Chart usGOLD   Chart usSILVER  
 
Food for thought
To know how to wait. It is the great secret to success
Joseph de Maistre  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1374.205.50
Silver 21.750.05
Platinum 1430.25-5.75
Palladium 704.30-5.50
WORLD MARKETS
DOWJONES 15309-7
NASDAQ 3481-1
NIKKEI 13245238
ASX 484247
CAC 40 3846-14
DAX 8213-16
HUI 2562
XAU 1030
CURRENCIES (€)
AUS $ 1.4081
CAN $ 1.3657
US $ 1.3391
GBP (£) 0.8551
Sw Fr 1.2321
YEN 127.2100
CURRENCIES ($)
AUS $ 1.0521
CAN $ 1.0195
Euro 0.7468
GBP (£) 0.6385
Sw Fr 0.9201
YEN 94.9600
RATIOS & INDEXES
Gold / Silver63.18
Gold / Oil13.96
Dowjones / Gold11.14
COMMODITIES
Copper 3.13-0.03
WTI Oil 98.41-0.03
Nat. Gas 3.950.04
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

Marketwire

 
 
Lake Shore Gold Corp.
TSX: LSG
Other Recent News

June 23, 2010
Lake Shore Gold Intersects High-Grade Mineralization at Thorne Property, Expands Resource Potential Near Surface and at Depth

- TH-10-21 intersects 18.18 gpt over 11.00 m, including 33.54 gpt over 5.00 m, 2.68 gpt over 21.20 m and 5.32 gpt over 8.00 m within 75 m of surface, up plunge of previous drilling on Fold Nose target.

- TH-10-24 intersects 13.19 gpt over 8.70 m, including 21.43 gpt over 4.20 m, 250 m below surface in Fold Nose target, 50 m down dip of previous drilling.

- TH-10-26 intersects 13.06 gpt over 8.50 m, including 295.00 gpt over 0.30 m, extends North Porphyry Zone 150 m down dip to 650 m below surface.

TORONTO, ONTARIO--(Marketwire - June 23, 2010) - Lake Shore Gold Corp. (TSX:LSG) ("Lake Shore Gold" or the "Company") today announced results from an additional 17 holes (5,885 m) of the 2010 drill program at the 100% Thorne property, the Company's third major target within its Timmins West Complex. The program is focused on the Gold River Trend, an east-west trending mineralized deformation and alteration zone, located approximately 2 km north of the Destor-Porcupine Fault Zone (DPFZ) and 3 km south of the Company's Thunder Creek and Timmins Mine deposits. The Gold River Deformation Zone is interpreted to represent a branch fault from the DPFZ with broad similarities to the Dome fault, a major ore control at the Dome mine and has been traced for over 3.0 kms of strike length.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "Today's results include significant extensions to mineralization in both the Fold Nose and North Porphyry zones with high grades and good widths. Both zones remain open along strike and at depth and include wide shallow mineralization with the possibility for open pit and/or underground bulk mining, as well as deeper higher-grade mineralization. We also continue to make good progress in the Gold River West area where there is also considerable opportunity for extensions along strike and at depth. The Thorne property is a very important project, one whose potential continues to grow as work progresses with a third drill having recently been mobilized to the property."

Significant results announced today include 13 holes from Gold River East which were designed to test areas surrounding the Fold Nose, North Porphyry and 4800 zones. Holes drilled in the Fold Nose Zone were focused near the east and west limits of past drilling to evaluate possibilities for increasing the current resource for this area of 1.2 million tonnes grading 3.00 gpt (121,000 ounces). TH-10-21 was collared on the east side of the current resource block and intersected 18.18 gpt over 11.00 m, including 33.54 gpt over 5.00 m, 2.68 gpt over 21.20 m, 5.32 gpt over 8.00 m and 2.83 gpt over 12.05 m. These intersections are within 75 metres of surface and vary from between 25 to 35 m above previously reported TH-96-36. TH-10-19 undercut TH-96-36 by 35 m and intersected 6.45 gpt over 1.10 m, 7.81 gpt over 3.20 m, including 16.72 gpt over 1.20 m with visible gold and 4.19 gpt over 3.20 m.

TH-10-24 was collared on the west edge of the current resource and intersected 13.19 gpt over 8.70 m, including 21.43 gpt over 4.20 m, 250 m below surface and 50 m down dip of previous holes on this section. Observations to date suggest mineralization is contained in a combination of wide and narrow zones situated within a broad east-west trending fold structure measuring approximately 250 m across and plunging moderately to the west. Higher grade zones appear to be associated with small scale fold noses within the broader structure and later cross cutting fractures. Given that past drilling in the Fold Nose Zone has largely been confined to a strike length of less than 140 m and less than 200 m from surface, the potential to extend zones to depth and define a combined open pit and underground resource are considered excellent.

At the North Porphyry Zone, TH-10-26 intersected 13.06 gpt over 8.50 m at a vertical depth of 650 m from surface and approximately 150 m below previously reported TH-10-09 and TH-10- 04, which intersected 3.95 gpt over 10.85 m, including 8.20 over 2.55 m, and 13.64 gpt over 2.55 m, respectively (see press release May 4, 2010). As with TH-10-09 and TH-10-04, mineralization in TH-10-26 is closely associated with strong hydrothermal alteration, minor quartz, 5 to 15 % sulphides measuring approximately 10 m wide and located on the south side an east west trending porphyry dike. TH-10-26 also contained several specks of visible gold.

In addition, TH-10-14 intersected 6.16 gpt over 1.20 m and TH-10-15 intersected 4.96 gpt over 4.40 m, including 22.02 gpt over 0.70 m, 480 m to the east of TH-10-26. TH-10-17, located 540 m east of TH-10-26, was the furthest east hole completed on the Gold River Trend and intersected 5.89 gpt over 1.30 m 130 m below surface and the zone remains open along strike and at depth. Interpretation of results received to date suggests a continuous series of mineralized lenses extending for over 500 m of strike length between the North Porphyry and 4800 zones. Most areas of this strike length have little to no testing below 100 m from surface with the exception of the North Porphyry Zone where new holes completed since February this year have extended mineralization from a vertical depth of 360 to 650 m below surface with mineralization being open along strike and at depth. Given the above new drill results, the potential to expand resources within this area from the current level of 0.29 million tonnes grading 10.60 gpt (98,000 ounces) are also considered excellent.

Additional encouraging results include 4 holes drilled in the Gold River West area which were designed mainly to confirm the current resource and examine possibilities for refining the geologic model. The most significant results are from TH-10-10 and TH-10-12 which were collared in untested gaps approximately 100 and 300 m east of previously reported TH-10-06, which intersected multiple high grade intercepts including 5.52 gpt over 5.40 m, 10.46 gpt over 9.00 m and 4.97 gpt over 6.00 m (see press release May 4, 2010). TH-10-10 intersected 5.05 gpt over 1.70 m and TH-10-12 intersected 5.68 gpt over 1.00 m and continued to confirm the continuity of the Hangingwall zones in the up-plunge direction towards surface. In addition, TH- 10-18 intersected 2.02 gpt over 17.60 m, 100 m west of TH10-06 near the west limit of the current resource and confirms the target here is still open to the west and downplunge. Past drilling west of TH-10-12 and along the projected westerly plunge line is very limited for the next 2 kilometers.

Drilling to date at the Thorne property has been ongoing with two drills active and a third drill recently being mobilized to accelerate testing along strike and to depth of the Fold Nose, North Porphyry and 4800 zones in the Gold River East area, as well as to conduct some wide spaced exploratory holes in the westerly down plunge extension of the Gold River West area.

Quality Control

The Qualified Person ("QP") for Lake Shore Gold's drill program at the Thorne Property is Jacques Samson, P.Geo. who as QP has prepared or supervised the preparation of the scientific or technical information for the property and verified the data disclosed in this press release.

Lake Shore Gold has implemented a quality-control program to ensure best practice in the sampling and analysis of the drill core. Assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than three grams per tonne gold, another pulp is taken and fire assayed with a gravimetric finish. Zones with visible gold are tested by pulp metallic analysis. NQ size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security-sealed bags for preparation at ALS Chemex Prep Lab located in Timmins, Ontario, and the pulps shipped to ALS Chemex Assay Laboratory in Vancouver, B.C. ALS Chemex is an ISO 9001-2000 registered laboratory preparing for ISO 17025 certification.

About Lake Shore Gold Corp.

Lake Shore Gold is a rapidly growing mining company with a goal to become a North American mid-tier gold producer through the successful exploration, development and operation of three wholly owned mines in Timmins, Ontario: Timmins Mine, Thunder Creek and Bell Creek Complex. The Company is currently carrying out an underground advanced exploration program at the Timmins Mine project, where it has both a shaft and a ramp, and is drifting from Timmins Mine to the adjacent Thunder Creek property. Progress is also being made with an underground advanced exploration program at its Bell Creek Complex, located on the east side of Timmins. The Bell Creek Mill has been refurbished to a capacity of 1,500 tonnes per day with plans in place to expand the Mill incrementally to 3,000 tonnes per day. The Company continues to invest aggressively in exploration primarily in Timmins and in select other areas of Northern Ontario and Quebec, and owns a large land position in Mexico. The Company's common shares trade on the TSX under the symbol LSG.

Forward-looking Statements

Certain statements in this press release relating to the Company's exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" within the meaning of securities legislation. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward- looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward- looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in Lake Shore Gold's most recent Annual Information Form and other regulatory filings which are posted on sedar at www.sedar.com.

There is no guarantee that drill results reported in this news release will lead to the identification of a deposit that can be mined economically, and further work is required to identify resources and reserves.

Thorne Project - Significant Assay Results (June 2010)                      
----------------------------------------------------------------------------
Hole               East      From        To   Interval    Grade             
----------------------------------------------------------------------------
Number           nad 83       (m)       (m)        (m)    (gpt)         Zone
----------------------------------------------------------------------------
TH-10-10         459715     88.00     89.70       1.70     5.05    West Zone
----------------------------------------------------------------------------
                           175.50    176.00       0.50     1.55      incl VG
----------------------------------------------------------------------------
TH-10-12         459541    232.75    247.00      14.25     1.41    West Zone
----------------------------------------------------------------------------
                  incl.    242.50    243.50       1.00     5.68             
----------------------------------------------------------------------------
TH-10-14         461920    137.35    138.55       1.20     6.16    4800 Zone
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
TH-10-15         461920     35.30     39.70       4.40     4.96    4800 Zone
----------------------------------------------------------------------------
                   incl     35.30     36.00       0.70    22.02             
----------------------------------------------------------------------------
TH-10-17         461994    172.00    173.30       1.30     5.89    4800 Zone
----------------------------------------------------------------------------
TH-10-18         459340    354.40    372.00      17.60     2.02    West Zone
----------------------------------------------------------------------------
                  incl.    368.00    371.30       3.30     4.04             
----------------------------------------------------------------------------
TH-10-19         461025    101.70    102.80       1.10     6.45    Fold Nose
----------------------------------------------------------------------------
                           114.00    117.20       3.20     7.81             
----------------------------------------------------------------------------
                  incl.    116.00    117.20       1.20    16.72     incl. VG
----------------------------------------------------------------------------
                           179.80    183.00       3.20     4.19             
----------------------------------------------------------------------------
                           220.70    221.00       0.30     6.80             
----------------------------------------------------------------------------
TH-10-20         461025    182.50    183.00       0.50     7.38    Fold Nose
----------------------------------------------------------------------------
                           195.70    196.30       0.60     7.36             
----------------------------------------------------------------------------
TH-10-21         461025     33.40     54.60      21.20     2.68    Fold Nose
----------------------------------------------------------------------------
                  incl.     34.00     42.00       8.00     5.32             
----------------------------------------------------------------------------
                            61.50     73.55      12.05     2.83             
----------------------------------------------------------------------------
                  incl.     61.50     65.00       3.50     8.85             
----------------------------------------------------------------------------
               or incl.     61.50     62.50       1.00    21.38             
----------------------------------------------------------------------------
                           104.00    115.00      11.00    18.18             
----------------------------------------------------------------------------
                  incl.    104.00    109.00       5.00    33.54             
----------------------------------------------------------------------------
                           186.00    187.20       1.20     3.19             
----------------------------------------------------------------------------
TH-10-22         461843    379.05    379.80       0.75     4.05    4800 Zone
----------------------------------------------------------------------------
TH-10-24         460950    254.80    263.50       8.70    13.19    Fold Nose
----------------------------------------------------------------------------
                  incl.    256.30    260.50       4.20    21.43             
----------------------------------------------------------------------------
TH-10-25         460950     45.00     49.00       4.00     1.26    Fold Nose
----------------------------------------------------------------------------
                           108.40    118.50      10.10     2.64             
----------------------------------------------------------------------------
                           162.90    163.50       0.60     8.06             
----------------------------------------------------------------------------
                           183.00    192.00       9.00     1.47             
----------------------------------------------------------------------------
                           222.70    230.00       7.30     1.52             
----------------------------------------------------------------------------
                  incl.    227.00    228.50       1.50     3.04     incl. VG
----------------------------------------------------------------------------
                                                                       North
TH-10-26         461467    683.00    688.85       5.85     2.06     Porphyry
----------------------------------------------------------------------------
                           769.50    778.00       8.50    13.06             
----------------------------------------------------------------------------
              and incl.    772.40    772.70       0.30   295.00     incl. VG
----------------------------------------------------------------------------
              and incl.    775.50    776.00       0.50    19.15             
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
TH-10-27         460950    161.00    162.00       1.00     5.20    Fold Nose
----------------------------------------------------------------------------
                           172.60    173.10       0.50     9.62             
----------------------------------------------------------------------------
                           391.30    393.50       2.20     3.17             
----------------------------------------------------------------------------
Notes:                                                                      
1) TH-10-11,TH10-13,TH10-16 and TH10-23 did not return significant assays.  
2) TH-10-11 and TH10-13 were drilled on sections 461895 and 461820E,        
   respectively (4800 Zone), and TH-10-16 was drilled on section 459340E    
   (upper portion of the West Zone).                                        
3) TH-10-23 was drilled on 460950E (Fold Nose).                             
4) Assays are reported uncut.                                               
5) True widths are not reported at this time.
 
To view Figure 1 (Location Map), please visit the following link: http://media3.marketwire.com/docs/lsg623fig1.pdf

To view Figure 2 (Plan View - Gold River East), please visit the following link: http://media3.marketwire.com/docs/lsg623fig2.pdf

To view Figure 3 (Cross Section - Fold Nose - Gold River East), please visit the following link: http://media3.marketwire.com/docs/lsg623fig3.pdf

To view Figure 4 (Cross Section - North Porphyry - Gold River East), please visit the following link: http://media3.marketwire.com/docs/lsg623fig4.pdf

CONTACT INFORMATION:

Lake Shore Gold
Tony Makuch
President & CEO
(416) 703-6298
info@lsgold.com

or

Lake Shore Gold
Mark Utting
Vice-President, Investor Relations
(416) 703-6298
info@lsgold.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click here. .
Tweet

Lake Shore Gold Corporation

PRODUCER
CODE : LSG.TO
ISIN : CA5107281084
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Lake Shore Gold Corporation
1/12/2013Haywood paints rosier picture for Lake Shore Gold in 2013
4/12/2012Lake Shore Gold underpins mill expansion with Sprott debt
4/3/2012Employee killed at Lake Shore Gold's Ontario mine
7/19/2011Lake Shore Gold hammered on lacklustre quarterly production
1/7/2010BRIEF-Lake Shore Gold says acquires interest in RT Minerals
3/27/2009UPDATE 1-Lake Shore Gold starts ore processing at Timmins Mi...
3/26/2009Lake Shore Gold starts processing ore from Timmins mine
Financings of Lake Shore Gold Corporation
2/28/2011Completes US$50 Million Corporate Revolving Credit Facility
10/26/2010Exercises Warrants in Northern Superior Resources
7/28/2010Secures US$50m credit facility
7/28/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
2/16/2010Closing of Second Tranche of Flow-Through Financing
12/31/2009Announces Closing of First Tranche of Flow-Through Financing
12/4/2009Announces Closing of Private Placement Financing
2/19/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations of Lake Shore Gold Corporation
3/13/2009Announces Appointment of Ignacio Bustamante to Board of Dire...
5/30/2008Announces Management Appointments
2/27/2007Appoints Hannu Virtanen as VP, Project Development
Financials of Lake Shore Gold Corporation
8/9/2012Lake Shore Gold Reports Strong Second Quarter Results
1/12/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
11/10/2011Announces Third Quarter 2011 =?ISO-8859-1?Q?=20Financial=20R...
8/10/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
5/26/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
5/4/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
8/11/2010Continued Progress During Second Quarter 2010
5/15/2008Announces First Quarter 2008 Results
Project news of Lake Shore Gold Corporation
10/14/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
8/16/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
3/29/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
3/4/2011(Thunder Creek)Reports Wide Intersections With High-Grade Sections Within P...
2/28/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
2/24/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
1/25/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
1/25/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
1/11/2011(Thorne)Demonstrates Near Surface Resource Potential and Extends Min...
1/6/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
12/1/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Por...
11/24/2010(Thunder Creek)Confirms and Expands Large Gold System in Thunder Creek Porp...
11/11/2010(West Timmins)Announces New High-Grade Intercepts, Major Extension of Main...
11/3/2010(Bell Creek)Extends High-Grade Core to Depth at Bell Creek
11/3/2010(Bell Creek)=?ISO-8859-1?Q?Lake=20Shore=20Gold=20Reaches=202,000=20Tonne...
11/1/2010(Thunder Creek)Continues to Confirm and Expand Thunder Creek Rusk Horizon
8/30/2010Expands Thunder Creek Rusk =?ISO-8859-1?Q?=20Zone,=20Announc...
8/30/2010Lake Shore Gold Expands Thunder Creek Rusk Zone, Announces A...
6/29/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
6/29/2010Ramp Reaches Thunder Creek Deposit, Intersects High-Grade Go...
6/23/2010Intersects High-Grade Mineralization at Thorne...
5/4/2010(West Timmins)Advances Third Major Gold Target
4/1/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
2/18/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
2/17/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
2/17/2010(Casa Berardi)Extends Casa Berardi "G Zone"
1/26/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
1/18/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
11/6/2009(Bell Creek)Confirms Presence of Large New Gold System
10/29/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
10/7/2009Releases Updated National Instrument 43-101 Report for Timmi...
10/1/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
8/25/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
8/24/2009Reports High-Grade Intercepts From Underground Drilling at T...
7/21/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
7/21/2009Lake Shore Gold discovers substantial new high-grade extensi...
7/7/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
5/5/2009(Thunder Creek) Reports Additional High-Grade intercepts at Thunder Creek
4/28/2009(Bell Creek)Commences Advanced Underground Exploration Program at the Be...
3/31/2009(Thunder Creek)Discovery of Second Mineralized Horizon in Porphyry
3/26/2009(Bell Creek)Commences Processing at Bell Creek Mill
12/16/2008Significantly Extends Rusk Zone and Announces New High-Grade...
12/10/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
7/10/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
3/31/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Corporate news of Lake Shore Gold Corporation
5/7/2013Announces Details of First Quarter 2013 Conference Call and ...
3/12/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
1/10/2013Achieves 2012 Production Target, Company Poised for Sharply ...
12/11/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
10/25/2012Announces Details of Third Quarter 2012 Conference Call and ...
9/18/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
9/7/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
8/16/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
7/13/2012Announces Details of Second Quarter 2012 Conference Call and...
7/4/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
5/10/2012Exceeds Targets and Achieves Continued Operating Improvement...
3/23/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
11/2/2011Announces Details of Third Quarter 2011 Conference Call and ...
8/5/2011Announces Details of Second Quarter 2011 Conference Call and...
7/19/2011Releases Production Resultsfor Second Quarter and First Six-...
4/1/2011Announces Adoption of Shareholder Rights Plan
3/14/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
2/1/2011Increases Interest in Northern Superior Resources Inc.
12/3/2010Disposal of remaining 6% stake in Lake Shore Gold by Hoschil...
10/14/2010Hochschild reduces stake in Lake Shore Gold to 6%
7/22/2010Confirms & Expands Mineral
5/27/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
5/12/2010Changes to Board of Directors
5/5/2010Announces Continued Progress
4/27/2010Expands Resource Potential at Timmins Mine
3/11/20102009 Year End Results
12/17/2009Completes Acquisition of "Bell Creek West" Properties
12/15/2009Announces Management Changes
12/15/2009Added to S&P/TSX Composite Index
11/24/2009Announces Changes to Board of Directors
11/6/2009and West Timmins Mining Complete Business Combination
8/27/2009and West Timmins Agree to Business Combination
8/6/2009Advances Projects on Schedule and Budget and Achieves Explor...
6/24/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
5/5/2009Continues to Expand Mineralion at Bell Creek
5/5/2009Continues to Advance Projects on Schedule and Budget and to ...
3/12/2009Completes 2008 on Schedule and Under Budget
5/20/2008Provides 2008/2009 Budget Plan
5/16/2008Announces Approval of Special Resolutions at Annual and Spec...
5/5/2008Comments on May 15, 2008 Shareholder Vote
4/16/2008Announces Revised Agreement With Hochschild Mining; Second P...
4/16/2008 Announces Management Changes
3/28/2008Announces 2007 Year End Results and Provides 2008 Outlook
3/24/2008Announces Management Changes
3/18/2008Announces Annual Meeting and Revised Date for Special Meetin...
2/25/2008 Completes Financing and Enters Into Strategic Alliance With...
7/17/2007Commences Drilling at Blakelock and Expands its Property Pos...
4/23/2007Completes Due Diligence on Bell Creek Acquisition
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (LSG.TO)Other OTC (LSGGF.PK)
0.285+0.00%2.29-0.87%
TORONTO
CA$ 0.285
06/18 16:00 -
0%
Prev close Open
0.290 0.285
Low High
0.280 0.295
Year l/h YTD var.
0.285 -  0.910 -62.99%
52 week l/h 52 week var.
0.285 -  1.15 -70.92%
Volume 1 month var.
815,388 -1.72%
24hGold TrendPower© : -37
Produces Gold
Develops
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-69.35%
2012-23.77%1.730.74
2011-70.46%4.421.10
2010-1.20%4.322.48
2009266.67%4.371.10
 
5 years chart
 
3 months chart
 
3 months volume chart