tonnage mining operation. The Company is well-funded with approximately $120 million on hand and is carrying out an aggressive definition drilling and exploration campaign. A NI 43-101 compliant Reserve/Resource estimate and Feasibility Study on the main Canadian Malartic gold deposit was released on November 25, 2008 and will be filed on SEDAR shortly. This estimate does not include the South Barnat Zone nor any other mineralized zone located outside the main deposit that is curren tly being evaluated by Osisko.

Mr. Robert Wares, P. Geo., Executive Vice-President and COO of Osisko, is the Qualified Person responsible for the technical information reported in this news release.
 
Forward Looking Statements
Certain statements contained in this press release may be deemed �forward-looking statements�. All statements in this release, other than statements of historical fact, that address events or developments that the Corporation expects to occur, are forward looking statements.  Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words �expects�, �plans�, �anticipates�, �believes�, �intends�, �estimates�, �projects�, �potential�, �scheduled� and similar expressions, or that events or conditions �will�, �would�, �may�, �could� or �should� occur.  Although the Corporation believes the expectations expressed in such forward-l ooking statements are based on reasonable assumptions, including, without limitation that all technical, economical and financial conditions will be met in order to put the Canadian Malartic Project into commercial production, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements.  Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development and mill production personnel, results of exploration and development activities, the Corporation�s limited experience with production and development stage mining operations, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated env ironmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions.  These factors are discussed in greater detail in the Corporation�s most recent Annual Information Form filed on SEDAR, which also provides additional general assumptions in connection with these statements.  The Corporation cautions that the foregoing list of important factors is not exhaustive.  Investors and others who base themselves on the Corporation�s forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail.  The Corporation believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon.  These statements speak only as of the date of this press release.


For further information, please contact:

John Burzynski
Vice-President Corporate Development
Tel. (514) 735-7131
www.osisko.com

Daniel Boase
Investor Relations
Tel. (416) 742-5600
Toll Free: 1-866-580-8891

Renmark Financial Communications Inc.
Eric St-Pierre: estpierre@renmarkfinancial.com
Ryan van de Polder: rvandepolder@renmarkfinancial.com
Montreal � Tel.: (514) 939-3989 / Fax: (514) 939-3717
Toronto � Tel.: (416) 644-2020 / Fax: (416) 644-2021
www.renmarkfinancial.com

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold producing company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.10+1.97%2.43-1.62%
TORONTO
CA$ 3.10
04/25 16:59 0.060
1.97%
Prev close Open
3.04 3.04
Low High
3.02 3.14
Year l/h YTD var.
2.42 -  3.21 12.32%
52 week l/h 52 week var.
2.36 -  3.87 -19.48%
Volume 1 month var.
653,155 17.87%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202413.55%
2023-22.00%4.532.64
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.69-0.77%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :