Golden Predator Intersects 74 m of 7.08 g/t Gold 250m East of Bohemian Zone, Brewery Creek Project, Yukon
Published : April 26, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Diamond | Gold | Gold Mine | Water |

VANCOUVER, April 26 /CNW/ - Golden Predator Corp. (TSX: GPD) (the "Company") is pleased to announce final assay results from its winter 2011 Diamond drilling campaign, which was designed to expand the recently discovered Bohemian Zone at the Company's Brewery Creek Project. Significant results include 74 m of 7.08 g/t gold in hole BC11-198, including 57.5 m of 8.90 g/t gold beginning at a depth of 6 m. Four of the final ten holes reported (including hole BC11-198) are from the new Schooner Zone located 250 m east of the recently discovered Bohemian Zone. Importantly, hole BC11-199 - the easternmost hole of the program - intersected 51.6 m of 1.71 g/t gold starting at a depth of 20 m with the hole bottoming in 2.85 g/t gold from 69.5 m to the final depth of 71.6 m. Nine of the ten final holes reported herein intersected significant mineralization. In total the 2011 winter program reported significant mineralization on 24 of the 25 holes drilled.

"The excellent results of this winter's drilling program have resulted in a significant eastern expansion of the Bohemian discovery. This clearly redefines the potential of the Brewery Creek project as a larger and higher grade gold deposit." said William M. Sheriff, Chairman & CEO. "This latest discovery illustrates the great untapped potential of the entire Brewery Creek Project area which remains greatly underexplored."

Brewery Creek Winter Drill Program

The 2011 winter drilling program at Brewery Creek focused on the Bohemian Zone and its potential eastern extension to the Schooner Zone. This program resulted in the delineation of a strongly mineralized east-northeast striking corridor at Bohemian that has a minimum strike length of 250 m and an average width in excess of 25 m. The zone is open along strike in both directions and at depth. It is thought that the strong mineralization encountered at Schooner, approximately 250 m east of the last Bohemian hole may represent the extension of the Bohemian zone. The full extent of the mineralization will ultimately be determined by infill drilling between the Bohemian and Schooner Zones as well as step-out drilling along the projected extensions to the known zones. This next phase of drilling is set to commence in May 2011.

The Brewery Creek Property is located 55 km due east of Dawson City, Yukon and comprises 793 quartz claims over 165 km(2). Brewery Creek was the site of a heap-leach gold mine which operated from 1996-2002 and produced 279,541 ounces of gold. Current resources remaining on the Property include an Indicated Resource of 3.98 MM tonnes grading 1.135 g/t gold and an Inferred Resource of 2.2 MM tonnes averaging 2.01 g/t gold (Diment and Simpson, 2009). The Brewery Creek Project is authorized under a Type A Water License and a production license with expiry dates of December 31, 2021.

The complete results of the Brewery Creek winter drill program, with accompanying maps, are available at: http://www.goldenpredator.com/documents/GPDNR11-17-BC-results-FINAL.pdf

    -------------------------------------------------------------------------
          2011 Diamond Drill Holes at Bohemian and Schooner Zones,
                              Brewery Creek, YT
                       Significant Intercepts (1), (2)
    -------------------------------------------------------------------------
    Drill Hole             From          To         Interval        Gold
                            (m)          (m)           (m)          (g/t)
    -------------------------------------------------------------------------
    BC11-190               29.0          39.0         10.0          1.26
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-191               54.0          73.4         19.4          2.37
    -------------------------------------------------------------------------
    including              62.0          73.4         11.4          3.73
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-192               56.0          78.8         22.8          2.61
    -------------------------------------------------------------------------
    including              72.7          78.8          6.1          6.40
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-193               42.0          56.0         14.0          2.59
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-195               24.0          61.0         37.0          0.70
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-196                8.0          43.0         35.0          0.87
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-197                3.0          36.0         33.0          1.02
    -------------------------------------------------------------------------
    including              30.0          36.0          6.0          2.93
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-198                6.0          80.0         74.0          7.08
    -------------------------------------------------------------------------
    including               6.0          63.5         57.5          8.90
    -------------------------------------------------------------------------
    and                    18.0          36.5         18.5         11.86
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-199               20.0          71.6 TD      51.6          1.71
    -------------------------------------------------------------------------
    including              30.5          71.6 TD      41.1          2.02
    -------------------------------------------------------------------------
    and                    58.0          71.6 TD      13.6          3.01
    -------------------------------------------------------------------------
    (1) Results where g/t x m is less than 2.5 are not reported in this
        table, unless the individual grade was (greater than or equal to)
        1 g/t gold over a minimum of 2.0 metres. Other intervals require
        (greater than or equal to) 0.5 g/t gold to be included.
    (2) grams per tonne (g/t) to troy ounces per short ton: g/t divided by
        34.2857 or multiply by .0292 meters to feet: 1 m equals 3.28084 ft.

Sampling Methodology, Quality Control and Assurance

Samples were fire assayed by ALS Chemex in Vancouver. Refer to the Company's news release dated March 24, 2011 for a complete discussion of sampling methods, quality control and assurance.

The technical content of this news release has been reviewed and approved by Bruce R. Otto, MSc, PGeo, CPG, the Company's Senior Structural Geologist and a Qualified Person as defined by National Instrument 43-101.

About Golden Predator Corp.

Golden Predator Corp., a well-funded exploration and development company, has a mandate to be the leading gold property explorer and developer in Yukon, Canada. Golden Predator has a vast Yukon property position with three advanced gold projects, 6 pipeline prospects as well as exploration landholdings, all totalling over 2,300 km(2). The 2011 winter drilling program has been completed at the Brewery Creek project and continues at the Grew Creek project. In 2011 Golden Predator will continue aggressive drill programs and work towards completing initial resource estimates for Grew Creek and Clear Creek and updating the existing resource estimate for Brewery Creek, in addition to conducting initial drilling at the recently acquired Harlan project.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and Golden Predator's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, Golden Predator assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change.

For further information: Golden Predator Corp. Investor Relations, (604) 648-GOLD (4653), info@goldenpredator.com, www.goldenpredator.com

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Golden Predator.

PRODUCER
CODE : GPY.V
ISIN : CA38116P1053
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Golden Predator. is a gold development stage company based in Canada.

Golden Predator. develops gold and silver in USA, and holds various exploration projects in Canada.

Its main asset in production is BALD MOUNTAIN in USA, its main asset in development is TAYLOR MINE in USA and its main exploration properties are BREWERY CREEK, CLEAR CREEK, LANTERN DEPOSIT, ST. ELMO, BUENA VISTA/FRENCH BOY, CEDAR (NEVADA), BOND, OGOPOGO, DEL, AGATE, MEL, DAD, LED, CHOPIN, MCCONNEL, DOME HILL, GOLD (SCHEELITE) DOME, HARLAN, PHOENIX JV, ANTIMONY MOUNTAIN, WINDFALL LAKE, ALBERTA SUN, TUSCARORA, AFGAN, GREW CREEK, ADELAIDE, WILLOUGHBY, ALKALIC, ANGEL'S CAMP, GOLDEN RIDGE ( NEVADA), PAN, TONKIN PROJECT, SONORA GULCH, MARG, BRUIN CREEK and BROWNS CREEK in Canada and GUIJOSO and MAGISTRAL I in Mexico.

Golden Predator. is listed in Canada. Its market capitalisation is CA$ 14.7 millions as of today (US$ 11.6 millions, € 9.8 millions).

Its stock quote reached its highest recent level on November 19, 2010 at CA$ 9.80, and its lowest recent point on April 25, 2014 at CA$ 0.03.

Golden Predator. has 91 570 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Golden Predator.
9/16/2011Corporate Presentation - Precious Metal Summit (September 15...
8/20/2009Corporate presentation August 2009
In the News and Medias of Golden Predator.
1/22/2019Golden Predator extends 3 Aces mineralization
Annual reports of Golden Predator.
receives 2,533,333 Shares of Silver Predator Corp.; Provides...
2008 Annual Report
Financings of Golden Predator.
9/23/2011Extends 950,000 Warrants
6/22/2011Golden Predator and Seabridge Gold Agree to Contribute Selec...
Nominations of Golden Predator.
2/13/2013Appoints Financial Advisor
Project news of Golden Predator.
8/18/2016(3ace Property)Predator Pours First Gold from Bulk Sample
8/15/2016(3ace Property)Predator Discovers Coarse Visible Gold in New Vein at 3 Aces...
9/27/2012(Brewery Creek)arranges USD $35,000,000 Loan Facility with RK Mine Finance;...
7/16/2012(Brewery Creek)and Tr'ondek Hwech'in First Nation Update Brewery Creek Proj...
7/10/2012(Brewery Creek)Drilling extends Brewery Creek\222s Bohemian Zone...
3/5/2012(Brewery Creek)Drills Third Major Brewery Creek Discovery; Classic Zone Hos...
1/5/2012(Pan)continues to expand North Slope Zone at its Brewery Creek Pr...
12/5/2011(Pan)Calculates NPV of Royalty Interest in Pan Project at USD $32...
9/1/2011Acquires Livingstone District; Now Controls Largest Land Pos...
8/11/2011(Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at Br...
8/11/2011(Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at ...
7/26/2011(Harlan)Commences Drill Program on its Enticing Harlan Project in ...
7/18/2011(Brewery Creek)Investigates Gold Recovery from Existing Heap Leach Pad at ...
7/5/2011(Grew Creek)drills 92.0 m of 2.02 g/t Gold; Commences Resource Calcu...
6/1/2011(Brewery Creek)Triples 2011 Budget, Adds Second Drill, and Plans for Third ...
5/26/2011(Grew Creek)Intersects 98.3 m of 1.83 g/t Gold at Carlos Zone, Grew Cree...
4/26/2011(Brewery Creek)Intersects 74 m of 7.08 g/t Gold 250m East of Bohemian Zone,...
4/21/2011(Harlan)Increases Land Position in the Yukon's Selwyn Basin to 7,800...
4/14/2011(Swede Dome)Stakes 4 Project Areas in Historic Yukon Placer Headwaters
4/8/2011(Brewery Creek)Intercepts 28 m of 5.06 g/t Gold at Brewery Creek's Bohemian...
3/24/2011(Brewery Creek)expands Bohemian Discovery with 32.9 m of 3.01 g/t Gold at ...
2/22/2011(Brewery Creek)COMMENCES 2011 YUKON DRILL PROGRAM
1/24/2011(Harlan)Acquires Harlan Property, Yukon
1/6/2011(Mcconnel)Acquires McConnell Property, Yukon
11/30/2010(Gold (scheelite) Dome)Intercepts 21.95 m of 1.00 g/t Gold from Hawthorne Ridge Zon...
12/10/2009(Brewery Creek)Intersects 20.17 gpt Gold over 1.90 m and 4.72 gpt Gold over...
11/16/2009(Gold (scheelite) Dome)Intersects 11.12 gpt Gold over 25.40 m including 52.35 gpt G...
11/5/2009(Antimony Mountain)Intersects 12.45 gpt Gold over 4.88 m including 28.81 gpt Go...
8/10/2009(Adelaide)completes Technical Report on the Adelaide Project, Nevada
6/8/2009(Brewery Creek)GOLDEN PREDATOR ACQUIRES BREWERY CREEK PROJECT, YT
2/11/2009(High Grade Gp) Reports on Initial Exploration at High Grade Project
Corporate news of Golden Predator.
8/2/2016Golden Predator Increases Previously Announced Offering to C...
7/26/2016Golden Predator Closes C$16.36 Million Financing; Includes C...
7/13/2016Golden Predator Commences Geotechnical and Metallurgical Dri...
7/6/2016Golden Predator Increases Previously Announced Offering to C...
6/27/2016Golden Predator and Tr’ondëk Hwëch’in Amend Brewery Creek Pr...
6/27/2016Golden Predator Announces $7,300,000 Investment By Eric Spro...
6/20/2016Golden Predator Intersects 11.43m of 31.82 g/t Gold at 3 Ace...
6/16/2016Golden Predator Retires 10,312,154 Common Shares
6/13/2016Tony Lesiak Appointed to Golden Predator’s Board of Director...
6/10/2016Golden Predator Exercises Option to Acquire Shares
6/8/2016Till Capital Receives $1,546,823 CDN From Sale of Golden Pre...
6/7/2016McEwen Mining’s Stefan Spears Appointed to Golden Predator’s...
6/6/2016Golden Predator Reports Initial Gold Gravity Recoveries of 8...
1/25/2016Golden Predator Recovers 79.9 to 90.8% Gold from 3 Aces Prel...
1/4/2016Golden Predator Announces TSXV Approval of Castle West Prope...
10/6/2015Golden Predator Chairman Increases Holdings
10/2/2015Golden Predator Announces Stock Option Grant
9/30/2015Golden Predator Arranges CDN $300,000 Line of Credit
9/30/2015Golden Predator Arranges CDN$300,000 Line of Credit
9/14/2015Golden Predator Confirms Continuity of High Grade Gold from ...
9/14/2015IIROC Trading Resumption - GPY
9/14/2015IIROC Trading Halt - GPY
9/11/2015Golden Predator announces re-election of board at Annual Gen...
9/3/2015Golden Predator Announces Board and Management Appointments;...
9/3/2015IIROC Trading Resumption - GPY
9/2/2015Golden Predator Announces Board and Management Appointments;...
9/2/2015Till Capital Announces Board and Executive Changes
8/24/2015Till Capital Reports on Golden Predator Annual General Meeti...
8/21/2015IIROC Trading Halt - GPY
7/30/2015Golden Predator Adopts Advance Notice Policy
7/16/2015Golden Predator Announces Convertible Debenture Financing
6/22/2015Golden Predator Receives 3 Aces Permit
4/21/2015Golden Predator Completes First Note Payable Payment
3/30/2015Golden Predator Announces Joint Venture and Option Agreement...
3/16/2015Golden Predator Announces Joint Venture and Option Agreement...
12/2/2014Metallurgical Tests Indicate 93.5% to 98.3% Overall Gold Rec...
11/20/2014Golden Predator Files Preliminary Economic Assessment Result...
11/12/2014Golden Predator Announces Positive Preliminary Economic Asse...
10/22/2014Golden Predator Appoints Janet Lee-Sheriff as Chief Executiv...
9/4/2014Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Pr...
8/25/2014Golden Predator Leases the Castle West Property, Nevada
8/5/2014Preliminary Economic Assessment on Brewery Creek Project, Yu...
7/15/2014Golden Predator Commences Preliminary Metallurgical Characte...
7/10/2014Golden Predator Announces Former Yukon Premier Dennis Fentie...
2/21/2013to start trading as Americas Bullion Royalty Corp. (TSX:AMB)...
2/19/2013and Tr\222ondek Hwech\222in ...
2/19/2013and Tr'ondek Hwech'in Disagree with YESAB
2/7/2013Approves Creation of Shareholder Rights Plan, Finalizes Name...
1/30/2013Silver Predator and Redtail Metals Sign Exploration Agreemen...
1/24/2013(Rogue)Discovers High-grade Gold Mineralization on Rogue B Property...
1/18/2013Announces Name Change to Gold Bullion Royalty Corp.
1/8/2013Tr'ondek Hwech'in and Golden Predator Continue to Work Toget...
1/8/2013Tr'ondëk Hwëch'in and Golden Predator Continue to Work Toget...
11/5/2012(Brewery Creek)- Classic Zone Drilling Intersects 41.2 m of 1.04 g/t Go...
10/12/2012William Sheriff, Chairman & CEO, Interviewed on BNN's Commod...
10/11/2012(Alkalic)Announces New Brewery Creek Discovery; Open-Ended Lone Star ...
10/11/2012(Alkalic)Announces New Brewery Creek Discovery: Open-Ended Lone Star ...
10/4/2012(Brewery Creek)Lower Fosters Zone Drilling Intersects 29.0 m of 1.86 g/t Go...
7/19/2012New Mineralization Encountered at Moosehead Pit, Brewery Cre...
7/16/2012and Tr\222ond\353k Hw\353ch\222in ...
6/28/2012JOINT NEWS RELEASE: Golden Predator Corp. and Seabridge Gold...
6/7/2012Joint News Release: Golden Predator Corp. and Seabridge Gold...
5/1/2012Announces Resource Estimate at Brewery Creek Project of 580,...
3/22/2012(Brewery Creek)Sleeman Zone Drilling Intersects 40.9 m of 1.81 g/t Gold and...
3/15/2012(Brewery Creek)Bohemian-Schooner Zone Drilling Intersects 24.0 m of 1.47 g/...
2/23/2012(Grew Creek)Intersects 68 m of 5.96 g/t Gold at Carlos Zone, Grew Creek ...
2/22/2012(Brewery Creek)East Big Rock Zone Drilling Intersects 15.2 m of 1.93 g/t Go...
1/20/2012Upcoming Events
1/12/2012(Brewery Creek)intersects 30.5 m of 1.97 g/t Gold at its Brewery Creek Proj...
1/10/2012(Harlan)announces New Gold Discovery at Cache Creek (Harlan) Project...
1/9/2012(Brewery Creek)Encounters 35.1 m of 1.63 g/t Gold and 136.72 g/t Silver at ...
9/12/2011100%\240OF\240EXPIRING\240WAR...
8/29/2011(Pan)Brewery Creek\222s Expanding Sle...
8/5/2011and Ross River Dena Council Sign Traditional Knowledge P...
6/30/2011(Pan)Continues to Expand Brewery Creek's Bohemian-Schooner Zone
6/21/2011(Grew Creek)Intersects 46.7m of 3.78 g/t Gold at Carlos Zone, Grew Creek...
3/17/2011RECEIVES 5,000,000 SHARES OF SILVER PREDATOR CORP.
9/29/2009Provides Update on Yukon Projects
7/28/2009Drilling Commences at Gold Dome Project, Yukon Territory
3/7/2009Completes Spin-Out
3/5/2009Announces Voting Results of Special Meeting
3/3/2009Timing of Shareholders Meeting To be Held On March 4, 2009
2/26/2009to Retire Convertible Debentures of Subsidiary
2/13/2009Confirms Date of Shareholder Meeting
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GPY.V)
0.160+0.00%
TSX-V
CA$ 0.160
09/01 16:52 -
0%
Prev close Open
0.160 0.160
Low High
0.155 0.160
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.160 -%
Volume 1 month var.
201,699 -%
24hGold TrendPower© : 50
Produces Gold
Develops Silver
Explores for Antimony - Copper - Gold - Silver - Tungsten - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2021-33.33%0.300.12
2020-31.43%0.480.15
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :