I attach a copy of Iluka's June Quarter Production Report. 

 

I would remind recipients that Iluka made a call a while back not to disclose sales volumes in its quarterlies - essentially so as not to provide competitors and customers with information on inventory positions. This remains the practice.

 

We have reported Iluka data only (though with a separate split of Consolidated Rutile Holdings (CRT) volumes* and revenues) following the divestment of Iluka's 51% interest effective 27 May, given CRT will be reported in the financials as a discontinuing business.

 

Main components of the report:

 

         Lower production a result of changes announced in April to the company's production base designed to manage supply in the context of weaker 2009 demand associated with the GEC and high feedstock inventories in major markets to be worked down. 

         WA production capacity has been reduced by approximately 50% - beginning to be reflected in production figures.

         Total sales volumes increased by over 60% in the June quarter relative to the March quarter, although a significant proportion of these volumes were lower value ilmenite sales.

         YTD total sales volumes substantially below sales in the pcp and, given the relative weakness, period-on-period, of sales of the higher value products of zircon and rutile, revenues were lower despite higher product prices received.

         Combined sales of high value TiO2 (rutile and synthetic rutile) in line with expectations; ilmenite sales have exceeded expectations associated with a recovery in sulphate pigment production in China

         Zircon sales volumes relative to prior year monthly averages have been weak, despite sales volumes more than doubling in the June quarter from a very weak March quarter.

         Iluka’s mineral sands sales revenue before hedging for the first six months was $195.2 million (48.6 per cent lower than the previous corresponding period). Revenue after hedging for the six months was $149.3 million (61.6 per cent lower than the previous corresponding period). These figures exclude CRT. Proceeds from sale of Iluka holding in CRT - $84 million (received, along with $110 million from earlier institutional placement).

         In relation to zircon, evidence is emerging that recovery in demand for raw materials is occurring in China, the largest global zircon market. Encouragingly, Iluka estimates that first half 2009 total zircon consumption in China, at approximately 170 thousand to 180 thousand tonnes, was 85 to 90 per cent of first half 2008 consumption levels, albeit with inventory draw down being a major component of supply - as opposed to imports.

         In Europe and North and South America, as with China, stocks of both raw material and customers’ finished products have been at higher than typical levels and have depressed demand for resupply. Zircon demand has been particularly weak in these more mature economies to date.

         Murray Basin Stage 2 project, Victoria, is nearing practical completion, with commissioning occurring progressively during the September quarter.

         Jacinth-Ambrosia project, South Australia, remains ahead of initial schedule. First production of heavy mineral concentrate expected in early 2010. 

         Capital expenditure for the June quarter was $161.2 million and $279.8 million for the six months to the end of June. Over 90% related to new growth projects: Murray Basin Stage 2, Jacinth-Ambrosia and the Brink development in Virginia.

 

Please let me know if I can provide any clarification.  Iluka reports its half year results on 19 August at which time a fulsome review of the business will be provided.

 

*Iluka will not receive the CRT volumes - in 2008 CRT zircon volumes were 52kt and rutile 74kt (CRT indicated it expected 09 levels to be about 12% lower). This will provide a guide to the lower sales contribution from CRT to Iluka.

Regards

 

Rob

 

Robert Porter | General Manager Investor Relations and Corporate Affairs
Iluka Resources Limited | Level 23, 140 St Georges Terrace | Perth WA 6000
Phone +61 8 9360 4751 | Mobile 0407 391 829 | Fax + 61 8 9360 4336

robert.porter@iluka.com

<
Data and Statistics for these countries : Australia | China | All
Gold and Silver Prices for these countries : Australia | China | All

Iluka Resources Ltd

DEVELOPMENT STAGE
CODE : ILU.AX
ISIN : AU000000ILU1
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Iluka is a zircon development stage company based in Australia.

Iluka holds various exploration projects in Australia.

Its main asset in development is TRIPITAKA in Australia and its main exploration properties are ECHO, TUTUNUP SOUTH, TUTUNUP, MURRAY BASIN, EUCLEA BASIN and ENEABBA in Australia.

Iluka is listed in Australia and in Germany. Its market capitalisation is AU$ 3.1 billions as of today (US$ 2.0 billions, € 1.9 billions).

Its stock quote reached its lowest recent point on November 28, 1997 at AU$ 1.22, and its highest recent level on June 14, 2013 at AU$ 9.99.

Iluka has 418 700 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Iluka Resources Ltd
11/24/2008China Market Overview
Annual reports of Iluka Resources Ltd
2010 Annual Report documentation
2009 Annual Report
Financials of Iluka Resources Ltd
10/13/2011(ILU): Quarterly Production Report to 30 September 2011
Project news of Iluka Resources Ltd
4/12/2012March 2012 Quarterly Production Report
2/22/2012Ore Reserves and Mineral Resources Increases
1/31/2012Invitation to 2011 Full Year Results Teleconference Thursday...
1/11/2012Quarterly Production Report to 31 December 2011
12/7/2011High Grade Titanium Dioxide Pricing
7/14/2011June 2011 Quarterly Production Report
4/12/2011(ILU) - March 2011 Quarterly Production Report
7/15/2010(Euclea Basin)Typhoon Mineral Resource Estimate
11/19/2009(Euclea Basin)Jacinth-Ambrosia Commences Production
10/13/2009(Murray Basin)Murray Basin Stage 2 Production Commencement
1/30/2009(Murray Basin)Correction - ASX Announcement - Further Murray Basin Heavy M...
1/30/2009(Murray Basin)Further Murray Basin Heavy Mineral Resource Discovery
1/20/2009(Murray Basin)December Quarter 2008 Production and Development Report
1/7/2009(Murray Basin) FINAL REGULATORY APPROVALS FOR MURRAY BASIN STAGE 2 PROJECT
7/7/2008(Scm Vallenar Iron)KEY PROJECT MILESTONE FOR JACINTH-AMBROSIA PROJECT ACHIEVED
5/21/2008(Scm Vallenar Iron)Jacinth-Ambrosia Mineral Sands Development
Corporate news of Iluka Resources Ltd
8/1/2016Recommended proposal for Sierra Rutile by Iluka
8/1/2016Recommended proposal for Iluka by Sierra Rutile
7/31/2016Iluka Acquisition of Sierra Rutile Limited
7/31/2016Acquisition of Sierra Rutile Presentation
7/29/2016ANNOUNCEMENT RE ILUKA RESOURCES LIMITED
5/19/2016Iluka 2016 AGM Results of Meeting
5/18/2016Iluka 2016 AGM Addresses
4/7/2016Iluka Reference Price - Zircon
3/23/2016Notice of Annual General Meeting and Proxy Form
3/21/2016Iluka Managing Director Succession
1/20/2016December 2015 Production Report
12/16/2015Full Year Physical and Financial Update
12/7/2015Omani sovereign wealth fund holds talks to invest in Kenmare
8/19/2015Edited Transcript of ILU.AX earnings conference call or pres...
8/17/2015Iluka 2015 4D Commentary (18 Aug 2015)
8/17/2015Iluka 2015 Half Year Results Slide Pack (18 Aug 2015)
8/17/2015Iluka Half Year Results to 30 June 2015 (18 Aug 2015)
7/15/2015June 2015 Quarterly Production Report (16 Jul 2015)
3/18/2015Appendix 4G and 2014 Corporate Governance Statement (18 Mar ...
3/18/2015Term Sheet Signed with Iluka for Phar Lap IOCG Project
3/17/2015Iluka Executive Management Changes (17 Mar 2015)
2/26/2015Form 8.3 - Iluka Resources Ltd
2/19/2015Synthetic Rutile Kiln to Recommence (19 Feb 2015)
2/19/20152015 Key Physical and Financial Parameters (19 Feb 2015)
8/5/2013and Finance: Iluka secures Sri Lankan mineral sands and Gemf...
12/12/2012Market Update
3/27/2012Lodgement of Full Year Results
2/20/2012REMINDER: Iluka Resources - Invitation to 2011 Full Year Res...
8/25/2011(ILU) - Half Year Results to 30 June 2011
8/2/20112011 Half Year Results Announcement and Teleconference - Thu...
7/26/2011(Eneabba)Eneabba Mining Re-Start and 2 Kiln Operation
7/14/2011Key Physical and Financial Parameters - July update
6/3/2011Jacinth-Ambrosia Site Visit
5/25/20112011 Annual General Meeting - Chairman and Managing Director...
5/23/2011News Release
3/31/2011Response to ASX Price and Volume Query
3/4/2011Managing Director - Performance and Retention Plan
2/24/2011Full Year Results to 31 December 2010
2/14/20112010 Full Year Results announcement and investment presentat...
7/20/2010June 2010 Quarterly Production Report
7/5/2010Mining Area C Iron Ore Royalty and Zircon Demand in China
5/20/20102010 Annual General Meeting
5/17/2010Launches On-line Zircon Sales Site
4/22/2010March 2010 Quarterly Production Report
2/24/20102010-2013 Business Trends Commentary
2/24/2010Full Year Results to 31 December 2009
2/16/20102009 Full Year Results Announcement
2/10/2010Jacinth-Ambrosia Mineral Sands Project
1/19/2010December Quarter 2009 Production and Development Report
10/22/2009Extract from David Robb's TZMI Key Note Presentation
10/14/2009September 2009 Quarterly Production and Development Report
10/7/2009Mineral Sands Briefing Material
8/19/2009Half Year Results to 30 June 2009
7/27/2009Board Changes
7/16/2009June 2009 Quarterly Production and Development Report
5/28/2009Annual General Meeting
5/20/2009Final Regulatory Approval Received for Jacinth-Ambrosia Proj...
2/18/2009Full Year Results to 31 December 2008
2/19/20092009 COMMENTARY
12/19/2008Announces Early Closure of Wagerup and Waroona Mine Sites
12/9/2008FURTHER ILUKA PROFIT UPGRADE
12/3/2008WA Parliamentary Passage of Bill to Facilitate Investment in...
11/17/2008Heavy Mineral Exploration Update, Eucla Basin, South Austral...
11/17/2008Key Regulatory Approval Received for Jacinth-Ambrosia Projec...
11/10/2008 KEY REGULATORY APPROVAL RECEIVED FOR MURRAY BASIN STAGE 2 P...
8/29/2008Open Briefing Interview with David Robb, Managing Director o...
8/21/2008Half Year Results to 30 June 2008
7/17/2008June Quarter 2008 Production and Development Report
6/30/2008TO RESTART WESTERN AUSTRALIAN OPERATIONS
6/5/2008DISRUPTION OF GAS AND ELECTRICITY SUPPLY
6/5/2008Interruption to the Supply of Gas to Iluka’s WA Operations
5/21/2008DEVELOPMENT APPROVAL FOR JACINTH-AMBROSIA MINERAL SANDS PROJ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (ILU.AX)FRANKFURT (ILZ.F)
7.35-0.27%4.42-0.54%
AUSTRALIA
AU$ 7.35
04/26 15:52 -0.020
-0.27%
Prev close Open
7.37 7.32
Low High
7.26 7.37
Year l/h YTD var.
6.29 -  7.63 10.69%
52 week l/h 52 week var.
6.29 -  11.94 -33.00%
Volume 1 month var.
358,341 1.94%
24hGold TrendPower© : 23
Produces
Develops Zircon
Explores for Ilmenite - Rutile - Zircon
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/16/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-9.93%
2023-14.38%9.9610.00
2022-5.64%9.9910.00
202155.62%9.9910.10
2020-31.76%9.9610.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :