Hana Mining Ltd.

Published : February 05th, 2013

Intersects 4.03% Cu and 50.7g/t Ag over 14 m Further Increasing the Size and Underground Potential o

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Botswana | Copper | Diamond | Growth | Market | Silver | South Africa |
February 5, 2013
NEWS RELEASE
 
Hana Mining Intersects 4.03% Cu and 50.7g/t Ag over 14 m Further Increasing the Size and Underground Potential of the Zone 5 Deposit

Closing Update

February 5, 2013 (Vancouver, British Columbia). Hana Mining Ltd. ("Hana" or the "Company") - (TSX-V: HMG) (Frankfurt: 4LH) (BSE: HANA) is pleased to announce further positive drill results from three deep exploration drill holes at Zone 5 of the Ghanzi sediment hosted Copper-Silver Project in Botswana. (Figure 1)

Highlights of deep drilling exploration results:
  • Estimated true width intercepts:
  • 1.61% CuEq(1) (1.42% Cu and 13.3 g/t Ag) over 17.36 metres in hole HA-594c-D,
  • 4.77% CuEq(1) (4.03% Cu and 50.7 g/t Ag) over 14.26 metres within a wider mineralized interval of
    3.61% CuEq(1) (3.06% Cu and 38.1 g/t Ag) over 19.09 metres in hole HA-654-D,
  • 1.23% CuEq(1) (1.18% Cu and 4.0 g/t Ag) over 3.51 metres in hole HA-655-D.
    (1) Copper equivalent calculated using US$3.00/lb Cu, US$30/oz Ag and is not adjusted for metallurgical recoveries. The formula used is as follows: CuEq = Cu% + (Ag g/t x 0.01458).

    The 2012 deep exploration drill program at Zone 5 was focused on wide 'step out' drilling from known high-grade mineralization (Figure 2). The 'step outs' were located 500 metres away from previous collar intercepts and intersected mineralization approximately 400 metres down dip from the current Inferred Mineral Resource at Zone 5 (Figure 3). All three holes intersected similar mineralization to that intersected near surface at approximately 600-650 metres vertically from surface.

    These drilling results confirm the continuity of high-grade copper mineralization at depth at Zone 5 over a defined strike length of 4,000 metres. The results from these holes were not included in the most recent resource estimate used to produce the Preliminary Economic Assessment ("PEA") released 14 May 2012. Zone 5 Inferred Mineral Resource holes were drilled to a maximum depth of 200 metres and produced an Inferred Mineral Resource of 520 MIbs Cu and 6.8 Moz Ag at a 0.40% Cu cutoff. During the 2012 drill programme, Hana completed 63 holes totaling 15,555 metres at Zone 5.

    Hana Mining President and CEO, Marek Kreczmer comments; "Zone 5 deep mineralization continues to be open along strike and at depth. The extent of the underground footprint suggests that the size of the resource at Zone 5 could possibly double our earlier estimate. The 2012 high-grade copper results from Zone 5 also have the potential to change the mine plan of the Ghanzi Project".

    During 2012, a total of 201 holes were drilled for an aggregate of 40,693 metres. Work focused on exploration and infill drilling at Zones 2, 4, 5 and 6. The 2012 drill program was successful in both discovering the extent of mineralization potential at the Ghanzi Project and increasing the confidence of known mineralization through infill drilling.

    Figure 1: Location of Zone 5 at the Ghanzi Project
    Figure 2: Location of Zone 5 Drilling Results at the Ghanzi Project, Including Sections N123250 to N127150 *Please note all figures are now showing section grid lines that are referenced in the result tables.

    Figure 3: Cross-section through N126250 at Zone 5 showing exploration deep drilling
    Corporate Update

    Hana Mining President and CEO, Marek Kreczmer also comments; "management from Hana and Cupric has recently met with the relevant Botswana regulatory authorities and was assured the approval process is progressing. The parties continue to work towards satisfaction and receipt of the outstanding Arrangement conditions. The closing of the Arrangement remains subject to the satisfaction or waiver of such conditions and the final approval of the TSX Venture Exchange. The closing of the Arrangement is expected to occur in February 2013."

    Qualified Person and Quality Assurance/Quality Control

    The drilling program and results are reviewed and approved by Marek Kreczmer, Chief Executive Officer for Hana. He is the qualified person as defined in NI 43-101 and has reviewed the technical information in this press release.

    Drill core is logged and photographed. Mineralized intervals are split in half by sawing and sampled at site. The remainder of the core is kept as a permanent record. Samples are placed into labeled bags, closed and packed into sealed bags that are shipped to Scientific Services Laboratory in Cape Town, South Africa. Hana has implemented an industry-standard QA/QC program that includes the blind insertion of certified standards, duplicates and blanks into the sample stream.

    About Hana Mining's Ghanzi Copper-Silver Project in Botswana:

    The Ghanzi Project is located in the center of the Kalahari Copper Belt in northwestern Botswana. The Ghanzi property covers 2,149 square kilometres, and contains sediment-hosted copper-silver deposits with a demonstrated cumulative tested strike length of 70 kilometres. This favorable geology extends over an estimated strike length of 600 kilometres.

    On May 14, 2012 Hana Mining released results of its most recent NI 43-101 compliant Preliminary Economic Assessment ("PEA") for the Ghanzi Project. The PEA details a 10,000 tonne per day open-pit mining and milling operation at the Banana Zone and Zone 5 at an initial capital expenditure of US$285.5 million. This operation is expected to produce approximately 66.4 million pounds of copper and 878,000 ounces of silver annually over a minimum 13-year mine life. The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic characteristics applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA will be realized.

    On October 24, 2012 Hana Mining announced a definitive plan of arrangement (the "Arrangement") with Cupric Canyon Capital LP for an all cash acquisition of all outstanding shares of Hana Mining Ltd.; pursuant to this agreement, shareholders of Hana will receive C$0.82 in cash for each common share. The offer values Hana's equity at approximately C$82 million. On December 27, 2012 at a Special Shareholders meeting, more than two thirds of Hana's shareholders approved the Arrangement offered by Cupric Canyon. On January 7, 2013 the Company received a final order of approval by the Supreme Court of British Columbia. The closing of the Arrangement remains subject to the satisfaction or waiver of certain conditions of the Arrangement and is expected to occur in February 2013. Upon closing of the transaction, Cupric intends to advance the Ghanzi project through the design, construction and operational phases of its development.

    For Further Information, contact:
    Marek Kreczmer
    CEO
    Hana Mining Ltd.
    Tel: (604) 676-0824
    Email: info@hanamining.com
    Website: www.hanamining.com

    Table 1: Drill Results from Zone 5. Interval indicates down hole interval lengths.
     

     

     

     

     

     

    Est. True

    CuEq1
    (%)

    Cu
    (%)

    Ag
    (g/t)

    Hole #

    Section

    Mineralized

    From

    To

    Interval

    Width

     

     

    Zone

    (m)

    (m)

    (m)

    (m)

    Zone 5 Deep Diamond Drilling

    HA-594c-D

    N125050

    Zone 5

    648.26

    686.00

    37.74

    36.61

    0.89

    0.79

    7.1

    includes

     

     

    652.40

    670.30

    17.90

    17.36

    1.61

    1.42

    13.3

    HA-654-D

    N126250

    Zone 5

    698.70

    718.18

    19.48

    19.09

    3.61

    3.06

    38.1

    includes

     

     

    699.23

    713.78

    14.55

    14.26

    4.77

    4.03

    50.7

    HA-655-D

    N127150

    Zone 5

    548.28

    558.62

    10.34

    10.13

    0.52

    0.48

    2.2

    includes

     

     

    549.06

    552.64

    3.58

    3.51

    1.23

    1.18

    4.0

    Copper equivalent calculated using US$3.00/lb Cu, US$30/oz Ag and is not adjusted for metallurgical recoveries. The formula used is as follows: CuEq = Cu% + (Ag g/t x 0.01458).

    The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

    Forward-Looking Statements

    Certain information contained in this news release, including any information relating to the proposed transaction (the "Transaction") and Hana's future financial or operating performance may be deemed "forward-looking". These statements relate to future events or future performance and reflect Hana's expectations regarding future growth, results of operations, business prospects and opportunities of Hana and the completion of the Arrangement. These forward-looking statements also reflect Hana's current internal projections, expectations or beliefs and are based on information currently available to Hana, respectively. In some cases forward-looking information can be identified by terminology such as "may", "will", "should", "expect", "intend", "plan", "anticipate", "believe", "estimate", "projects", "potential", "scheduled", "forecast", "budget" or the negative of those terms or other comparable terminology. Assumptions upon which such forward looking information is based include perceived merit of properties; exploration results and budgets; mineral reserves and resource estimates; work programs; capital expenditures; timelines; strategic plans; completion of transactions; market prices for precious and base metals; or other statements that are not statements of fact. Although Hana believes that the forward-looking information contained in this news release is based on reasonable assumptions, readers cannot be assured that actual results will be consistent with such statements. Accordingly, readers are cautioned against placing undue reliance on forward-looking information. Hana expressly disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, events or otherwise, except in accordance with applicable securities laws.

    Associated File: http://www.hanamining.com/i/pdf/NR-Zone-5-Deep-for-Feb-5-2013.pdf
    667 KB in size, approx. 2 minutes, 5 seconds to download at 56.6Kbps

    You can also view this News Release on our website at:
    http://www.hanamining.com/s/NewsReleases.asp?ReportID=569603
     

    Home    Corporate    Projects    Investors    News    Reports    Contact    Disclaimer    Subscribe    
    Data and Statistics for these countries : Botswana | South Africa | All
    Gold and Silver Prices for these countries : Botswana | South Africa | All

    Hana Mining Ltd.

    EXPLORATION STAGE
    CODE : HMG.V
    Follow and Invest
    Add to watch list Add to your portfolio Add or edit a note
    Add Alert Add to Watchlists Add to Portfolio Add Note
    ProfileMarket
    Indicators
    VALUE :
    Projects & res.
    Press
    releases
    Annual
    report
    RISK :
    Asset profile
    Contact Cpy

    Hana Mining is a copper and silver development stage company based in Canada.

    Hana Mining holds various exploration projects in Botswana.

    Its main exploration property is GHANZI in Botswana.

    Hana Mining is listed in Canada and in Germany. Its market capitalisation is CA$ 80.6 millions as of today (US$ 78.4 millions, € 58.5 millions).

    Its stock quote reached its lowest recent point on March 27, 2009 at CA$ 0.06, and its highest recent level on December 17, 2010 at CA$ 5.68.

    Hana Mining has 99 494 000 shares outstanding.

    Your feedback is appreciated, please leave a comment or rate this article.
    Rate : Average note :0 (0 vote) View Top rated
     
    Financings of Hana Mining Ltd.
    2/7/2012Announces Completion of Non-Brokered Financing and Investmen...
    1/30/2012Announces Final Allocation of Previously Announced Financing
    1/27/2012Announces Non-Brokered Financing
    5/20/2010Closing of Bought-Deal Private Placement
    4/30/2010Arranges $21Million Bought-Deal Private Placement
    5/27/2009has closed the first tranche of its brokered private placeme...
    Nominations of Hana Mining Ltd.
    11/7/2012New Hana Mining Builds the Corporate Structure with Appointm...
    5/5/2011Appoints New Chief Financial Officer
    4/5/2011shareholders overwhelmingly approve the appointment of three...
    3/21/2011Announces the Nomination of Three Highly Experienced Candida...
    7/19/2010Appointment of Pat Donnelly, former mining analyst, as VP Co...
    Project news of Hana Mining Ltd.
    2/8/2013Receives Approval from Botswana Minister of Minerals, Energy...
    1/10/2013(Ghanzi)Receives Renewal of Ghanzi Project Prospecting Licenses
    10/25/2012Agrees To C$0.82 Per Share All-Cash Acquisition By Cupric Ca...
    8/20/2012Expands Zone 5 at Depth with Strong Drill Results
    8/13/2012Continues to Hit High-Grade Copper-Silver Mineralization at ...
    6/29/2012(Ghanzi)Files Ghanzi Preliminary Economic Assessment Technical Repor...
    4/17/2012continues to hit high-grade copper-silver mineralization at ...
    2/21/2012(Ghanzi)Infill drilling at the Northeast Fold confirms new geologica...
    6/13/2011(Ghanzi)Comments on Share Price - Drilling Continues
    5/26/2011(Ghanzi)Provides Update on Banana Zone
    3/14/2011(Ghanzi)Provides Update on Banana Zone Preliminary Economic Assessme...
    8/5/2010(Ghanzi)RC Drilling in Banana Zone Intersects 3.40% Cu and 48.0 g/t ...
    7/14/2010(Ghanzi)Expands Banana Zone at Ghanzi Copper-Silver Project by 4.2 K...
    6/18/2010(Ghanzi)Expands Banana Zone by 7 Kilometres
    6/3/2010(Ghanzi)Expands Chalcocite Zone - New Drilling Increases Strike Leng
    5/19/2010Files NI 43-101
    3/30/2010(Ghanzi)RC drilling in Banana Zone intersects 1.63% Cu and 39.5 g/t ...
    3/4/2010(Ghanzi)RC drilling in Banana Zone intersects 1.90% Cu and 17.4 g/t ...
    1/5/2010(Ghanzi)New VP Engineering to Support Ghanzi Copper-Silver Project P...
    12/8/2009drilling intersects 1.84% Cu and 23.6 g/t Ag over 7 metres i...
    10/1/2009(Ghanzi)Announces New President and COO to Drive Ghanzi Copper-Silve...
    9/28/2009(Ghanzi)RC drilling intersects 2.53% Cu and 32 g/t Ag over 17 metres...
    9/15/2009(Ghanzi)Reports Positive Results From a Preliminary Groundwater Inve...
    8/26/2009(Ghanzi)Letter from the CEO-Hana Mining Ltd.
    7/15/2009(Ghanzi)Agrees to Purchase 100% of Ghanzi Copper-Silver Project in B...
    6/25/2009(Ghanzi)43-101 Technical Report for Ghanzi Copper-Silver Deposit, Bo...
    5/28/2009(Ghanzi)New results at Ghanzi Copper-Silver Project in Botswana
    Corporate news of Hana Mining Ltd.
    2/20/2013Completes Arrangement with Cupric Canyon Capital LP
    2/14/2013Receives Approval From Botswana Competition Authority
    2/5/2013Intersects 4.03% Cu and 50.7g/t Ag over 14 m Further Increas...
    2/4/2013Provides Update on Arrangement with Cupric Canyon Capital
    1/7/2013Receives Final Court Order for Arrangement with Cupric Canyo...
    12/11/2012Advises Regarding Shareholder Meeting
    11/1/2012Discovers New Mineralization Further Increasing the Size of ...
    10/26/2012from DML's Neighbour, Hana Mining
    10/23/2012Reports Consistent High Grades over Thick Intersections at Z...
    10/22/2012New Hana Mining Builds Corporate Advisory Team
    9/24/2012Finds Strong Copper-Silver Mineralization from New Drill Pro...
    9/18/2012Welcomes Two New Board Members
    8/27/2012Reports More Strong Results from Zone 5 including 4.54% CuEq...
    8/1/2012Drilling continues to encounter down-dip mineralization and ...
    7/24/2012Diamond Drilling Extends Down Dip Extension and Confirms Thi...
    7/16/2012announces high-grade copper-silver mineralization from Zone ...
    5/23/2012Shares Commence Trading on the Botswana Stock Exchange
    5/14/2012(Ghanzi)Announces Positive Preliminary Economic Assessment for the G...
    3/28/2012Diamond Drilling Extends the Strike and Down Dip Extension o...
    3/27/2012to Cancel the Issuance of Stock Options
    3/12/2012Diamond drilling encounters consistent high-grade copper-sil...
    2/27/2012Infill drilling continues to encounter consistent high-grade...
    1/24/2012Infill drilling encounters some of the best intercepts of co...
    1/9/2012Infill drilling encounters consistent high-grade copper-silv...
    11/28/2011Infill Drilling Again Encounters Consistent High-Grade Coppe...
    10/24/2011(Ghanzi)announces the appointment of a highly experienced Technical ...
    10/3/2011announces exceptional silver recoveries from oxide-transitio...
    9/20/2011(Ghanzi)announces the appointment of highly experienced and successf...
    9/13/2011Infill drilling again encounters consistent high-grade coppe...
    8/29/2011Infill drilling continues to encounter consistent high-grade...
    8/22/2011Infill drilling encounters high-grade copper-silver minerali...
    8/15/2011(Ghanzi)announces the appointment of a highly experienced Project Di...
    7/26/2011Infill Drilling Again Encounters Thick Intersections of Copp...
    7/11/2011Infill drilling still continues to encounter thick intersect...
    6/16/2011Infill drilling continues to encounter thick intersections o...
    6/13/2011Comments on Share Price-Drilling Continues
    4/19/2011Infill Drilling Extends Copper-Silver Mineralization by 300 ...
    7/8/2010Comments on Share Price-Drilling Continues
    5/25/2010Revisions to Arrangement for Spin-out of New Hana Copper Min...
    4/29/2010Letter to Shareholders
    3/19/2010New Advisory Board Member
    3/5/2010New Chief Financial Officer
    1/22/2010Spin-Out of Kuke Property to New Hana Copper Mining Ltd.
    7/13/2009Botswana ranked as most favourable mineral investment climat...
    6/1/2009completion of inferred resource estimate - Ghanzi Copper-Sil...
    5/30/2009Completes $3.2 Million Placement
    Comments closed
     
    Latest comment posted for this article
    Be the first to comment
    Add your comment
    TSX-V (HMG.V)FRANKFURT (4LH.F)
    0.810+0.00%0.144+132.26%
    TSX-V
    CA$ 0.810
    02/19 16:59 -
    0%
    Prev close Open
    0.810 0.810
    Low High
    0.810 0.810
    Year l/h YTD var.
     -  -
    52 week l/h 52 week var.
    - -  0.810 -%
    Volume 1 month var.
    61,000 -%
    24hGold TrendPower© : 27
    Produces
    Develops
    Explores for Copper - Silver
     
     
     
    Analyse
    Interactive chart Add to compare
    Interactive
    chart
    Print Compare Export
    Last updated on : 1/6/2010
    You must be logged in to use the porfolio and watchlists (free)
    Top Newsreleases
    MOST READ
    Annual variation
    DateVariationHighLow
     
    5 years chart
     
    3 months chart
     
    3 months volume chart
     
     
    Mining Company News
    Plymouth Minerals LTDPLH.AX
    Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
    AU$ 0.12-8.00%Trend Power :
    Santos(Ngas-Oil)STO.AX
    announces expected non-cash impairment
    AU$ 7.82+1.69%Trend Power :
    Oceana Gold(Au)OGC.AX
    RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
    AU$ 2.20+0.00%Trend Power :
    Western Areas NL(Au-Ni-Pl)WSA.AX
    Advance Notice - Full Year Results Conference Call
    AU$ 3.86+0.00%Trend Power :
    Canadian Zinc(Ag-Au-Cu)CZN.TO
    Reports Financial Results for Q2 and Provides Project Updates
    CA$ 0.12+4.55%Trend Power :
    Stornoway Diamond(Gems-Au-Ur)SWY.TO
    Second Quarter Results
    CA$ 0.02+100.00%Trend Power :
    McEwen Mining(Cu-Le-Zn)MUX
    TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
    US$ 11.04+1.38%Trend Power :
    Rentech(Coal-Ngas)RTK
    Rentech Announces Results for Second Quarter 2017
    US$ 0.20-12.28%Trend Power :
    KEFIKEFI.L
    Reduced Funding Requirement
    GBX 0.54-2.53%Trend Power :
    Lupaka Gold Corp.LPK.V
    Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
    CA$ 0.06+0.00%Trend Power :
    Imperial(Ag-Au-Cu)III.TO
    Closes Bridge Loan Financing
    CA$ 2.52+6.78%Trend Power :
    Guyana Goldfields(Cu-Zn-Pa)GUY.TO
    Reports Second Quarter 2017 Results and Maintains Production Guidance
    CA$ 1.84+0.00%Trend Power :
    Lundin Mining(Ag-Au-Cu)LUN.TO
    d Share Capital and Voting Rights for Lundin Mining
    CA$ 16.05+2.62%Trend Power :
    Canarc Res.(Au)CCM.TO
    Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
    CA$ 0.24+2.13%Trend Power :
    Havilah(Cu-Le-Zn)HAV.AX
    Q A April 2017 Quarterly Report
    AU$ 0.19-7.32%Trend Power :
    Uranium Res.(Ur)URRE
    Commences Lithium Exploration Drilling at the Columbus Basin Project
    US$ 6.80-2.86%Trend Power :
    Platinum Group Metals(Au-Cu-Gems)PTM.TO
    Platinum Group Metals Ltd. Operational and Strategic Process ...
    CA$ 1.90+1.60%Trend Power :
    Devon Energy(Ngas-Oil)DVN
    Announces $340 Million of Non-Core Asset Sales
    US$ 51.43-0.46%Trend Power :
    Precision Drilling(Oil)PD-UN.TO
    Announces 2017Second Quarter Financial Results
    CA$ 8.66-0.35%Trend Power :
    Terramin(Ag-Au-Cu)TZN.AX
    2nd Quarter Report
    AU$ 0.03+0.00%Trend Power :