Reward Minerals

Published : July 31st, 2015

JUNE 2015 QUARTERLY ACTIVITIES REPORT

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Magnesium | Market | Potassium | Recovery | Water |

JUNE 2015 QUARTERLY ACTIVITIES REPORT

ASX RELEASE

30 July 2015

ASX CODE

RWD

SHARE PRICE

$0.70

SHARES ON ISSUE

119.0M

OPTIONS

24.1M ($0.25 - $1.09)

MARKET CAPITALISATION

$83.3M (undiluted)

CASH

$7.6M June'15 Qtly

DIRECTORS & MANAGEMENT

Colin McCavana

Chairman

Rod Della Vedova

Non-Executive Director

Michael Ruane

Managing Director

Daniel Tenardi

Projects Director

Paul Savich

Corporate Development Officer

& Company Secretary

Bianca Taveira

Company Secretary

KEY SOP PROJECTS

LD Potash Project Karly Potash Project Dora Potash Project

HEAD OFFICE

Reward Minerals Ltd

159 Stirling Highway

Nedlands WA 6009

PO Box 1104

Nedlands WA 6909

QUARTERLY REPORT FOR THE PERIOD ENDING

30 June 2015

Corporate

Cash on hand at 30 June 2015 was approximately $7.6 million.
During the quarter research was initiated by Euroz Securities. Details are available on the
Reward Minerals Limited ("Reward" or the "Company") website.
In June the Company completed investor roadshows in Melbourne and Sydney meeting with a number of resources focussed institutions. As a result of significant investor interest following the presentations, on 19 June the Company announced that it had raised $5.25 million at $0.72 per share for the advancement of the LD Potash Project. The raising provides funding to move Resource definition and Project studies to an advanced stage.
To further bolster its cash reserves the Company sold its listed investment in Agrimin Limited during the quarter. Reward also received $0.7 million of R&D grant funds during the period.

LD Potash Project

Recent Drilling Results

Since the commencement of drilling at its LD Project in March 2015 the Company has continued to release drilling results from the ongoing Resource definition program being undertaken to expand the existing LD Potassium Sulfate ("SOP") Resource at depth using the Company's recently purchased heli-transportable coring rig. A diagram of proposed hole locations and sequencing is provided in Figure 1 below.
LD currently hosts a JORC (2004) Indicated 24.4Mt SOP Resource grading 6.17kg/m3 in- situ from surface to an average depth of only four metres. The SOP content of the associated Resource brine is 12.37kg/m3.
Figure 1 outlines the location of the drill holes completed to date. Results from drilling have been highly encouraging and indicate potential for a substantial high grade SOP Resource within the boundaries of the lake.
A summary of results is provided herein, please refer to the announcement of 11 May 2015 for full results.

ACN 009 173 602

ABN 50 007 173 602

T: 08 9386 4699

F: 08 9386 9473

E: [email protected]

Table 1: Location of Drill Holes

www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd

LD Potash Project

Recent Drilling Results (cont.)

Drilling has aimed to penetrate the high porosity sediment profile and 10-15 metres into unweathered silcrete/carbonate basement which has typically occurred at circa 100 metres depth. All holes have been HQ (ɸ96mm) with core retrieved measuring 60-63mm in diameter.
The depth of holes drilled to date are provided in Table 1 (above).

Hole Stratigraphy

Significant intercepts (vertical horizons) of high porosity (40+% brine volume) sediments have been intersected in all holes to date. Near surface horizons are commonly gypsum cemented clayey sands and gypsiferous clays. Other horizons of note include variable/mixed layers of fine grained weathered siltstones, calcrete and carbonaceous
shales.

Figure 1: LD Resource Expansion Drill Program (10 July 2015)


2 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd

LD Potash Project

Recent Drilling Results (cont.)

Core SOP Content

SOP grades have typically been higher in the 0-3 metre horizon, before decreasing with somewhat lower values for the remainder of the hole depth. The high near surface grade will benefit early production based on brines recovered from surface trenches on the lake.
The SOP content of cores retrieved from drilling completed to date are presented in Table 2 below. The highest in- situ grades were contained within core from LDDH1503 where the SOP content averaged 12.7kg/m3 of sediment over the 135 metre depth.

Brine SOP Content

Estimation of the SOP content in brine contained in the core is an approximation only based on an assumed specific gravity (SG) of the brine while it is in the core. Brine SOP grades were significantly higher in the top 0-3 metres as presented in Table 2 below.

Table 2: LD Resource Drilling Results to date

Hole ID Horizon Avg. Brine Avg. In-situ SOP Avg. In-situ

SOP Grade2 GradeNote 3 MgSO4 Grade4

Date of

Announcement

LDDH1501

0-131m

n/a1

n/a1

n/a1

11 May 2015

LDDH1502

0-87m

11.5 kg/m3

6.8 kg/m3

5.8 kg/m3

11 May 2015

LDDH1503

0-3m

21.5 kg/m3

12.7 kg/m3

25.4 kg/m3

11 May 2015

LDDH1503

4-135m

11.8 kg/m3

7.1 kg/m3

6.7 kg/m3

11 May 2015

LDDH1504

0-3m

20.9 kg/m3

12.1 kg/m3

24.8 kg/m3

10 July 2015

LDDH1504

4-110m

10.4 kg/m3

5.1 kg/m3

3.8 kg/m3

10 July 2015

Notes:

1: Drilled using fresh water mud regime

2: Kilograms of SOP per m3 of brine

3: Kilograms of SOP per m3 of in-situ material (solids and brine)

4: Kilograms of MgSO4 per m3 of in-situ material (solids and brine)

Core Porosity

The "porosity" figure quoted for the core sediments is the ratio of the volume of brine extracted from the core to the volume of the wet core sample leached. As mentioned above, there are approximations involved in the brine volume calculation hence the porosity figures quoted are indicative only.
Porosities were typically highest within the upper portion of the cores retrieved, entrained in clayey sands and gypsiferous clays. These high porosity sediments were encountered down to 135 metres (EOH) within LDDH1503 while at LDDH1504 competent rock was reached at 83 metres suggesting a shallowing of the palaeo-system to the southwest.

Core Moisture Content

The average moisture (H2O) content of the cores is obtained by drying the samples at 110ºC. The moisture content provides an estimate of the volume of brine contained within sediments. Moisture content has averaged above 20%

(weight/weight) for holes drilled to date.
3 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd

LD Potash Project

Recent Drilling Results (cont.)

Core Brine Content - Moisture + Soluble Salts

The mass percentage for the entrained brine recovered from hole LDDH1503 averaged 32.4% by weight, translating to an average brine volume of approximately 50% over the 135 metre horizon. Hole LDDH1504 had a brine content of 34.7% by weight or 55% for the 0-83 metre horizon. The value for the 83-110 metre horizon in LDDH1504 was considerably lower at 16.9% (weight/weight).

Core Density (SG)

Core SG for the 70 samples selected from LDDH1503 averaged 1.97t/m3. Within hole LDDH1504 the SG results for the 0-83 metre horizon averaged 1.92t/m3 while the average for the 83-110 metre horizon increased to 2.28t/m3 reflecting the more competent nature of the sediments at depth.

Magnesium Sulfate Content

The Magnesium Sulfate analyses of the cores retrieved are outlined within Table 2 above. Preliminary, results to date indicate that MgSO4 present in the core is sufficient to result in crystallisation of the K present as Schoenite (K2SO4·MgSO4·6H2O) upon evaporation of the contained brine.

Other Drilling

During the quarter the Company purchased a Hanjin RC rig capable of drilling 300mm+ diameter bores to determine preliminary flow/recovery characteristics of the brine body at the LD Project. The company is currently assessing logistics of operating the rig on the lake.

Figure 2: Company-owned RC drilling rig


4 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd

LD Potash Project

Development

On 2 April 2015, the Company released the results of its Scoping Study for the LD SOP Project (for full details refer to ASX announcement). The study is considered an important milestone in the Company's goal of advancing the LD Project toward production and demonstrates strong economics underpinning the Project.
The Company focussed on delivering results which are sound from both technical and economic aspects. While the Scoping Study delivers an estimation accuracy of ±30%, some 70% of the Project's capital and 60% of operational expenditure estimates are supported by design and/or quotes obtained from reputable suppliers providing a level of assurance typically reserved for more advanced project studies.

Results of the scoping study were assessed for economic viability using a Discounted Cashflow Model developed by the Company and key outcomes are presented below including a sensitivity to the SOP price. Recent SOP sales at the time were in the range of approximately A$630/t to A$1,012/t (sources: €445/t to US$735/st: US Gulf, Argus FMB, Fertecon).

Table 3: Project Economics

Low Case

Base Case

High Case

SOP Price

A$700/t

(US$560/t)

A$750/t

(US$600/t)

A$800/t

(US$640/t)

SOP Production

400,000tpa

400,000tpa

400,000tpa

Capital Cost1

A$320M

A$320M

(US$256M)

A$320M

Mine Gate

Operating Cost

A$204/t

A$204/t

(US$164/t)

A$204/t

Operating Cost

(FOB)2

A$328/t

A$328/t

(US$263/t)

A$328/t

Life of Mine3

+13 years

+13 years

+13 years

Pre-Tax NPV10%

A$425M

(US$340M)

A$534M

(US$427M)

A$642M

(US$514M)

Pre-Tax IRR

33%

37%

42%

EBITDA (avg p.a.)

A$135M

(US$108M)

A$154M

(US$123M)

A$173M

(US$138M)

Notes:

1 - Excludes Contingencies

2 - Operating cost includes mining, processing, general administration and haulage and port costs

3 - LOM calculated based on existing 24.4Mt Indicated JORC (2004) resource at 20% specific yield

4 - Exchange rate assumption: USD0.80:AUD1.00

Reward is currently undertaking a drilling program at the LD Project which has the potential to significantly expand the existing 24.4Mt JORC (2004) Indicated SOP Resource (at depth) and thereby substantially extend the mine life.

For full details of the Scoping Study please refer to ASX release dated 2 April 2015.

5 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd

Dora Potash Project

With the Company's focus on the LD Project, only limited work was performed during the quarter at the Dora Project. Tenement holdings have been rationalised to retain potential resource areas while minimising the Dora Project holding costs.

Earlier exploration at Dora targeted the palaeovalley which traverses the granted tenements located north-west of Lake Dora proper. To date 17 holes have been drilled. The static water table (SWT) in the drilling area is generally less than four metres below surface. Heavy brine flows encountered in seven of the holes drilled.

Brines recovered from the holes drilled were relatively low in Total Dissolved Salts ("TDS") indicating they are well under saturation levels, presumably due to incoming surface runoff. The chemistry of the brines is favourable in terms of K:Mg, SO4:K and Na:K ratios however the dilution of the Palaeochannel brines by fresh ground water percolating from the margins of the valley significantly reduces the SOP content of in-situ brines. While dilution is not ideal, favourable evaporation conditions in the region counteract the dilution effect of surface waters to a significant degree.

Additional drilling and brine analysis data is required to better define Palaeochannel depth and width dimensions for

Resource estimation purposes.

Refer to the announcement dated 11 October 2014 for full details and analytical results.

Figure 3 - Dora West Tenement Area, Drill Hole Locations and Depth


6 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd

Karly Potash Project

In line with the Company's focus on its flagship LD Project limited work was performed during the quarter at the Karly Project. In addition, tenement holdings have been rationalized while retaining target areas but reducing Project holding costs.

During 2014 the Company completed a maiden drilling program at the Karly Project. A total of 20 RC drill holes and one cased borehole were completed for a total of 2,909 metres. The widely spaced holes covered a north-west south-east distance of approximately 35km and an east-west distance of approximately 20km at the widest point (see Figure 5 below).

Figure 4 - Karly drill hole location and maximum SOP assay result

The Static Water Level ("SWL") was less than two metres in all areas tested therefore the ground drilled was effectively saturated with water or brine from near surface. Chemistry and ion ratios of brines encountered were similar to those observed at the LD and Dora West Projects and hence suitable for SOP recovery following evaporation.

Data recovered confirmed the Palaeovalley concept and the presence of a large Palaeo-system. Based on brine flows into the Waukarlycarly Embayment from a south-easterly direction which concentrate in the vicinity of Lake Waukarlycarly providing brines with SOP values of up to 9kg/m3 near the evaporation epicentre. Considerable additional exploration is required to provide a meaningful assessment of the Waukarlycarly Embayment Potash potential.

Refer to the announcement dated 3 December 2014 for full details and analytical results.

7 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd


For further information please visit our website: www.rewardminerals.com
Yours faithfully

Michael Ruane

Director

on behalf of the Board

Competent Persons Statement

The information in this report that relates to Exploration Targets and Exploration Results is based on information comp iled by Mr David O'Farrell, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr O'Farrell is a consultant to Reward Minerals Ltd. Mr O'Farrell has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edit ion of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr O'Farrell consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Mineral Resources or Ore Reserves is based on information compiled by Mr Mr Si mon Coxhell, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on th e basis that the information has not materially changed since it was last reported. Mr Coxhell is a consultant to Reward Minerals Lt d. Mr Coxhell has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Repor ting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Coxhell consents to the inclusion in the report of th e matters based

on his information in the form and context in which it appears.

8 www.rewardminerals.com

30 July 2015 ASX RELEASE

Reward Minerals Ltd


Tenement Holdings as at 30 June 2015

Tenement

Status

RWD Ownership

at Quarter End

% Interest Acquired

During the Quarter

% Interest Disposed

During the Quarter

LD, Western Australia

E45/2801

Granted

100%

-

-

E45/2802

Granted

100%

-

-

E45/2803

Granted

100%

-

-

E69/2156

Granted

100%

-

-

E69/2157

Granted

100%

-

-

E69/2158

Granted

100%

-

-

E69/2159

Granted

100%

-

-

E69/2902

Granted

100%

-

-

E45/3285

Granted

100%

-

-

E45/3286

Granted

100%

-

-

E45/4090

Granted

100%

-

-

E45/4121

Granted

100%

-

-

L45/302

Granted

100%

-

-

M45/1227

Granted

100%

-

-

EL(A)69/3275

Application

-

-

-

EL(A)69/3276

Application

-

-

-

EL(A)69/3277

Application

-

-

-

Lake Auld, Western Australia

E45/2804

Granted

100%

-

-

Lake Winifred, Western Australia

E45/4272

Granted

100%

-

-

Dora West, Western Australia

E45/3246

Granted

100%

-

-

E45/4292

Granted

100%

-

-

EL(A)45/4321

Application

-

-

-

EL(A)45/4488

Application

-

-

-

Karly, Western Australia

E45/4273

Granted

100%

-

-

E45/4274

Granted

100%

-

-

E45/4291

Granted

100%

-

-

E45/4293

Granted

100%

-

-

E45/4294

Granted

100%

-

-

E45/4299

Granted

100%

-

-

E45/4324

Granted

100%

-

-

EL(A)45/4426

Withdrawn

-

-

-

EL(A)45/4482

Application

-

-

-

9 www.rewardminerals.com

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Reward Minerals

CODE : RWD.AX
ISIN : AU000000RWD5
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Reward Min. is a gold exploration company based in Australia.

Reward Min. is listed in Australia and in Germany. Its market capitalisation is AU$ 5.4 millions as of today (US$ 3.7 millions, € 3.3 millions).

Its stock quote reached its highest recent level on April 01, 2011 at AU$ 1.38, and its lowest recent point on July 05, 2024 at AU$ 0.02.

Reward Min. has 135 760 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate news of Reward Minerals
4/19/2016APPENDIX 3B
4/18/2016Change of Director's Interest Notice (MR)
4/12/2016APPENDIX 3B
3/31/2016Change of Director's Interest Notice (MR)
3/31/2016Appendix 4G
3/31/2016Company Presentation
1/6/2016Exercise of Unlisted Options and 3B
1/6/2016Change of Director's Interest Notice (MR)
12/10/2015LD Project - Pilot Ponds Approval Received
12/8/2015Notification of Expiry of Unlisted Options
12/3/2015APPENDIX 3B
12/2/2015BW Equities Research Report on RWD
12/1/2015Change of Director's Interest Notice (MR)
11/22/2015LD Project - Substantial SOP Resource
9/9/2015Change of Director's Interest Notice (MR)
9/4/2015LD Project - Mining Proposal for Pilot Ponds Submitted
8/26/2015LD Project - Development Update
8/5/2015APPENDIX 3B
7/31/2015APPOINTMENT OF JOINT COMPANY SECRETARY
7/31/2015JUNE 2015 QUARTERLY CASHFLOW REPORT
7/31/2015JUNE 2015 QUARTERLY ACTIVITIES REPORT
7/16/2015Change of Director's Interest Notice (MR)
7/10/2015LD Project - Excellent Drilling Results
7/10/2015Corporate Presentation - Developing the LD Project
7/10/2015Appendix 3B
6/26/2015Change in substantial holding (MR)
6/26/2015Notice pursuant to paragraph 708A(5)(e) of the Corps. Act
6/26/2015Appendix 3B - Placement
6/22/2015Request for Trading Halt
6/22/2015A$5 million raised for the LD Potash Project
6/3/2015LD Project - Further Core Data Received
5/29/2015Chairman's Address to Shareholders
5/29/2015Results of Annual General Meeting
5/27/2015Change in substantial holding (MR IRC)
4/8/2015Appendix 3B
4/2/2015LD Scoping Study Returns Significant Results
4/1/2015ANNUAL REPORT 2014
3/26/2015Corporate Presentation - Developing the LD Project
3/26/2015LD Resource Expansion Commencement of Drilling
3/26/2015Clarification Statement
3/26/2015Change of Director's Interest Notice (MR)
11/11/2014Dora West Project – Drilling Results
11/11/2014Quarterly Report for Period ended 30 September 2014
10/16/2014Request for Trading Halt
3/18/2014Form 604 (MR)
3/18/2014Appendix 3Y (MR)
3/18/2014Disclosure Notice Under Section 708A(5)(e)
2/27/2014Appendix 3B
2/11/2014The directors of Global Resources Corporation Limited are pl...
1/28/2014Company Presentation
12/11/2013Response to Price Query
10/28/2013Final allotment of shortfall
10/8/2013Allotment of Shortfall
9/4/2013Notification of Shortfall from Rights Issue
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (RWD.AX)BERLIN (RW1.BE)
0.040+0.00%0.074+4.23%
AUSTRALIA
AU$ 0.040
09/19 11:00 -
0%
Prev close Open
0.040 0.040
Low High
0.040 0.040
Year l/h YTD var.
0.023 -  0.064 -20.00%
52 week l/h 52 week var.
0.023 -  0.080 -16.67%
Volume 1 month var.
0 -%
24hGold TrendPower© : -27
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-20.00%0.070.02
2023-52.38%0.120.03
2022-19.23%0.150.09
2021-10.34%0.200.10
20207.41%0.220.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.