Hathor Exploration Limited

Published : September 06th, 2011

Intersects 42 m of 2.95 % U3O8 at Far East Zone as Roughrider Continues to Grow

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Cobalt |
Tuesday, September 06, 2011

Hathor Intersects 42 m of 2.95 % U3O8 at Far East Zone as Roughrider Continues to Grow


Hathor Exploration Limited (TSX: HAT) ("Hathor" or the "Company") is pleased to provide an update on the 2011 summer drill program at the Far East Zone of the Roughrider Uranium Deposit in the Athabasca Basin, with new data from 10 drill holes (MWNE-11-701B to 710).. Drill Hole 707 is highlighted:
  • Two separate intervals of 42 m of 2.95% U3O8 and 6.5 m of 11.31 % U3O8
  • Combined drill hole GT (grade x thickness) of 200, the highest GT to date on Far East, and the 12th highest GT of the nearly 400 drill holes completed on the entire deposit so far.

The Far East Zone continues to produce an intensity in mineralization and alteration that surpasses the Company's expectations; it is a material development in the overall mineral resource potential of the Roughrider Uranium Deposit. Furthermore, it is open both east along strike and southeast up-dip from the most intense mineralization intersected to date.

Table 1 presents highlights of the composited assay data from seven drill holes. A complete list of composited assay data are provided in Table 2.. Previous mineralized intersections from the Far East Zone are summarized on page 1 of the Company's news release dated July 26, 2011.

Table 1: Composited Assay Data Highlights.
DDH
From
(m)
To
(m)
Grade
(U3O8 %)
Thickness
(m)
GT
MWNE-11-701B
333.00
394.00
1.78
61.00
108.86
MWNE-11-702
320.50
324.00
2.74
3.50
9.58
MWNE-11-702
338.50
350.50
2.65
12.00
31.81
MWNE-11-702
393.50
394.00
15.70
0.50
7.85
MWNE-11-703
336.00
370.00
3.34
34.00
113.70
MWNE-11-703
382.00
385.00
7.31
3.00
21.94
MWNE-11-704
354.50
371.50
0.78
17.00
13.28
MWNE-11-704
378.00
383.50
1.17
5.50
6.44
MWNE-11-707
343.00
385.00
2.95
42.00
123.72
MWNE-11-707
398.50
405.00
11.31
6.50
73.52
MWNE-11-709
355.00
358.50
14.50
3.50
50.74
MWNE-11-709
428.00
428.50
15.80
0.50
7.90
MWNE-11-709
435.50
436.50
11.88
1.00
11.88
MWNE-11-710
332.50
390.00
1.92
57.50
110.40
GT - Grade x Thickness; Based on a cut-off of 0.05 % U3O8. All intervals are core lengths.

The 3D geological model for Far East Zone outlines an approximate geometry of 95 m (length) by 35 m (width), with an average thickness of 33.0 m. The weighted average grade and average grade of all assays received to date are 2.25 and 2.90 % U3O8 respectively. Density measurements range from 1.97 to 5..04 g/cm3, with an average of 2.42 g/cm3 for 500 samples.

Assays are pending for 8 drill holes from the Far East Zone, including MWNE-11-712A and MWNE-11-715, which intersected totals of 9.10 m and 7.00 m of off-scale radioactivity, respectively. Drill hole MWNE-11-715 intersected 2.8 m (269.0 to 271.8 m) of continual off-scale radioactivity, manifest in drill core as massive pitchblende mineralization, with average measured dry bulk density of 4.24 g/cm3 for the interval 369.5 to 371.0 m.

Mineralization between the East and Far East Zones is not included within the current outline of either zone. This represents further potential for the overall mineral resource of the Roughrider Uranium Deposit, as emphasized in the NI 43-101 compliant report completed for the East Zone in June, 2011 and filed on SEDAR.

2011 Summer Program Summary

The 2011 summer drill program utilized two drill rigs for approximately nine weeks. A total of 9,600 metres were completed in 20 drill holes; 19 were at the Far East Zone. Figure 1 shows spatial relationship of the three mineralized zones at the Roughrider Uranium Deposit (West, East, and Far East) with drill holes colour-coded on the basis of grade x thickness value (GT). Figure 2 shows the spatial distribution of drill holes at the Far East Zone, with drill holes colour-coded on the basis of GT value. Figure 3 is a cross section depicting Line 125E (�10 m). Figure 4 shows examples of mineralization styles from the drill holes reported in this news release.

Drill holes MWNE-11-701B and MWNE-11-710, supplemented by drill holes MWNE-11-695 and MWNE-11-700 that were released previously, provide the first complete drill fence (Line 120E) of assays from the summer drilling (Figure 3).

Drill holes MWNE-11-702 and MWNE-11-703 are infill drill holes on Lines 90E and 100E, respectively.

Drill holes MWNE-11-705, MWNE-11-706 and MWNE-11-708 contain variable radioactivity and intermittent uranium mineralization but are not included within the margins of the Far East Zone as currently defined (see Figure 2).

Drill holes MWNE-11-704 and MWNE-11-707 are from Line 130E (see Table 1 for intersections). Drill hole MWNE-11-712B is up-dip on the same line and intersected 9.10 m of of-scale radioactivity (see news release dated August 15, 2011). Assays are pending for this drill hole.

Drill holes MWNE-11-711 and MWNE-11-715 are not reported herein because assays are pending. These drill holes intersected 1.8 and 7.0 m of off-scale radioactivity respectively (see news releases dated July 26 and August 15, 2011).

Sample Analysis and QAQC

Samples were analyzed for U3O8 at the Geoanalytical Laboratories of the Saskatchewan Research Council (SRC). The facilities used for the analysis operate in accordance with ISO/IEC 17025:2005 (CAN-P-4E). The samples were analyzed using ISO/IEC 17025:2005-accredited U3O8 method. The samples were analyzed for a suite of other base metal elements including nickel, cobalt, copper and lead by ICP-ES. Dry bulk density determinations were carried out by Hathor staff on the drill core.

Field and laboratory of select samples show good reproducibility. Full details of the Company's QAQC program are documented in the NI43-101 compliant report completed for the East Zone in June, 2011 and available on SEDAR.

All mineralized drill hole intersections are reported as down-hole intervals, not true thickness. True thicknesses are determined within the context of 3D geological models used for exploration and resource modeling.

Midwest Northeast Property

The Midwest Northeast Property ('the property'), which contains the Roughrider Uranium Deposit, is located within the main uranium-producing eastern corridor of the Athabasca Basin. The Property comprises 3 mineral leases covering 598 ha. Infrastructure is excellent. The property is connected to Highway 905 by a 6 km winter road. The property is 8.5 km north of Points North, the main service hub, including airport, for northeastern Saskatchewan. The property is within 25 km of operating uranium mine, mill and tailings facilities established at Rabbit Lake and McClean Lake during the past 35 years of production in the Athabasca.

Subsequent to the successful acquisition of Terra Ventures Inc. (see news release dated August 5, 2011), Hathor owns 100 % of the Midwest Northeast Property and the Roughrider Uranium Deposit.

Continued No Action to Cameco's Hostile and Predatory Offer

On August 30, 2011 Cameco Corporation made an unsolicited all cash take-over bid offer for Hathor at a price per Hathor common share of C$3.75. Hathor's closing share price on the TSX on Friday, September 2, the last day of trading before this news release, was C$4.13.

The Board of Directors of Hathor, together with its legal and financial advisors, is assessing Cameco's offer. The Company continues to urge its shareholders not to respond to the Cameco offer until the Company has formally responded to the offer and makes available to shareholders information on the economic parameters for Roughrider, continued assays from the recently completed drill program at Far East Zone, and also insights into the strategic nature of the Athabasca Basin in the global uranium industry and how that relates to the value of the Roughrider uranium deposit.

Hathor will formally respond to the Cameco offer no later than September 14th, 2011.

Alistair McCready, Ph.D., P.Geo., Hathor's V.P. Exploration, and Michael Gunning, Ph.D., P.Geo., Hathor's President & Chief Executive Officer, are Qualified Persons as defined by National Instrument 43-101 and have reviewed and approved the technical disclosures in this news release.

For more information on Hathor, please visit the Company's website at www.hathor.ca, or contact Tony Nunziata at 403-560-7040 or Kelsea Murray at 604-684-6707.

___________________________________
Dr. Michael H. Gunning, President & CEO
Hathor Exploration Limited

Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX Exchange) accepts responsibility for the adequacy or accuracy of this release.


This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Such forward-looking information concerns Hathor's anticipated operations in future periods, planned exploration and development of its properties, and plans related to its business and other matters that may occur in the future. This information relates to analyses and other information that is based on expectations of future performance and planned work programs. Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if a mineral property is developed. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation: exploration hazards and risks; risks related to exploration and development of natural resource properties; uncertainty in Hathor's ability to obtain funding; precious and base metal price fluctuations; recent market events and conditions; risks related to the uncertainty of mineral resource calculations and the inclusion of inferred mineral resources in economic estimation; risks related to governmental regulations; risks related to obtaining necessary licenses and permits; risks related to Hathor's business being subject to environmental laws and regulations; risks related to Hathor's mineral properties being subject to prior unregistered agreements, transfers, or claims and other defects in title; risks relating to competition from larger companies with greater financial and technical resources; risks relating to Hathor's inability to meet its financial obligations under agreements to which it is a party; ability to recruit and retain qualified personnel; and risks related to Hathor's directors and officers becoming associated with other natural resource companies which may give rise to conflicts of interests. This list is not exhaustive of the factors that may affect Hathor's forward-looking information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking information. Hathor's forward-looking information is based on the reasonable beliefs, expectations and opinions of management on the date the statements are made and Hathor does not assume any obligation to update forward-looking information if circumstances or management's beliefs, expectations or opinions change, except as required by law. For the reasons set forth above, investors should not place undue reliance on forward-looking information. For a complete discussion, please refer to Hathor's Annual Information Form and unaudited financial statements and MD&A for its most recently completed financial year on SEDAR at www.sedar.com.



Figure 1: Plan map of Roughrider Uranium Deposit with unconformity pierce-points of drill holes colour-coded based on GT value. Outline of West and East Zones are from recent NI43-101 report (Keller et al. 2011).


Figure 2: Grid line plan map of Far East Zone at Roughrider Uranium Deposit, with drill holes completed during 2011 winter (unlabelled) and summer (labelled) drill programs. Drill holes are colour-coded based on GT value.


Figure 3: Cross section showing summary composite intervals for the main zone of mineralization at Far East Zone at Roughrider; Grid Line 125 East (� 10 m), view northeast.


Figure 4: Uranium mineralization styles at Roughrider Far East from drill holes released herein:
(Top) Massive to semi-massive mineralization, NQ core, MWNE-11-701B.
(Middle) Hematite associated mineralization, NQ core, MWNE-11-707.
(Bottom) Multi-stage vein and replacement mineralization, NQ core, MWNE-11-704.

Table 2: Complete Composited Assay Data for Holes in this Release.
GT - Grade x Thickness; Based on a cut-off of 0.05 % U3O8. All intervals are core lengths.


DDH
From
(m)
To
(m)
Grade
(U3O8 %)
Thickness
(m)
GT
 
MWNE-11-701B
228.50
231.00
0.06
2.50
0.14
MWNE-11-701B
326.50
327.00
0.11
0.50
0.05
MWNE-11-701B
329.50
330.50
1.55
1.00
1.55
MWNE-11-701B
333.00
394.00
1.78
61.00
108.86
comprising
333.00
350.00
1.12
17.00
19.08
comprising
350.00
352.00
0.01
2.00
0.02
comprising
352.00
385.00
2.64
33.00
87.22
comprising
385.00
387.50
0.01
2.50
0.03
comprising
387.50
394.00
0.39
6.50
2.51
MWNE-11-701B
398.50
399.00
5.96
0.50
2.98
MWNE-11-701B
403.50
404.00
0.07
0.50
0.03
 
MWNE-11-702
309.50
310.00
0.07
0.50
0.03
MWNE-11-702
311.50
315.50
0.78
4.00
3.11
MWNE-11-702
320.50
324.00
2.74
3.50
9.58
MWNE-11-702
332.00
332.50
0.06
0.50
0.03
MWNE-11-702
335.00
336.50
1.61
1.50
2.41
MWNE-11-702
338.50
350.50
2.65
12.00
31.81
MWNE-11-702
352.50
353.50
3.19
1.00
3.19
MWNE-11-702
356.50
357.50
0.06
1.00
0.06
MWNE-11-702
374.50
375.50
2.36
1.00
2.36
MWNE-11-702
383.00
384.00
0.06
1.00
0.06
MWNE-11-702
388.00
388.50
0.05
0.50
0.03
MWNE-11-702
393.50
394.00
15.70
0.50
7.85
MWNE-11-702
396.00
396.50
0.30
0.50
0.15
 
MWNE-11-703
235.00
236.50
0.11
1.50
0.17
MWNE-11-703
240.00
241.00
0.06
1.00
0.06
MWNE-11-703
331.50
333.00
0.11
1.50
0.17
MWNE-11-703
336.00
370.00
3.34
34.00
113.70
comprising
336.00
338.50
2.05
2.50
5.12
comprising
338.50
340.50
0.01
2.00
0.02
comprising
340.50
358.50
5.41
18.00
97.41
comprising
358.50
360.50
0.01
2.00
0.02
comprising
360.50
365.00
1.37
4.50
6.17
comprising
365.00
367.00
0.00
2.00
<0.01
comprising
367.00
370.00
1.65
3.00
4.95
MWNE-11-703
373.50
374.00
0.46
0.50
0.23
MWNE-11-703
379.50
380.00
1.15
0.50
0.58
MWNE-11-703
382.00
385.00
7.31
3.00
21.94
MWNE-11-704
335.50
344.50
0.34
9.00
3.02
 
MWNE-11-704
347.50
348.00
0.16
0.50
0.08
MWNE-11-704
354.50
371.50
0.78
17.00
13.28
MWNE-11-704
374.50
375.50
0.09
1.00
0.09
MWNE-11-704
378.00
383.50
1.17
5.50
6.44
MWNE-11-704
423.00
423.50
0.33
0.50
0.16
MWNE-11-704
431.50
432.00
0.21
0.50
0.11
MWNE-11-704
445.50
446.00
0.13
0.50
0.07
MWNE-11-704
447.50
448.00
0.10
0.50
0.05
 
MWNE-11-705
365.50
369.00
0.11
3.50
0.39
 
MWNE-11-706
310.00
311.50
0.16
1.50
0.24
MWNE-11-706
320.00
321.50
0.09
1.50
0.13
MWNE-11-706
325.50
326.50
1.01
1.00
1.01
 
MWNE-11-707
224.00
224.50
0.07
0.50
0.03
MWNE-11-707
227.50
230.50
0.09
3.00
0.27
MWNE-11-707
325.00
325.50
0.08
0.50
0.04
MWNE-11-707
330.50
332.00
0.27
1.50
0.40
MWNE-11-707
334.50
339.00
0.17
4.50
0.77
MWNE-11-707
343.00
385.00
2.95
42.00
123.72
comprising
343.00
357.50
0.44
14.50
6.37
comprising
357.50
359.50
<0.01
2.00
<0.01
comprising
359.50
385.00
4.60
25.50
117.34
MWNE-11-707
392.50
395.50
0.56
3.00
1.67
MWNE-11-707
398.50
405.00
11.31
6.50
73.52
 
 
MWNE-11-708
321.00
321.50
5.46
0.50
2.73
 
MWNE-11-709
334.50
337.00
0.34
2.50
0.84
MWNE-11-709
340.50
346.50
0.70
6.00
4.21
MWNE-11-709
349.50
352.00
0.38
2.50
0.95
MWNE-11-709
355.00
358.50
14.50
3.50
50.74
MWNE-11-709
360.50
361.00
0.34
0.50
0.17
MWNE-11-709
377.00
377.50
1.10
0.50
0.55
MWNE-11-709
381.00
385.00
0.52
4.00
2.06
MWNE-11-709
428.00
428.50
15.80
0.50
7.90
MWNE-11-709
431.50
433.00
2.29
1.50
3.43
MWNE-11-709
435.50
436.50
11.88
1.00
11.88
MWNE-11-709
449.50
452.00
0.22
2.50
0.54
MWNE-11-709
455.50
456.00
0.91
0.50
0.46
MWNE-11-709
462.50
465.00
0.06
2.50
0.16
MWNE-11-709
488.50
489.50
0.19
1.00
0.19
 
MWNE-11-710
319.50
220.00
0.13
0.50
0.06
MWNE-11-710
249.00
250.00
0.32
1.00
0.32
MWNE-11-710
296.00
296.50
0.08
0.50
0.04
MWNE-11-710
320.00
320.50
0.06
0.50
0.03
MWNE-11-710
332.50
390.00
1.92
57.50
110.40
comprising
332.50
335.50
0.43
3.00
1.29
comprising
335.50
337.50
0.01
2.00
0.02
comprising
337.50
374.50
2.63
37.00
97.31
comprising
374.50
376.50
0.02
2.00
0.04
comprising
376.50
381.00
1.47
4.50
6.62
comprising
381.00
383.00
<0.01
2.00
<0.01
comprising
383.00
390.00
0.76
7.00
5.32
MWNE-11-710
395.50
396.50
0.50
1.00
0.50
MWNE-11-710
398.00
399.00
2.23
1.00
2.23
MWNE-11-710
422.50
424.50
0.12
2.00
0.25


You can also view this News Release on our website at:
http://www.hathor.ca/s/NewsReleases.asp?ReportID=477265


Home | Corporate | Projects | Investors | News | Contact | Forward | Subscribe |

EXPLORATION STAGE
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Hathor Expl. is a silver and gold exploration company based in Canada.

Hathor Expl. holds various exploration projects in Canada.

Its main exploration properties are ELSIAR (LCR), RUSSELL LAKE, CARSWELL, OLD FORT BAY, VEDETTE LAKE, MILIKEN CREEK, HATCHET LAKE / NORTH HATCHET, HORNBY BAY, RUSSELL SOUTH, MIDWEST NORHTEAST, HENDAY, WOLLASTON NE, RUSSEL LAKE URANIUM and ABO (HARRISON) in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of
5/28/2009Announces Increase in Size of Bought Deal Flow-Through Share...
5/28/2009Announces $8 Million Bought Deal Flow-Through Share Financin...
11/20/2008News Release, November 20, 2008 - Brokered Private Placement...
11/5/2008News Release, November 4, 2008 - $6,000,000 BROKERED PRIVATE...
9/10/2008September 10, 2008 - HATHOR TRIGGERS EARLY EXPIRY OF WARRANT...
6/12/2008BOUGHT DEAL CLOSES, RAISING GROSS PROCEEDS OF $15,000,000
Project news of
9/9/2011(Russell Lake)Drilling Underway at Russell Lake
9/6/2011Intersects 42 m of 2.95 % U3O8 at Far East Zone as Roughrid...
4/15/2011(Russell Lake)Provides Update on Russell Lake Project
4/11/2011Continues to Grow Roughrider as Far East Discovery is Expand...
2/24/2011(Midwest Norhteast)Extends Roughrider Uranium Mineralization Eastward
1/12/2011(Henday)Follow Up Winter Drilling Begins at Henday Uranium Project,...
1/18/2011(Russell South)Drilling is Underway at Russell
9/9/2009(Midwest Norhteast)Discovers High-Grade Uranium Mineralization 200 Metres from ...
8/5/2009(Midwest Norhteast)Summer Drill Program Discovers Two New Alteration Zones at M...
6/25/2009(Midwest Norhteast)Midwest NorthEast Drill Hole #131 Intercepts 13.5 metres of ...
2/27/2009(Henday)Options Forum?s Henday Property Northeast of the Roughrider ...
1/20/2009(Midwest Norhteast) Commences Drilling at its Midwest Northeast Project
12/16/2008(Midwest Norhteast) to Have 4 Drills at Midwest NorthEast Uranium Property this
11/4/2008(Midwest Norhteast)News Release (November 4, 2008) - Hathor Drills 23 Metres of...
10/2/2008(Midwest Norhteast)Drills 46 Metres Grading 3.25% U3O8 at Midwest NorthEast Pro...
9/23/2008(Midwest Norhteast)Extends Roughrider Zone Uranium Mineralization a Further 15 ...
8/27/2008(Midwest Norhteast)Drill Core Assays Up To 58.2% U3O8 at Midwest NorthEast Prop...
8/6/2008(Midwest Norhteast)Base metal and gold analysis from winter drill program at Mi...
7/9/2008(Midwest Norhteast)69.2 Metres of Uranium Mineralization in First Hole of Midwe...
7/9/2008Drill Hole Location Map of Roughrider Zone Including Hole 30
5/21/2008(Midwest Norhteast) Drills 15.0 Metres Grading 10.02% U3O8
4/25/2008(Midwest Norhteast)Midwest NorthEast Uranium Project Intercepts 6% Nickel over ...
4/23/2008(Midwest Norhteast)More Encouraging Results from Midwest Nort
3/25/2008(Midwest Norhteast)Six More Drill Holes Intersect Uranium Mineralization at Mid...
3/3/2008(Midwest Norhteast)Midwest NorthEast Project – 11.9 Metres of 5.29 % U3O8
2/26/2008(Midwest Norhteast) Midwest NorthEast Project Update
1/10/2008(Midwest Norhteast)Receives Permits and Secures 2 Drill Rigs for Midwest NorthE...
11/29/2007(Midwest Norhteast)Targets 24 Drill Holes at Midwest Northeast Uranium Project
Corporate news of
10/14/2011Letter to Shareholders
9/14/2011Board Unanimously Recommends Shareholders Reject Unsolicited...
9/13/20112011-09-13 News Release
8/29/2011Urges No Action by Shareholders in Response to Cameco Offer
8/5/2011and Terra Ventures Inc. Complete Merger
8/3/2011Shareholders of Terra Ventures Inc. Approve Plan of Arrangem...
7/26/2011intersects 52 m at 2.40 % U3O8, including 9.5 m at 5.61 % U...
5/10/2011Hathor Exploration Limited and Terra Ventures Inc. Execute D...
4/22/2011Hathor Exploration Limited to Acquire Terra Ventures Inc.
4/21/2011Hathor Exploration Limited to Acquire Terra Ventures Inc.
3/29/2011Receives Conditional Acceptance for TSX Listing
3/19/2011A Note from Hathor's President
1/25/2011Expands Senior Management Team
7/16/2009Offer for Northern Continental Resources
6/1/2009Forum and Hathor Identify High Priority Drill Targets on Hen...
3/2/2009News Release, March 02, 2009 - HATHOR DRILLS 15 METRES of 12...
8/25/2008Drills More Off-Scale Uranium Mineralization at Midwest Nort...
7/29/2008Drill Map including July 28 results
7/28/2008Hathor Extends Roughrider Zone
7/24/2008Adopts Shareholder Rights Plan
6/23/2008Commences Drilling at its Midwest NorthEast Project
4/30/2008Gravity & Resistivity Surveys Increase the Size of Roughride...
4/16/2008CLAIM INSPECTION CONFIRMS THAT THE ROUGHRIDER ZONE IS ENTIRE...
1/22/2008 2008 Russell Lake Exploration Program Now Under Way
1/17/2008Restarts Drill Program at South Russell Uranium Project, Ath...
1/3/2008 Extends Offer for Northern Continental Resources shareholde...
12/20/2007Commences French Translation of Offering Circular for Northe...
12/10/2007Responds to Northern Continental Resources Directors’ Circul...
11/26/2007First Drill Results from 2007 Program on Russell Lake Uraniu...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (HAT.V)
Prev close Open
Low High
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  - -100.00%
Volume 1 month var.
-100.00%
Produces
Develops
Explores for Copper - Gold - Molybdenum - Uranium
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :