Chart usGOLD   Chart usSILVER  
 
Food for thought
Put 10% of your money into Gold and hope it does not work
Wall Street Saying  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1387.940.34
Silver 22.540.05
Platinum 1449.25-8.25
Palladium 723.80-11.20
WORLD MARKETS
DOWJONES 15254-37
NASDAQ 3447-12
NIKKEI 14612128
ASX 4964-77
CAC 40 3957-10
DAX 8305-47
HUI 257-2
XAU 97-3
CURRENCIES (€)
AUS $ 1.3373
CAN $ 1.3334
US $ 1.2915
GBP (£) 0.8542
Sw Fr 1.2421
YEN 130.4000
CURRENCIES ($)
AUS $ 1.0354
CAN $ 1.0321
Euro 0.7742
GBP (£) 0.6616
Sw Fr 0.9616
YEN 100.9730
RATIOS & INDEXES
Gold / Silver61.58
Gold / Oil14.79
Dowjones / Gold10.99
COMMODITIES
Copper 3.300.00
WTI Oil 93.83-0.42
Nat. Gas 4.24-0.03
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

Re:        News Release - Monday, June 02, 2008
Title:     Firestone Ventures Intersects 6.63 Metres of 29.41% Zinc, 5.50% Lead at Torlon Hill

June 2/2008 - Firestone Ventures Inc. (FV:TSX-V;F5V:FSE) would like to announce results from the next five drill holes at the Company's Torlon Hill high grade zinc-lead project, situated in western Guatemala. A total of 36 holes were drilled to depths ranging from 19.81 metres to 185.97 metres, totalling 3,458.7 metres. Assay results are pending from drill holes TH08-86 to TH08-101. The drill program is now complete.

Significant intersections from drill holes TH08-81 to TH08-85 are listed below:

Hole
Number

Total Depth of
Hole (metres)

From
(metres)

To
(metres)

Width
(metres)

Zn
(%)

Pb
(%)

Ag
(g/t)

TH08-81

28.35

0.00

3.20

3.20

20.42

6.02

23.38

 

also

11.28

17.91

6.63

29.41

5.50

20.92

TH08-82

20.73

0.00

3.04

3.04

17.65

2.60

10.00

TH08-83

25.60

0.00

3.00

3.00

9.43

5.91

34.00

 

also

15.24

18.29

3.05

3.77

5.32

21.00

TH08-85

33.52

0.00

13.00

13.00

4.10

2.25

7.50

 

also

24.39

30.25

5.86

4.81

2.14

23.00


Holes TH08-81 to TH08-85 were infill and expansion holes drilled along the eastern and southern boundary of the main "Bulge" area of surface zinc mineralization. Hole TH08-86 was lost when the drill string twisted off at 82 meters and the hole did not reach the target depth of 120 meters; the hole was re-drilled as TH08-86A. Results are pending from drill holes TH08-86A to 90, drilled in the area around last year's drill hole TH07-53, which intersected 42.5 metres grading 9.7% zinc, 4.7% lead and 20 g/t silver at 55.5 metre depth. The remaining drill holes, TH08-91 to TH08-101 were drilled at a wide spacing to test zinc-lead soil anomalies south of the previously drilled area.

A map showing the drill hole locations is available at www.firestoneventures.com, along with drill hole specifications.

Mineralization at the intensely oxidized Torlon Hill deposit consists largely of smithsonite (a zinc carbonate mineral) cross-cut by galena (lead sulphide) veinlets. The deposit is contained within a shallowly southeast-dipping body measuring approximately 400 metres long, 20 to 100 metres wide and up to 30 metres thick. Previous high-grade drill intersections include 25 metres of 26.77% zinc, 1.42% lead, 5.98% silver and 53.3 metres of 9.66% zinc, 1.86% lead and 12.21 g/t silver (see news release dated Oct. 4, 2007). Most mineralization defined by drilling to date occurs on or near surface. The deposit is still open to expansion, mainly to the west and south.

This news release has been reviewed and approved by J. Cleary, CPG, Qualified Person and by Al Workman, P.Geo., Vice President of Watts, Griffis and McOuat Limited. The road-accessible Torlon Hill project is located 18 kilometres northwest of the city of Huehuetenango, which is situated on the Pan-American Highway in western Guatemala. Sample preparation, quality control and analytical techniques have been described previously (see March 19, 2008 news release). All samples were analyzed by ALS Chemex in Vancouver, B.C.

Firestone Ventures Inc. is a well-financed Canadian-based resource exploration and development company with zinc, gold and uranium projects in Western Canada and Central America. The common shares of the Company are currently listed on the TSX Venture Exchange (symbol FV) and the Frankfurt Stock Exchange (symbol F5V). For further information please contact:

Lori Walton, P. Geol., President
info@firestoneventures.com
Toll Free: 1-888-221-5588
Fax: (780) 428-3476
www.firestoneventures.com
Trading Symbol: FV: TSX-V;F5V: FSE

For Investor Relations please call: Contact Financial Inc. at (604) 689-7422
Investors can also visit www.agoracom.com/IR/Firestone or email questions to FV@agoracom.com.
The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release

Copyright � 2008 FIRESTONE VENTURES INC. (FV) All rights reserved. For more information visit our website at http://www.firestoneventures.com/ or send email to returns@firestoneventures.com ..

Tweet

Firestone Ventures

EXPLORATION STAGE
CODE : FV.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Firestone Ventures
2/5/2009Firestone Ventures Reviews 2008 and Begins 2009 Field Season
Annual reports of Firestone Ventures
2008 Annual report
Annual Report 2007
Financings of Firestone Ventures
11/5/2012Announces Closing of Private Placement
9/13/2012Announces Non-Brokered Private Placement
2/16/2012Closes Private Placement and Extends Expiry Date of Outstand...
12/22/2011Announces Private Placement First Closing
4/18/2011Finavera Wind Energy Closes Over-Allotment Option on Flow-Th...
12/21/2010Announces Non-Brokered Private Placement
6/28/2008and Northern Tiger Resources Inc. - Completion of Plan of Ar...
4/10/2006Announces private placement
Nominations of Firestone Ventures
6/18/2012Appoints New Directors and Chairman and Announces AGM Result...
4/3/2012Appoints Dr. K. Barron and Mr. T. Tucker to Advisory Board
12/20/2011Announces Executive Vice President Appointment
5/22/2006announces CFO appointment
Financials of Firestone Ventures
6/27/2011Finavera Wind Energy Provides Corporate Update and Releases ...
Project news of Firestone Ventures
4/24/2013Files Positive Preliminary Economic Assessment Technical Rep...
7/21/2010(Antelope Project)Expands Antelope Zinc-Lead-Silver Property and Starts Fieldw...
6/24/2010(Quetzal)Intersects 10 Metres Grading 20.0% Zinc, 1.2% Lead and 13.9 ...
5/18/2010Reports High-Grade Zinc-Lead-Silver Assays from Quetzal Proj...
9/9/2009(Torlon Hill)Announces Exploration Plans for Zinc Properties in Guatemala
7/16/2009(Torlon Hill)Defines new Zinc-Lead-Silver Soil Anomaly at Torlon Hill
4/3/2009(Torlon Hill)Completes Phase One of Exploration Program
1/13/2009(Torlon Hill)43-101 Technical Report on Torlon Hill Zinc-Lead Project
12/10/2008(Torlon Hill)Completes Additional Positive Metallurgical Testwork on the ...
11/18/2008(Torlon Hill)Announces Torlon Hill Zinc-Lead Resource Estimate
9/17/2008(Torlon Hill)Completes Positive First Round of Metallurgical Testwork on ...
7/25/2008(Torlon Hill) drills four m of 16.15% Zn at Torlon Hill
7/24/2008(Torlon Hill)Intersects 4.00 Metres of 16.15% Zinc and Expands Area of Hi...
6/2/2008(Torlon Hill)Intersects 6.63 Metres of 29.41% Zinc, 5.50% Lead at Torlon ...
5/28/2008(Torlon Hill)Project Update
4/15/2008(Torlon Hill)Intersects 19.81 Metres of 10.01% Zinc, 4.66% Lead at Torlon...
4/15/2008(Torlon Hill)Intersects 19.81 Metres of 10.01% Zinc, 4.66% Lead at Torlon...
3/19/2008Intersects 15.3 metres of 10.1% Zinc including 2.7 metres of...
3/3/2008(Sonora Gulch)Plans Spin-out of Canadian Properties and Signs Memorandum o...
2/26/2008(Torlon Hill)Update on Firestone Ventures 2008 Drilling Program at Torlon...
2/1/2008Identifies New Drill Targets Adjacent to Torlon Hill
4/5/2006Intersects 33 metres grading 22% Zinc at Torlon Hill
Corporate news of Firestone Ventures
3/28/2013(Torlon Hill)Announces Consolidation of Torlon Hill Ownership through Ame...
3/6/2013(Torlon Hill)Releases Positive Preliminary Economic Assessment for the To...
1/28/2013Announces Private Placement Offering and Stock Option Grant
1/14/2013Announces Acquisition of Whale Cove Projects South of Northq...
12/5/2012Completes Site Visit with Minéro Mining to Advance Torlon Zi...
10/17/2012Announces Mr. Ted Yates as Metal Advisor
9/24/2012Announces Business Alliance with Minero Mining to Advance To...
6/8/2011Spring 2011 Exploration Update
3/11/2011Finavera Wind Energy Inc. Prices Previously Announced Flow-T...
3/2/2011Extends Expiry Date of Outstanding Warrants
9/23/2010Defines 4 km Zinc Corridor on Antelope Property, Nevada
2/1/2010Results from Quetzal Zinc-Lead-Silver Project
1/12/2010Acquires Antelope Zinc-Lead-Silver Oxide Property, Nevada
4/13/2010Identifies Zinc-Lead-Silver Soil Anomalies
2/5/2009Reviews 2008 and Begins 2009 Field Season
12/8/2008Update for 2008/2009 Field Season
10/24/2008in the Media: Minesite.com Europe's leading mining portal
10/17/2008President's Letter To The Shareholders
10/18/2008Corporate Update
9/10/2008Current Market Conditions
7/22/2008' Spin-out, Northern Tiger Resources, begins exploration in ...
6/23/2008Shareholders Approve Plan of Arrangement
6/14/2008Trading Halt Requested Pending Shareholder Meeting to Consid...
5/27/2008Corporate Update
1/21/2008Commences Drilling at Torlon Hill Zinc-Lead Project
12/5/2007Acquires 100% Interest in the Sonora Gold Project, Yukon
3/20/2006zinc rises to record levels: Bloomberg
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (FV.V)Other OTC (FSVEF.PK)
0.030-25.00%0.0500
TSX-V
CA$ 0.030
05/24 11:31 -0.010
-25%
Prev close Open
0.040 0.030
Low High
0.030 0.030
Year l/h YTD var.
0.030 -  0.100 -40.00%
52 week l/h 52 week var.
0.010 -  0.100 -40.00%
Volume 1 month var.
4,980 -25.00%
24hGold TrendPower© : -2
Produces
Develops
Explores for Lead - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-62.50%
201260.00%0.350.02
2011-50.00%0.200.04
2010-16.67%0.210.07
2009140.00%0.200.04
 
5 years chart
 
3 months chart
 
3 months volume chart